Y25-787_Specifications.pdf

PDF 662 KB Posted

Attached to
Siplin Pond 6749 Retrofit
Solicitation number
Y25-787
Issued by
Orange County, Orlando City, Florida

About this file

This is a Technical Specifications document prepared by TLP Engineering Consultants for Orange County, Florida's Environmental Protection Division and Public Works Department, detailing construction requirements for the Siplin Pond 6749 Retrofit project. The project involves converting an existing dry detention pond into a wet detention pond with enhanced stormwater treatment capabilities in Winter Garden. Key construction deliverables include approximately 98 linear feet of 18-inch reinforced concrete pipe installation, two type-7 manholes, type-D modified inlets, underdrain systems with six-inch corrugated polyethylene tubing, approximately 1,600 square yards of sod installation, concrete driveway construction at six-inch thickness, and installation of a Bio-Sorption Activated Media (BAM) filter system for nutrient removal. The project must achieve substantial completion within 210 consecutive calendar days from the Notice to Proceed, with final completion expected by day 240. A non-mandatory pre-bid meeting is scheduled for June 30, 2025, at 10:30 am via Microsoft Teams, and sealed electronic bids must be submitted through the OpenGov e-Procurement Platform by 4:00 pm EST on Tuesday, July 29, 2025. Questions must be submitted by Monday, July 14, 2025, at 5:00 pm EST through the same platform.

The estimated total construction cost is $232,363.52, with contract awards made to the lowest responsive and responsible bidder. Liquidated damages of $500 per day apply for failure to meet completion deadlines, and retainage will be held at five percent of progress payments. The contractor is responsible for all mobilization, traffic maintenance, erosion and water pollution prevention, clearing and grubbing, excavation, dewatering with appropriate permitting, and site restoration including turf establishment to a minimum of ninety percent coverage. The BAM filter system is designed for a twenty-year service life, with an estimated future replacement cost of approximately $152,620.57. The contractor must comply with National Pollutant Discharge Elimination System (NPDES) requirements, obtain necessary permits including a St. Johns River Water Management District Permit, prepare a Storm Water Pollution Prevention Plan (SWPPP), and submit Notice of Intent and Notice of Termination documentation to the Florida Department of Environmental Protection. Additional compliance requirements include E-Verify, drug-free workplace certification, anti-human trafficking provisions, and submission of signed and sealed as-built plans prepared by a Florida-licensed Professional Engineer or Registered Professional Surveyor and Mapper.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL PROVISIONS

PART H

For:

SIPLIN ROAD POND 6749

Orange County

Prepared For:

ORANGE COUNTY ENVIRONMENTAL

PROTECTION DIVISION

AND

ORANGE COUNTY PUBLIC WORKS

Prepared By:

TLP Engineering Consultants

450 S. Orange Avenue, Suite 600 Orlando, Florida 32801

SIPLIN ROAD POND 6749

INDEX OF TECHNICAL PROVISIONS

TP DESCRIPTION

TP 101 MOBILIZATION

TP 102 MAINTENANCE OF TRAFFIC

TP 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND

WATER POLLUTION

TP 110 CLEARING AND GRUBBING

TP 120 EXCAVATION, EMBANKMENT, AND GRADING

TP 425 INLETS, MANHOLES, AND JUNCTION BOXES

TP 430 PIPE CULVERTS AND STORM SEWERS

TP 440 UNDERDRAINS

TP 522 CONCRETE SIDEWALKS, 4-INCH THICKNESS; CONCRETE

DRIVEWAYS, 6-INCH THICKNESS

TP 570 PERFORMANCE TURF, SOD

TP 900-1 AS BUILT PLANS

TP 900-2 INDEMNIFICATION

TP 900-3 BIOSORPTION ACTIVATED MEDIA (BAM)

TP 900-4 FLEXIBLE GEOMEMBRANE

TP 101 - Mobilization

TP 101

MOBILIZATION

Mobilization shall include all items detailed in Article 101 of the FDOT Standard Specifications for Road & Bridge Construction, FDOT Standard Plans, the Special Provisions and the plans, except as modified below.

Preservation of Property Corners including all items detailed in Section 7-11 of the Standard Specifications shall be included in the contract price for mobilization.

Basis of Payment

The work and incidental costs covered under Mobilization will be paid for at the contract lump sum price and will be paid in partial payments in accordance with the following:

Percent of Original Contract Amount Allowable Percent of the Lump Sum Earned Price for the Items*

5 25 10 50 25 75 50 100

*Partial payments as detailed above will be limited to 10% of the original Contract amount for the roadway pay items.

Payment shall be made under:

Pay Item:

101-1 Mobilization LS

133507 Cross-Out

TP 102 – Maintenance of Traffic

TP 102

MAINTENANCE OF TRAFFIC

All Maintenance of Traffic work shall conform to the requirements of Section 102 of the FDOT Standard Specifications for Road & Bridge Construction Standard Plan Index 102-600 of the FDOT Standard Plans, the plans, except as modified below.

The road shall be kept open to two-way traffic on a paved surface during construction except when full closures are allowed by the plans or by the Engineer, lane closure information is not required to be added into the FDOT notification system.

The Contractor shall not be permitted to isolate residences or places of business. Access shall be provided to all residences and all places of business whenever construction interferes with the existing means of access.

