Y22-792-RC_CHW_Valve-Drawings.pdf
PDF 9 MB Posted
- Solicitation number
- Y22-792-RC
- Issued by
- Orange County, Orlando City, Florida
About this file
These are engineering design drawings for the Orange County Convention Center (OCCC) N/S Building Penthouse Chilled Water (CHW) Valve project, prepared by Hanson Professional Services Inc. dated June 25, 2021. The project involves installing new motorized shut-off valves and inline flow meters to existing chilled water supply and return piping located in the north, center, and south mechanical penthouses. The work includes integrating these new valves and flow meters with the existing building automation system, and providing temporary cooling solutions for critical equipment areas during chilled water line shutdowns. As a bid additive, the project requires setting up temporary cooling for specific rooms such as data centers, telecom spaces, and audio/visual rooms across different floors to maintain operational continuity.
The design drawings include detailed mechanical and electrical plans for the fourth-floor penthouses, showing the precise locations of new valves, flow meters, and associated electrical connections. The project requires coordination with Orlando Utilities Commission (OUC) and OCCC, with a minimum 72-hour notification required before any chilled water service shutdowns. The control sequences specify that the new isolation valves will communicate with the building automation system, with capabilities to monitor flow rates, detect potential leaks, and automatically close valves if significant flow imbalances are detected. The temporary cooling solutions involve placing temporary HVAC units strategically to maintain cooling in critical spaces, with specific requirements for ductwork, condensate routing, and equipment placement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Y22-792-RC_CHW_Valve-Specs.pdf | ||
| Y22-792-RC_Part_G.pdf | ||
| Y22-792-RC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
/2
/2
:0 :0
A
M
C
U s e rs
\r y a n \D o c u m e n ts
\M E
-O C
C C
-P E
N T
H O
U S
E C
H W
-1 p ry a n E
C .r v t
720 N. Maitland Ave., Suite 102 Maitland, FL 32751
(407) 622-2050 Office Fax
OCCC N/S BUILDING
PENTHOUSE CHW
VALVES
9800 International Dr Orlando, FL 32819
COVER SHEET
G-001
06/25/2021
20G0032
BM
BM
SP
100% CD
DRAWING INDEX
SHEET
NO. SHEET NAME
G-001 COVER SHEET
M-001 MECHANICAL NOTES, LEGENDS, AND ABBREVIATIONS
M-101 FOURTH FLOOR PIPING - SOUTH PENTHOUSE ENLARGED PLAN
M-102 FOURTH FLOOR PIPING - CENTER PENTHOUSE ENLARGED PLAN
M-103 FOURTH FLOOR PIPING - NORTH PENTHOUSE ENLARGED PLAN
M-104 BID ADDITIVE - FIRST FLOOR - TEMPORARY COOLING SPACES
M-105 BID ADDITIVE - THIRD FLOOR - TEMPORARY COOLING SPACE
M-106 BID ADDITIVE - FOURTH FLOOR - TEMPORARY COOLING SPACES
M-501 CONTROLS
E-001 GENERAL ELECTRICAL NOTES, LEGEND AND ABBREVIATIONS
E-101 FOURTH FLOOR POWER - SOUTH PENTHOUSE ENLARGED PLAN
E-102 FOURTH FLOOR POWER - CENTER PENTHOUSE ENLARGED PLAN
E-103 FOURTH FLOOR POWER - NORTH PENTHOUSE ENLARGED PLAN
9800 International Dr Orlando, FL 32819
100% CD
JUNE 25, 2021
OCCC N/S BUILDING PENTHOUSE CHW VALVES
HANSON PROFESSIONAL SERVICES INC.
720 N. Maitland Ave., Suite 102
Maitland, FL 32751
(407) 622-2050
CODES IN EFFECT AT TIME OF DRAWING SUBMITTAL
FLORIDA BUILDING CODE, SEVENTH EDITION (2020)
FLORIDA ENERGY CONSERVATION CODE, SEVENTH EDITION (2020)
NEC (NFPA 70) 2017 EDITION
TO THE BEST OF THE ENGINEER'S KNOWLEDGE, THE PLANS AND SPECIFICATIONS
COMPLY WITH THE 2020 FLORIDA BUILDING CODE WITH ALL CURRENT
AMENDMENTS.
PROJECT INFORMATION
SCOPE OF WORK
ELECTRICAL:
PROVIDE NEW CIRCUITS FOR THE NEW MOTORIZED ACTUATORS.
