Y23-742_Specifications.pdf

PDF 22 MB Posted

Attached to
University Shores Water and Sewer Improvements Package No. 4
Solicitation number
Y23-742
Issued by
Orange County, Orlando City, Florida

About this file

This document is a comprehensive technical specifications file for the University Shores Water and Sewer Improvements Package No. 4 project, issued by Orange County Utilities in Florida. The project involves extensive water and wastewater infrastructure improvements, including the construction of approximately 24,848 linear feet of water mains (ranging from 4-inch to 12-inch diameter), replacement/installation of 9,078 linear feet of sanitary sewer mains (8-inch and 10-inch diameter), point repairs, manhole rehabilitation, lateral replacements and lining, and service line work. The project is scheduled for bid submission on February 7, 2023, with an estimated total project cost of $19,829,801.53. The work will be conducted within five adjacent utility service areas and requires maintaining continuous operation of existing utility lines throughout construction.

The technical specifications detail comprehensive requirements for materials, installation methods, testing, documentation, and quality control, with specific provisions for erosion control, traffic maintenance, public information management, and post-construction documentation. Funding appears to be through Orange County, with specific technical and performance standards mandated through detailed specifications covering everything from pipe materials and installation to video inspection protocols and warranty requirements. The project includes significant infrastructure rehabilitation and replacement, emphasizing modernization of water and wastewater systems in the University Shores area, with strict adherence to Orange County Utilities' standards and construction specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BIDS

FOR

UNIVERSITY SHORES

WATER AND SEWER IMPROVEMENTS

PACKAGE NO. 4

PART H

TECHNICAL SPECIFICATIONS

BID Submittal

September 2022

PART H

THIS PAGE INTENTIONALLY LEFT BLANK

Table of Contents-1

TABLE OF CONTENTS FOR

TECHNICAL SPECIFICATIONS

ORANGE COUNTY UTILITIES DIVISION

Orange County, Florida

University Shores Water and Sewer Improvements

Package No. 4

OCU File Number: 56528 (Water and Wastewater Improvements)