The Contractor shall furnish, erect and maintain all necessary traffic control devices, including flagmen and pilot cars, in accordance with the Manual of Uniform Traffic Control Devices for Streets and Highways, published by the U.S. Department of Transportation, Federal Highway Administration. The Contractor shall provide and maintain in a safe condition the entire project limits included, but not limited to pre-existing conditions, driving lanes, temporary approaches, crossings, and intersections with trails, roads, streets, business parking lots, residences, garages and completed work. The Contractor shall take all necessary precautions for the protection of the work and the safety of the public in accordance with Section 102

The Contractor shall present his signed and sealed Maintenance of Traffic Plan that is approved by Orange County Traffic Engineering to the Engineer at the preconstruction conference, and shall be fully and solely responsible for the adequacy of the Maintenance of Traffic plan regardless of the source. The plan shall be signed and sealed by the contractor’s own professional engineer licensed in the State of Florida. Any proposed revisions to the approved Maintenance of Traffic plan are required to be approved by the Engineer.

The Contractor shall be responsible for installation of signs for all business along the project corridor. Signs should be manufactured and installed in accordance with FDOT Standard Plans. No special compensation will be made to the contractor to defray costs of any of the work or delays for complying with the requirements of installing business signs, but such costs shall be considered as having been included in the price stipulated for the Maintenance of Traffic pay item.

Basis of Payment

All materials, work and incidental costs related to Maintenance of Traffic will be paid for at the contract lump sum price. All material, labor and equipment necessary for the construction and maintenance of the entire project limits included, but not limited to pre-existing conditions, driving lanes, temporary approaches, crossings, intersections with trails, roads, streets, business parking lots, residences, garages, temporary driving lanes, side streets, driveway connections, and completed work, as may be directed by the Engineer shall be included in the contract price.

Payment shall be made under:

Pay Item:

102-1 Maintenance of Traffic LS

TP 104 - Prevention, Control and Abatement of Erosion and Water Pollution

PREVENTION, CONTROL and ABATEMENT of EROSION and WATER POLLUTION

LAND CLEARING

Prevention, control and abatement of erosion and water pollution shall conform to the requirements of Section 104 of the FDOT Standard Specifications for Road and Bridge Construction, National Pollution Discharge Elimination System (NPDES) requirements, except as modified below.

The Contractor shall present at the Preconstruction Conference its Storm Water Pollution Prevention Plan (SWPPP) and a separate schedule to manage erosion and water pollution. This schedule shall include a complete outline of the proposed construction of all erosion and pollution control and abatement items required.

The Contractor shall be responsible for the preparation and submittal of the Notice of Intent (NOI) and Notice of Termination (NOT) to the Florida Department of Environmental Protection (FDEP) and shall obtain the FDEP Generic Permit for Stormwater Discharge from Large and Small Construction Activities.

DEWATERING

The term treatment as used in this technical provision means the application of all FDEP approved techniques and/or methods available to remove the exceedances out of dewatering effluent except impounding. Impounding is not considered a treatment method for purposes of compensation under this technical provision.

The CONTRACTOR shall include in his/her bid all applicable costs, including monitoring, resulting from treatment and disposal of contaminated groundwater with concentration levels that exceed the allowable limits of the FDEP generic permit, and shall not be entitled to any adjustment in the Contract Price as a result of any change in the permit fees or unanticipated treatment and disposal costs.

Prior to any work commencing, and for the duration of the work, the CONTRACTOR is responsible for meeting all the conditions of the applicable permits and submitting any required reports to the appropriate agencies.

The CONTRACTOR shall dewater only in relation to the location and relocation of facilities owned by the COUNTY. No compensation shall be provided for dewatering performed for facilities that are not owned by the COUNTY.

Permitting

If exceedances are found in the dewatering effluent, the CONTRACTOR will be required to:

TP 104

TP 104 - Prevention, Control and Abatement of Erosion and Water Pollution

1. Immediately notify the COUNTY and report the exceedances that are encountered.

2. Meet with the FDEP to determine any and all alternatives that are acceptable.

3. Obtain prior COUNTY approval of treatment and disposal alternatives.

4. Obtain prior written COUNTY authorization to use pay item TP 104-14

5. Apply and obtain any and all permits and/or treatment approvals that FDEP requires including, but not limited to:

a. Generic Permit for Discharges from Petroleum Contaminated Sites (62- 621.300(1), F.A.C.). Allows discharges from sites with automotive gasoline, aviation gasoline, jet fuel, or diesel fuel contamination.

b. Permit for all Other Contaminated Sites (62-04; 62-302; 62-620 & 62-660, F.A.C.). The coverage is available only through the individual NPDES permit issued by FDEP. Allows discharges from sites with general contaminant issues, i.e. ground water and/or soil contamination other than petroleum fuel contamination.

c. Generic Permit for the Discharge of Produced Ground Water from Any Non- Contaminated Site Activity (62-621.300(2), F.A.C.).

d. Generic Permit for Stormwater Discharge from Large or Small Construction Activities (62-621.300(4) (a), F.A.C.).

6. Apply and obtain any and all permits and/or treatment approvals that the Water Management District requires including, but not limited to:

a. No-Notice Short-Term Dewatering Permit (40E-20.302(3), F.A.C.) If the CONTRACTOR’S proposed work is expected to exceed 90 days in duration, or does not meet any of the other requirements listed with the requirements of Rule 40E-20.302(3), the CONTRACTOR must apply for and obtain a Dewatering General Water Use Permit (40E-20.302(2) F.A.C.)

The CONTRACTOR shall not be entitled to file, or recover under, any delay claim based on preparation of permit applications and the time required for obtaining the applicable permits. If, prior to or during the dewatering, it is determined that the disposal or discharge of the dewatering effluent is not authorized by the FDEP’s Generic Permit for the Discharge of Produced Ground Water from Any Non-Contaminated Site Activity, the CONTRACTOR shall diligently pursue further required permit(s) from FDEP or other agencies without resort to delay claims or compensa t ion from the COUNTY for either permit application activities or the time required to obtain such permits.