MECHANICAL:
INSTALL NEW MOTORIZED SHUT-OFF VALVES AND INLINE FLOW METERS TO
EXISTING SUPPLY AND RETURN CHILLED WATER PIPING LOCATED IN THE NORTH,
CENTER, AND SOUTH MECHANICAL PENTHOUSES. NEW VALVES AND FLOW
METERS TO BE INTEGRATED TO EXISTING BUILDING AUTOMATION SYSTEM.
BID ADDITIVE: TEMPORARY COOLING IS TO BE PROVIDED TO KEY EQUIPMENT
AREAS WHEN SHUT-DOWN OF CHILLED WATER LINES OCCURS. REFER TO SHEETS
M-104, M-105, AND M-106 FOR MORE INFORMATION.
MEP ENGINEERS
ORANGE COUNTY MAYOR
Jerry L. Demings
DISTRICT 1 COMMISSIONER
Nicole H. Wilson
DISTRICT 2 COMMISSIONER
Christine Moore
DISTRICT 5 COMMISSIONER
Emily Bonilla
DISTRICT 6 COMMISSIONER
Victoria P. Siplin
DISTRICT 4 COMMISSIONER
Maribel Gomez Cordero
DISTRICT 3 COMMISSIONER
Mayra Uribe
PROJECT LOCATION
COUNTY PROJECT No. 0965-21
222 DESTINATION LOUNGE AMP ROOM 222 A2-222 6-243 P5_A2258 608 SF Y
306 AUDIO VISUAL RACK ROOM 306-431 A2-306 5-318.2 P5_A2357 532 SF Y
407 ELECTRICAL ROOM/IDF ROOM 407 A2-407 1-404.1 P5_A2415 1,863 SF Y Y
406 ELECTRICAL ROOM/IDF ROOM 406 A2-406 No Room
406 OUC SUBSTATION ROOM 4 406-404 A2-406 6-404 P5_A2459 1,700 SF
406 MWCHANICAL EQUIPMENT ROOM 4 406-403 A2-406 6-402.1 P5_A2453 600 SF
406 ELEVATOR EQUIPMENT ROOM 4 406-401 A2-406 6-401 P5_A2458 310 SF
405 ELECTRICAL ROOM 4 405-406 A2-405 5-404 P5_A2547 No Room
405 TRANSFORMER ROOM 4 405-405 A2-405 5-404.1 P5_A2547 No Room
405 ELECTRICAL ROOM 4 405-401 A2-405 5-402 P5_A2450 1,300 SF Y
402 ELECTRICAL ROOM 4 402-403 A2-402 2-402 P5_A2423 1,260 SF
401 ELECTRICAL ROOM 4 401-408 A2-401 1-404 P5_A2415 760 SF
401 TRANSFORMER ROOM 4 401-407 A2-401 1-404.1 P5_A2415 910 SF
401 ELEVATOR EQUIPMENT 4 401-406 A2-401 1-403 P5_A2414 140 SF
301 AUDIO/VISUAL RECORDING 3 301-434 A2-301 1-356.3 P5_A2315 405 SF Y Y
206 OFFICE 2 206-417 A2-206 6-215.1 P5_A2259 1,850 SF Y
106 TELECOM MDF 1 106-446 A2-106 6-137 P5_A2159 2,650 SF Y Y
DRAWING ROOM NAME LEVEL
NEW OCCC
ROOM NO.
ARCH
DWG. NO.
ARCH DWG.
ROOM NO.
ARCH
DWG. NO.
PDF AREA (FT2)
CRITICAL
ROOMS
HANSON
DESIGN
CRITICAL & NON-CRITICAL ROOMS TO RECEIVE TEMPORARY COOLING - BID ADDITIVE
ADDITIONAL INFORMATION PROVIDED BY
OCCC. CONTRACTOR TO COORDINATE
EXACT REQUIREMENTS WITH OCCC.
STATE OF
No. 86510
S C
O
TT
ALLEN NEUN
E R
P R O F
ESS IONAL E
NG
IN
E E R
F L O R I D
A
L I C E N S E
MECHANICAL SYMBOLS (HVAC)
MECHANICAL SYMBOLS (GENERAL)
MECHANICAL LEGEND (PIPING)
PIPING DESIGNATIONS
MECHANICAL SYMBOLS (PIPING)
A
PRESSURE RELIEF VALVE TAG
REHEAT OR BOOSTER COIL TAG
VAV BOX TAG
HUMIDISTATH
NIGHT SETBACK STATN
HX = HT. EXCHANGER
MD MOTORIZED DAMPER
ACC AIR COOLED CONDENSER
PENTHOUSE (INTAKE OR RELIEF)PH
RLFA RELIEF AIR
PRESSURE REGULATING VALVE
(STEAM, AIR & WATER, ARROW POINTS
TO LOWER PRESSURE.)