CPH Project No. O28109.6

September 2022

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF THE

CONTRACT PROVIDED BY ORANGE COUNTY PURCHASING

DIVISION 1 - GENERAL REQUIREMENTS

01001 General Work Requirements 01001-1 – 01001-18

01010 Summary of Work 01010-1 - 01010-2

01021 Soils Report and Other Information 01021-1 – 01021-6

01025 Measurement and Payment 01025-1 – 01025-44

01027 Application for Payment 01027-1 – 01027-4

01050 Surveying and Field Engineering 01050-1 – 01050-8

01065 Permits and Fees 01065-1 – 01065-2

01070 Abbreviations and Symbols 01070-1 – 01070-6

01091 Reference Specifications 01091-1 – 01091-2

01101 Special Requirements (Gravity Inspections Only) 01101-1 – 01101-6

01200 Project Meetings 01200-1 – 01200-6

01300 Submittals 01300-1 – 01300-12

01301 Product Substitutions 01301-1 – 01301-4

01310 Progress Schedules 01310-1 – 01310-8

01340 Web Based Project Controls Systems 01340-1 – 01340-6

01370 Schedule of Values 01370-1 – 01370-2

01380 Audio-Visual Documentation 01380-1 - 01380-4

01400 Quality Control 01400-1 - 01400-4

01410 Testing and Testing Laboratory Services 01410-1 – 01410-2

01516 Collection System Bypass 01516-1 – 01516-4

01560 Erosion and Sedimentation Control 01560-1 – 01560-4

01570 Maintenance of Traffic 01570-1 - 01570-6

01580 Project Identification and Signs 01580-1 – 01580-4

01590 Construction Field Office 01590-1 – 01590-6

01610 Delivery, Storage and Handling 01610-1 – 01610-6

Table of Contents-2

01700 Project Closeout 01700-1 - 01700-6

01720 Project Record Documents 01720-1 – 01720-4

01740 Warranties and Bonds 01740-1 – 01740-4

DIVISION 2 – SITE WORK

02050 Demolition of Existing Structures 02050-1 - 02050-6

02080 Abandonment, Removal and Salvage or Disposal of

Existing Pipe 02080-1 – 02080-4

02100 Temporary Erosion and Sedimentation Control 02100-1 – 02100-2

02140 Dewatering 02140-1 – 02140-6

02215 Finish Grading 02215-1 - 02215-2

02220 Excavating, Backfilling and Compacting 02220-1 - 02220-10

02360 Sheet Steel Piling 02360-1 – 02360-4

02570 Stabilized Subgrade 02570-1 – 02570-4

02573 Asphalt Pavement Removal and Replacement 02573-1 – 02573-10

02574 Recycled Concrete Aggregate Base 02574-1 – 02574-6

02576 Concrete Sidewalks and Driveways 02576-1 – 02576-6

02577 Stormwater System 02577-1 – 02577-4

02578 Solid Sodding 02578-1 – 02578-4

02660 Potable Water System 02660-1 - 02660-8

02661 Wastewater Force Mains 02661-1 – 02661-6

02670 Pressure Main Sample Collection 02670-1 – 02670-2

02761 Cleaning Sanitary Sewer Systems 02761-1 – 02761-6

02762 Televising Sanitary Sewer Systems 02762-1 – 02762-16

02763 Televising Sanitary Sewer Laterals 02763-1 – 02763-4

02764 Televising Existing Manholes 02764-1 – 02764-8

02771 Cure-In-Place Pipe for Sanitary Sewer Renewal 02771-1 – 02771-24

02772 Cure-In-Place Pipe for Lateral Renewal 02772-1 – 02772-12

02773 Service Lateral Clean-Outs for Televising Access 02773-1 – 02773-2

02774 Wastewater Gravity Collection System 02774-1 – 02774-10

02775 Wastewater Manhole Rehabilitation 02775-1 – 02775-8

DIVISION 3 - CONCRETE

03100 Concrete Formwork 03100-1 – 03100-4

03200 Concrete Reinforcement 03200-1 – 03200-4

03300 Cast-in-Place Concrete 03300-1 – 03300-8

03410 Precast Concrete Structures 03410-1 – 03410-6

03600 Grouting 03600-1 – 03600-4

03601 Flowable Fill Grouting 03601-1 – 03601-4

DIVISIONS 4 – 8 – NOT USED

DIVISION 9 – FINISHES

09901 Coatings and Linings 09901-1 – 09901-16

09910 Prefabricated Fiberglass Liners 09910-1 – 09910-6

Table of Contents-3

DIVISION 10 – 14 – NOT USED

DIVISION 15 – MECHANICAL

15062 Ductile Iron Pipe and Fittings 15062-1 – 15062-8

15064 Polyvinyl Chloride (PVC) Pipe and Fittings 15064-1 – 15064-8

15100 Ancillary Equipment 15100-1 – 15100-12

15110 Plug Valves 15110-1 – 15110-6

15111 Gate Valves 15111-1 – 15111-6

DIVISION 16 – NOT USED

APPENDICES

A Geotechnical Engineering Reports

Geotechnical Engineering Report prepared by Terracon dated April 22, 2014

Groundwater Sampling / Testing prepared by Terracon dated March 2014

B Forms

Right of Entry Form (for work on private property)

Pressure Test (B104)

System Connection (B103)

Water Main Disinfection Certification (B102)

C Permits Obtained by County

FDEP Water Permit

FDEP Wastewater Permit

D Orange County Utilities Department - List of Approved Products

Appendix D List of Approved Products - 2021

G Dewatering Discharge Off-Site FDEP Generic Permit for the Discharge of Produced Ground Water FDEP Low-Level Mercury Method Memo – EPA – Analytical Methods for Mercury in NPDES Permits Orange County EPD Work Instruction ftp://ftp.ocfl.net/divisions/Utilities/pub/C I P/Master CIP Technical Specifications/Appendix B Forms (Right of Entry Form for work on private property).doc

Table of Contents-4

THIS PAGE LEFT BLANK INTENTIONALLY

01001 - 1 of 18 OCU Master CIP Technical Specifications rev: April 2020

SECTION 01001 1

GENERAL WORK REQUIREMENTS 2

PART 1 - GENERAL ................................................................................................................... 2 6

1.01 NOTICE AND SERVICE ............................................................................................ 2 7

1.02 WORK TO BE DONE ................................................................................................. 2 8

1.03 DRAWINGS AND PROJECT MANUAL................................................................... 2 9

1.04 PROTECTION AND RESTORATION ....................................................................... 3 10

1.05 PUBLIC NUISANCE ................................................................................................... 4 11

1.06 CONTRACTOR’S PAYMENTS TO COUNTY FOR OVERTIME WORK ............. 4 12

1.07 MAINTENANCE OF SERVICE ................................................................................. 5 13

1.08 TRANSFER OF SERVICE .......................................................................................... 5 14

1.09 LABOR ......................................................................................................................... 5 15

1.10 MATERIALS AND EQUIPMENT .............................................................................. 6 16

1.11 MANUFACTURER'S SERVICE ................................................................................ 6 17

1.12 INSPECTION AND TESTING .................................................................................... 7 18

1.13 PROJECT SITE AND ACCESS .................................................................................. 9 19

1.14 UTILITIES ................................................................................................................. 10 20

1.15 RELATED CONSTRUCTION REQUIREMENTS .................................................. 13 21

1.16 CONSTRUCTION NOT PERMITTED ..................................................................... 16 22

PART 2 - PRODUCTS (NOT USED) ....................................................................................... 17 23

PART 3 - EXECUTION (NOT USED) ..................................................................................... 17 24

01001 - 2 of 18

SECTION 01001 1

GENERAL WORK REQUIREMENTS 2

PART 1 - GENERAL 3

1.01 NOTICES 4

A. All notices or other papers required to be delivered by the Contractor to the County shall be 5 delivered to the office of the Engineering Division, Orange County Utilities Department, 9150 6

Curry Ford Road, Orlando, FL 32825. 7

1.02 WORK TO BE DONE 8

A. The Contractor shall furnish all labor, materials, equipment, tools, services, and incidentals to 9 complete all work required by these specifications and as shown on the Drawings, at a rate of 10 progress which will ensure completion of the Work within the Contract Time stipulated. 11

B. The Contractor shall perform the Work complete, in place, and ready for continuous service, 12 and shall include repairs, testing, permits, clean up, replacements, and restoration required as a 13 result of damages caused during this construction. 14

C. The Contractor shall comply with all City, County, State, Federal, and other codes, which are 15 applicable to the proposed Work. 16

D. All newly constructed Work shall be carefully protected from injury in any way. No 17 wheeling, walking, or placing of heavy loads on it shall be allowed and all portions damaged 18 shall be reconstructed by the Contractor at his own expense. 19

E. Scope of Work: See Section 01010 "Summary of Work" and the Bid Schedule for details. 20

1.03 DRAWINGS AND PROJECT MANUAL 21

A. The Work shall be performed in accordance with the Drawings and Specifications prepared 22 by the County/Professional. All work and materials shall conform to the Orange County 23

Utilities Standards and Construction Specifications Manual, latest edition or as indicated in 24 these Specifications or Drawings. 25

B. The Contractor shall verify all dimensions, quantities and details shown on the Drawings, 26

Supplementary Drawings, Schedules, Specifications or other data received from the 27