TP 104

TP 104 - Prevention, Control and Abatement of Erosion and Water Pollution

TP 104

The CONTRACTOR shall consider and anticipate the potential need to obtain the herein discussed permits in developing his schedule, and shall make every effort to avoid or minimize potential impacts to his critical path that might result from delays in dewatering activities due to the time necessary for the CONTRACTOR to obtain the necessary permits. The CONTRACTOR shall make every effort to schedule activities requiring dewatering as late as possible during his schedule, and shall schedule activities not impacted by dewatering as early as possible. For each day, up to a maximum of one hundred eighty (180) days that the CONTRACTOR diligently pursues such permit(s) and is unable to avoid adversely impacting his critical path, a day will be added to the time allotted to the CONTRACTOR to complete performance of the Project.

Treatment

The CONTRACTOR shall implement the appropriate treatment that is acceptable to FDEP, COUNTY, and, if necessary, the Water Management District to attain compliance for all exceedances encountered during dewatering activities. Treatments may include, but are not limited to: chemical treatment, ion exchange treatment, filtration, and disposal of discharged groundwater in a properly permitted facility.

The CONTRACTOR shall:

1. Make every effort to minimize the spread of contamination into uncontaminated areas;

2. Provide for the health and safety of all workers at the job site and make provisions necessary for the health and safety of the public that may be exposed to any potentially hazardous conditions;

3. Ensure such provisions adhere to all applicable laws, rules or regulations covering hazardous conditions in a manner commensurate with the level of severity of the conditions;

4. If necessary, provide contamination assessment and remediation personnel to handle site assessment, determine the course of action necessary for site security, and perform the necessary steps under applicable laws, rules, and regulations for additional assessment and/or remediation work to resolve the contamination issue;

5. Delineate the contamination area(s), any staging or holding area required, and develop a work plan that will provide the schedule of projected completion dates for the final resolution of the contamination issue;

6. Maintain jurisdiction over activities inside any delineated contamination areas and any associated staging or holding areas;

7. Be responsible for the health and safety of workers within the delineated areas; and

8. Provide continuous access to representatives of regulatory or enforcement agencies having jurisdiction.

TP 104 - Prevention, Control and Abatement of Erosion and Water Pollution

TP 104

Basis of Payment

All work and incidental costs required to comply with the articles of this specification will be paid at the contract lump sum price for Prevention, Control and Abatement of Erosion and Water Pollution.

Payment will be made under:

104-14 Prevention, Control and Abatement of Erosion and Water Pollution LS

TP 110 – Clearing and Grubbing

TP 110

CLEARING AND GRUBBING

All clearing and grubbing shall be performed in accordance with the requirements of Section 110 of the FDOT Standard Specifications for Road & Bridge Construction, except as modified below.

Scope of work to include but not be limited to, the removal of all rigid, asphalt pavement, Portland cement concrete pavement, curb, curb and gutter, ditch pavement, sidewalk, driveway aprons, concrete slabs, concrete structures, brick, fences, gravity walls, retaining walls, pipes, etc.

Clearing and Grubbing shall also include the removal of existing pavement and base course and backfilling with suitable material, as shown in the construction plans. Removal of the existing roadway shall also include the proper disposal of the removed materials as specified above.

Basis of Payment

All work and incidental costs required to perform clearing and grubbing as herein specified will be paid for at the contract lump sum price.

Payment shall be made under:

110-1-1 Clearing and Grubbing LS

TP 120

TECHNICAL PROVISIONS

TP 120 – Excavation, Embankment, and Grading

EXCAVATION, EMBANKMENT AND GRADING

All excavation and embankment work shall conform to the requirements of Section 120 of the FDOT Standard Specifications for Road & Bridge Construction and FDOT Standard Plans, except as modified below.

Basis of Payment

Subsoil Excavation will be paid for at the contract price per cubic yard.

Payment shall constitute full compensation for all work described herein and in the Special Provisions and shall include the excavation and disposal of muck, clay, rock, or any other material that is unsuitable in its original position and that is excavated below the finished grading template. Work under this pay item shall also include the excavation of all suitable material within the specified limits as necessary to excavate the unsuitable material. The bottom of the finished grading template shall be considered to be the top of the finished base, shoulders, and slopes for stabilized bases and the finished shoulder and slope lines and bottom of base or rigid pavement for rigid pavement or all other bases. Payment shall also include the provision, placement, shaping, and compaction of suitable backfill material to replace the removed unsuitable material up to the original grade line or to the bottom of the proposed roadway base material, whichever is lower.

The limits of Subsoil Excavation indicated in the construction plans are considered to be particularly variable, in accordance with field conditions actually encountered.

Excavation, Embankment and Grading will be paid for at the contract lump sum price.

Payment shall constitute full compensation for all work described herein and in the Special Provisions and shall include grading of shoulders, graded road connections, slopes, compaction, final dressing, subsoil excavation, replacement material and all work required for completing the project that is not paid for under the other pay items. Also included are removals and off-site disposal or on-site utilization of all materials, structures, abandoned utilities and obstructions as directed by the Engineer.

Payment shall be made under:

Item 120-9 Excavation, Embankment, and Grading LS

TP 425 – Inlets, Manholes, and Junction Boxes

TP 425

INLETS, MANHOLES, AND JUNCTION BOXES

Construction of Inlets, Manholes and Junction Boxes shall conform to the requirements of Section 425 of the FDOT Standard Specifications for Road & Bridge Construction and FDOT Standard Plans except as modified below.

Testing and Acceptance Criteria

Testing for drainage structures shall be in compliance with the following criteria:

• Two tests shall be performed per each twelve (12) inch lift.

• 100% of a Standard Proctor (AASHTO T 99, Method C) is required.

