This is a Stormwater Management Report prepared by TLP Engineering Consultants for Orange County, Florida, detailing the design and analysis of the Siplin Road Pond 6749 retrofit project (Contract Y16-900B). The project involves converting an existing non-functional dry detention pond into a wet detention pond with a Bio-Sorption Activated Media (BAM) filter system to improve water quality treatment in the Black Lake Watershed. The retrofit design includes excavating the pond to a depth of 97.1 feet NAVD88, reconstructing maintenance berms with varied side slopes (1:4 to 1:3), installing a 1,650.5-square-foot BAM filter with a 2-foot minimum thickness, placing approximately 105 linear feet of perforated 6-inch underdrain pipe, constructing a modified Type D control structure, and installing approximately 98 linear feet of 18-inch reinforced concrete pipe outfall with supporting infrastructure including two new manholes and mitered end sections. The project encompasses approximately 0.70 acres of disturbed areas requiring erosion and sediment control, with sodding of approximately 1,600 square yards upon completion. A non-mandatory pre-bid meeting was scheduled for June 30, 2025, and sealed electronic bids were due by 4:00 pm EST on Tuesday, July 29, 2025, via the OpenGov e-Procurement Platform. The estimated construction cost is $232,363.52, with substantial completion required within 210 consecutive calendar days and final completion within 240 days from the Notice to Proceed, subject to liquidated damages of $500 per day for delays.
The BAM filter system is designed for a 20-year service life with approximately 80 percent and 95 percent removal efficiencies for total nitrogen and total phosphorus, respectively, with an estimated future replacement cost of $152,620.57 (assuming 3 percent annual inflation). Hydraulic analyses using ICPR modeling demonstrated that the proposed wet detention pond design reduces peak stages and outflows compared to existing conditions across all design storm events (mean annual, 10-year, 25-year, and 100-year/24-hour storms). The permanent pool volume of 1.77 acre-feet exceeds the St. Johns River Water Management District minimum requirement of 1.75 acre-feet, and the treatment volume of 0.93 acre-feet achieves the required drawdown within 72 hours through a 2.5-inch orifice. The project requires a St. Johns River Water Management District individual permit demonstrating net water quality improvement, NPDES compliance for construction dewatering, and compliance with Orange County Code and FDOT standards. The contractor is responsible for obtaining necessary permits and conducting all related utility coordination. Retainage will be held at 5 percent of progress payments, and the contract will be awarded to the lowest responsive and responsible bidder. The report documents three design alternatives evaluated before selecting the wet pond with side bank BAM filter configuration and includes detailed hydraulic, geotechnical, and cost-benefit analyses supporting the final design recommendation.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TLP ENGINEERING CONSULTANTS
450 S ORANGE AVE | SUITE 600 | ORLANDO, FL 32801
Tel 407.901.5060 | www.tlpeng.com
STORMWATER MANAGEMENT
REPORT
FINAL
For:
SIPLIN ROAD POND 6749
(Pond 6749) Contract #Y16-900B
Orange County June 2023
(updated 9/20/23)
Prepared For:
Orange County Environmental Protection Division
And Orange County Public Works Department
PROFESSIONAL ENGINEER CERTIFICATE
I hereby certify that I am a registered professional engineer in the State of Florida practicing with TLP Engineering Consultants, Inc., authorized to operate as an engineering business by the State of Florida, Department of Business and Professional Regulation, Board of Professional Engineers, and that I have reviewed or approved the evaluation, findings, opinions, conclusions, or technical advice hereby reported for:
Project: Siplin Road Pond 6749
Location: Orange County, FL
Client: Orange County EPD & Orange County PW
This Drainage Design Report includes a summary of data collection efforts and hydraulic analyses prepared for the project. I acknowledge that the procedures and references used to develop the results contained in this report are standard to the professional practice of civil engineering as applied through design standards and criteria set forth by the federal, state, and local regulatory agencies as well as professional judgment and experience.
APPROVED BY: THIS DOCUMENT HAS BEEN DIGITALLY SIGNED
AND SEALED BY
ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE NOT
CONSIDERED SIGNED AND SEALED. THE SIGNATURE
MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
TLP ENGINEERING CONSULTANTS, INC.
450 SOUTH ORANGE AVE., SUITE 600
ORLANDO, FLORIDA 32801
PH: 407-901-5060
BRENT T. GILLETTE, P.E. NO. 72355
TLP ENGINEERING CONSULTANTS
450 S ORANGE AVE | SUITE 600 | ORLANDO, FL 32801
Tel 407.901.5060 | www.tlpeng.com
Table of Contents
1. GENERAL INFORMATION
1.1. Project Location
1.2. Purpose
1.3. Vertical Datum Information
1.4. Existing Drainage Patterns
1.4.1. Pre-Project Conditions
1.5. Tailwater
1.6. Floodplain Impacts and Mitigation
1.7. Geotechnical Data
1.8. Rules & Regulations/Regulatory Agency Coordination
1.8.1. Existing Stormwater Management
1.8.2. SJRWMD Stormwater Treatment Criteria
2. PRE-RETROFIT ANALYSIS
2.1 Best Management Practices Evaluation Technical Memorandum
2.2 Existing Pond Functionality
3 POND 6749 RETROFIT (PROPOSED) ANALYSIS
3.1 Proposed Design Analyses
3.2 Stormwater Treatment Volume
3.3 Design Storm Events
3.4 Existing Condition ICRP Analysis
3.5 Proposed Condition ICRP Analysis
3.6 Existing Versus Proposed ICPR Analysis
3.7 BAM System Analysis and Functionality
3.8 BAM Filter Maintenance / Replacement
4 STORM DRAIN, POND CONTROL STRUCTURE AND POND CONSTRUCTION
4.1 Proposed Construction Plans
4.2 Skimmer Head Loss Analysis
5 REFERENCES
List of Tables
Table 1. Soil Types and Characteristics Table 2. Existing Versus Proposed Pond #6749 Peak Stage and Peak Outflow Table 3. Existing vs. Proposed TN and TP Load Reductions Pond #6749
List of Appendices
Appendix A: Project Figures Appendix B: Calculations Appendix C: ICPR Reports Appendix D: BMP Analysis Appendix E: Cost Estimate Appendix F: Field Visit Photographs Appendix G: Project Coordination Meeting Notes Appendix H: FEMA FIRMette Appendix I: VERTCON Datum Conversion Appendix J: Black Lake Watershed BMP Evaluation Technical Memorandum Appendix K: USDA Web Soil Survey Appendix L: Geotechnical Report Appendix M: Siplin Road Community Development Project No. 83-51 Existing Plans
1. GENERAL INFORMATION
The Orange County Public Works and Orange County Environmental Protection Division has retained TLP Engineering Consultants Inc. (TLP) to design and prepare a set of construction plans to retrofit Orange County’s existing Pond 6749 in Orange County, Florida. All work for the pond retrofit will be within Orange County’s Right-of-Way.
This drainage retrofit project is to modify the existing detention pond and add a side bank filter as part of an initiative of Best Management Practices within the Black Lake Watershed.
1.1. Project Location
The project is located within the western portion of Orange County, at the eastern end of Siplin Road, in the City of Winter Garden. The project is located within Section 27, Township 22 South, Range 27 East. The limits of the project are shown on the Project Location Map and a reproduction of the USGS Quadrangle Map for the project is shown in Appendix A, Figures 1 and 2, respectively.
1.2. Purpose
The stormwater management report has been prepared according to the Scope of Services to document the project’s proposed pond retrofit with regards to the permitted drainage design criteria, stormwater pond design and stormwater conveyance systems. TLP has reviewed the existing record documents, performed field reviews, and studied the proposed pond retrofit best management practices and design to gain a clear understanding of the stormwater requirements associated with this project.
1.3. Vertical Datum Information
The proposed stormwater management design is referenced to the NAVD 88 vertical datum, unless otherwise noted. The historic plans are based on the NGVD 29 vertical datum. Existing elevations were converted using Elev. NGVD29 – 0.922-ft = Elev. NAVD88. Please refer to Appendix I for the VERTCON datum conversion.