County/Professional, and shall notify same, in writing, of all errors, omissions, conflicts and 28 discrepancies found therein. Failure to discover or correct errors, conflicts or discrepancies 29 shall not relieve the Contractor of full responsibility for unsatisfactory Work, faulty 30 construction or improper operation resulting there from, nor from rectifying such conditions at 31 his own expense. 32

C. All schedules are given for the convenience of the County and the Contractor and are not 33

01001 - 3 of 18 guaranteed to be complete. The Contractor shall assume all responsibility for the making of 1 estimates of the size, kind, and quantity of materials and equipment included in the Work to be 2 done under this Contract. 3

D. Intent: 4

1. All Work called for in the Specifications applicable to this Contract, but not shown on 5 the Drawings in their present form, or vice versa, shall be of like effect as if shown or 6 mentioned in both. Work not specified either in the Drawings or in the 7

Specifications, but involved in carrying out their intent or in the complete and proper 8 execution of the Work, is required and shall be performed by the Contractor as 9 though it were specifically delineated or described. 10

2. Items of material, equipment, machinery, and the like may be specified on the 11

Drawings and not in the Specifications. Such items shall be provided by the 12

Contractor in accordance with the specification on the Drawings. 13

3. The apparent silence of the Specifications as to any detail, or the apparent omission 14 from them of a detailed description concerning any Work to be done and materials to 15 be furnished, shall be regarded as meaning that only the best general practice is to 16 prevail and that only material and workmanship of the best quality is to be used, and 17 interpretation of these Specifications shall be made upon that basis. 18

E. Refer to the Contract for the order of precedence of items and documents. 19

1.04 PROTECTION AND RESTORATION 20

A. The Contractor shall be responsible for the preservation of all public and private property, 21 and shall use every means of protection necessary to prevent damage thereto. If any direct or 22 indirect damage is done to public or private property by or on account of any act, omission, 23 neglect, or misconduct in the execution of the Work on the part of the Contractor, such property 24 shall be restored by the Contractor, at his expense, to a condition similar or equal to that 25 existing before the damage was done, or the Contractor shall make good the damage in other 26 manner acceptable to the County/Professional. 27

B. Protection of Trees and Shrubs 28

1. Protect with boxes or other barricades. 29

2. Do not place excavated material so as to injure trees or shrubs. 30

3. Install pipelines in short tunnels between and under root systems. 31

4. Support trees to prevent root disturbance during nearby excavation. 32

C. Tree and Limb Removal 33

1. Tree limbs, which interfere with equipment operation and are approved for pruning, 34 shall be neatly trimmed and the tree cut coated with tree paint. 35

2. The County may order the Contractor, for the convenience of the County, to remove 36 trees along the line or trench excavation. The Contractor shall obtain any permits 37 required for removal of trees. Ordered tree removal shall be paid for under the 38 appropriate Contract Items. 39

D. Trees or shrubs destroyed by negligence of the Contractor or his employees shall be replaced 40

01001 - 4 of 18 by the Contractor with new stock of similar size and age, at the proper season and at the sole 1 expense of the Contractor. 2

E. Lawn Areas: All lawn areas disturbed by construction shall be replaced with like kind to a 3 condition similar or equal to that existing before construction. Where sod is to be removed, it 4 shall be carefully removed, and the same re-sodded, or the area where sod has been removed 5 shall be restored with new sod in the manner described in the applicable section. 6

F. Where fencing, walls, shrubbery, grass strips or area must be removed or damaged incident 7 to the construction operation, the Contractor shall, after completion of the work, replace or 8 restore to the original condition. 9

G. The cost of all labor, materials, equipment, and work for restoration shall be deemed 10 included in the appropriate Contract Item or items, or if no specific item is provided therefore, 11 as part of the overhead cost of the Work, and no additional payment will be made therefore. 12

1.05 PUBLIC NUISANCE 13

A. The Contractor shall not create a public nuisance including, but not limited to, encroachment 14 on adjacent lands, flooding of adjacent lands, or excessive noise. 15

B. Sound levels measured by the County/Professional shall not exceed 45 dBA from 8 p.m. to 8 16 a.m. or 55 dBA 8 a.m. to 8 p.m. This sound level shall be measured at the exterior of the nearest 17 exterior wall of the nearest residence. Levels at the equipment shall not exceed 85 dBA at any time. 18

Sound levels in excess of these values are sufficient cause to have the Work halted until equipment 19 can be quieted to these levels. Work stoppage by the County/Professional for excessive noise shall 20 not relieve the Contractor of the other portions of this specification including, but not limited to, 21 completion dates and bid amounts. 22

C. No extra charge may be made for time lost due to work stoppage resulting from the creation 23 of a public nuisance. 24

1.06 CONTRACTOR’S PAYMENTS TO COUNTY FOR OVERTIME WORK 25

A. County Inspector Work Hours: Normal work hours for the County’s inspector(s) are 26 defined as any 8-hour period between the hours of 7:00 a.m. and 7:00 p.m. on the 27 weekdays of Monday through Friday. Any County Inspector(s) work beyond the 28 aforementioned normal work hours shall be requested in writing 48-hours in advance. All 29 overtime, any County holidays or weekend work compensation for the County’s 30

Inspector(s) to work beyond the normal working hours are considered overtime 31 compensation and shall be paid for by the Contractor. The overtime pay rate will be 32

$51.00 per hour or the most current rate as listed in the County Fee Directory prepared 33 by the Office of Management and Budget, in section “Orange County Utilities Engineering 34

& Construction”, under the heading of “Inspection Fee other than Normal Working 35

Hours”. The Contractor agrees that the County shall deduct charges for work outside 36 normal work hours and for overtime pay from payments due the Contractor. 37