Method of Measurement

The quantities measured for payment under this Section shall be the number of inlets, manholes, junction boxes, yard drains, special end walls, and shallow ditch drains satisfactorily completed and accepted, including drainage structure under drains where required.

Basis of Payment

Structures included in this Section will be paid for at the contract unit price each, completed and accepted. Payments shall constitute full compensation for furnishing all materials and completing all work described herein or shown on the plans, including all excavation;

dewatering; subsoil excavation and replacement material; backfilling and compacting around structures; disposal of surplus material; and furnishing and placing of all concrete; reinforcing steel; gratings; frames; covers, and any other necessary fittings as shown in the plans, required for acceptable construction, or as directed by the Engineer. Where required, drainage structure underdrains shall be included in the unit price for inlets and manholes. Any alteration of pipe grades up to one (1) foot to clear utilities shall be made and connections to structures made at no additional cost to the County or utility.

Payment shall be made under:

Item No. 425-1-549 Inlets, Type D (Modified) Structure EA Item No. 425-2-41 Manhole, Type 7 Structure EA

TP 430- Pipe Culverts and Storm Sewers

TP 430

PIPE CULVERTS AND STORM SEWERS

Construction of Pipe Culverts, Storm Sewers and Mitered End Sections shall conform to the requirements of Section 430 of the “Standard Specifications”, except as modified herein or as directed by the Engineer. All round and elliptical pipes shall be steel reinforced concrete pipe (SRCP) or polypropylene pipe (PP) as specified in the roadway construction plans.

Lifting holes in reinforced concrete pipe are prohibited.

Proposed storm sewer pipe to be connected to existing structures shall have openings cut into the existing structure without permanently damaging the structure. All structure openings shall be grouted watertight, with non-shrink grout, after pipe installation, and the structure shall be restored as approved by the Engineer.

The cost of connections to existing structures shall be included in the price bid for the pipe.

Final pipe inspection requirements shall conform to Section 430-4.8 of the Standard

Specifications. All culverts and storm sewer pipes shall be videoed by the contractor and inspected and approved by the Engineer prior to final paving.

All pipe culvert designated in the plans to be desilted shall be videoed in accordance to Section 430-4.8 of the Standard Specifications and approved by the Engineer prior to payment.

All contractor pipe crews shall be trained by the pipe materials supplier prior to installation of the storm system. The contractor shall coordinate this training and notify the County inspection staff of the scheduled training.

Concrete Pipe Joints

Each joint in a concrete pipe culvert or storm sewer shall be wrapped on the exterior of the pipe with a band of filter fabric measuring 3 feet wide centered on the joint and lapped a minimum of 2 feet. The filter fabric shall meet the requirements of Section 985 of the Standard Specifications and shall be secured against the outside of the pipe by stainless metal or plastic strapping or by other methods approved by the Engineer. These costs shall be included in the per linear foot price for the pipe.

Method of Measurement

Quantities measured for payment under this Section shall be the length in linear feet of pipe culvert or storm sewer measured in place, completed and accepted. Measurements shall be from the inside face of structure wall to inside face of structure wall.

For mitered end sections the quantity measured for payment shall be the number completed and accepted.

TP 430- Pipe Culverts and Storm Sewers

TP 430

Basis of Payment

Pipe Culverts and Storm Sewers will be paid for at the contract unit price completed and accepted. The unit price shall include connection of proposed pipes to existing structures and the replacement of the backfill, base course, and pavement removed for pipe trenching. Payment shall be full compensation for all work and materials described herein, including excavation (in whatever material is encountered), dewatering, removing unsuitable material and replacing with select bedding material, backfilling, compaction, furnishing and installing all pipe, disposing of surplus materials, and other work as may be required for an acceptable installation.

Payment shall be made under:

Item No 430-175-118 Pipe Culvert, SRCP-Class III, Round 18” LF 430-518-120 Straight Concrete Endwalls, 18”, Single, Round EA 430-982-125 Mitered End Section, Round, 18” EA

TECHNICAL PROVISION

TP 440 – Underdrains

TP 440

UNDERDRAINS

Roadway Underdrain and underdrain cleanout structures shall be constructed in the locations indicated on the plans or as directed by the Engineer and shall conform to the requirement herein. Underdrain pipe shall have a diameter of six (6) inches, unless indicated otherwise on the plans.

Materials

Materials used for this Section shall conform to the following requirements:

A. Filter Fabric:

Filter fabric shall meet or exceed the following minimum properties:

Fabric Property Test Method Unit Typical Value

Grab Tensile Strength ASTM D-1682 lb 120 Grab Tensile Elongation ASTM D-1682 % 55 Trapezoidal Tear Strength ASTM D-1117 lb 50 Mullen Burst Strength ASTM D-3786 psi 210 Puncture Strength ASTM D-3787 lb 70 Water Flow Rate CFMC-GET-2 gal/min/sf 285 EOS COE-DW-02215 US Std Sieve 100+

The following filter fabrics are approved for use:

Mirafi 140-N Typar 3401 Trevira 1114

B. Pipe Wrap:

The filter fabric pipe wrap shall be an approved strong tough porous nylon, polyester, polypropylene or other approved fabric which completely covers and is secured to the perforated plastic tubing pipe underdrain in such a way as to prevent infiltration of trench backfill material.

The filter enveloping shall weigh a minimum of (4) four ounces per square yard and shall retain soil particles larger than 212 microns (No. 70 sieve). When tested in accordance with ASTM D-1682, the grab strength (wet) of the filter wrap shall not be less than 100 lbs. and the grab elongation shall not be less than 60 percent.

Storage and handling of filter envelope shall be in accordance with the manufacturer's recommendations. Torn or punctured filter wrap shall not be used.