1.4. Existing Drainage Patterns
1.4.1. Pre-Project Conditions
Pond 6749 is an existing dry detention pond and receives stormwater runoff from a medium-density single family residential land use via existing storm sewer systems. The contributing drainage area consists of approximately 7.45 acres, 2.98 acres of impervious and 4.24 acres of pervious ground cover. Land use is single-family residential. Pond 6749 discharges to Black Lake Watershed and ultimately Black Lake after providing water quality treatment and peak discharge attenuation for the 25-year/24-hour storm event.
1.5. Tailwater
All tailwater data for this project was retrieved from the surveyed wetland seasonal high-water elevations, as shown on Figure 3, in Appendix A.
1.6. Floodplain Impacts and Mitigation
Based upon FEMA FIRM Map #12095C0215H, effective September 24, 2021, the are no floodplain boundaries encompassing Pond 6749 as the pond area is designated as Zone X.
Zone X indicates that no base flood elevation is determined in this area and is designated as an area of minimal flood hazard. Please refer to the FEMA Map in Appendix H.
1.7. Geotechnical Data
The USDA Web Soil Survey was used to review the soil types in the Pond 6749 project vicinity. Two (2) existing soil types were found within the project limits and are shown in Table 1. The soil types found within the project corridor consists of A/D and B/D hydrologic group soils. These soil types are attributed to high groundwater tables and are considered poorly drained soils. Please refer to the USDA Soil Resource Report in Appendix K.
Table 1. Soil Types and Characteristics
Soil Symbol Soil Name Hydrologic
Group
37 St. Johns fine sand B/D 44 Smyrna-Smyrna, wet, fine sand, 0 to 2 percent slopes A/D
Detailed geotechnical soil borings were performed by Antillian Engineering Associates, Inc.
The study conducted two auger-borings located on the banks of the pond. The borings encountered groundwater at depths of six feet and ten feet below the existing ground surfaces elevations of 104.6 and 104.4 feet, respectively. The Geotech study recommends setting the estimated seasonal high groundwater elevations at 98.60 feet. The results for groundwater table and estimated SHWT are included in a separate geotechnical report included in Appendix L.
1.8. Rules & Regulations/Regulatory Agency Coordination
The project is located within the jurisdiction of the St. Johns River Water Management District (SJRWMD). The existing pond was permitted under FDEP rule 17-25 when it was constructed in 1985. A pre-application meeting was held on April 26, 2022, see Appendix G.
The project will require an individual permit showing net water quality improvement.
1.8.1. Existing Stormwater Management
The existing dry detention pond 6749 was designed for the residential stormwater runoff areas. The pollution abatement and recovery volume and sizing of the pond and outlet structure has been checked by calculation using the areas and the weighted curve numbers for the existing land use conditions.
1.8.2. SJRWMD Stormwater Treatment Criteria
The project is located within the SJRWMD jurisdiction. Treatment criteria per Section
22.2 of the Permit Information Manual for this on-line pond is the greater of 1.0 inch over basin area or 2.5 inch over impervious area with an additional 0.5 inch of runoff when using filter media. Recovery criteria per Section 22.3 of the Permit Information Manual for this pond is to recover the entire treatment volume within 72-hours following a storm event.
2. PRE-RETROFIT ANALYSIS
2.1 Best Management Practices Evaluation Technical Memorandum Geosyntec Consultants conducted a detailed Best Management Practices (BMP) evaluation in order to support the overall pollutant reduction goals for the Black Lake Watershed in Orange County, Florida. The memo documented the efforts and results of the BMP feasibility of three sites owned and selected by Orange County. Siplin Road Pond 6749 was selected due its proximity to Black Lake. The memo suggests the use of Bio-Sorption Activated Media (BAM) filter in this BMP project and provided an analysis for potential BMP design options. See the BMP Evaluation Technical Memo (BMP Tech Memo) located in Appendix J for additional details.
2.2 Existing Pond Functionality
Historical data has shown that the existing pond is not performing as designed and has shown significant groundwater inundation. Ultimately, it is not performing as a dry detention pond. TLP conducted a field visit on June 1st, 2021 and verified the conditions shown from historical aerials, which are consistent with the findings in the BMP Tech Memo. See Appendix F for field visit pictures.
The 6” underdrain is not working properly due to the flow line of the underdrain being lower than the control structure pipe flow line which does not allow for positive outflow.
The survey obtained for the proposed improvements also shows the existing pond bottom to be approximately 1.5-feet lower than was originally designed. The plans for the existing Pond 6749 can be found in Appendix M.
3 POND 6749 RETROFIT (PROPOSED) ANALYSIS
3.1 Proposed Design Analyses
The proposed pond design is a wet detention pond utilizing a side bank BAM filter system and a proposed control structure. This system hydraulically functions properly with positive drainage through the side bank filter and perforated with an invert elevation two feet below the normal water elevation of 98.60-ft and discharges into the proposed control structure. The outfall pipe of the control structure acts as the control elevation with a flowline of 98.60-ft. The PPV was able to be achieved by reconstructing the pond with a
1:4 side slope on the East side and a 1:3 side slope to 2 feet below the normal water elevation on the North, South, and West side. See calculations in Appendix B.
The post-retrofit drainage basin boundary delineations are the same as the existing condition. All outfall locations remain the same as in the pre-development condition. Land use types remain the same as in the pre-development condition. Additionally, the proposed post-development stormwater management system will mimic existing drainage conditions, with the use of BAM filtration system and a pond control structure.
3.2 Stormwater Treatment Volume
Using the total basin area of 7.45 acre and total impervious area of 2.98 the water quality treatment volume was able to be calculated per SJRWMD Application’s Handbook section 22.2. The 1 inch over the basin area calculated to 0.62 ac-ft, and the 2.5 inch over the impervious area calculated to 0.62 ac-ft as well. Accounting for the additional
0.5 inch as stated in section 1.8.2 of this report. The total required pollution abatement volume calculated to 0.93 ac-ft. This set the treatment weir elevation at 101.75-ft, providing a total treatment volume of 0.93 ac-ft of treatment volume. The drawdown orifice for the wet detention pond was sized to be 2.5 inches in diameter to provide a drawdown of the treatment volume within 72 hours (Section 23.3 SJRWMD Application Handbook), providing the drawdown in 59.60 hours. The SJRWMD required PPV for this project is 1.75 ac-ft per SJRWMD Application’s Handbook section 26.1. The proposed pond provides 1.77 ac-ft of PPV.
3.3 Design Storm Events
ICPR Version 4.0 was used to compare the pond’s existing conditions to alternatives conditions with the use of four (4) design storm events. The models used Orange County rainfall distribution curve built-in to ICPR.
a. Mean Annual/24-hour: 4.5 inches of rainfall
b. 10-year/24-hour: 7.5 inches of rainfall
c. 25-year/24-hour: 8.6 inches of rainfall
d. 100-year/24-hour: 10.6 inches of rainfall
3.4 Existing Condition ICRP Analysis
The following Nodes were used for the existing condition ICPR analysis model.
JBL1116 (Pond 6749) – this is the existing dry pond’s stage area node.
JBL1005 (Boundary condition) – this is the project’s boundary condition node and is a time stage node representing the tailwater condition of elevation 98.0.
The following are the components for the existing drop structure used for the existing condition ICPR analysis model.
D_JBL1116 – represents the 15” pipe from the proposed control structure to the boundary condition.
W1 – represents the top grate opening of the control structure.
W2 – represents the eight-inch drawdown orifice.
The following is the existing manual basin data.
B_JBL1116 (Existing basin) – this manual basin represents the existing land cover and drainage areas flowing to the existing dry pond. The hydrograph method is the NRCS unit hydrograph, and the infiltration method is the Green-Ampt method.
3.5 Proposed Condition ICRP Analysis
The following Nodes were used for the proposed condition ICPR analysis model.
Pond 6749 (Proposed wet detention pond) – this is the proposed wet pond’s stage area node.
Gravel Envelope – this is the proposed underdrain/gravel envelope of the system after flowing through the BAM filter.
CS-1 (outfall structure) – this a flow through node representing the outfall structure (CS-1)
Outfall (Boundary condition) – this is the project’s boundary condition node and is a time stage node representing the tailwater condition of elevation 98.0 NAVD88.
The following is the percolation link used for the proposed condition ICPR analysis model.
BAM Filter – represents the Bio Activated Media used for pond drawdown and pollutant removal.
The following are the weirs used for the proposed condition ICPR analysis model.
W1 CS-1 – represents the treatment weir elevation (101.75 NAVD88) and opening of 8” wide by 1.31’ deep.