01001 - 5 of 18

1.07 MAINTENANCE OF SERVICE 1

A. Unless noted otherwise on the plans, the operation of the existing water, reclaimed 2 water or wastewater facility on each of the respective locations shall remain in service 3 until the transfer of service has been completed. The Contractor shall, prior to 4 interrupting any utility service (water, sewer, etc.) for the purpose of making cut -ins to the 5 existing lines or for any other purposes, contact the County and make arrangements for the 6 interruption which will be satisfactory to the County. 7

B. Utility lines that are damaged during construction shall be repaired by the Contractor 8 and service restored within 4-hours of the breakage. The County retains the option of 9 repairing any damage to utility pipes in order to expedite service to the customers. The 10

Contractor will remain responsible for all costs associated with the repair. 11

1.08 TRANSFER OF SERVICE 12

A. When the County has accepted a proposed facility and placed it into operation, the 13 transfer of service is complete. The Contractor may begin the work of removing the 14 existing or temporary facilities. 15

1.09 LABOR 16

A. Supervision: The Contractor shall supervise and direct the Work efficiently and with his 17 best skills and attention. The Contractor shall have a competent, English speaking 18 superintendent or representative, who shall be on the site of the Project at all working 19 hours, and who shall have full authority by the Contractor to direct the performance of the 20

Work and make arrangements for all necessary materials, equipment, and labor without 21 delay. 22

B. Jurisdictional Disputes: It shall be the responsibility of the Contractor to pay all costs 23 that may be required to perform any of the Work shown on the Drawings or specified 24 herein to avoid any work stoppages due to jurisdictional disputes. The basis for subletting 25 work in question, if any, shall conform to precedent agreements and decisions on record 26 with the Building and Construction Trades Department, AFL-CIO, dated June, 1973, 27 including any amendments thereto. 28

C. Apprenticeship: The Contractor shall comply with all of the requirements of Section 29

446, Florida Statutes, for all contracts in excess of $25,000 excluding roadway, highway 30 or bridge contracts and the Contractor agrees to insert in any subcontract under this 31

Contract the requirements of this Article. 32

01001 - 6 of 18

1.10 MATERIALS AND EQUIPMENT 1

A. MANUFACTURER 2

1. All transactions with the manufacturers or Subcontractors shall be through the 3

Contractor, unless the Contractor and the County/Professional request that the 4 manufacturer or Subcontractor communicate directly with the County/Professional. 5

Any such transactions shall not in any way release the Contractor from his full 6 responsibility under this Contract. 7

2. All workmanship and materials shall be of the highest quality. The equipment shall 8 be the product of manufacturers who are experienced and skilled in the field with an 9 established record of research and development. No equipment will be considered 10 unless the manufacturer has designed and manufactured equipment of comparable 11 type and size and have demonstrated sufficient experience in such design and 12 manufacture. 13

3. No material shall be delivered to the Site without prior approval of the 14

County/Professional. 15

4. All apparatus, mechanisms, equipment, machinery, and manufactured articles for 16 incorporation into the Project shall be the new (most current production at time of 17 bid) and unused standard products of recognized reputable manufacturers. 18

5. Manufactured and fabricated products: 19

a. Design, fabricate and assemble in accord with the best engineering and shop practices. 20

b. Manufacture like parts of duplicate units to standard sizes and gauges, to be 21 interchangeable. 22

c. Any two or more pieces of material or equipment of the same kind, type or 23 classification, and being used for identical types of service, shall be made by the same 24 manufacturer. 25

d. Products shall be suitable for service conditions as specified and as stated by 26 manufacturer. 27

e. Equipment capacities, sizes and dimensions shown or specified shall be adhered 28 to unless variations are specifically approved in writing. 29

f. Do not use material or equipment for any purpose other than that for which it is 30 designed or is specified. 31

1.11 MANUFACTURER'S SERVICE 32

A. Where service by the manufacturer is specified to be furnished as part of the cost of the item 33 of equipment, the Work shall be at the Contractor's expense. 34

B. The services provided shall be by a qualified manufacturer's service representative to check 35 and verify the completed installation, place the equipment in operation, and instruct the 36

County's operators in the operation and maintenance procedures. Such services are to be for 37 period of time and for the number of trips specified. A working day is defined as a normal 8-38 hour working day on the job and does not include travel time. 39

C. The services shall further demonstrate to the County/Professional’s complete satisfaction that 40 the equipment will satisfactorily perform the functions for which it has been installed. 41

01001 - 7 of 18

1.12 INSPECTION AND TESTING 1

A. General 2

1. All materials and equipment furnished by the Contractor shall be subject to the 3 inspection, review and acceptance of the County and meet the requirements as 4 outlined in the Orange County Utilities Standards and Construction Specifications 5

Manual. If in the testing of any material or equipment it is ascertained by the 6

County/Professional that the material or equipment does not comply with the 7

Contract, the Contractor shall be notified thereof, and the Contractor will be directed 8 to refrain from delivering said material or equipment, or to remove it promptly from 9 the Site or from the Work and not accepted by the County shall be replaced with 10 acceptable material, without cost to the County. 11

2. Tests of electrical and mechanical equipment and appliances shall be conducted in 12 accordance with recognized test codes of the ANSI, ASME, or the IEE, except as 13 may otherwise be stated herein. 14

3. The Contractor shall give notice in writing to the County sufficiently in advance of 15 his intention to commence the manufacture or preparation of materials especially 16 manufactured or prepared for use in or as part of the permanent construction. Such 17 notice shall contain a request for inspection, the date of commencement and the 18 expected date of completion of the manufacture or preparation of materials. Upon 19 receipt of such notice, the County shall arrange to have a representative present at 20 such times during the manufacture as may be necessary to inspect the materials; or 21 the County will notify the Contractor that the inspection will be made at a point other 22 than the point of manufacture; or the County will notify the Contractor that inspection 23 will be waived. 24

