About this file

This is a Project Manual Volume 02 for the Orange TV Internal Operations Center II renovation project in Orlando, Florida, prepared by Architectural Design Collaborative for Orange County Capital Projects Division. The specifications document outlines comprehensive construction requirements across multiple divisions including procurement, general requirements, existing conditions, concrete, wood, thermal protection, openings, finishes, specialties, equipment, furnishings, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, and earthwork. The project encompasses detailed specifications for fire suppression systems (including wet-pipe sprinkler systems, standpipes, fire hydrants, and related components), plumbing systems, HVAC installations, electrical systems, and various interior finishes. Key requirements include coordination drawings prepared by subcontractors using AutoCAD, submission of shop drawings and hydraulic calculations approved by the Engineer of Record and authorities having jurisdiction, and compliance with NFPA standards (particularly NFPA 13 for sprinkler systems and NFPA 24 for fire-service mains). The estimated project cost is $1,624,878, with sealed bids due July 9, 2026 at 4:00 p.m. EST, submitted electronically through the OpenGov e-Procurement Platform, and questions due by June 15, 2026 at 5:00 p.m. EST.

The specifications require bidders to provide extra materials including sprinkler cabinets with spare components, maintain product quality standards certified by testing agencies (UL and FM Global listings), and comply with multiple industry standards and local authority requirements. Contractors must obtain AutoCAD-compatible architectural and engineering drawings and designate the fire protection subcontractor as lead coordinator for composite layering of coordination drawings from all trades. The project involves selective demolition, installation of new piping systems with restrained joints and thrust blocks, installation of sleeves and seals for penetrations, and comprehensive testing and commissioning of all systems. Specific products and manufacturers are identified for major equipment including fire hydrants, backflow preventers, sprinklers, valves, and alarm devices, with substitutions subject to compliance with specified standards. All work must meet Florida State Statutes requirements and local code provisions, with final coordination drawings and project record documents delivered to the Owner upon completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100% Construction Documents Architectural Design Collaborative

PROJECT

MANUAL

Volume 02

FOR THE

Orange TV

PREPARED FOR

Orange County Capital Projects Division Internal Operations Center II

400 South Street, 5th Floor Orlando, Florida 32801

May 2026

Orange County Capital Projects Division Orange TV

Orlando, Florida

TABLE OF CONTENTS 00 0110-1

SECTION 00 0110

TABLE OF CONTENTS

DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0000 Cover 00 0110 Table of Contents

DIVISION 01 GENERAL REQUIREMENTS

01 1100 Summary of Work 01 2300 Alternates 01 2500 Substitution Procedures 01 2600 Contract Modification Procedures 01 2900 Payment Procedures 01 3100 Project Management and Coordination 01 3119 Project Meetings 01 3200 Construction Progress Documentation 01 3233 Photographic Documentation 01 3234 Pre-Construction Video Recording 01 3300 Submittal Procedures 01 4000 Quality Requirements 01 4200 References 01 5000 Temporary Facilities and Controls 01 6000 Product Requirements 01 7300 Execution 01 7329 Cutting and Patching 01 7700 Closeout Procedures 01 7800 Warranties and Bonds 01 7823 Operation and Maintenance Data 01 7839 Project Record Documents 01 7900 Demonstration and Training 01 8116 Facility Environmental Requirements 01 8119 Indoor Air Quality Requirements

DIVISION 02 EXISTING CONDITIONS

02 4113 Selective Demolition

DIVISION 03 CONCRETE

03 0580 Underslab Vapor Retarder 03 3003 Cast-In-Place Concrete 03 5414 Cement Based Underlayment

DIVISIONS 04 - 05

Not Used

DIVISION 06 WOOD, PLASTICS, AND COMPOSITES

06 0500 Common Work Results for Wood, Plastics, and Composites 06 1000 Rough Carpentry

DIVISION 07 THERMAL AND MOISTURE PROTECTION

07 8400 Firestopping Systems

TABLE OF CONTENTS 00 0110-2

07 9000 Joint Protection

DIVISION 08 OPENINGS

08 1416 Flush Wood Doors 08 3100 Access Doors and Panels 08 4116 Interior Aluminum Doors and Frames 08 7100 Door Hardware

DIVISION 09 FINISHES

09 2216 Non-Structural Metal Framing 09 2900 Gypsum Board 09 3000 Tiling 09 5100 Acoustical Ceilings 09 5433 Linear Wood Ceilings 09 6519 Resilient Tile Flooring 09 6813 Carpet Tile 09 7733 Fiberglass Reinforced Panels 09 9000 Painting

DIVISION 10 SPECIALTIES

10 1100 Visual Display Boards 10 1400 Signage 10 2813 Toilet Accessories 10 4400 Fire Protection Specialties

DIVISION 11 EQUIPMENT

11 3100 Residential Equipment

DIVISION 12 FURNISHINGS

12 2000 Window Treatments 12 3216 Manufactured Plastic-Laminate-Clad Casework 12 3663 Quartz Surfacing Countertops

DIVISIONS 15-20

Not Used

DIVISION 21 FIRE SUPPRESSION

21 0500 Common Work Results for Fire Suppression 21 0517 Sleeves and Sleeve Seals for Fire-Suppression Piping 21 0518 Escutcheons for Fire-Suppression Piping 21 0553 Identification for Fire Suppression Piping and Equipment 21 1100 Facility Fire Suppression Water Servicing Piping 21 1313 Wet Pipe Sprinkler Systems

DIVISION 22 PLUMBING

22 0500 Common Work Results for Plumbing 22 0519 Meters and Gages for Plumbing Piping 22 0523 General-Duty Valves for Plumbing Piping 22 0529 Hangers and Supports for Plumbing Piping and Equipment 22 0553 Identification for Plumbing Piping and Equipment