W2 CS-1 – represents the top grate opening of the control structure.
W3_CS-1_Orifice – represents the . six inch underdrain pipe connection to the control structure with a 2.5” opening for drawdown through the BAM filter.
The following is the pipe used for the proposed condition ICPR analysis model.
P_CS-1 – represents the 18” pipe from the proposed control structure CS- 1 to the boundary condition.
The following is the proposed manual basin data.
B_JBL1116 (Existing basin) – this manual basin represents the existing land cover and drainage areas flowing to Pond 6749. The hydrograph method is the NRCS unit hydrograph, and the infiltration method is the Green-Ampt method.
3.6 Existing Versus Proposed ICPR Analysis
As shown in Table 2a and Table 2b, the proposed pond reduces the peak stages as well as reducing the peak outflows from the pond for the design storm events.
Table 2a. Existing Versus Proposed Pond #6749 Peak Stage Condition Type of Pond Warning
Stage Top of Bank*
Mean Annual -24Hr 10-Yr -24Hr 25-Yr -24Hr 100-Yr -24Hr
Existing Condition
Dry Pond 103.70 101.65 103.01 103.20 103.33
Proposed Conditions
Wet Pond w/ Side bank filter
104.00 100.10 102.09 102.39 102.94
Table 2b. Existing Versus Proposed Pond #6749 Peak Flow
Condition Type of Pond Warning Stage Top of
Bank* Mean Annual -24Hr 10-Yr -24Hr 25-Yr -24Hr 100-Yr -24Hr
Existing Condition
Dry Pond 103.70 1.56 2.52 5.20 8.63
Proposed Conditions
Wet Pond w/ Side bank filter
104.00 0.19 0.80 1.52 3.26
* The east berm is to be regraded to an elevation of 104.00 to provide a minimum 1-ft of free board between the DHW and top of berm.
3.7 BAM System Analysis and Functionality
The proposed wet detention pond design will treat the stormwater through two types of pollutant removal processes. The first of which will be the treatment volume from the normal water level to the designed overflow weir via the control structure (CS-1). The second pollutant removal will provide the drawdown of the pond via flow through the BAM side bank filter system removing pollutants phosphorus and nitrogen. The 6” pipe conveying the drawdown will have a 2.5” orifice at the normal water elevation 98.60. A two-foot-thick BAM layer has been designed to achieve approximately 75% removal of total nitrogen and 95% removal of total phosphorus. Additionally, the PPV will create a settling condition in which the removal of particulates and associated pollutants will increase the proposed pond’s removal efficiency.
The BAM filter surface area is calculated based on manufacturer specifications and uses the water quality volume, a factor of safety of 2, BAM permeability of 0.83 ft/hr and a drawdown time of 72 hours. The minimum BAM media filter surface area calculated to be 1,357.61 square feet. To achieve a 20-year lifespan accounting for orthophosphate adsorption, the surface area was increased to 1,583.87 square feet. Accounting for a minimum of two feet of filter thickness, the minimum volume of BAM filter computed to being 3,167.75 cubic feet. The media filter provided is 3,658.60 cubic feet due to the surface area needed and depth to the 6-inch perforated pipe. The BAM filter surface area provided is 1,650.5 square feet. See Appendix B for details of calculations.
As discussed in the Black Lake Watershed BMP Tech Memo, Section 3.4.1.1, due to the existing pond not functioning as designed and the probable interception of groundwater into the underdrains, the removal efficiencies of the existing conditions are assumed to be zero.
The software program BMP trains was used to analyze the existing versus the proposed total nitrogen and total phosphorus load reductions. The removal efficiency by converting to a wet detention pond with a BAM side bank filter yields a removal efficiency for Total Nitrogen and Total Phosphorus of 80% and 95%, respectively. Table 3 below summarizes the results. The results from BMP Trains can be found in Appendix D.
Table 3 - Annual Removal Rates and Efficiencies
TN TP TN TP
Received 20.06 3.23 44.22 7.12
Removed by Pond 8.29 2.31 18.28 5.09 Removed by BAM Filter 7.81 0.77 17.22 1.70
Total Removed 16.1 3.08 35.49 6.79 Discharged 3.96 0.15 8.73 0.33 % Removal 80% 95% 80% 95%
(kg/yr) (lb/yr) Average Annual
3.8 BAM Filter Maintenance / Replacement
Filter inspection is anticipated to be completed annually to ensure the filter is operating appropriately. The expected service life of the filter is approximately 20-years and will likely need to be replaced at this interval to maintain the required removal efficiencies.
The estimated future cost (assuming 3% inflation per year) is approximately $152,620.57. See Appendix E.
4 STORM DRAIN, POND CONTROL STRUCTURE AND POND
CONSTRUCTION
The proposed pond retrofit design (Alternative 2) consists of removal of the existing 6” underdrain and reconstruction of the pond maintenance berms and side slopes. Additionally, this reconstruction will cause for the removal of two (2) mitered end sections. These mitered end sections will be replaced with proposed mitered ends sections along with 2 manholes and pipe connections to outfall the existing storm sewer systems into the proposed wet detention pond at elevation 96.60 NAVD88 each, 2 feet below the normal water level. The pond’s existing control structure and outfall pipe will be removed and a proposed Type D modified DBI control structure will be constructed with an 18” reinforced concrete pipe outfall and a mitered end section. This control structure will include construction a top grate at elevation
103.0 and a 8”W x 1.31’H overflow weir at the proposed invert elevation 101.75 feet NAVD88 to accommodate the treatment volume required. Additionally, a BAM filter connection will be constructed to the control structure with a 6” PVC pipe capped with a 2.5-inch opening at the connection into the control structure (CS-1). This control structure will also include a skimmer 28”Lx16”Hx61”W. See Appendix B, Pond Design plan sheet.
4.1 Proposed Construction Plans
Due to the disturbed soil area being less than one (1) acre, a stormwater pollution prevention plan is not required. The area of Pond 6749 improvements is approximately
0.70 acres. The Contractor is responsible for submitting an NPDES and de-watering permit for construction.
4.2 Skimmer Head Loss Analysis
During large storm events pond stormwater will enter the modified ditch bottom inlet, Type D control structure through the weir. To analyze if significant rise in the pond’s design high water elevation will occur due to the skimmer’s flow area restricting the weir’s flow, a skimmer head loss analysis was performed. The analysis showed that the skimmer’s flow area was three times larger than the weir flow are The designed skimmer size was within FDOT’s standard index 425-070 at 28” Lx18”Hx61”W.
5 REFERENCES
FDOT Drainage Design Guide – January 2022 FDOT Drainage Manual – January 2022 FDOT Standard Plans – FY 2022-2023 St. Johns River Water Management District Environmental Resource Permit Applicant’s
Handbook 1 and 2 Orange County Code of Ordinances Sec. 34-250 Geosyntec Consultants Black Lake Watershed “Best Management Practices Evaluation Technical
Memorandum”
Siplin Road Pond 6749 Retrofit Contract #Y16-900B – TWO #36 Stormwater Management Report
Appendix A Project Figures
N
SIPLIN RD
FL TURNPIKE
TWO No. 36
PROJECT LOCATION
FIGURE 1
CERT. OF AUTH. #27205
PH: (407) 901-5060
ORLANDO, FL 32801
450 S. ORANGE AVE., SUITE 600
TLP ENGINEERING CONSULTANTS, INC.
Orange County
F L
W COLONIAL DR.
BLACK LAKE
6749 Retrofit
Siplin Road Pond
A V
A L
O N
R
D
D A
N I E
L S
R
D
PROJECT LOCATION
N
MIDDLE SCHOOLINNOVATION
SIPLIN RD
FL TURNPIKE
TWO No. 36
CERT. OF AUTH. #27205
PH: (407) 901-5060
ORLANDO, FL 32801
450 S. ORANGE AVE., SUITE 600
TLP ENGINEERING CONSULTANTS, INC.
Orange County
F L
W COLONIAL DR.
