REQUEST FOR COMPETITIVE BIDS AND PROPOSALS FOR INTERNAL CONNECTIONS
Solicitation number
PE-68910-NONST-2025-000000024
Issued by
Lanier County, Georgia

About this file

This is a Request for Proposal (RFP) pricing spreadsheet and installation requirements document from the Liberty County School System in Georgia for Category 2 E-rate eligible network equipment and services. The RFP requires the installation of Cisco Meraki switches, APC UPS systems, and PDUs across four schools: Button Gwinnett Elementary, Lyman Hall Elementary, Joseph Martin Elementary, and Snelson Golden Middle School. The project includes the installation of 47 switches, 27 UPS units, and 27 PDUs, with all work to be completed by July 27, 2025. A mandatory bid meeting is scheduled for February 28, 2025, at 4:00 PM at Lyman Hall Elementary.

The pricing must adhere to E-rate program's Lowest Corresponding Price (LCP) requirements, and vendors must include their E-rate SPIN number with the submission. The project includes both E-rate eligible components (switches, UPS units, installation) and ineligible components (PDUs). Vendors are required to provide detailed pricing for all equipment, including part numbers, quantities, and unit prices, with separate totals for eligible and ineligible items. The installation requirements specify detailed procedures for equipment removal, mounting, cabling, labeling, and daily progress reporting. The district will accept functionally equivalent products that are interoperable and compatible with the existing Meraki network.

View the file

Other files

File Type Posted
Y28GA_LibertyCountySchoolSystem_RFP_Category2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Directions

MANDATORY WALKTHROUGH DATE

There will be a mandatory bid meeting for this RFP.

WALKTHROUGH: To begin February 28, 2025 at 4:00 PM at the Lyman Hall Elementary 1396 Shaw Road, Hinesville, GA 31313

DIRECTIONS FOR THE PRICING SPREADSHEET:

Please fill in the following spreadsheets with Description of Products, Part Numbers (if applicable), Quantity, and Price for the items proposed by your company.

Additional line items or parts may be added if needed to reflect a complete proposal.

Formulas included in the spreadsheet are for convenience only - each bidder is required to confirm that the pricing and formulas are correct.

Please include this pricing workbook in a digital format with the RFP response.

LOWEST CORRESPONDING PRICE (LCP):

Lowest corresponding price is defined as the lowest price that a service provider charges to nonresidential customers who are similarly situated to a particular applicant (school, library, or consortium) for similar services. See 47 C.F.R. § 54.500.

Service providers cannot charge applicants a price above the LCP for E-rate Program services. See 47 C.F.R. § 54.511(b).

This ensures that: 1) service providers do not charge applicants more than they would charge their other customers for the same services. See First Report and Order, 12 FCC Rcd 8776, 9031-32, para. 484; and 2) any lack of experience in negotiating in a service market does not prevent applicants from receiving competitive prices. See First Report and Order, 12 FCC Rcd 8776, 9031, para. 484.

A service provider – regardless of the size of the company or the category of service provided – must ensure that the LCP is provided to applicants. The applicant is not obligated to ask for it, but must receive it. See 1996 Universal Service Order, 12 FCC Rcd 87, 383, para. 540.

Vendor Information and SPIN

SERVICE PROVIDER INFORMATION

COMPANY NAME:

E-RATE SPIN NUMBER

ADDRESS:

CITY, STATE ZIP:

Company Contact:
(This person must be able to answer questions about the quote submitted.)

Contact Phone:

Contact Email:

IMPORTANT INSTALL & CONFIG INFO

Installation Instructions:

1. Vendor will provide on-site network technician to assist Liberty technical team with the configuration of switching equipment into existing infrastructure during the physical installation.

2. Existing switches/switch cabling/adaptors must be removed and taken to a designated area in the central office at 200 Bradwell Street, Hinesville, GA.

3. Existing UPS units/PDUs/ rail kits must be removed and discarded as they are replaced unless marked to keep.

4. UPS must be mounted using rails kits at the bottom of the rack unless otherwise directed.

5. Some UPS units may be wall mounted. Vendor will be responsible for any additional mounting brackets if unable to use the included hardware.

6. UPS will be connected using orange patch cable to the designated switch port.

7. All unused equipment must be taken to a designated area in the central office at 200 Bradwell Street, Hinesville, GA.

8. Boxes, packaging, and other installation debris must be discarded. School dumpsters may be used.

9. Vendor will be responsible for handling all replacements of defective and inoperable equipment until the project is completed.

10. Vendor is responsible for troubleshooting and repairing any fiber or copper ethernet cables damaged during installation of new switching equipment.