C. Filter Aggregate (Coarse Aggregate):

Stone: When stone is used for filter aggregate, it shall be composed of clean durable rock that is non-cementitious when exposed to water for extended periods and shall be so certified by a geotechnical engineer.

Slag: Slag shall be clean, tough and durable. It may be either air-cooled blast-furnace slag

TP 440 – Underdrains

TP 440

or phosphate slag. It shall be reasonably uniform in density and quality and shall be so certified by a geotechnical engineer.

Gradation: The gradations of stone and slag filter aggregates shall be designed and certified by a geotechnical engineer and approved by the Engineer.

D. Pipe

Corrugated Polyethylene Tubing: Corrugated Polyethylene Tubing for use as underdrain shall conform to the requirements of AASHTO M-252, latest edition. Polyethylene Tubing shall be delivered in twenty (20) foot lengths (minimum) and shall be fitted, prior to installation, with a filter fabric wrap.

Procedures

Construction procedures shall conform to the following:

Excavation Trench:

The trench shall be excavated carefully to such depth as is required to permit the pipe to be laid to the grade designed and to the dimensions shown in the plans.

The underdrain trench shall be constructed in a dry condition. This shall be accomplished by the use of a positive dewatering method.

Placing Filter Fabric:

After the trench has been excavated, the filter fabric shall be rolled out over the trench and walked into the trench. Care shall be taken to prevent the excavated material from entering the trench after the fabric has been installed.

Laying Pipe:

After the filter fabric has been placed in the trench, approximately four (4) inches of filter aggregate shall be placed in the trench. The pipe shall be bedded firmly in the filter in the aggregate to the correct line and grade. The upper end of the run of roadway underdrain pipe shall terminate at the underdrain cleanout to prevent any filter aggregate from entering the pipe.

Placing and Compacting Filter Aggregate:

After the pipe has been laid to grade, the pipe shall be firmly held in place by mechanical means while the filter aggregate is placed to a maximum height of five (5) inches plus one (1) inch (compacted) above the top of the pipe. After the first lift is placed and compacted to the satisfaction of the Engineer, the remainder of the filter aggregate shall be placed. The excavation of the trench, the placement of the filter fabric, the installation of the pipe, and the placement and compaction of the first lift of filter aggregate shall be accomplished in a single continuous operation.

TP 440 – Underdrains

TP 440

Special care shall be taken to avoid displacement or damage to the pipe or filter fabric.

Backfill above Filter Aggregate:

After the filter aggregate has been placed to the required height above the pipe, as shown on the plans, the filter fabric shall be lapped full width of trench from both sides. The portion of the trench above the filter aggregate shall be filled with Bio-Sorption Activated Media per the manufacturers requirements.

Method of Measurement

Quantities measured for payment under this Section shall be the length in feet of underdrains measured in place, along the center line and gradient of the underdrain, completed and accepted.

The measurement shall include the portion of the pipe extending into the walls or junction boxes, etc.

Basis of Payment

Underdrains will be paid for at the contract unit price per linear foot of underdrain, completed and accepted. Payment shall be full compensation for all work described herein, including dewatering, excavation, filter aggregate, filter fabric, pipe, backfilling, compacting, and disposal of surplus material, connections to structures and cleanouts.

Underdrains included in the contract price of other pay items will not be included in this Section for payment.

440-1-50 Underdrains, Type V LF

TP 522

TP 522 – Concrete Sidewalks, 4-inch thickness; Concrete Driveways, 6-inch thickness

CONCRETE SIDEWALKS, 4 INCH THICKNESS

Construction of 4-inch concrete sidewalk and 6-inch concrete driveway shall conform to the FDOT Standard Specifications for Road & Bridge Construction and FDOT Standard except as modified below.

Foundation

Foundation material shall meet the specified densities and shall be saturated but free of standing water just prior to placing concrete.

Contraction Joints

Contraction joints shall be sawed. All joints shall be straight lines oriented at 90 degrees to the edge of sidewalk, radially if in a curve, or as directed otherwise. The minimum depth of joints shall be 1 1/2 inches or 1/4 the nominal thickness of concrete placed, whichever is greater.

Joint installation shall proceed in the same direction and sequence as the concrete placement.

Sawing shall begin as soon as the concrete has hardened to the degree that excessive raveling will not occur and before uncontrolled cracking begins. Every third transverse joint and all longitudinal joints shall be sawcut within 8 hours after finishing. Remaining transverse joints, shall be sawcut within 24 hours of placement.

Construction Joints

Construction joints shall be constructed at the end of all pours and at other locations where the concrete placement operations are stopped for as long as 30 minutes. They shall be placed at least 10 feet from any other transverse construction joint or end of pavement section.

Metal keyways shall be installed at all construction joints in driveway crossings 6-inches and greater in thickness. Concrete thickness shall be increased by 2-inches for a minimum distance of 6-inches either side of construction joints.

Curing

Concrete shall be cured as provided in Section 520-8, except as modified herein or as approved by the Engineer.

The Contractor shall ensure enough resources are available to meet the curing requirements.

If using curing compound, follow the manufacturer’s recommendations. Alternate methods may be used when preapproved by the Engineer.

Equipment shall be maintained as necessary to ensure a uniform application of compound.

Apply additional coats of compound when directed by the Engineer.

Storage containers having greater than a five gallon capacity may be utilized only with prior approval of the Engineer. The Contractor shall submit the manufacturer's literature describing the placement, storage and mixing requirements for storage exceeding five gallons. The

Contractor shall provide and utilize mechanical mixers meeting the manufacturer’s recommendations for all containers larger than five gallons. The Contractor shall conform to all storage, mixing and application requirements.