BLACK LAKE
6749 Retrofit
Siplin Road Pond
A V
A L
O N
R
D D A
N I E
L S
R
D
PROJECT LOCATION
EXHIBIT
QUADRANGLE MAP
FIGURE
Tyler Renfro Text Box
FIGURE 2
FIGURE 3A
FIGURE 3B
Appendix B Proposed Calculations
Pond 6749
DATE
MADE BY: TDR 01/24/22
CHECKED BY: BTG 11/01/22
Basin Impervious Pervious Pond Total
98 78 100 87
JBL1116 2.979 4.236 0.232 7.447
2.979 4.236 0.232 7.447
Total Basin Area = 7.45 ac Total Impervious Area = 2.98 ac
Filtration Treatment Volume is larger of:
0.62 ac-ft
0.62 ac-ft
X On-Line Offline 0.31 ac-ft Required Pollution Abatemet Volume (PAV) = 0.93 ac-ft
Elev (ft)
Area (ac)
Avg Area (ac)
∆ Depth (ft)
∆ Storage (ac-ft)
Σ Storage (ac-ft)
104.00 0.4396 1.875
0.40 2.35 0.94
101.65 0.3592 0.936
0.34 1.40 0.47
100.25 0.3113 0.467
0.28 1.65 0.47
98.60 0.2548 0.000
Orifice Diameter = 2.50 in (See Orifice Drawdown) Top of Structure Elev = 103.00 ft
Weir Rise = 1.35 ft (Top of Structure - Weir Elevation)
1/2 Treatment Volume
NWL (LP of Filter Media)
Weir Elev (Treatment Volume)
Top of Slope
BASIN ANALYSIS (PRE/POST): POST
Basin Areas
DESCRIPTION
Land Use 1200 (Subdivision)
Total
WATER QUALITY
1.0'' Over Total Basin Area = 2.5'' Over Treated Impervious Area =
STAGE STORAGE CALCULATION FOR MINIMUM WEIR ELEVATION
Description
BASIN DESIGNATION: Pond 6749
TLP Engineering Consultants, Inc.
PROJECT TITLE: Siplin Road Pond 6749
PROJECT NUMBER: C16900B036 (T201507.36)
2/9/2023
Orifice Drawdown
TLP Engineering Consultants, Inc.
PROJECT TITLE:
PROJECT NUMBER: DATE
BASIN DESIGNATION: MADE BY: TDR 01/03/19
BASIN ANALYSIS (PRE/POST): CHECKED BY: BTG 01/24/22
Based on Q = CA(2gh) .̂5
Orifice Invert= 98.60 SHWT = 98.60 ft b (ft) = 0.5 Treatment Volume Elev = 101.65 ft
A (sq ft)= 0.0341 Treatment Volume = 0.93 ac-ft Diameter (In.)= 2.50
No. Of Orifice(s)= 1 Baseflow = 0 cf/day
0.0000 cfs
Elevation Storage ∆ Storage ∆ Storage H H/b C0 Flow Time ∑ Time ft ac-ft ac-ft c.f. ft cfs hours hours
101.65 0.93
0.09 4051.08 0.152 0.305 0.575 0.27 4.20
101.35 0.84 4.2
0.09 4051.08 0.457 0.915 0.709 0.31 3.60
101.04 0.74 7.8
0.09 4051.08 0.762 1.525 0.709 0.29 3.84
100.74 0.65 11.6
0.09 4051.08 1.067 2.135 0.709 0.27 4.12
100.43 0.56 15.8
0.09 4051.08 1.372 2.745 0.709 0.25 4.48
100.13 0.47 20.2
0.09 4051.08 1.677 3.355 0.709 0.23 4.95
99.82 0.37 25.2
0.09 4051.08 1.982 3.965 0.709 0.20 5.62
99.52 0.28 30.8
0.09 4051.08 2.287 4.575 0.709 0.17 6.64
99.21 0.19 37.5
0.09 4051.08 2.593 5.185 0.709 0.13 8.58
98.91 0.09 46.0
0.09 4051.08 2.898 5.795 0.709 0.08 14.86
98.60 0.00 60.9
Pond 6749
Siplin Road Pond 6749 C16900B036 (T201507.36)
POST
SJRWMD criteria is for the design to provide for the drawdown of the treatment volume specified within 72 hours following a storm event.
DATE
MADE BY: BTG 01/03/19
CHECKED B TDR 01/24/22
SJRWMD Section 26.1 Calculating Permanent Pool Volumes
Minimum Permanent Pool Volume (PPVmin) = (RT)(FR) 0.89 ac-ft Equation 26-2 Residence Time (RT) = 21 days
Average Flow Rate (FR) = 0.04 ac-ft/day
Average Flow Rate (FR) = [(DA)( C)( R)]/(WS) = 0.04 ac-ft/day Equation 26-3
Drainage Area to Pond (DA) = 7.45 ac Runoff Coefficient ( C) = 0.32 Harper & Baker 2007
Wet Season Rainfall Depth ( R) = 33.05 in NWS, 2020 Length of Wet Season (WS) = 153 days
PPVactual = 1.77 ac-ft MEETS PPV CRITERIA 10' Maintenance Berm, 1:4 to 96.60, 1:2 to pond bottom, then 1:3 on west side for PPV
Elev (ft)
Area (ac)
Avg Area (ac)
∆ Depth (ft)
∆ Storage (ac-ft)
Σ Storage (ac-ft)
98.60 0.2548 1.77
0.23 2.00 0.45
96.60 0.1978 1.32
0.13 10.00 1.32
86.60 0.0657 0.00
Mean Depth (MD) = PPV / Ap 6.95 ft MEETS MEAN DEPTH CRITERIA PPVactual = 1.77 ac-ft
Area at Control Elevation (Ap) = 0.25 ac
Actual Residence Time Per PPVactual = 41.77 days
BASIN DESIGNATION: Pond 6749
TLP Engineering Consultants, Inc.
PROJECT TITLE: Siplin Road Pond 6749
PROJECT NUMBER: C16900B036 (T201507.36)
1:2 to 1:3/1:4
Bottom
BASIN ANALYSIS (PRE/POST): POST
Permanent Pool Volume
Description
NWL (LP of Filter Media)
PROJECT TITLE:
PROJECT NUMBER: DATE
BASIN DESIGNATION: MADE BY: TDR 01/03/19
BASIN ANALYSIS (PRE/POST): CHECKED B BTG 01/24/22
WQ(v) 40,510.96 ft^3 Factor of Safety FS 2 ft^3 Laboratory permeability of filter media K (fm) 0.83 ft/hr Required drawdown time t 72 hr
Minimum Surface area of filter media sF(fm) 1,355.79 ft^2 BAM surface area increase for 20 year lifespan sF(fm) (20yr) 1,626.95 ft^2 Volume of Media filter minimum (surface area filter *2') V(media) 3,253.89
#57 Stone, Double Washed 2,904.00 ft^3 ft^2
Minimum Provided Treatment Elev = 101.65
NWL = 98.60
Depth (ft) = 3.05 3.32
Horizontal Width (ft) = 12.20 13.26 Slope (H:V) 4:1 4:1 idth (CL of BAM along slope) (ft) = 12.58 13.67 Length of Filter around Pond (ft) = 129.37 120.00
Surface Area for BAM (SF) = 1626.95 1640.17 Thickness of BAM (ft) = 2.00 2.00
Cross Sectional Area of BAM (SF) = 25.15 27.98 Volume of BAM (CF) = 3253.89 3357.60 rea; Cover Layer (#57 Stone) (SF) = 9.24 a; Bottom Layer (#57 Stone) (SF) = 14.96
Water Quality Volume (0.93 ac-ft)
Siplin Road Pond 6749 C16900B036 (T201507.36) Pond 6749
POST
Media filter surface area provided
1,640.2
Meda filter provided * 3,357.60
* extra media filter due to surface area needed and depth to perforated pipe
TLP Engineering Consultants, Inc.
Skimmer Check
PROJECT TITLE:
PROJECT NUMBER: DATE
BASIN DESIGNATION: MADE BY: TDR 01/03/19
BASIN ANALYSIS (PRE/POST): CHECKED BY: BTG 01/24/22
Skimmer Head Loss Analysis Skimmer Check (FDOT Index 425-070): Control Structure = DBI TYPE D
Design Note 2: Check flow area beneath skimmer must be 3 times larger than the area of Weir.
Weir Dimenstions: Skimmer Dimension Diagram:
Rise 16.20 inches Span 9.00 inches
Skimmer Dimensions:
Length, L 28.00 inches W L Height, H 18.00 inches H Width, W 61.00 inches X
Note: Width based on Pre-Cast Contruction Wall Thickness of 6".