4. When inspection is waived or when the County/Professional so requires, the 25

Contractor shall furnish to the County authoritative evidence in the form of 26

Certificates of Manufacture that the materials to be used in the Work have been 27 manufactured and tested in conformity with the Contract Documents. These 28 certificates shall be notarized and shall include five (5) copies of the results of 29 physical tests and chemical analysis, where necessary, that have been made directly 30 on the product or on similar products of the manufacturer. 31

5. The Contractor must comply with these provisions before shipping any material. 32

Such inspections by the County shall not release the Contractor from the 33 responsibility for furnishing materials meeting the requirements of the Contract 34

Documents. 35

B. Cost 36

1. County shall employ and pay for the services of an independent testing laboratory to 37 perform testing indicated on the Contract Documents, or at the County’s discretion to 38 ensure conformity with the Contract Documents. 39

2. The cost of field leakage and pressure tests and shop tests of materials and equipment 40 specifically called for in the Contract Documents shall be borne by the Contractor. 41

Such costs shall be deemed to be included in the Contract price. 42

3. The Contractor shall notify the County laboratory a minimum of 48-hours in advance 43 of operations for scheduling of tests. When tests or inspections cannot be performed 44 after such notice, the Contractor shall reimburse County for expenses incurred. 45

01001 - 8 of 18

4. The Contractor shall pay for all work required to uncover, remove, replace, retest, 1 etc., any work not tested due to the Contractor's failure to provide the 48-hours 2 advance notice or due to failed tests. The Contractor shall also provide compensation 3 for the County/Professional’s personnel for required re-testing due to failed or 4 rescheduled testing. 5

C. Shop Testing 6

1. Each piece of equipment for which pressure, duty, capacity, rating, efficiency, 7 performance, function or special requirements are specified shall be tested in the shop 8 of the manufacturer in a manner which shall conclusively prove that its characteristics 9 comply fully with the requirements of the Contract Documents. No such equipment 10 shall be shipped to the worksite until the County/Professional notifies the Contractor, 11 in writing, that the results of such tests are acceptable. 12

2. The manufacturing company shall provide five (5) copies of the manufacturer's actual 13 shop test data and interpreted results signed by a responsible official of the 14 manufacturing company and notarized, showing conformity with the Contract 15

Documents as a prerequisite for the acceptance of any equipment. The cost of shop 16 tests (excluding cost of County's representative) and of furnishing manufacturer's 17 preliminary and shop test data of operating equipment shall be borne by the 18

Contractor and shall be included in the Contract price. 19

D. Field Testing: 20

1. The County shall employ and pay for services of an independent testing laboratory to 21 perform testing specifically indicated in the Contract Documents. Employment of the 22 laboratory shall in no way relieve Contractor's obligations to perform the Work of the 23

Contract. The Contractor shall provide compensation for retesting of all failed tests. 24

2. The County may at any time during the progress of the Work, request additional 25 testing beyond that which is specified in the Contract. This testing will be at the 26

County's expense. Contractor shall: 27

a. Cooperate with laboratory personnel, provide access to the Project. 28

b. Secure and deliver to the laboratory adequate quantities of representative samples 29 of materials proposed to be used and which require testing. 30

c. Provide to the laboratory the preliminary design mix proposed to be used for 31 concrete, and other material mixes, which require control by the testing laboratory. 32

E. Demonstration Tests: Upon completion of the Work and prior to final payment, all 33 equipment and piping installed under this Contract shall be subjected to acceptance or 34 demonstration tests as specified or required to provide compliance with the Contract 35

Documents. The Contractor shall furnish all labor, fuel, energy, water and all other equipment 36 necessary for the demonstration tests at no additional cost to the County. 37

F. Final Inspection: Prior to preparation of the final payment application, a final inspection will 38 be performed by the County to determine if the Work is properly and satisfactorily constructed 39 in accordance with the requirements of the Contract Documents. See also Section 01700 40

"Project Closeout." 41

01001 - 9 of 18

G. Inspection by existing utility owners: The Contractor shall pay for all inspections during the 1 progress of the work required and provided by the owner of all existing public utilities 2 paralleling or crossing the Work, as shown on the Drawings. All such inspection fees shall be 3 deemed included in the appropriate Contract Item or items, or if no specific item is provided 4 therefore, as part of the overhead cost of the Work, and no additional payment will be made 5 therefore. 6

H. Inspection by Other Agencies: The Florida Department of Transportation, the Florida 7

Department of Environmental Protection, and other authorized governmental agencies shall 8 have free access to the site for inspecting materials and work, and the Contractor shall afford 9 them all necessary facilities and assistance for doing so. Any instructions to the Contractor 10 resulting from these inspections shall be given through the County. These rights of inspections 11 shall not be construed to create any contractual relationship between the Contractor and these 12 agencies. 13

1.13 PROJECT SITE AND ACCESS 14

A. RIGHT-OF-WAY AND EASEMENTS 15

1. The use of public streets and alleys shall be such as to provide a minimum of 16 inconvenience to the public and to other traffic. Any earth or other excavated 17 material shall be removed by the Contractor and the streets cleaned to the satisfaction 18 of the County. 19

2. The Contractor shall not enter or occupy private land outside of easements, except by 20 written permission of the property owner. 21

3. At the time of the Pre-Construction meetings, the Contractor shall become fully 22 acquainted with the status of all easements. Should easements not be acquired by the 23

County in specific areas of the Work, the Contractor shall sequence and schedule his 24 work therein so as not to interfere with the progress of work in other areas of the 25