11. Vendor will be responsible for installation and mounting of all purchased equipment. This includes restoring patch cabling and installing all power cables.

12. All cables must be appropriately trained and secured using district approved cable management techniques.

13. All switching and UPS equipment must be labeled with device information determined by the district. All labeling must be approved by the district prior to installation.

14. Daily progress spreadsheets including, school, room number, switch serial number, and physical stacking order, with switch 1 being the top switch in the stack.Eligible Sites for Installation
SiteSwitchesUPSIneligible
PDUDeadline
Button Gwinnett Elementary11667/27/25
Lyman Hall Elementary10667/27/25
Joseph Martin Elementary10887/27/25
Snelson Golden Middle16777/27/25

MANDATORY WALKTHROUGH DATE

There will be a mandatory bid meeting for this RFP.

WALKTHROUGH: To begin February 28, 2025 at 4:00 PM at the Lyman Hall Elementary 1396 Shaw Road, Hinesville, GA 31313

Bill of Materials

Liberty County School System
The District will accept Functionaly Equivalent Products

Equivalent Products must be Interoperable and Compatible with Existing Meraki Network

NETWORK EQUIPMENT
Manufacturer Part #DescriptionQty.Unit PriceExtended Price
MS250-48FP-HWCisco Meraki MS250-48FP-HW 48x 1GB PoE+ RJ-45 4x 10GB SFP9$0.00$0.00
MA-PWR-1025WACCisco Meraki PWR-MS320-1025WAC MS-PWR-1025WAC 1025W AC Switch Power Supply4$0.00$0.00
MS225-48FP-HWCisco Meraki MS225-48FP-HW 48x 1GB PoE+ RJ-45 4x 10GB SFP+33$0.00$0.00
MS225-24Cisco Meraki MS225-24-HW 24x 1GB RJ-45 4x 10GB SFP+5$0.00$0.00
MA-PWR-CORD-USCisco Meraki MA-PWR-CORD-US US Notched Power Cord51$0.00$0.00
MA-CBL-40G-50CMCisco Meraki MA-CBL-40G-50CM MS Family 0.5m Switch Stacking Cable51$0.00$0.00
MA-CBL-40G-1MCisco Meraki MA-CBL-40G-1M MS Family 1m Switch Stacking Cable4$0.00$0.00
MA-SFP-10GB-LRCisco Meraki MA-SFP-10GB-LR 10GB BASE-LR 1310nm SMF SFP+ Transceiver4$0.00$0.00
MA-SFP-1GB-SXCisco Meraki MA-SFP-1GB-SX 1GB BASE-SX 850nm MMF Transceiver SFP54$0.00$0.00
SMT1500RM2UCAPC Smart-UPS, Line Interactive, 1500VA, Rackmount 2U, 120V, 6x NEMA 5-15R outlets, SmartConnect Port+SmartSlot, AVR, LCD14$0.00$0.00
SMT750RM2UCAPC Smart-UPS, Line Interactive, 750VA, Rackmount 2U, 120V, 6x NEMA 5-15R outlets, SmartConnect Port+SmartSlot, AVR, LCD13$0.00$0.00
A3L791-10-ORGOrange 10' or greater bootless patch cable, cat5e or greater31$0.00$0.00
InstallationSee tab labeled "IMPORTANT INSTALL & CONFIG INFO" for the Statement of Work Associated with the Installation Services1$0.00$0.00
Other FeesTaxes (if applicable) Shipping, etc., must be included to be considered for E-Rate1$0.00$0.00
Total:$0.00
INELIGIBLE
Manufacturer Part #DescriptionQty.Unit PriceExtended Price
PDUMH151.4kW Single-Phase Local Metered PDU, 120V Outlets (13 5-15R), 5-15P, 100-127V Input, 15 ft. (4.57 m) Cord, 1U Rack-Mount27$0.00$0.00
Installation of PDUSee tab labeled "IMPORTANT INSTALL & CONFIG INFO" for the Statement of Work Associated with the Installation Services1$0.00$0.00
Other FeesTaxes (if applicable) Shipping, etc., must be included to be considered for E-Rate1$0.00$0.00
Total:$0.00
The quantities shown on the spreadsheets are estimates. The District reserves the right to increase or decrease quantities or timeframes as is needed to meet District needs.
Please include all part numbers being proposed, even if not included above. Feel free to correct any existing part numbers if different in the proposed solution
If licensing or other items are required for the solution being proposed, please include.
Please add additional rows if necessary.
The Service Provider is responsible for pricing and formulas in this spreadsheet.

File details come from the government source that posted it. Updated .