Effective Length, X = L - Bolt Pattern Bolt Pattern = 7" + 4" + 1.5" = 12.5 inches
Note:
X = 15.50 inches
Flow Area of Weir = 1.01 sf
Required Flow Area Beneath Skimmer = 3.04 sf
Actual Flow Area Beneath Skimmer = 6.57 sf OK
C16900B036 (T201507.36)
TLP Engineering Consultants, Inc.
Siplin Road Pond 6749
Pond 6749
POST
Use index 425-070.
Appendix C ICPR Reports
DESIGN PLANS FOR:
BY DESCRIPTIONDATE
SHEET
NO.
PROJECT NO.
BY DESCRIPTIONDATE
REVISIONS
PROJECT NAME
J:\PROJECTS\T201507 - Orange County Cont SvcsY16-900 B\_TWO36_POND6749\_POND6749\drainage\Report_Exhibits\Nodal Diagram\PDPLRD01_NodalDiagram.dgnBrent Gillette 2/9/2023 12:24:39 PM Default
POND 6749 RETROFIT
SIPLIN ROAD POND 6749 RETROFIT
BRENT GILLETTE, P.E. 72355
PH. 407-901-5060
ORLANDO, FL. 32801
450 S. ORANGE AVENUE, SUITE 600
TLP ENGINEERING CONSULTANTS, INC.
JBL1005
NODE REACH
LEGEND
BASIN
FLOW DIRECTION
EXISTING
NODAL_DIAGRAM
B_JBL1116
JBL1116
D_JBL1116
W1
W2
15" PIPE
Pond 6749 - Existing 1
C:\Users\Brent Gillette\Desktop\ICPR4 Projects\TWO36 - Pond 6749\Proposed\ 2/9/2023 15:41
Manual Basin: B_JBL1116 Scenario: Existing
Node: JBL1116 (Pond 6749) Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: GreenAmpt
Time of Concentration: 9.0000 min Max Allowable Q: 9999999.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 7.4472 ac
Area [ac] Land Cover Zone Soil Zone Rainfall Name Crop Coefficient Zone
Reference ET Station
0.1115 1200 323159 ~ORANGE
0.0247 1200 323159 ~ORANGE
2.9051 1200 323159 ~ORANGE
0.0046 1200 323151 ~ORANGE
0.3458 1200 323143 ~ORANGE
2.0083 1200 323162 ~ORANGE
1.9016 1200 323161 ~ORANGE
0.1455 1200 323151 ~ORANGE
Comment:
Node: JBL1005 (Outfall) Scenario: Existing
Type: Time/Stage Base Flow: 0.00 cfs
Initial Stage: 98.00 ft Warning Stage: 100.09 ft
Boundary Stage:
Year Month Day Hour Stage [ft] 0 0 0 0.0000 98.00 0 0 0 999999.0000 98.00
Comment: Tailwater set at surveyed seasonal high water elevation at the discharge location. Warning Stage set at maximum stage during 100-year/24-hour storm from the Lake Apopka model noted in the Geosyntec Black Lake Watershed Best Management Practices Evaluation Technical Memorandum.
Node: JBL1116 (Pond 6749) Scenario: Existing
Type: Stage/Volume Base Flow: 0.00 cfs
Initial Stage: 99.40 ft
Pond 6749 - Existing 2
Warning Stage: 103.00 ft
Stage [ft] Volume [ac-ft] Volume [ft3]
99.09 0.2600 11326
100.00 0.3000 13068
101.00 0.3300 14375
102.00 0.3800 16553
103.00 0.4200 18295
103.70 0.4600 20038
Comment: Surveyed water elevation at 99.4 and minimum top of bank found on East side at 103.7.
Drop Structure Link: D_JBL1116 Scenario: Existing
From Node: JBL1116 (Pond 6749)
To Node: JBL1005 (Outfall) Link Count: 1
Flow Direction: Both Solution: Combine
Increments: 0 Pipe Count: 1
Damping: 0.0000 ft Length: 51.00 ft
FHWA Code: 4 Entr Loss Coef: 0.50 Exit Loss Coef: 0.00
Bend Loss Coef: 0.00 Bend Location: 0.00 dec Energy Switch: Energy
Upstream Pipe Downstream Pipe Invert: 99.34 ft Invert: 97.88 ft
Manning's N: 0.0120 Manning's N: 0.0120 Geometry: Circular Geometry: Circular
Max Depth: 1.25 ft Max Depth: 1.25 ft Bottom Clip
Default: 0.00 ft Default: 0.00 ft Op Table: Op Table:
Ref Node: Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000 Top Clip
Default: 0.00 ft Default: 0.00 ft Op Table: Op Table:
Ref Node: Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Pipe Comment: Existing 15" Pipe from Control Structure to MES Oufall
Weir Component Weir: 1
Weir Count: 1 Weir Flow Direction: Both
Damping: 0.0000 ft Weir Type: Sharp Crested Vertical
Geometry Type: Circular Invert: 100.47 ft
Control Elevation: 100.47 ft Max Depth: 0.67 ft
Bottom Clip Default: 0.00 ft
Op Table:
Ref Node:
Top Clip Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200 Weir Table:
Orifice Default: 0.600 Orifice Table:
Weir Comment: 8" orifice with elbow drop for weed control. Orifice invert into control structure is at 100.47. Elbow elevation
Pond 6749 - Existing 3 outside of control structure invert is 100.19.
Weir Component Weir: 2
Weir Count: 1 Weir Flow Direction: Both
Damping: 0.0000 ft Weir Type: Horizontal
Geometry Type: Rectangular Invert: 103.06 ft
Control Elevation: 103.06 ft Max Depth: 4.50 ft Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip Default: 0.00 ft
Op Table:
Ref Node:
Top Clip Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200 Weir Table:
Orifice Default: 0.600 Orifice Table:
Weir Comment: Grate elevation of control structure.
Drop Structure Comment:
Pond 6749 - Existing 4
Simulation: 100YR24HR Scenario: Existing
Run Date/Time: 2/9/2023 3:25:10 PM Program Version: ICPR4 4.07.08
General Run Mode: Normal
Year Month Day Hour [hr] Start Time: 0 0 0 0.0000 End Time: 0 0 0 30.0000
Hydrology [sec] Surface Hydraulics [sec]
Groundwater [sec]
Min Calculation Time: 60.0000 0.1000 900.0000 Max Calculation Time: 30.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 15.0000 0 0 0 10.0000 5.0000 0 0 0 14.0000 15.0000 0 0 0 30.0000 15.0000
Surface Hydraulics
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 5.0000
Groundwater
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 60.0000
Restart File Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables Rainfall Folder: Boundary Stage Set:
Reference ET Folder: Extern Hydrograph Set:
Unit Hydrograph
Folder:
Curve Number Set:
Green-Ampt Set: SiplinRd Vertical Layers Set:
Impervious Set: Impervious
Pond 6749 - Existing 5
Roughness Set:
Crop Coef Set:
Fillable Porosity Set:
Conductivity Set:
Leakage Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr Max Iterations: 6 ET for Manual Basins: False