Project. Any rescheduling of work due to easement acquisitions shall be performed 26 by the Contractor at no additional cost to the County. The County agrees that it will 27 make every effort to acquire all remaining easements with all speed and diligence 28 possible so as to allow the completion of the Work within the Contract time. 29

B. ACCESS 30

1. Neither the material excavated nor the materials or equipment used in the 31 construction of the Work shall be so placed as to prevent free access to all fire 32 hydrants, valves or manholes. 33

2. Access to businesses located adjacent to the project site must be maintained at all 34 times. Contractor may prearrange the closing of business access with the business 35

Owner. Such prearranged access closing shall not exceed two (2) hours. Property 36 drainage and grading shall be restored and all construction debris removed within 48-37 hours of backfilling trench. 38

3. Contractor agrees that representatives of the County and any governmental agents 39 will have access to the Work wherever it is in preparation or progress and that the 40

Contractor shall provide facilities for such access and inspection. 41

01001 - 10 of 18

1.14 UTILITIES 1

A. UTILITY CONSTRUCTION 2

1. Public utility installations and structures shall be understood to include all poles, 3 tracks, pipes, wires, conduits, house service connections, vaults, manholes and all 4 other appurtenances and facilities pertaining thereto, whether owned or controlled by 5 governmental bodies or privately owned by individuals, firms or corporations, used to 6 serve the public with transportation, traffic control, gas, electricity, telephone, 7 sewerage, drainage or water. Other public or private property, which may be affected 8 by the Work, shall be deemed included hereunder. 9

2. All open excavations shall be adequately safeguarded by providing temporary 10 barricades, caution signs, lights and other means. The Contractor shall, at his own 11 expense, provide suitable and safe bridges and other crossings for accommodating 12 travel by pedestrians and workmen. Bridges provided for access to private property 13 during construction shall be removed when no longer required. 14

3. The length of open trench will be controlled by the particular surrounding conditions, 15 but shall always be confined to the limits described by the County. If any excavation 16 becomes a hazard, or if it excessively restricts traffic at any point, the County may 17 require special construction procedures. As a minimum, the Contractor shall conform 18 to the following restoration procedures: 19

a. Interim Restoration: All excavations shall be backfilled and compacted as 20 specified by the end of each working day. For excavations within existing paved 21 areas; limerock base or soil cement base (match existing) shall be spread and 22 compacted to provide a relatively smooth surface free of loose aggregate material. At 23 the end of each workweek, the S-I asphaltic surface course shall be completed and 24 opened to traffic. Contractor shall coordinate his construction activity including 25 density tests and inspections to allow sufficient time to achieve this requirement. All 26 driveway cuts shall be backfilled, compacted, and limerock base spread and 27 compacted immediately after installation. Contractor shall coordinate with the 28 individual property owners prior to removing the driveway section. Any utility 29 crossing an existing roadway, parking lot or other paved area shall be patched by the 30 end of the working day. 31

b. All pipe and fittings shall be neatly stored in a location, which will cause the least 32 disturbance to the public. All debris shall be removed and properly disposed of by the 33 end of each working day. 34

c. Final Restoration Overlay: After completing all installations, and after testing of 35 the pipe (but no sooner than 30-days after applying the S-I asphaltic surface), final 36 restoration shall be performed. In no event shall final restoration begin after 37 substantial completion. Final restoration shall provide an S-III asphaltic overlay as 38 specified in an uninterrupted continuous operation until completion. Any additional 39 restoration required after testing shall be repaired in a timely manner at no additional 40 cost to the County. 41

d. Maintenance of all restored facilities shall be the Contractor’s responsibility. This 42 maintenance shall be performed on an on-going basis during the course of 43 construction. The Contractor’s Progress Schedule shall reflect the above restoration 44 requirements. 45

01001 - 11 of 18

e. Additional Restoration for Work in Business or Commercial Districts: The 1

Contractor shall restore all private property, damaged by construction, to its original 2 condition. Access to businesses located adjacent to the project site must be maintained 3 at all times. Contractor may prearrange the closing of business accesses with the 4 business owner. Such prearranged access closing shall not exceed two (2) hours. 5

Property drainage and grading shall be restored within 24-hours of backfilling trench. 6

B. EXISTING UTILITIES 7

1. The locations of all existing underground piping, structures and other facilities are 8 shown based on information received from the respective owner. The locations are 9 shown without express or implied representation, assurance, or guarantee that they 10 are complete or correct or that they represent a true picture of underground piping, 11 conduit and cables to be encountered. It is the Contractor’s responsibility to verify all 12 existing underground piping, structures and other facilities. 13

2. The Contractor shall, at all times, employ acceptable methods and exercise reasonable 14 care and skill so as to avoid unnecessary delay, injury, damage or destruction of 15 existing utility installations and structures; and shall, at all times in the performance 16 of the Work, avoid unnecessary interference with, or interruption of, utility services; 17 and shall cooperate fully with the owners thereof to that end. 18

3. When existing facilities are found to be in conflict with the Work, the County 19 reserves the right to modify alignments to avoid interference with existing facilities. 20

4. All utilities, which do not interfere with the work, shall be carefully protected against 21 damage. Any existing utilities damaged in any way by the Contractor shall be 22 restored or replaced by the Contractor at his expense as directed by the County. Any 23 existing facilities, which require operation to facilitate repairs, shall be operated only 24 by the owner of the respective utility. 25

5. It is the responsibility of the Contractor to ensure that all utility and/or poles, the 26 stability of which may be endangered by the proximity of excavation, be temporarily 27 stayed and/or shored in position while work proceeds in the vicinity of the pole and 28 that the utility or other companies concerned be given reasonable advance notice of 29 any such excavation. 30