TABLE OF CONTENTS 00 0110-3

22 0700 Plumbing Insulation 22 1116 Domestic Water Piping 22 1119 Domestic Water Piping Specialties 22 1316 Sanitary Waste and Vent Piping 22 1319 Sanitary Waste Piping Specialties

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 0500 Common Work Results for Mechanical 23 0510 Basic Mechanical Materials and Methods 23 0513 Common Motor Requirements for HVAC Equipment 23 0529 Hangers and Supports for HVAC Piping and Equipment 23 0553 Identification for HVAC Piping and Equipment 23 0593 Testing, Adjusting, and Balancing for HVAC 23 0713 Duct Insulation 23 3113 Metal Ducts 23 3300 Duct Accessories 23 3423 Power Ventilators 23 3713 Diffusers, Registers, and Grilles

DIVISIONS 24-25

Not Used

DIVISION 26 ELECTRICAL

26 0500 Common Work Results for Electrical 26 0501 Investigation of Existing Electrical Systems 26 0519 Low-Voltage Conductors and Cables 26 0526 Grounding and Bonding 26 0529 Hangers and Supports 26 0533 Raceway and Boxes 26 0553 Identification of Electrical Systems 26 0573 Overcurrent Device Coordination Study with Arc Flash Analysis 26 0816 Demonstration of Completed Electrical Systems 26 0923 Stand Alone Lighting Control Devices 26 2416 Panelboards 26 2726 Wiring Devices 26 2816 Enclosed Switches and Circuit Breakers 26 2913 Enclosed Controllers 26 2923 Variable-Frequency Motor Controllers 26 4313 Surge Protective Devices 26 5100 Interior Lighting

DIVISION 27 COMMUNICATIONS

27 2626 Data Communications Integration

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

28 3111 Addressable Fire-Alarm System

DIVISIONS 29-30

Not Used

TABLE OF CONTENTS 00 0110-4

DIVISION 31 EARTHWORK

31 3116 Chemical Soil Treatment

END OF SECTION 00 0110

COMMON MOTOR REQUIREMENTS FOR FIRE

SUPPRESSION EQUIPMENT

21 05 13 - 1/6

SECTION 21 05 00 - COMMON WORK RESULTS FOR FIRE SUPPRESSION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Piping materials and installation instructions common to most piping systems.

2. Fire-suppression equipment and piping demolition.

3. Equipment installation requirements common to equipment sections.

4. Painting and finishing.

5. Supports and anchorages.

1.2 DEFINITIONS

A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.

B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.

C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.

D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in chases.

E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures.

Examples include installations within unheated shelters.

1.3 SUBMITTALS

A. Welding certificates.

1.4 QUALITY ASSURANCE

A. Steel Support Welding: Qualify processes and operators according to NFPA 13 for Hanger Requirements.

B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure Vessel Code: Section IX, "Welding and Brazing Qualifications."

1. Comply with provisions in NFPA 13 for Welding Requirements.

2. Certify that each welder has passed AWS B2.1 qualification tests for welding processes involved and that certification is current.

21 05 13 - 2/6

C. Electrical Characteristics for Fire-Suppression Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.

D. NFPA Standards: Sprinkler system equipment, specialties, accessories, installation, and testing shall comply with the following:

1. NFPA 13, "Installation of Sprinkler Systems."

2. NFPA 14, “Installation of Standpipe and Hose Systems”

1.5 DELIVERY, STORAGE, AND HANDLING

A. Properly store all piping, fittings, valves, etc. away from the outdoor environment. There shall be no visual corrosion or defects of any kind on any fire protection equipment prior to installation.

1.6 EXTRA MATERIALS

A. The contractor shall include 100 additional escutcheons for each different type of sprinkler, 2 additional flow switches, and 2 additional tamper switches.

1.7 COORDINATION

A. Arrange for pipe spaces, chases, slots, and openings in building structure during progress of construction, to allow for fire-suppression installations.

B. Coordinate installation of required supporting devices and set sleeves in poured-in-place concrete and other structural components as they are constructed.

C. Coordinate requirements for access panels and doors for fire-suppression items requiring access that are concealed behind finished surfaces. Access panels and doors are specified in Division 08 Section "Access Doors and Frames."

D. Coordinate the installation of underground drain piping prior to pouring of the concrete floor slabs.

E. The Contractor shall coordinate efforts of all trades and shall furnish (in writing, with copies to the Architect and Owner) any information necessary to permit the Work of all trades to be installed satisfactorily and with the least possible interference or delay.

F. The Contractor and all Subcontractors shall prepare a complete set of construction coordination drawings (“Coordination Drawings”) indicating the equipment actually purchased and the exact routing and elevations for all lines such as piping, busway, conduit, ductwork , etc., including conduit embedded in concrete and openings, sleeves, etc., required in the structure, walls, partitions, etc. The Coordination Drawings shall be submitted complete for review to the Architect, Engineer and Owner. The Coordination Drawing preparation and completion shall comply with the requirements of the Schedule. Prior to commencing the Work, the Subcontractor shall obtain from the Architect or Engineer a set of AutoCAD compatible format Architectural and Engineering Drawings on compact disks, to be used to produce the Coordination Drawings. The Subcontractor shall give to the Architect and Engineer a written