Over-Relax Weight Fact:
0.5 dec dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Opt:
Global
Max dZ: 1.0000 ft OF Region Rain Opt: Global Link Optimizer Tol: 0.0001 ft Rainfall Name: ~ORANGE
Rainfall Amount: 10.60 in Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (2D): 0.0050 ft Dflt Damping (1D): 0.0050 ft Min Node Srf Area
(2D):
100 ft2 Min Node Srf Area
(1D):
100 ft2
Energy Switch (2D): Energy Energy Switch (1D): Energy
Comment:
Pond 6749 - Existing 6
Green-Ampt: SiplinRd [Set]
Soil Zone Kv Saturated [fpd]
MC Saturated [dec]
MC Residual [dec]
MC Initial [dec] MC Field [dec] MC Wilting [dec]
323133 16.314 0.4146 0.0145 0.0880 0.0880 0.0290 323135 8.464 0.4354 0.0415 0.1650 0.1650 0.0830 323139 21.203 0.4123 0.0140 0.0860 0.0860 0.0280 323143 25.664 0.4103 0.0190 0.1050 0.1050 0.0380 323148 46.365 0.4613 0.0105 0.0740 0.0740 0.0210 323151 19.390 0.4236 0.0150 0.0910 0.0910 0.0300 323155 25.322 0.5085 0.0475 0.2510 0.2510 0.0950 323156 25.740 0.7258 0.0402 0.4990 0.4990 0.2450 323157 26.079 0.5073 0.0510 0.2480 0.2480 0.1150 323159 24.296 0.4420 0.0225 0.1060 0.1060 0.0450 323161 26.084 0.4420 0.0080 0.0680 0.0680 0.0160 323162 25.720 0.4420 0.0150 0.0920 0.0920 0.0300 323167 22.233 0.4525 0.0355 0.1500 0.1500 0.0710
Soil Zone Pore Size Index [dec]
Bubble Pressure [in]
Allow Recharge WT Initial [ft] Layer Thickness [ft]
# of Cells per Layer
323133 0.53 1.357 No 1.84 0.00 0 323135 0.33 2.526 No 3.71 0.00 0 323139 0.57 1.397 No 1.05 0.00 0 323143 0.55 1.392 No 0.30 0.00 0 323148 0.56 1.204 No 4.17 0.00 0 323151 0.54 1.304 No 1.12 0.00 0 323155 0.51 0.880 No 0.03 0.00 0 323156 0.55 0.496 No 0.10 0.00 0 323157 0.51 0.812 No 0.39 0.00 0 323159 0.53 1.214 No 1.77 0.00 0 323161 0.56 1.254 No 4.13 0.00 0 323162 0.53 1.220 No 4.59 0.00 0 323167 0.46 1.304 No 0.98 0.00 0
Pond 6749 - Existing 7
Impervious: Impervious [Set]
Land Cover Zone % Impervious % DCIA % Direct Ia Impervious [in] Ia Pervious [in] 1200 40.00 20.00 0.00 0.000 0.000 2210 0.00 0.00 0.00 0.000 0.000 6300 0.00 0.00 0.00 0.000 0.000
Manual Basin Runoff Summary [Existing] Basin Name
Sim Name Max Flow [cfs]
Time to Max Flow [hrs]
Total Rainfall [in]
Total Runoff [in]
Area [ac] Equivalent Curve Number
% Imperv % DCIA
B_JBL111
010YR24H
R
3.25 10.0500 7.50 2.51 7.4472 55.7 40.00 20.00
B_JBL111
025YR24H
R
5.20 10.0000 8.60 3.15 7.4472 54.6 40.00 20.00
B_JBL111
100YR24H
R
8.67 9.0333 10.60 4.31 7.4472 52.4 40.00 20.00
B_JBL111
_MA24HR 1.64 8.8333 4.50 1.06 7.4472 60.6 40.00 20.00
Pond 6749 - Existing 8
Node Max Conditions w/ Times [Existing] Node Name
Sim Name
Warning Stage [ft]
Max Stage [ft]
Min/Max Delta Stage [ft]
Max Total Inflow [cfs]
Max Total Outflow [cfs]
Max Surface Area [ft2]
Time to Max Stage [hr]
Time to Min/Max Delta Stage [hr]
Time to Max Total Inflow [hr]
Time to Max Total Outflow [hr]
JBL1116
(Pond 6749)
010YR2
4HR
103.00 103.01 0.0010 3.25 2.52 2126 9.1682 8.1571 10.0505 9.1656
JBL1116
(Pond 6749)
025YR2
4HR
103.00 103.20 0.0010 5.20 5.20 2333 10.0099 7.0320 10.0015 10.0099
JBL1116
(Pond 6749)
100YR2
4HR
103.00 103.33 -0.0010 8.66 8.63 2468 9.0499 14.0731 9.0304 9.0451
JBL1116
(Pond 6749)
_MA24H
R
103.00 101.65 0.0010 1.64 1.56 2012 9.0779 4.3870 8.8361 9.0779
Existing Pond 6749 Mass Balance
Scenario Sim Relative Time
[hrs] Total Inflow
Volume [ac_ft] Total Outflow Volume [ac_ft]
% Error (By Inflow) [%]
Existing 025YR24HR 0.0000 0.0000 0.0000 0.0000 Existing 025YR24HR 0.0834 0.0000 0.0000 0.0000 Existing 025YR24HR 0.1675 0.0001 0.0000 0.0000 Existing 025YR24HR 0.2511 0.0002 0.0000 0.0000 Existing 025YR24HR 0.3340 0.0003 0.0000 0.0000 Existing 025YR24HR 0.4183 0.0004 0.0000 0.0000 Existing 025YR24HR 0.5050 0.0006 0.0000 0.0000 Existing 025YR24HR 0.5895 0.0008 0.0000 0.0000 Existing 025YR24HR 0.6714 0.0009 0.0000 0.0000 Existing 025YR24HR 0.7527 0.0011 0.0000 0.0000 Existing 025YR24HR 0.8361 0.0013 0.0000 0.0000 Existing 025YR24HR 0.9194 0.0014 0.0000 0.0000 Existing 025YR24HR 1.0027 0.0016 0.0000 0.0000 Existing 025YR24HR 1.0861 0.0018 0.0000 0.0000 Existing 025YR24HR 1.1694 0.0020 0.0000 0.0000 Existing 025YR24HR 1.2527 0.0021 0.0000 0.0000 Existing 025YR24HR 1.3361 0.0023 0.0000 0.0000 Existing 025YR24HR 1.4194 0.0025 0.0000 0.0000 Existing 025YR24HR 1.5027 0.0027 0.0000 0.0000 Existing 025YR24HR 1.5861 0.0029 0.0000 0.0000 Existing 025YR24HR 1.6727 0.0033 0.0000 0.0000 Existing 025YR24HR 1.7541 0.0039 0.0000 0.0000 Existing 025YR24HR 1.8376 0.0046 0.0000 0.0000 Existing 025YR24HR 1.9177 0.0053 0.0000 0.0000 Existing 025YR24HR 2.0026 0.0061 0.0000 0.0000 Existing 025YR24HR 2.0852 0.0070 0.0000 0.0000 Existing 025YR24HR 2.1690 0.0079 0.0000 0.0000 Existing 025YR24HR 2.2526 0.0088 0.0000 0.0000 Existing 025YR24HR 2.3337 0.0096 0.0000 0.0000 Existing 025YR24HR 2.4198 0.0105 0.0000 0.0000 Existing 025YR24HR 2.5025 0.0114 0.0000 0.0000 Existing 025YR24HR 2.5857 0.0123 0.0000 0.0000 Existing 025YR24HR 2.6671 0.0134 0.0000 0.0000 Existing 025YR24HR 2.7512 0.0146 0.0000 0.0000 Existing 025YR24HR 2.8353 0.0158 0.0000 0.0000 Existing 025YR24HR 2.9177 0.0171 0.0000 0.0000 Existing 025YR24HR 3.0007 0.0185 0.0000 0.0000 Existing 025YR24HR 3.0837 0.0199 0.0000 0.0100 Existing 025YR24HR 3.1676 0.0216 0.0000 0.0100 Existing 025YR24HR 3.2505 0.0235 0.0000 0.0100 Existing 025YR24HR 3.3334 0.0255 0.0000 0.0100 Existing 025YR24HR 3.4176 0.0276 0.0000 0.0100 Existing 025YR24HR 3.5005 0.0298 0.0000 0.0100
Scenario Sim Relative Time
[hrs] Total Inflow
Volume [ac_ft] Total Outflow Volume [ac_ft]