C. NOTICES 31

1. All governmental utility departments and other owners of public utilities, which may 32 be affected by the Work, will be informed in writing by the Contractor two (2) weeks 33 after the execution of the Contract or Contracts covering the Work. Such notice will 34 be sent out in general, and directed to the attention of the governmental utility 35 departments and other owners of public utilities for such installations and structures 36 as may be affected by the Work. 37

2. The Contractor shall comply with Florida Statute 553.851 regarding protection of 38 underground gas pipelines. Evidence of notification to the gas pipeline owner shall 39 be furnished to the County within two (2) weeks after the execution of the Contract. 40

3. It shall be the Contractor's responsibility to contact utility companies at least 72-hours 41 in advance of breaking ground in any area or on any unit of the work so maintenance 42 personnel can locate and protect facilities, if required by the utility company. 43

01001 - 12 of 18

4. The Contractor shall give a minimum five (5) working day notice to utility personnel 1 prior to interrupting a utility service (water, sewer, etc.). 2

D. EXPLORATORY EXCAVATIONS 3

1. Exploratory excavations shall be conducted by the Contractor for the purpose of 4 locating underground pipelines or structures in advance of the construction. Test pits 5 shall be excavated in areas of potential conflicts between existing and proposed 6 facilities and at piping connections to existing facilities a minimum of 48-hours or 7

1,000-feet in advance of work. If there is a potential conflict, the Contractor shall 8 notify the County/Professional immediately. Information on the obstruction to be 9 furnished by the Contractor shall include: Location, Elevation, Utility Type, Material 10 and Size. Test pits shall be backfilled immediately after their purpose has been 11 satisfied and the surface restored and maintained in a manner satisfactory to the 12

County. 13

E. UTILITY CROSSINGS 14

1. It is intended that wherever existing utilities must be crossed, deflection of the pipe 15 within specified limits and cover shall be used to satisfactorily clear the obstruction 16 unless otherwise indicated on the Drawings. However, when in the opinion of the 17

County this procedure is not feasible, the County may direct the use of fittings for a 18 utility crossing or conflict transition as detailed on the Drawings. 19

F. RELOCATIONS 20

1. Relocations shown on the Drawings: Public utility installations or structures, 21 including but not limited to poles, signs, fences, piping, conduits and drains that 22 interfere with the positioning of the work which are shown on the Drawings to be 23 removed, relocated, replaced or rebuilt by the Contractor shall be considered as part 24 of the general cost of doing the Work and shall be included in the prices bid for the 25 various contract items. No separate payment shall be made therefore. 26

2. Relocations not shown on the Drawings 27

a. Where public utility installations or structures are encountered during the course 28 of the work, and are not indicated on the Drawings or in the Specifications, and when, 29 in the opinion of the County, removal, relocation, replacement or rebuilding is 30 necessary to complete the Work, such work shall be accomplished by the utility 31 having jurisdiction, or such work may be ordered, in writing by the County, for the 32

Contractor to accomplish. 33

b. If such work is accomplished by the utility having jurisdiction, it will be carried 34 out expeditiously and the Contractor shall give full cooperation to permit the utility to 35 complete the removal, relocation, replacement or rebuilding as required. 36

c. If such work is accomplished by the Contractor, it will be paid for as a Change 37

Order. 38

3. All existing castings, including valve boxes, junction boxes, manholes, hand holes, 39 pull boxes, inlets and similar structures in the areas of construction that are to remain 40 in service and in areas of trench restoration and pavement replacement, shall be 41 adjusted by the Contractor to bring them flush with the surface of the finished work. 42

01001 - 13 of 18

4. All existing utility systems which conflict with the construction of the work herein, 1 which can be temporarily removed and replaced, shall be accomplished at the 2 expense of the Contractor. Work shall be done by the utility unless the utility 3 approves in writing that the Work may be done by the Contractor. 4

1.15 RELATED CONSTRUCTION REQUIREMENTS 5

A. PUBLIC INFORMATION OFFICER 6

1. The Contractor shall provide community interaction and coordination through a 7 designated Public Information Officer (PIO). The PIO will provide resolution to 8 complaints and problems from community members affected by the construction for 9 the entire project duration. The PIO will manage a project designated 24-hour hotline 10 phone number for citizens to call. The PIO will field these calls, provide answers to 11 questions, research issues with the project team or appropriate agencies and follow up 12 each complaint in a timely manner. All after hour calls will be reported to the 13

County’s Representative the following business day. 14

2. The PIO will maintain a daily diary of call and/or interactions with the community, as 15 well as a complaint log chronicling all issues and proposed resolutions. This report 16 shall be sent to the County on Monday and Friday of each week. When applicable, all 17 associated correspondence, bulletins, notifications and reports shall be managed in the 18 project Contract Manager. 19

3. The PIO shall create and maintain the project stakeholder list. The PIO will create the 20 flyer notification to alert stakeholders and local residents/businesses of project start 21 and potential impacts. The PIO will work closely with Orange County Utilities staff 22 for flyer notification approval. The PIO should have in-house graphic design and 23 mailing capabilities for flyer distributions. The County shall have 10 days to make 24 comments, review, and provide approval or revision requests. 25

4. Mailers shall be sent out at least 10 days prior to the start of the work. Door hangers 26 shall be sent out at least 3 prior before the start of the work. 27

5. The PIO shall attend the project progress meetings and provide the project team with 28 a report of public issues since the last progress meeting. The PIO will be engaged 29 though project final completion. The PIO will also disseminate roadway closures, 30 sewer hookups, temporary and permanent restoration and other relevant construction 31 information to the community, as well as, when appropriate, to the media, emergency 32 services personnel and other interested agencies. Any major public issues will be 33 reported to the County’s project representative daily. 34