21 05 13 - 3/6 release acceptable to the Architect and Engineer signed by a corporate officer of the Subcontractor, prior to receipt of the compact disks. The fire protection shop drawings, prepared on electronic media (CADD) at a scale not less than 1/4” = 1’-0”, shall serve as the base Drawings to which all other Subcontractors will overlay and add their Work. The Division 21 Fire Protection Subcontractor shall be designated as the lead contractor in the development of the composite layering process and shall be responsible for electronically restacking the various trade layers into the final composite (CADD) Drawings. Each trade shall draw their Work on separate layers represented by individual colors. Each Coordination Drawing shall be completed and signed off by the other Subcontractors and the Contractor prior to the installation of the Work in the area covered by the specific Coordination Drawing. The Subcontractors Work shall be installed in accordance with the Shop Drawings and the Coordination Drawings and shall include the required maintenance access space and the code clearance space. If the Contractor allows one trade to install their Work before coordinating with the Work of other trades, the Contractor shall make necessary changes to correct the condition without extra cost to the Owner. The Coordination Drawings indicating piping, conduit, busway and equipment support points and loads exceeding 1,000 lb. imposed on the building structure shall be submitted to the Architect for review and approval. The elevation, location, support points, static, dynamic and expansion forces and loads imposed on the structure at support and anchor points and the size of all lines shall be indicated. All beam penetrations, slab penetrations and sleeves shall be indicated, sized and coordinated with all other Work. All required code clearance space and required maintenance access space shall be indicated and coordinated with all other work. All Work routed underground or embedded in concrete shall be indicated by dimension to column and building lines and shall be coordinated. This requirement for Coordination Drawings shall not be construed as authorization for the Contractor or Subcontractor to make any unauthorized changes to the Drawings. All space allocations shown on the Drawings shall be maintained, such as ceiling height. Prior to final acceptance of the Work, the Contractor shall give the Drawing files in the latest version of AutoCAD or compatible format on CD-RW Recordable Rewrite Compact Discs, containing the Contractor’s coordination documentation, to the Owner.

PART 2 - PRODUCTS

2.1 PIPE, TUBE, AND FITTINGS

A. Refer to individual Division 21 piping Sections for pipe, tube, and fitting materials and joining methods.

B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.

2.2 JOINING MATERIALS

A. Refer to individual Division 21 piping Sections for special joining materials not listed below.

B. Pipe-Flange Gasket Materials: Suitable for chemical and thermal conditions of piping system contents.

1. ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch maximum thickness unless thickness or specific material is indicated.

a. Full-Face Type: For flat-face, Class 125, cast-iron flanges.

21 05 13 - 4/6

2. AWWA C110, rubber, flat face, 1/8 inch thick, unless otherwise indicated; and full-face or ring type, unless otherwise indicated.

C. Flange Bolts and Nuts: ASME B18.2.1, carbon steel, unless otherwise indicated.

D. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.

E. Welding Filler Metals: Comply with AWS D10.12 for welding materials appropriate for wall thickness and chemical analysis of steel pipe being welded.

PART 3 - EXECUTION

3.1 PIPING SYSTEMS - COMMON REQUIREMENTS

A. Install piping according to the following requirements and Division 21 Sections specifying piping systems.

B. Drawing plans, schematics, and diagrams indicate general location and arrangement of piping systems. Indicated locations and arrangements were used to size pipe and calculate friction loss, expansion, pump sizing, and other design considerations. Install piping as indicated unless deviations to layout are approved on Coordination Drawings.

C. Install piping in concealed locations, unless otherwise indicated and except in equipment rooms and service areas.

D. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise. All exposed piping shall be routed as high as possible to the underside of floor/roof deck above.

E. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.

F. Install piping to permit valve servicing.

G. Install piping at the required slopes.

H. Install piping free of sags and bends. All piping shall be visually aligned throughout.

I. Install fittings for changes in direction and branch connections.

J. Install piping to allow application of insulation.

K. Select system components with pressure rating equal to or greater than system operating pressure.

L. Verify final equipment locations for roughing-in.

M. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.

21 05 13 - 5/6

N. All fire protection equipment are subject to the requirements of specification section 01 8111 Sustainable Construction Requirements.

3.2 PIPING JOINT CONSTRUCTION

A. Join pipe and fittings according to the following requirements and Division 21 Sections specifying piping systems.

B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.

C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.

D. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:

1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.

2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.

E. Welded Joints: Construct joints according to NFPA 13, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.

F. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.

3.3 PAINTING

A. Painting of fire-suppression systems, equipment, and components except sprinklers is specified in Division 09 Sections "Interior Painting" and "Exterior Painting."

B. Damage and Touchup: Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish.

3.4 ERECTION OF METAL SUPPORTS AND ANCHORAGES

A. Refer to Division 05 Section "Metal Fabrications" for structural steel.

B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor fire-suppression materials and equipment.

C. Field Welding: Comply with NFPA 13.

END OF SECTION 21 05 13

21 05 13 - 6/6

PAGE INTENTIONALLY LEFT BLANK

SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION

PIPING

21 05 17 - 1/4

SECTION 21 05 17 - SLEEVES AND SLEEVE SEALS FOR FIRE-SUPPRESSION PIPING

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Sleeves.

2. Sleeve-seal systems.

3. Sleeve-seal fittings.

4. Grout.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

PART 2 - PRODUCTS

2.1 SLEEVES

A. Cast-Iron Wall Pipes: Cast or fabricated of cast or ductile iron and equivalent to ductile-iron pressure pipe, with plain ends and integral waterstop unless otherwise indicated.

B. Galvanized-Steel-Pipe Sleeves: ASTM A 53/A 53M, Type E, Grade B, Schedule 40, zinc coated, with plain ends.

2.2 SLEEVE-SEAL SYSTEMS

A. Description: Modular sealing-element unit, designed for field assembly, for filling annular space between piping and sleeve.

1. Sealing Elements: EPDM-rubber interlocking links shaped to fit surface of pipe. Include type and number required for pipe material and size of pipe.

2. Pressure Plates: Stainless steel.

3. Connecting Bolts and Nuts: Stainless steel of length required to secure pressure plates to sealing elements.

2.3 SLEEVE-SEAL PENETRATING AN ACOUSTICAL ASSEMBLY

21 05 17 - 2/4

A. Provide a split seal with a closed cell sponge rubber cemented to the two halves. The inside diameter is slightly smaller than the outside diameter. When clamped around the body, the system will provide a good tight seal.