% Error (By Inflow) [%]
Existing 025YR24HR 3.5844 0.0320 0.0000 0.0100 Existing 025YR24HR 3.6678 0.0344 0.0000 0.0100 Existing 025YR24HR 3.7506 0.0369 0.0000 0.0000 Existing 025YR24HR 3.8339 0.0394 0.0000 0.0000 Existing 025YR24HR 3.9175 0.0420 0.0000 0.0000 Existing 025YR24HR 4.0005 0.0446 0.0000 0.0000 Existing 025YR24HR 4.0837 0.0472 0.0001 0.0100 Existing 025YR24HR 4.1669 0.0502 0.0006 0.0100 Existing 025YR24HR 4.2505 0.0534 0.0014 0.0200 Existing 025YR24HR 4.3341 0.0568 0.0028 0.0300 Existing 025YR24HR 4.4173 0.0602 0.0046 0.0400 Existing 025YR24HR 4.5011 0.0638 0.0068 0.0500 Existing 025YR24HR 4.5861 0.0675 0.0094 0.0600 Existing 025YR24HR 4.6680 0.0712 0.0122 0.0700 Existing 025YR24HR 4.7539 0.0751 0.0155 0.0700 Existing 025YR24HR 4.8368 0.0789 0.0187 0.0800 Existing 025YR24HR 4.9186 0.0826 0.0221 0.0800 Existing 025YR24HR 5.0006 0.0864 0.0256 0.0900 Existing 025YR24HR 5.0863 0.0904 0.0294 0.0900 Existing 025YR24HR 5.1695 0.0944 0.0331 0.0900 Existing 025YR24HR 5.2528 0.0985 0.0369 0.1000 Existing 025YR24HR 5.3361 0.1028 0.0408 0.1000 Existing 025YR24HR 5.4195 0.1072 0.0449 0.1100 Existing 025YR24HR 5.5028 0.1117 0.0490 0.1100 Existing 025YR24HR 5.5861 0.1162 0.0533 0.1100 Existing 025YR24HR 5.6695 0.1209 0.0576 0.1100 Existing 025YR24HR 5.7528 0.1256 0.0621 0.1100 Existing 025YR24HR 5.8361 0.1303 0.0666 0.1100 Existing 025YR24HR 5.9195 0.1351 0.0712 0.1100 Existing 025YR24HR 6.0028 0.1399 0.0758 0.1100 Existing 025YR24HR 6.0855 0.1449 0.0805 0.1100 Existing 025YR24HR 6.1673 0.1512 0.0854 0.1100 Existing 025YR24HR 6.2509 0.1589 0.0909 0.1100 Existing 025YR24HR 6.3341 0.1672 0.0970 0.1100 Existing 025YR24HR 6.4173 0.1760 0.1037 0.1100 Existing 025YR24HR 6.5004 0.1852 0.1111 0.1100 Existing 025YR24HR 6.5849 0.1948 0.1192 0.1100 Existing 025YR24HR 6.6667 0.2046 0.1274 0.1000 Existing 025YR24HR 6.7520 0.2153 0.1362 0.1000 Existing 025YR24HR 6.8336 0.2257 0.1450 0.1000 Existing 025YR24HR 6.9182 0.2367 0.1544 0.0900 Existing 025YR24HR 7.0001 0.2474 0.1638 0.0900 Existing 025YR24HR 7.0834 0.2586 0.1735 0.0900
Scenario Sim Relative Time
[hrs] Total Inflow
Volume [ac_ft] Total Outflow Volume [ac_ft]
% Error (By Inflow) [%]
Existing 025YR24HR 7.1677 0.2706 0.1836 0.0900 Existing 025YR24HR 7.2511 0.2832 0.1940 0.0800 Existing 025YR24HR 7.3343 0.2963 0.2047 0.0800 Existing 025YR24HR 7.4175 0.3097 0.2157 0.0800 Existing 025YR24HR 7.5006 0.3233 0.2270 0.0800 Existing 025YR24HR 7.5838 0.3372 0.2386 0.0800 Existing 025YR24HR 7.6675 0.3523 0.2507 0.0700 Existing 025YR24HR 7.7504 0.3684 0.2631 0.0700 Existing 025YR24HR 7.8335 0.3853 0.2759 0.0700 Existing 025YR24HR 7.9170 0.4026 0.2893 0.0700 Existing 025YR24HR 8.0002 0.4202 0.3031 0.0600 Existing 025YR24HR 8.0838 0.4385 0.3173 0.0600 Existing 025YR24HR 8.1670 0.4582 0.3320 0.0600 Existing 025YR24HR 8.2503 0.4791 0.3472 0.0600 Existing 025YR24HR 8.3337 0.5009 0.3629 0.0600 Existing 025YR24HR 8.4173 0.5232 0.3793 0.0500 Existing 025YR24HR 8.5004 0.5457 0.3960 0.0500 Existing 025YR24HR 8.5837 0.5685 0.4133 0.0500 Existing 025YR24HR 8.6668 0.5914 0.4327 0.0600 Existing 025YR24HR 8.7524 0.6150 0.4558 0.0600 Existing 025YR24HR 8.8368 0.6384 0.4791 0.0600 Existing 025YR24HR 8.9209 0.6616 0.5024 0.0600 Existing 025YR24HR 9.0005 0.6837 0.5244 0.0600 Existing 025YR24HR 9.0836 0.7063 0.5472 0.0500 Existing 025YR24HR 9.1691 0.7276 0.5695 0.0400 Existing 025YR24HR 9.2541 0.7475 0.5899 0.0300 Existing 025YR24HR 9.3348 0.7689 0.6099 0.0400 Existing 025YR24HR 9.4170 0.7958 0.6348 0.0500 Existing 025YR24HR 9.5026 0.8274 0.6652 0.0600 Existing 025YR24HR 9.5834 0.8591 0.6964 0.0600 Existing 025YR24HR 9.6702 0.8942 0.7312 0.0600 Existing 025YR24HR 9.7522 0.9281 0.7648 0.0600 Existing 025YR24HR 9.8334 0.9622 0.7987 0.0700 Existing 025YR24HR 9.9186 0.9985 0.8349 0.0700 Existing 025YR24HR 10.0015 1.0341 0.8703 0.0700 Existing 025YR24HR 10.0842 1.0688 0.9055 0.0600 Existing 025YR24HR 10.1678 1.0996 0.9378 0.0500 Existing 025YR24HR 10.2517 1.1263 0.9658 0.0400 Existing 025YR24HR 10.3365 1.1504 0.9910 0.0300 Existing 025YR24HR 10.4216 1.1729 1.0142 0.0300 Existing 025YR24HR 10.5013 1.1928 1.0346 0.0200 Existing 025YR24HR 10.5882 1.2137 1.0559 0.0200 Existing 025YR24HR 10.6726 1.2336 1.0760 0.0100
Scenario Sim Relative Time
[hrs] Total Inflow
Volume [ac_ft] Total Outflow Volume [ac_ft]
% Error (By Inflow) [%]
Existing 025YR24HR 10.7550 1.2529 1.0954 0.0100 Existing 025YR24HR 10.8383 1.2725 1.1150 0.0100 Existing 025YR24HR 10.9216 1.2921 1.1346 0.0100 Existing 025YR24HR 11.0050 1.3117 1.1542 0.0100 Existing 025YR24HR 11.0860 1.3302 1.1731 0.0100 Existing 025YR24HR 11.1684 1.3472 1.1913 0.0100 Existing 025YR24HR 11.2501 1.3623 1.2084 0.0100 Existing 025YR24HR 11.3339 1.3769 1.2258 0.0100 Existing 025YR24HR 11.4170 1.3906 1.2428 0.0100 Existing 025YR24HR 11.5001 1.4038 1.2595 0.0100 Existing 025YR24HR 11.5839 1.4166 1.2760 0.0100 Existing 025YR24HR 11.6668 1.4285 1.2920 0.0100 Existing 025YR24HR 11.7503 1.4397 1.3078 0.0100 Existing 025YR24HR 11.8335 1.4506 1.3231 0.0000 Existing 025YR24HR 11.9170 1.4613 1.3380 0.0000 Existing 025YR24HR 12.0001 1.4717 1.3524 0.0000 Existing 025YR24HR 12.0844 1.4823 1.3666 0.0000 Existing 025YR24HR 12.1677 1.4932 1.3803 0.0000 Existing 025YR24HR 12.2501 1.5042 1.3936 0.0000 Existing 025YR24HR 12.3344 1.5156 1.4069 0.0000 Existing 025YR24HR 12.4168 1.5270 1.4198 0.0000 Existing 025YR24HR 12.5015 1.5387 1.4328 0.0000 Existing 025YR24HR 12.5840 1.5502 1.4454 0.0000 Existing 025YR24HR 12.6692 1.5620 1.4583 0.0000 Existing 025YR24HR 12.7501 1.5731 1.4704 0.0000 Existing 