6. The designated PIO shall have a minimum 2 years’ experience in providing similar 35 services on Orange County Utilities, Orange County Public Works or FDOT 36 construction projects. The PIO shall be fluent in English and Spanish and shall visit 37 the construction site, meeting locations and affected resident’s homes as required. 38

7. The PIO shall be a third-party marketing communications/public relations business 39 with a minimum of 10 years demonstrated experience with public sector 40 infrastructure projects. In-house contractor staff or HOA staff is not acceptable 41

8. Potential PIO specialists that may meet the qualifications requirements as noted 42 above include the following: 43

a. Quest Corporation of America 44

01001 - 14 of 18

B. TRAFFIC MAINTENANCE 1

1. Refer to Section 01570 – Maintenance of Traffic 2

C. BARRIER AND LIGHTS 3

1. The Contractor shall exercise extreme care in the conduct of the Work to protect 4 health and safety of the workmen and the public. The Contractor shall provide all 5 protective measures and devices necessary, in conformance with applicable local, 6 state and federal regulations. Protective measures shall include but are not limited to 7 barricades, warning lights/flashers and safety ropes. 8

2. All equipment and vehicles operating within 10-feet of the roadway shall have 9 flashing strobe lights attached. 10

D. DEWATERING AND FLOTATION 11

1. The Contractor, with his own equipment, shall do all pumping necessary to dewater 12 any part of the work area during construction operations to insure dry working 13 conditions. The Contractor shall take the necessary steps to protect on-site and off-14 site structures. Damage to any structures due to dewatering shall be repaired or the 15 structures replaced at the Contractor's expense. 16

2. The Contractor shall be completely responsible for any tanks, wetwells or similar 17 structures that may become buoyant during the construction and modification 18 operations due to the ground water or floods and before the structure is put into 19 operation. The proposed final structures have been designed to account for 20 buoyancy; however the Contractor may employ methods, means and techniques 21 during construction which may affect the buoyancy of structures. The Contractor 22 shall take the necessary steps to protect structures. Damage to any structures due to 23 floating or flooding shall be repaired or the structures replaced at the Contractor's 24 expense. 25

3. Contractor shall be responsible for any required permits for the discharge of ground 26 water. 27

E. DUST AND EROSION CONTROL 28

1. The Contractor shall prevent dust nuisance from his operations or from traffic. 29

2. Contractor is responsible for providing effective temporary erosion and sediment 30 control measures during construction or until final controls become effective. 31

3. Temporary erosion controls include, but are not limited to, grassing, mulching, 32 netting, watering and reseeding on-site surfaces and soil and borrow area surfaces and 33 providing interceptor ditches at ends of berms and at those locations which will 34 ensure that erosion during construction will be either eliminated or maintained within 35 acceptable limits as established by the County, FDEP and any other agency having 36 jurisdiction. 37

4. Temporary sedimentation controls include, but are not limited to; silt dams, traps, 38 barriers, and appurtenances at the foot of sloped surfaces which will ensure that 39 sedimentation pollution will be either eliminated or maintained within acceptable 40 limits as established by the County, FDEP and any other agency having jurisdiction. 41

5. The construction of temporary erosion and sedimentation control facilities shall be in 42 accordance with the technical provision of section 104 “Prevention, Control, and 43

Abatement of Erosion and Water Pollution” of the FDOT Standard Specifications for 44

01001 - 15 of 18

Road and Bridge Construction, latest edition. 1

F. LINES AND GRADES 2

1. All Work under this Contract shall be constructed in accordance with the lines and 3 grades shown on the Drawings, or as given by the County/Professional. 4

2. When the location of the Work is dimensioned on the Drawings, it shall be installed in 5 that location; when the location of the Work is shown on a scaled drawing, without 6 dimensions, the Work shall be installed in the scaled location unless the County approves 7 an alternate location for the piping. Where fittings are noted on the Drawings, such 8 notation is for the Contractor's convenience and does not relieve the Contractor from 9 laying and jointing different or additional items where required. The County/Professional 10 may require detailed pipe laying drawings and schedules for project control. 11

3. The Contractor shall, at his own expense, establish all working or construction lines 12 and grades as required from the project control points set by the County, and shall be 13 solely responsible for the accuracy thereof. 14

4. Water main and forcemain shall be installed to provide long uniform gradient or slope 15 to pipe to minimize air pockets and air release valves. The stationing shown on the 16

Drawings for air and vacuum release valve assemblies are approximate and the 17

Contractor shall field adjust these locations to locate these valves at the highest point 18 in the pipeline installed. All locations must be accepted by the County. 19

5. To insure a uniform gradient for gravity pipe and pressure pipe, all lines shall be 20 installed using the following control techniques as a minimum: 21

a. Gravity lines; continuous control, using laser beam technology. 22

b. Pressure lines; control stakes set at 50-foot intervals using surveyors’ level 23 instrument. 24

G. TEMPORARY CONSTRUCTION 25

1. Temporary fences: If, during the course of the Work, it is necessary to remove or 26 disturb any fencing, the Contractor shall at his own expense, provide a suitable 27 temporary fence which shall be maintained until the permanent fence is replaced. 28

2. Responsibility for Temporary Structures: In accepting the Contract, the Contractor 29 assumes full responsibility for the sufficiency and safety of all temporary structures or 30 work and for any damage which may result from their failure or their improper 31 construction, maintenance or operation. 32

H. DAILY REPORTS 33

1. The Contractor shall submit to the County’s Representative daily reports of 34 construction activities including non-work days. The reports shall be complete in 35 detail and shall include the following information: 36

a. Days from Notice to Proceed; Days remaining to substantial and…