B. Manufacturer: Mason Industries, Model SWS or equal product from other manufacturers.

2.4 SLEEVE-SEAL FITTINGS

A. Description: Manufactured plastic, sleeve-type, waterstop assembly made for imbedding in concrete slab or wall. Unit has plastic or rubber waterstop collar with center opening to match piping OD.

2.5 GROUT

A. Standard: ASTM C 1107/C 1107M, Grade B, post-hardening and volume-adjusting, dry, hydraulic-cement grout.

B. Characteristics: Nonshrink; recommended for interior and exterior applications.

C. Design Mix: 5000-psi, 28-day compressive strength.

D. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 SLEEVE INSTALLATION

A. Install sleeves for piping passing through penetrations in floors, partitions, roofs, and walls.

B. For sleeves that will have sleeve-seal system installed, select sleeves of size large enough to provide 1-inch annular clear space between piping and concrete slabs and walls.

1. Sleeves are not required for core-drilled holes.

C. Install sleeves in concrete floors, concrete roof slabs, and concrete walls as new slabs and walls are constructed.

1. Permanent sleeves are not required for holes in slabs formed by molded-PE or -PP sleeves.

2. Cut sleeves to length for mounting flush with both surfaces.

a. Exception: Extend sleeves installed in floors of mechanical equipment areas or other wet areas 2 inches above finished floor level.

3. Using grout, seal the space outside of sleeves in slabs and walls without sleeve-seal system.

D. Install sleeves for pipes passing through interior partitions.

1. Cut sleeves to length for mounting flush with both surfaces.

21 05 17 - 3/4

2. Install sleeves that are large enough to provide 1/4-inch annular clear space between sleeve and pipe or pipe insulation.

3. Seal annular space between sleeve and piping or piping insulation; use joint sealants appropriate for size, depth, and location of joint. Comply with requirements for sealants specified in Division 07 Section "Joint Sealants."

E. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Comply with requirements for firestopping specified in Division 07 Section "Penetration Firestopping."

3.2 SLEEVE-SEAL-SYSTEM INSTALLATION

A. Install sleeve-seal systems in sleeves in exterior concrete walls and slabs-on-grade at service piping entries into building.

B. Select type, size, and number of sealing elements required for piping material and size and for sleeve ID or hole size. Position piping in center of sleeve. Center piping in penetration, assemble sleeve-seal system components, and install in annular space between piping and sleeve. Tighten bolts against pressure plates that cause sealing elements to expand and make a watertight seal.

3.3 SLEEVE-SEAL-FITTING INSTALLATION

A. Install sleeve-seal fittings in new walls and slabs as they are constructed.

B. Assemble fitting components of length to be flush with both surfaces of concrete slabs and walls. Position waterstop flange to be centered in concrete slab or wall.

C. Secure nailing flanges to concrete forms.

D. Using grout, seal the space around outside of sleeve-seal fittings.

3.4 SLEEVE AND SLEEVE-SEAL SCHEDULE

A. Use sleeves and sleeve seals for the following piping-penetration applications:

1. Exterior Concrete Walls above Grade:

a. Piping Smaller Than NPS 6: Cast-iron wall sleeves.

b. Piping NPS 6 and Larger: Cast-iron wall sleeves.

2. Exterior Concrete Walls below Grade:

a. Piping Smaller Than NPS 6: Cast-iron wall sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

b. Piping NPS 6 and Larger: Cast-iron wall sleeves with sleeve-seal system.

21 05 17 - 4/4

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

3. Concrete Slabs-on-Grade:

a. Piping Smaller Than NPS 6: Cast-iron wall sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

b. Piping NPS 6 and Larger: Cast-iron wall sleeves with sleeve-seal system.

1) Select sleeve size to allow for 1-inch annular clear space between piping and sleeve for installing sleeve-seal system.

4. Concrete Slabs above Grade:

a. Piping Smaller Than NPS 6: Galvanized-steel-pipe sleeves.

b. Piping NPS 6 and Larger: Galvanized-steel-pipe sleeves.

5. Interior Partitions:

a. Piping Smaller Than NPS 6: Galvanized-steel-pipe sleeves.

b. Piping NPS 6 and Larger: Galvanized-steel-sheet sleeves.

END OF SECTION 21 05 17

ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING

21 05 18 - 1/2

SECTION 21 05 18 - ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Escutcheons.

2. Floor plates.

PART 2 - PRODUCTS

2.1 ESCUTCHEONS

A. One-Piece, Cast-Brass Type: With polished, chrome-plated and rough-brass finish and setscrew fastener.

B. One-Piece, Deep-Pattern Type: Deep-drawn, box-shaped brass with chrome-plated finish and spring-clip fasteners.

C. One-Piece, Stamped-Steel Type: With chrome-plated finish and spring-clip fasteners.

D. Split-Casting Brass Type: With polished, chrome-plated and rough-brass finish and with concealed hinge and setscrew.

E. Split-Plate, Stamped-Steel Type: With chrome-plated finish, concealed and exposed-rivet hinge, and spring-clip fasteners.

2.2 FLOOR PLATES

A. One-Piece Floor Plates: Cast-iron flange with holes for fasteners.

B. Split-Casting Floor Plates: Cast brass with concealed hinge.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install escutcheons for piping penetrations of walls, ceilings, and finished floors.

ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING

21 05 18 - 2/2

B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of piping and with OD that completely covers opening.

1. Escutcheons for New Piping in finish spaces:

a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type with chrome finish.

b. Piping thru wall: One-piece, cast-brass type chrome finish.

2. Escutcheons for New Piping in unfinished spaces:

a. Piping with Fitting or Sleeve Protruding from Wall: One-piece, deep-pattern type with rough-brass finish.

b. Piping thru wall: One-piece, cast-brass type rough-brass finish.