Certification and Acceptance

Contractor shall furnish a delivery ticket with each batch of concrete before discharging concrete at the placement site. Ensure the delivery ticket includes material quantities incorporated into the batch, sources of materials, batch adjustments, batch size, time loaded, time discharged, and the allowable jobsite water addition.

Ensure the batcher responsible for producing the concrete signs the delivery ticket, certifying that the batch was produced in accordance with the Contract Documents.

Record water added at the jobsite. Sign the delivery ticket certifying that the concrete was placed in accordance with the Contract Documents.

Acceptance by the County will be by certification on the delivery ticket signed by the batcher and the Contractor. Certify that the concrete meets a minimum compressive strength of 3,000 psi at 28 days. The Engineer may verify the strength of the concrete.

Remedial Action

Delineate, remove to the full depth and width, and replace, at no cost to the Department, concrete that has:

1. Any cracking greater than 1/4 inch in vertical displacement.

2. Any spalling or flaking off of the surface layer that exposes the rough, pitted aggregate surface in excess of 10 square inches.

3. Any intersecting cracks visible in the hardened concrete (regardless of size) in sidewalk, ditch pavement, slope pavement, traffic separator, or curb and gutter.

4. Any uncontrolled cracks that appear during the life of the Contract unacceptable to the

Engineer.

Replacement

When cracking occurs and the Engineer determines the cause to be underlying materials, the Engineer may increase the required thickness of the replacement concrete at their discretion and at no cost to the Department.

Quantities measured for payment under this Section shall be the actual area in square yards of concrete constructed in place.

Concrete Sidewalk including ramps and driveways will be paid for at the contract unit prices, completed and accepted. Payment shall constitute full compensation for all work described herein, and shall include all labor, equipment, materials, clearing and grubbing, excavation, grading, compaction, expansion material (asphalt impregnated), and all incidentals necessary to complete the work to the lines, grades, and thickness indicated on the plans.

Subgrade preparation and additional concrete required for thickened slabs as indicated on the plans or as directed by the Engineer shall be included in the contract unit price for 6-inch Concrete Sidewalk.

Item No 522-2 Concrete Driveway, 6” Thick SY

TP 570 – Performance Turf

TP 570

DESCRIPTION

Establish a growing, healthy turf over all areas designated in the Plans. Use sod in areas designated in the Plans to be sodded. Maintain turf areas until final acceptance of all contract work. Work shall include all mulching, sodding, fertilizing, clipping removal, litter control, edging and watering necessary to provide routine maintenance of the grassed area throughout the establishment period or until the work is accepted by the Engineer.

There must be at least 90% coverage of healthy grass prior to acceptance by the Engineer. The Engineer, at any time, may require replanting of any areas in which the establishment of the grass stand does not appear to be developing satisfactorily.

The CONTRACTOR shall mow grassed areas every 14 days, or as required by the Engineer, until final acceptance of the work.

MATERIALS

General

All sod shall meet the requirements of the Florida Department of Agriculture and Consumer Services and all applicable state laws, and shall be approved by the Engineer before installation.

All sod and mulch shall be free of noxious weeds and exotic pest plants, plant parts or seed listed in the current Category I “List of Invasive Species” from the Florida Exotic Pest Plant Council (FLEPPC, http://www.fleppc.org ). Any plant officially listed as being noxious or undesirable by any Federal Agency, any agency of the State of Florida or any local jurisdiction in which the project is being constructed shall not be used. Any such noxious or invasive plant or plant part found to be delivered in seed, sod or mulch will be removed by the CONTRACTOR at his expense and in accordance with the law.

All materials shall meet plant quarantine and certification entry requirements of Florida Department of Agriculture & Consumer Services, Division of Plant Industry Rules.

Sod

Types: Unless a particular type of sod is called for in the Contract Documents, sod may be either centipede, bahia, or bermuda at the CONTRACTOR’S option. It shall be well matted with roots.

Where sodding will adjoin, or be in sufficiently close proximity to, private lawns, other types of sod may be used if desired by the affected property owners and approved by the Engineer.

Dimensions: The sod shall be taken up in commercial-size rectangles, or rolls, preferably 12 inches by 24 inches or larger, except where 6 inch strip sodding is called for, or as rolled sod at least 12 inches in width and length consistent with the equipment and methods used to handle the rolls and place the sod. Sod shall be a minimum of 1-1/4 inches thick including a 3/4 inch thick layer of roots and topsoil. Reducing the width of rolled sod is not permitted after the sod has been taken up from the initial growing location. Any netting contained within the sod shall be certified by the manufacturer to be degradable within three years.

Condition: The sod shall be sufficiently thick to secure a dense stand of live turf. The sod shall be live, fresh and uninjured, at the time of planting. It shall have a soil mat of sufficient thickness adhering firmly to the roots to withstand all necessary handling. It shall be planted within 48 hours after being cut and kept moist from the time it is cut until it is planted. No sod which has been cut for more than 48 hours may be used unless specifically authorized by the Engineer. A letter of certification from the turf Contractor as to when the sod was cut, and what type, shall be provided to the Engineer upon delivery of the sod to the job site.

The source of the sod may be inspected and approved by the Engineer prior to being cut for use in the work.

Mulch

The mulch material shall be compost meeting the requirements below, hardwood barks, shavings or chips; or inorganic mulch materials as approved by the Engineer; or hydraulically applied wood fiber mulch or bonded fiber matrix (BFM) for the establishment of turf material.

Prepared Soil Layer

All material shall be suitable for plant growth. The organic matter content of the prepared soil layer after mixing shall be a minimum of 2.5%, a maximum of 10%, in accordance with FM 1-T- 267 and have a pH value of 4.5 or greater and less than or equal to 8.5 as determined in accordance with FM 5-550. The organic matter content shall be created using any of the following materials.