025YR24HR 12.8339 1.5846 1.4827 0.0000 Existing 025YR24HR 12.9193 1.5962 1.4953 0.0000 Existing 025YR24HR 13.0028 1.6076 1.5074 0.0000 Existing 025YR24HR 13.0853 1.6186 1.5193 0.0000 Existing 025YR24HR 13.1679 1.6287 1.5310 0.0000 Existing 025YR24HR 13.2509 1.6380 1.5426 0.0000 Existing 025YR24HR 13.3334 1.6467 1.5537 0.0000 Existing 025YR24HR 13.4173 1.6552 1.5647 0.0000 Existing 025YR24HR 13.5011 1.6634 1.5753 0.0000 Existing 025YR24HR 13.5834 1.6713 1.5854 0.0000 Existing 025YR24HR 13.6682 1.6792 1.5955 0.0000 Existing 025YR24HR 13.7514 1.6869 1.6050 0.0000 Existing 025YR24HR 13.8352 1.6945 1.6143 0.0000 Existing 025YR24HR 13.9192 1.7021 1.6233 0.0000 Existing 025YR24HR 14.0024 1.7096 1.6320 0.0000 Existing 025YR24HR 14.0849 1.7167 1.6404 0.0000 Existing 025YR24HR 14.1676 1.7226 1.6485 0.0000 Existing 025YR24HR 14.2502 1.7276 1.6559 0.0000
Scenario Sim Relative Time
[hrs] Total Inflow
Volume [ac_ft] Total Outflow Volume [ac_ft]
% Error (By Inflow) [%]
Existing 025YR24HR 14.3344 1.7320 1.6626 0.0000 Existing 025YR24HR 14.4169 1.7358 1.6685 0.0000 Existing 025YR24HR 14.5010 1.7395 1.6740 0.0000 Existing 025YR24HR 14.5845 1.7430 1.6790 0.0000 Existing 025YR24HR 14.6674 1.7464 1.6835 0.0000 Existing 025YR24HR 14.7527 1.7499 1.6878 -0.0100 Existing 025YR24HR 14.8372 1.7534 1.6919 -0.0100 Existing 025YR24HR 14.9191 1.7569 1.6957 -0.0100 Existing 025YR24HR 15.0020 1.7604 1.6994 -0.0100 Existing 025YR24HR 15.0903 1.7640 1.7033 -0.0100 Existing 025YR24HR 15.1713 1.7669 1.7068 -0.0100 Existing 025YR24HR 15.2538 1.7696 1.7101 -0.0100 Existing 025YR24HR 15.3373 1.7721 1.7133 -0.0100 Existing 025YR24HR 15.4206 1.7745 1.7162 -0.0100 Existing 025YR24HR 15.5030 1.7767 1.7190 -0.0100 Existing 025YR24HR 15.5847 1.7788 1.7216 -0.0100 Existing 025YR24HR 15.6705 1.7812 1.7242 -0.0100 Existing 025YR24HR 15.7539 1.7835 1.7266 -0.0100 Existing 025YR24HR 15.8372 1.7860 1.7291 -0.0100 Existing 025YR24HR 15.9205 1.7884 1.7315 -0.0100 Existing 025YR24HR 16.0039 1.7909 1.7340 -0.0100 Existing 025YR24HR 16.0872 1.7934 1.7364 -0.0100 Existing 025YR24HR 16.1705 1.7958 1.7389 -0.0100 Existing 025YR24HR 16.2539 1.7980 1.7413 -0.0100 Existing 025YR24HR 16.3372 1.8002 1.7437 -0.0100 Existing 025YR24HR 16.4205 1.8024 1.7460 -0.0100 Existing 025YR24HR 16.5039 1.8045 1.7483 -0.0100 Existing 025YR24HR 16.5872 1.8066 1.7505 -0.0100 Existing 025YR24HR 16.6705 1.8089 1.7527 -0.0100 Existing 025YR24HR 16.7539 1.8113 1.7550 -0.0100 Existing 025YR24HR 16.8372 1.8138 1.7573 -0.0100 Existing 025YR24HR 16.9205 1.8163 1.7596 -0.0100 Existing 025YR24HR 17.0039 1.8189 1.7620 -0.0100 Existing 025YR24HR 17.0872 1.8215 1.7645 -0.0100 Existing 025YR24HR 17.1705 1.8242 1.7670 -0.0100 Existing 025YR24HR 17.2539 1.8267 1.7695 -0.0100 Existing 025YR24HR 17.3372 1.8293 1.7721 -0.0100 Existing 025YR24HR 17.4205 1.8319 1.7746 -0.0100 Existing 025YR24HR 17.5039 1.8345 1.7772 -0.0100 Existing 025YR24HR 17.5872 1.8370 1.7798 -0.0100 Existing 025YR24HR 17.6705 1.8394 1.7823 -0.0100 Existing 025YR24HR 17.7539 1.8417 1.7848 -0.0100 Existing 025YR24HR 17.8372 1.8439 1.7872 -0.0100
Scenario Sim Relative Time
[hrs] Total Inflow
Volume [ac_ft] Total Outflow Volume [ac_ft]
% Error (By Inflow) [%]
Existing 025YR24HR 17.9205 1.8460 1.7896 -0.0100 Existing 025YR24HR 18.0039 1.8481 1.7918 -0.0100 Existing 025YR24HR 18.0872 1.8502 1.7941 -0.0100 Existing 025YR24HR 18.1705 1.8525 1.7963 -0.0100 Existing 025YR24HR 18.2539 1.8548 1.7986 -0.0100 Existing 025YR24HR 18.3372 1.8572 1.8008 -0.0100 Existing 025YR24HR 18.4205 1.8597 1.8032 -0.0100 Existing 025YR24HR 18.5039 1.8622 1.8055 -0.0100 Existing 025YR24HR 18.5872 1.8647 1.8079 -0.0100 Existing 025YR24HR 18.6705 1.8670 1.8103 -0.0100 Existing 025YR24HR 18.7539 1.8693 1.8127 -0.0100 Existing 025YR24HR 18.8372 1.8715 1.8150 -0.0100 Existing 025YR24HR 18.9205 1.8737 1.8173 -0.0100 Existing 025YR24HR 19.0039 1.8758 1.8196 -0.0100 Existing 025YR24HR 19.0872 1.8778 1.8218 -0.0100 Existing 025YR24HR 19.1705 1.8797 1.8240 -0.0100 Existing 025YR24HR 19.2539 1.8815 1.8261 -0.0100 Existing 025YR24HR 19.3372 1.8832 1.8281 -0.0100 Existing 025YR24HR 19.4205 1.8849 1.8300 -0.0100 Existing 025YR24HR 19.5039 1.8865 1.8318 -0.0100 Existing 025YR24HR 19.5872 1.8881 1.8336 -0.0100 Existing 025YR24HR 19.6705 1.8898 1.8354 -0.0100 Existing 025YR24HR 19.7539 1.8917 1.8371 -0.0100 Existing 025YR24HR 19.8372 1.8936 1.8389 -0.0100 Existing 025YR24HR 19.9205 1.8957 1.8408 -0.0100 Existing 025YR24HR 20.0039 1.8977 1.8427 -0.0100 Existing 025YR24HR 20.0872 1.8997 1.8446 -0.0100 Existing 025YR24HR 20.1705 1.9014 1.8465 -0.0100 Existing 025YR24HR 20.2539 1.9029 1.8484 -0.0100 Existing 025YR24HR 20.3364 1.9042 1.8501 -0.0100 Existing 025YR24HR 20.4205 1.9055 1.8518 -0.0100 Existing 025YR24HR 20.5039 1.9067 1.8533 -0.0100 Existing 025YR24HR 20.5872 1.9078 1.8547 -0.0100 Existing 025YR24HR 20.6705 1.9090 1.8561 -0.0100 Existing 025YR24HR 20.7539 1.9104 1.8575 -0.0100 Existing 025YR24HR 20.8372 1.9118 1.8589 -0.0100 Existing 025YR24HR 20.9205 1.9132 1.8603 -0.0100 Existing 025YR24HR 21.0039 1.9147 1.8617 -0.0100 Existing 025YR24HR 21.0872 1.9161 1.8631 -0.0100 Existing 025YR24HR 21.1705 1.9175 1.8645 -0.0100 Existing 025YR24HR 21.2539 1.9187 1.8659 -0.0100 Existing 025YR24HR 21.3372 1.9199 1.8672 -0.0100 Existing 025YR24HR 21.4205 1.9210 1.8685 -0.0100
Scenario Sim Relative Time
[hrs] Total Inflow
Volume [ac_ft] Total Outflow Volume [ac_ft]
% Error (By Inflow) [%]
Existing 025YR24HR 21.5039 1.9221 1.8698 -0.0100 Existing 025YR24HR 21.5872 1.9232 1.8710 -0.0100…