C. Install floor plates for piping penetrations of equipment-room floors.

D. Install floor plates with ID to closely fit around pipe, tube, and insulation of piping and with OD that completely covers opening.

1. New Piping: One-piece, floor-plate type.

END OF SECTION 21 05 18

IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND

EQUIPMENT

21 05 53 - 1/4

SECTION 21 05 53 - IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Equipment labels.

2. Warning signs and labels.

3. Pipe labels.

4. Valve tags.

5. Warning tags.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples: For color, letter style, and graphic representation required for each identification material and device.

C. Equipment-Label Schedule: Include a listing of all equipment to be labeled and the proposed content for each label.

D. Valve Schedules: Valve numbering scheme.

1.4 CLOSEOUT SUBMITTALS

A. Maintenance Data: For each piping system to include in maintenance manuals.

PART 2 - PRODUCTS

2.1 EQUIPMENT LABELS

A. Plastic Labels for Equipment:

1. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/16 inch thick, with predrilled holes for attachment hardware.

2. Letter Color: Red.

3. Background Color: White.

4. Maximum Temperature: Able to withstand temperatures up to 160 deg F.

21 05 53 - 2/4

5. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

6. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

7. Fasteners: Stainless-steel rivets or self-tapping screws.

8. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

B. Label Content: Include equipment's Drawing designation or unique equipment number.

C. Equipment-Label Schedule: For each item of equipment to be labeled, on 8-1/2-by-11-inch bond paper. Tabulate equipment identification number and identify Drawing numbers where equipment is indicated (plans, details, and schedules) and the Specification Section number and title where equipment is specified. Equipment schedule shall be included in operation and maintenance data.

2.2 WARNING SIGNS AND LABELS

A. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/16 inch thick, with predrilled holes for attachment hardware.

B. Letter Color: Red.

C. Background Color: Yellow.

D. Maximum Temperature: Able to withstand temperatures up to 160 deg F.

E. Minimum Label Size: Length and width vary for required label content, but not less than 2-1/2 by 3/4 inch.

F. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three-fourths the size of principal lettering.

G. Fasteners: Stainless-steel rivets or self-tapping screws.

H. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.

I. Label Content: Include caution and warning information, plus emergency notification instructions.

2.3 PIPE LABELS

A. General Requirements for Manufactured Pipe Labels: Preprinted, color-coded, with lettering indicating service and showing flow direction.

B. Pretensioned Pipe Labels: Precoiled, semirigid plastic formed to partially cover circumference of pipe and to attach to pipe without fasteners or adhesive.

21 05 53 - 3/4

C. Pipe-Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings; pipe size; and an arrow indicating flow direction.

1. Flow-Direction Arrows: Integral with piping-system service lettering to accommodate both directions, or as separate unit on each pipe label to indicate flow direction.

2. Lettering Size: At least 1-1/2 inches high.

D. Pipe-Label Colors:

1. Background Color: Red.

2. Letter Color: White.

2.4 VALVE TAGS

A. Valve Tags: Stamped or engraved with 1/4-inch letters for piping-system abbreviation and 1/2-inch numbers.

1. Tag Material: Brass, 0.032 inch thick, with predrilled holes for attachment hardware.

2. Fasteners: Brass wire-link chain, beaded chain or S-hook.

3. Valve-Tag Color: Red.

4. Letter Color: White.

B. Valve Schedules: For each piping system, on 8-1/2-by-11-inch bond paper. Tabulate valve number, piping system, system abbreviation (as shown on valve tag), location of valve (room or space), normal-operating position (open, closed, or modulating), and variations for identification.

Mark valves for emergency shutoff and similar special uses.

1. Valve-tag schedule shall be included in operation and maintenance data.

2.5 WARNING TAGS

A. Warning Tags: Preprinted or partially preprinted, accident-prevention tags, of plasticized card stock with matte finish suitable for writing.

1. Size: 3 by 5-1/4 inches minimum.

2. Fasteners: Brass grommet and wire.

3. Nomenclature: Large-size primary caption such as "DANGER," "CAUTION," or "DO NOT

OPERATE."

4. Color: Yellow background with black lettering.

PART 3 - EXECUTION

3.1 PREPARATION

A. Clean piping and equipment surfaces of substances that could impair bond of identification devices, including dirt, oil, grease, release agents, and incompatible primers, paints, and encapsulants.

21 05 53 - 4/4

3.2 LABEL INSTALLATION

A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.

B. Coordinate installation of identifying devices with locations of access panels and doors.

C. Install or permanently fasten labels on each major item of mechanical equipment.

D. Locate equipment labels where accessible and visible.

E. Piping Color-Coding: Painting of piping is specified in Division 09 Section "Interior Painting."

F. Pipe-Label Locations: Locate pipe labels where piping is above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums;

and exterior exposed locations as follows:

1. Near each valve and control device.

2. Near each branch connection excluding short takeoffs. Where flow pattern is not obvious, mark each pipe at branch.

3. Near penetrations through walls, floors, ceilings, and inaccessible enclosures.

4. At access doors, manholes, and similar access points that permit view of concealed piping.

5. Near major equipment items and other points of origination and termination.

6. Spaced at maximum intervals of 50 feet along each run. Reduce intervals to 25 feet in areas of congested piping and equipment.

7. On piping above removable acoustical ceilings. Omit intermediately spaced labels.

3.3 VALVE-TAG INSTALLATION

A. Install tags on valves and control devices in piping systems. List tagged valves in a valve-tag schedule.

B. Valve-Tag Application Schedule: Tag valves according to size, shape, and with captions similar to those indicated in "Valve-Tag Size and Shape" Subparagraph below:

1. Valve-Tag Size and Shape:

a. Fire-Suppression Standpipe: 1-1/2 inches, round.

b. Wet-Pipe Sprinkler System: 1-1/2 inches, round.

c. Dry-Pipe Sprinkler System: 1-1/2 inches, round.