Prepared soil layer materials may be obtained from either, or a combination of, the following sources:

(1) Excavation within the limits of construction on the project. Such material may be stockpiled or windrowed on the project in areas approved by the Engineer.

(2) Designated borrow pits for the project.

(3) From other sources of organic soil materials provided by the Contractor.

Organic Soil: This may consist of muck, mucky peat and peat and shall have an organic matter content of 30% or more if the mineral fraction is more than 50% clay, or more than 20% organic matter if the mineral fraction has no clay.

Compost: Meet the requirements of Florida Department of Environmental Protection Rule

62.709.550 Type Y (yard waste), Type YM (yard waste and manure), Type A (municipal solid waste compost) or Rule 62.640.850 Type AA (composted biosolids) and have unrestricted distribution.

Compost for use as a Soil Amendment: If the electrical conductivity (EC) value of the compost exceeds 4.0dS (mmhos/cm) based on the saturated paste extract method, the compost shall be leached with water prior to application.

Compost for use as a Mulch: The compost shall contain no foreign matter, such as glass, plastic or metal shards. The compost shall be slightly coarse to coarse in nature (over half of the solids shall be from particles 1/2 inches in size and no greater than 6 inches. Preference shall be given to compost or mulch made from uncontaminated woody waste materials.

Fertilizer

Ensure that all employees applying fertilizer, possess a current Florida Department of Agriculture and Consumer Services Commercial Applicator license in accordance with Section 482.1562, F.S. provide a copy of current certificates to the Engineer. Fertilizers shall comply with the State and County fertilizer laws.

The numerical designations for fertilizer indicate the minimum percentages (respectively) of (1) total nitrogen, (2) available phosphoric acid, and (3) water-soluble potash, contained in the fertilizer. At least 65% of the nitrogen shall be from a slow-release source.

Certification

The CONTRACTOR shall provide the Engineer a certified test report from the manufacturer of the commercial fertilizer confirming that the requirements of this Section are met. The certified test report shall include test results for total nitrogen, available phosphoric acid, water-soluble potash, and sulfur. Each certification shall cover one batch per type for dry type fertilizer.

Fertilizer Rates

Soil laboratory fertilization recommendations are based on the amount (lbs) of nutrients (N, P2O5, K2O) to apply per given area (usually 1,000 square feet.). From this recommendation it is necessary to select an appropriate fertilizer grade and then determine how much of this fertilizer to apply to the area.

If a complete fertilizer (containing all three primary nutrients) is not available in the ratio of N-P- K necessary to match the ratio required in the fertilizer recommendation, mixed-grade or single-nutrient fertilizers should be used to satisfy each nutrient requirement.

To calculate fertilizer rates:

• Measure the area to be fertilized in square feet.

• Select fertilizers, to be used based on the soil testing laboratory recommendations by matching the ratio of nutrients recommended to the fertilizer grades available.

• Determine the amount of fertilizer to apply to a given area (1,000 square feet.) by dividing the recommended amount of nutrient by the percentage of the nutrient (on a decimal basis) in the fertilizer. Apply no more than 0.25 lbs P2O5/1000 square feet per application prior to planting.

• Adjust the amount of fertilizer to the project area.

Insecticides and Herbicides

Use products found on the following website, http://state.ceris.purdue.edu/, approved by the Florida Department of Agriculture for the State of Florida. The use of restricted products is prohibited. Do not use any products in the sulfonylurea family of chemicals. Herbicide application by broadcast spraying is not allowed.

CONTRACTOR shall procure any necessary licenses, pay all charges and fees, and give all notices necessary for lawful performance of the work.

CONTRACTOR shall ensure that all insecticides and herbicides are applied in accordance with Chapter 5E-9, Florida Administrative Code. Provide a copy of current certificates upon request, to the Engineer.

CONTRACTOR shall ensure that employees who work with herbicides comply with all applicable Federal, State, and local regulations.

CONTRACTOR shall comply with all regulations and permits issued by any regulatory agency within whose jurisdiction work is being performed. Post all permit placards in a protected, conspicuous location at the work site.

CONTRACTOR shall acquire all permits required for aquatic plant control as outlined in Chapter 62C-20, Florida Administrative Code, Rules of the Florida Department of Environmental Protection. Contact the Regional Field Office of Bureau of Invasive Plant Management of the Florida Department of Environmental Protection for proper permits and subsequent approval. If application of synthetic organo-auxin herbicides is necessary, meet the requirements of Chapter 5E-2, Florida Administrative Code.

Water

The water used in the grassing operations may be obtained from any approved source.

The water shall be free of any substance, which might be harmful to plant growth. Effluent water shall meet all Federal, State and local requirements.

Construction Methods

Incorporate turf installation into the project at the earliest practical time.

Use the methods and materials necessary to establish and maintain the initial grassing until final acceptance.

Sod: Place the sod on the prepared surface, with edges in close contact. Do not use sod which has been cut for more than 48 hours.

Place the sod to the edge of all landscape areas as shown in the Plans and as shown in the Design Standards.

Place rolled sod parallel with the roadway and cut any exposed netting even with the sod edge.

Monitor placed sod for growth of pest plants and noxious weeds. If pest plants and/or noxious weeds manifest themselves within 30 days of placement of the sod during the months April through October, within 60 days of placement of the sod during the months of November through March treat affected areas by means acceptable to the COUNTY at no expense to the COUNTY. If pest plants and/or noxious weeds manifest themselves after the timeframes described above from date of placement of sod, the Engineer, at his sole option, will determine if treatment is required and whether or not the CONTRACTOR will be compensated for such treatment.

Remove and replace any sod as directed by the Engineer.