3.4 WARNING-TAG INSTALLATION

A. Write required message on, and attach warning tags to, equipment and other items where required.

END OF SECTION 21 05 53

FACILITY FIRE-SUPPRESSION WATER-SERVICE

21 11 00 - 1/9

SECTION 21 11 00 - FACILITY FIRE-SUPPRESSION WATER-SERVICE PIPING

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes fire-suppression water-service piping and related components outside the building and service entrance piping through wall into the building.

B. Utility-furnished products include water meters that will be furnished to the site, ready for installation.

C. Related Sections:

1. Division 21 Section "Wet-Pipe Sprinkler Systems" for wet-pipe fire-suppression sprinkler systems inside the building.

2. Division 21 Section "Dry-Pipe Sprinkler Systems" for dry-pipe fire-suppression sprinkler systems inside the building.

1.3 SUBMITTALS

A. Product Data: For each type of product indicated.

B. Shop Drawings:

1. Detail precast concrete vault assemblies and indicate dimensions, method of field assembly, and components.

2. Wiring Diagrams: For power, signal, and control wiring.

1.4 QUALITY ASSURANCE

A. Regulatory Requirements:

1. Comply with requirements of utility company supplying water. Include tapping of water mains and backflow prevention.

2. Comply with standards of authorities having jurisdiction for fire-suppression water-service piping, including materials, hose threads, installation, and testing.

B. Piping materials shall bear label, stamp, or other markings of specified testing agency.

C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

21 11 00 - 2/9

D. Comply with the "Approval Guide," published by FM Global, or UL's "Fire Protection Equipment Directory" for fire-service-main products.

E. NFPA Compliance: Comply with NFPA 24 for materials, installations, tests, flushing, and valve and hydrant supervision for fire-suppression water-service piping.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Preparation for Transport: Prepare valves, including fire hydrants, according to the following:

1. Ensure that valves are dry and internally protected against rust and corrosion.

2. Protect valves against damage to threaded ends and flange faces.

3. Set valves in best position for handling. Set valves closed to prevent rattling.

B. During Storage: Use precautions for valves, including fire hydrants, according to the following:

1. Do not remove end protectors unless necessary for inspection; then reinstall for storage.

2. Protect from weather. Store indoors and maintain temperature higher than ambient dew point temperature. Support off the ground or pavement in watertight enclosures when outdoor storage is necessary.

C. Handling: Use sling to handle valves and fire hydrants if size requires handling by crane or lift.

Rig valves to avoid damage to exposed parts. Do not use handwheels or stems as lifting or rigging points.

D. Deliver piping with factory-applied end caps. Maintain end caps through shipping, storage, and handling to prevent pipe-end damage and to prevent entrance of dirt, debris, and moisture.

E. Protect stored piping from moisture and dirt. Elevate above grade. Do not exceed structural capacity of floor when storing inside.

F. Protect flanges, fittings, and specialties from moisture and dirt.

G. Store plastic piping protected from direct sunlight. Support to prevent sagging and bending.

1.6 PROJECT CONDITIONS

A. Interruption of Existing Fire-Suppression Water-Service Piping: Do not interrupt service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary water-distribution service according to requirements indicated:

1. Notify Owner no fewer than five days in advance of proposed interruption of service.

2. Do not proceed with interruption of service without Owner's written permission.

1.7 COORDINATION

A. Coordinate connection to water main with utility company.

PART 2 - PRODUCTS

2.1 DUCTILE-IRON PIPE AND FITTINGS

21 11 00 - 3/9

A. Mechanical-Joint, Ductile-Iron Pipe: AWWA C151, with mechanical-joint bell and plain spigot end.

B. Mechanical-Joint, Ductile-Iron Fittings: AWWA C110, ductile- or gray-iron standard pattern or AWWA C153, ductile-iron compact pattern.

1. Glands, Gaskets, and Bolts: AWWA C111, ductile- or gray-iron glands, rubber gaskets, and steel bolts.

C. Flanges: ASME B16.1, Class 125, cast iron.

2.2 BACKFLOW PREVENTERS

A. Double-Check, Detector-Assembly Backflow Preventers:

1. Manufacturers: Subject to compliance with requirements:

a. Ames Fire & Waterworks; a division of Watts Water Technologies, Inc.

b. FEBCO; SPX Valves & Controls.

c. Watts Water Technologies, Inc.

d. Zurn Plumbing Products Group; Wilkins Water Control Products Division.

2. Standards: ASSE 1048 and UL's "Fire Protection Equipment Directory" listing or "Approval Guide," published by FM Global, listing.

3. Operation: Continuous-pressure applications.

4. Body Material: Cast iron with interior lining complying with AWWA C550 or that is FDA approved.

5. End Connections: Flanged.

6. Configuration: Designed for horizontal, straight through flow.

7. Accessories:

a. Valves: UL 262, "Approval Guide," published by FM Global, listing, approved;

OS&Y gate type with flanged ends on inlet and outlet.

b. Bypass: With displacement-type water meter, shutoff valves, and reduced-pressure backflow preventer.

2.3 FIRE HYDRANTS

A. AWWA Wet-Barrel Fire Hydrants:

1. Manufacturers: Subject to compliance with requirements:

a. American AVK Company; Valves & Fittings Division.

b. Clow Valve Company; a division of McWane, Inc.

c. Jones, James Company.

d. Mueller Co.; Water Products Division.

2. Description: Post type, with one NPS 4-1/2 (DN 115) and two NPS 2-1/2 (DN 65) outlets and with NPS 6 (DN 150) threaded or flanged inlet, and base section with NPS 6 (DN 150) mechanical-joint inlet. Include interior coating according to AWWA C550.

3. Standard: AWWA C503.

4. Pressure Rating: 200 psig (1380 kPa) minimum.

B. UL-Listed, Wet-Barrel Fire Hydrants:

1. Manufacturers: Subject to compliance with requirements:

21 11 00 - 4/9

a. American AVK Company; Valves & Fittings Division.

b. Clow Valve Company; a division of McWane, Inc.

c. Jones, James Company.

d. Mueller Co.; Water Products Division.

2. Description: Freestanding, with one NPS 4-1/2 (DN 115) and two NPS 2-1/2 (DN 65) outlets and with NPS 6 (DN 150) threaded or flanged inlet, and base section with NPS 6 (DN 150) mechanical-joint inlet.

3. Standards: UL 246 and "Approval Guide," published by FM Global, listing.

4. Design: Wet barrel.

5. Pressure Rating: 200 psig (1380 kPa).

6. Outlet Threads: NFPA 1963, with external hose thread used by local fire department.

Include cast-iron caps with steel chains.

7. Operating and Cap Nuts: Pentagon, 1-1/2 inches (38 mm) point to flat.

8. Direction of Opening: Hydrant valves open by turning operating nut to left or counterclockwise.

9. Exterior Finish: Red alkyd-gloss enamel paint unless otherwise indicated.

2.4 FIRE-DEPARTMENT CONNECTIONS

A. Manufacturers: Subject to compliance with requirements:

1. Elkhart Brass Mfg. Company, Inc.

2. Guardian Fire Equipment, Inc.

3. Potter Roemer.

4. Reliable Automatic Sprinkler Co., Inc.

B. Description: Freestanding, with cast-bronze body, thread inlets according to NFPA 1963 and matching local fire-department hose threads, and threaded bottom outlet. Include lugged caps, gaskets, and chains; lugged swivel connection and drop clapper for each hose-connection inlet;

18-inch- (460-mm-) high brass sleeve; and round escutcheon plate.

C. Standard: UL 405.

D. Connections: Three NPS 2-1/2 (DN 65) inlets and one NPS 6 (DN 150) outlet.

E. Inlet Alignment: Inline, horizontal.

F. Finish Including Sleeve: Polished chrome plated.

G. Escutcheon Plate Marking: "AUTO SPKR & STANDPIPE."

2.5 GROUT

A. Standard: ASTM C 1107, Grade B, posthardening and volume adjusting, dry, hydraulic-cement grout.

B. Characteristics: Nonshrink; recommended for interior and exterior applications.

C. Design Mix: 5000-psi (34-MPa), 28-day compressive strength.

21 11 00 - 5/9

D. Packaging: Premixed and factory packaged.

PART 3 - EXECUTION

3.1 EARTHWORK

A. Comply with excavating, trenching, and backfilling requirements in Division 31 Section "Earth Moving."

3.2 PIPING INSTALLATION

A. Water-Main Connection: Arrange with water utility company for tap of size and in location indicated in water main.

B. Water-Main Connection: Tap water main according to requirements of water utility company and of size and in location indicated.

C. Make connections larger than NPS 2 (DN 50) with tapping machine according to the following:

1. Install tapping sleeve and tapping valve according to MSS SP-60.

2. Install tapping sleeve on pipe to be tapped. Position flanged outlet for gate valve.

3. Use tapping machine compatible with valve and tapping sleeve; cut hole in main.

Remove tapping machine and connect water-service piping.

4. Install gate valve onto tapping sleeve. Comply with MSS SP-60. Install valve with stem pointing up and with valve box.

D. Make connections NPS 2 (DN 50) and smaller with drilling machine according to the following:

1. Install service-saddle assemblies and corporation valves in size, quantity, and arrangement required by utility company's standards.

2. Install service-saddle assemblies on water-service pipe to be tapped. Position outlets for corporation valves.

3. Use drilling machine compatible with service-saddle assemblies and corporation valves.

Drill hole in main. Remove drilling machine and connect water-service piping.

4. Install corporation valves into service-saddle assemblies.

5. Install manifold for multiple taps in water main.

6. Install curb valve in water-service piping with head pointing up and with service box.

E. Comply with NFPA 24 for fire-service-main piping materials and installation.

F. Install ductile-iron, water-service piping according to AWWA C600 and AWWA M41.

1. Install encasement for piping according to ASTM A 674 or AWWA C105.

G. Bury piping with depth of cover over top at least 30 inches (750 mm), with top at least 12 inches (300 mm) below level of maximum frost penetration, and according to the following:

1. Under Driveways: With at least 36 inches (910 mm) of cover over top.

2. In Loose Gravelly Soil and Rock: With at least 12 inches (300 mm) of additional cover.

H. Install piping by tunneling or jacking, or combination of both, under streets and other obstructions that cannot be disturbed.

21 11 00 - 6/9

I. Extend fire-suppression water-service piping and connect to water-supply source and building fire-suppression water-service piping systems at locations and pipe sizes indicated.

1. Terminate fire-suppression water-service piping at building wall until building-water-piping systems are installed. Terminate piping with caps, plugs, or flanges as required for piping material. Make connections to building's fire-suppression water-service piping systems when those systems are installed.

J. Install underground piping with restrained joints at horizontal and vertical changes in direction.

Use restrained-joint piping, thrust blocks, anchors, tie-rods and clamps, and other supports.

K. Comply with requirements in Division 21 Sections for fire-suppression-water piping inside the building.

L. Comply with requirements in Division 22 Section "Domestic Water Piping" for potable-water piping inside the building.

3.3 JOINT CONSTRUCTION

A. Install couplings, flanges, flanged fittings, unions, nipples, and transition and special fittings that have finish and pressure rating same as or higher than systems pressure rating for aboveground applications unless otherwise indicated.