Turf Establishment

Perform all work necessary, including watering and fertilizing, to sustain an established turf until final acceptance, at no additional expense to the COUNTY. Provide the filling, leveling, and repairing of any washed or eroded areas, as may be necessary.

Established turf is defined as follows:

1. An established root system (leaf blades break before seedlings or sod can be pulled from the soil by hand).

2. No bare spots larger than one square foot.

3. No continuous streaks running perpendicular to the face of the slope.

4. No deformation of the turf areas caused by mowing or other CONTRACTOR equipment.

5. No exposed sod netting.

6. No pests or noxious weeds.

Monitor turf areas and remove all competing vegetation, pest plants, and noxious weeds (as listed by the Florida Exotic Pest Plant Council, Category I “List of Invasive Species”, Current Edition, http://www.fleppc.org). Remove such vegetation regularly by manual, mechanical, or chemical control means, as necessary. When selecting herbicides, pay particular attention to ensure use of chemicals that will not harm desired turf. Use herbicides in accordance with provision

During the entire establishment period and until turf is established in accordance with this specification, continue inspection and maintenance of erosion and sedimentation control. Take responsibility for the proper removal and disposal of all erosion and sedimentation control items after turf has been established.

Notify the Engineer, with a minimum of seven calendar days advance notice, to conduct inspections of the turf at approximate 90-day intervals during the establishment period to determine establishment. Results of such inspections will be made available to the CONTRACTOR within seven calendar days of the date of inspection. Determination of an established turf will be based on the entire project and not in sections.

The CONTRACTOR’S establishment obligations of this specification will not apply to deficiencies due to the following factors, if found by the Engineer to be beyond the control of the CONTRACTOR, his subcontractors, vendors or suppliers:

• Determination that the deficiency was due to the failure of other features of the Contract.

• Determination that the deficiency was the responsibility of a third party performing work not included in the Contract or its actions.

The COUNTY will only pay for replanting as necessary due to factors determined by the COUNTY to be beyond the control of the CONTRACTOR.

Litter Removal

During each cycle all litter and debris are to be removed prior to and upon completion of a mowing cycle. Litter and debris removal includes the pickup removal, and disposal from the right-of-way and COUNTY property of any obstacle such as wood, signs, tires, cans, etc., which cannot be traversed by the mowing equipment. It will also be the CONTRACTOR’S responsibility to remove any item such as bags of trash, newspapers, magazines, food containers, boxes, sheets of paper, etc., which will be torn, ripped, scattered or further subdivided by the mowers, which will result in an objectionable appearance.

Clipping Removal

During each cycle all grass clippings that are not uniformly distributed, and detract from the appearance of the mowing operation will be removed from the site by the CONTRACTOR, upon completion of the mowing operation to allow for a neat and clean appearance after completion.

The CONTRACTOR will remove and dispose of all grass clippings from the pavement, curbs and curb inlets located within the limits of the project.

The grass clipping removal will be performed in conjunction with the mowing cycle. It is the responsibility of the CONTRACTOR to maintain the inlet openings free from the debris generated during their right-of-way mowing operation. Grass clippings will not be blown into drains or storm drain inlets. Failure to adhere to this will result in the CONTRACTOR, at his/her own expense within two (2) working days, jetting out these pipes and drains or reimbursing the COUNTY for the clean-up effort carried out by COUNTY personnel.

Edging

Edging is the removal of all weeds, sand, vegetation, debris and plant material by the CONTRACTOR from all edges of curbs, to maintain these areas in an attractive and manicured condition. Edging includes the removal of growth mechanically and manually and shall be performed in conjunction with the mowing cycle. The edging of curbs will create a distinct void;

approximately one-half (1/2) inch horizontally between the structure and the turf. String trimmers will not be used in edging. Edging also includes the removal of all sand and debris from the areas designated to be edged. Upon completion of edging by the CONTRACTOR, no growth, sand or debris will touch any of the structures designated to be edged. The CONTRACTOR from the areas designated for edging will remove all sand and debris.

NOTE: Areas specified for edging will not be treated with herbicide.

Basis of Payment

All material, work, and incidental costs related to prepare the area for turf will be paid for at the contract unit price completed and accepted. The unit price shall also include:

1. Clearing and grubbing work to include but not limited to, the removal of all rigid, asphalt pavement, Portland cement concrete pavement, curb, curb and gutter, ditch pavement, and brick.

2. Excavation in whatever material encountered, removing unsuitable material, and replacing with select bedding material, backfilling, compaction, furnishing and installing, disposing of surplus material, and other work as may be required for acceptable installation and establishment of turf.

Payment shall be made under:

Item No.

570- 1-2 Performance Turf , SOD (Bahia or Match Exist.) SY

TP 900-1- As Built Plans

AS-BUILT PLANS

The As-Built Plans shall incorporate all the changes made to the red line As-Built plans. They shall show locations and elevations of paving, swales, ditches, pipe inverts and structures constructed, and all relocated or reset property corners, section corners and 1/4 section corners.

Upon the completion of the project, the Contractor shall submit to the County one (1) set of

Drawings with Statement of Certifications, certifying that the project was constructed according to the Construction Plans and Specifications, and that the AS BUILT PLANS are correct representation of what was constructed. The plans shall delineate all red line information contained on the As-Built

Plans.

Digital files include CAD and PDF of the as-built survey that are submitted on CD, DVD or

Thumbdrive and are complete with all reference files. All CAD files must be complete with reference files and any other documents and images associated with the CAD files. CAD files must be identically matching to the signed and sealed as-built survey. The submitted digital files must be in the original format of the plans. i.e. Autocad Civil 3d, Microstation, etc. The County prefers the most current version of Autocad Civil 3d.

The Contractor shall…

This is the start of the file's text. The full file is on GovTribe.