B. Install unions adjacent to each valve in tubing NPS 2 (DN 50) and smaller.

C. Install flanges, flange adaptors, or couplings for grooved-end piping on valves, apparatus, and equipment having NPS 2-1/2 (DN 65) and larger end connections.

D. Ream ends of tubes and remove burrs.

E. Remove scale, slag, dirt, and debris from outside and inside of pipes, tubes, and fittings before assembly.

F. Copper-Tubing, Brazed Joints: Join copper tube and fittings according to CDA's "Copper Tube Handbook," "Brazed Joints" Chapter.

G. Copper-Tubing, Pressure-Sealed Joints: Use proprietary crimping tool and procedure recommended by copper, pressure-seal-fitting manufacturer.

H. Ductile-Iron Piping, Gasketed Joints for Fire-Service-Main Piping: UL 194.

I. Ductile-Iron Piping, Grooved Joints: Cut-groove pipe. Assemble joints with grooved-end, ductile-iron-piping couplings, gaskets, lubricant, and bolts.

J. Flanged Joints: Select appropriate gasket material in size, type, and thickness suitable for water service. Join flanges with bolts according to ASME B31.9.

K. PE Piping Heat-Fusion Joints: Clean and dry joining surfaces by wiping with clean cloth or paper towels. Join according to ASTM D 2657.

L. PVC Piping Gasketed Joints: Use joining materials according to AWWA C900. Construct joints with elastomeric seals and lubricant according to ASTM D 2774 or ASTM D 3139.

21 11 00 - 7/9

M. Fiberglass Piping Bonded Joints: Use adhesive and procedure recommended by piping manufacturer.

N. Dissimilar Materials Piping Joints: Use adapters compatible with both piping materials, with OD, and with system working pressure.

O. Do not use flanges or unions for underground piping.

3.4 ANCHORAGE INSTALLATION

A. Anchorage, General: Install water-distribution piping with restrained joints. Anchorages and restrained-joint types that may be used include the following:

1. Concrete thrust blocks.

2. Locking mechanical joints.

3. Set-screw mechanical retainer glands.

4. Bolted flanged joints.

5. Heat-fused joints.

6. Pipe clamps and tie rods.

B. Install anchorages for tees, plugs and caps, bends, crosses, valves, and hydrant branches in fire-suppression water-service piping according to NFPA 24 and the following:

1. Gasketed-Joint, Ductile-Iron, Water-Service Piping: According to AWWA C600.

2. Gasketed-Joint, PVC Water-Service Piping: According to AWWA M23.

3. Bonded-Joint Fiberglass, Water-Service Piping: According to AWWA M45.

C. Apply full coat of asphalt or other acceptable corrosion-resistant material to surfaces of installed ferrous anchorage devices.

3.5 VALVE INSTALLATION

A. MSS Valves: Install as component of connected piping system.

B. Support valves and piping, not direct buried, on concrete piers. Comply with requirements for concrete piers in Division 03 Section "Cast-in-Place Concrete."

3.6 BACKFLOW PREVENTER INSTALLATION

A. Install backflow preventers of type, size, and capacity indicated. Include valves and test cocks.

Install according to requirements of plumbing and health department and authorities having jurisdiction.

B. Do not install backflow preventers that have relief drain in vault or in other spaces subject to flooding.

C. Do not install bypass piping around backflow preventers.

D. Support NPS 2-1/2 (DN 65) and larger backflow preventers and piping on concrete piers.

Comply with requirements for concrete piers in Division 03 Section "Cast-in-Place Concrete."

21 11 00 - 8/9

E. Install protective pipe bollards on two sides of each fire-department connection.

3.7 FIRE HYDRANT INSTALLATION

A. General: Install each fire hydrant with separate gate valve in supply pipe, anchor with restrained joints or thrust blocks, and support in upright position.

B. Wet-Barrel Fire Hydrants: Install with valve below frost line. Provide for drainage.

C. AWWA Fire Hydrants: Comply with AWWA M17.

D. UL-Listed or FM-Approved Fire Hydrants: Comply with NFPA 24.

3.8 FIRE-DEPARTMENT CONNECTION INSTALLATION

A. Install ball drip valves at each check valve for fire-department connection to mains.

B. Install protective pipe bollards on two sides of each fire-department connection. Pipe bollards are specified in Division 05 Section "Metal Fabrications."

3.9 CONNECTIONS

A. Connect fire-suppression water-service piping to existing water main. Use tapping sleeve and tapping valve.

B. Connect fire-suppression water-service piping to interior fire-suppression piping.

3.10 FIELD QUALITY CONTROL

A. Use test procedure prescribed by authorities having jurisdiction or, if method is not prescribed by authorities having jurisdiction, use procedure described below.

B. Piping Tests: Conduct piping tests before joints are covered and after concrete thrust blocks have hardened sufficiently. Fill pipeline 24 hours before testing and apply test pressure to stabilize system. Use only potable water.

C. Hydrostatic Tests: Test at not less than one-and-one-half times the working pressure for two hours.

1. Increase pressure in 50-psig (350-kPa) increments and inspect each joint between increments. Hold at test pressure for one hour; decrease to 0 psig (0 kPa). Slowly increase again to test pressure and hold for one more hour. Maximum allowable leakage is 2 quarts (1.89 L) per hour per 100 joints. Remake leaking joints with new materials and repeat test until leakage is within allowed limits.

D. Prepare test and inspection reports.

3.11 IDENTIFICATION

21 11 00 - 9/9

A. Install continuous underground detectable warning tape during backfilling of trench for underground fire-suppression water-service piping. Locate below finished grade, directly over piping. Underground warning tapes are specified in Division 31 Section "Earth Moving."

B. Permanently attach equipment nameplate or marker indicating plastic fire-suppression water-service piping or fire-suppression water-service piping with electrically insulated fittings, on main electrical meter panel.