PRESSURE - TEMPERATURE RELIEF VALVE
REDUCED PRESSURE BACK FLOW PREVENTER
POINT OF DISCONNECT
EQUIPMENT TAGS (XX = MARKS BELOW)
UH = UNIT HEATER
EHC = ELECTRIC HEATING COIL
EF = EXHAUST FAN
CT = COOLING TOWER
CH = CHILLER
AS = AIR SEPARATOR
AHU = AIR HANDLING UNIT
Z = WHERE DETAIL OR SECTION IS SHOWN
X = SECTION [LETTER] OR DETAIL [NUMBER]
SMOKE DAMPER (S)
S
X
(OR ∅X")
EXHAUST DUCT
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHWS
CHWR
24X12
SUPPLY AIR
OUTDOOR AIR
MOTORIZED VALVE
EXHAUST AIR
THERMOSTAT (X = COIL OR BOX NUMBER)T
FLEXIBLE DUCT CONNECTION
DISCHARGE OR SUPPLY DUCT
RETURN OR OUTSIDE AIR DUCT
SYMBOL ON DRAWING)
ON ACTUAL DUCT SIZE & NOT ON SCHEMATIC
TURNING VANES (NUMBER OF VANES SHALL BE BASED
FOR INTERNAL INSULATION, WHERE SPECIFIED
OPENING. SHEET METAL SIZE MUST BE INCREASED
DIMENSION. SIZE SHOWN IS INTERNAL CLEAR
DUCT SIZE DESIGNATION. SIDE SHOWN IS FIRST
REVISIONS
ROOM NUMBERS
M
SA
EA
OA
RA RETURN AIR
AIR DEVICE DESIGNATION
RUN BETWEEN JOISTRBJ
TDE
AFF ABOVE FINISHED FLOOR
TOP DUCT ELEVATION
CEILING SUPPLY AND RETURN AIR DEVICE
FLEXIBLE DUCT
VOLUME DAMPER (VD)
ACCESS DOOR (AD)
ACCESS PANEL (AP)
FIRE DAMPER (F)
MOTORIZED DAMPER (ELEC. OR PNEU.)
D
R
INCLINE DROP IN DIRECTION OF ARROW
INCLINE RISE IN DIRECTION OF ARROW
FOB = FLAT ON BOTTOM (IF APPLICABLE)
FOT = FLAT ON TOP OR
TRANSITIONS: GIVE SIZES.
F
M
AP
AD
AP
S
FLEXIBLE PIPE CONNECTION
VENTURI FLOW MEASURING STATION
SOLENOID VALVE
BUTTERFLY VALVE
WITH PRESSURE TAPS
PLUG VALVE
COMBINATION BALANCE & SHUTOFF VALVE
THREE - WAY AS INDICATED
AUTOMATIC CONTROL VALVE,
PNEUMATIC STRAIGHT THRU OR
AIR VENT, MANUAL (MAV)
P
P
UNION JOINT
FLANGE JOINT
"Y" STRAINER
TEE - UP, BRANCH OUT OF TOP
TEE - DOWN, BRANCH OUT OF BOTTOM
ELBOW - UP
ELBOW - DOWN
RISE OR DROP
DIRECTION OF FLOW
SLEEVE THRU WALL
CAP ON END OF PIPE
THERMOMETER, THERMOMETER WELL
PRESSURE GAUGE WITH GAUGE COCK
PUMP (TRIANGLE POINTS IN DIR. OF FLOW)
FLOW SWITCH
PRESSURE SWITCH
GATE VALVE
CHECK VALVE
BALL VALVE
GAUGE COCK
PRV
X
Z
FCU = FAN COIL UNIT
CU = CONDENSING UNIT
RTU = ROOFTOP UNIT
POINT OF CONNECT
HEX NOTES ON DRAWINGS & SCHEDULES
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
This item has been digitally signed and sealed by Scott Neuner P.E. on the date listed using a digital signature.
Printed copies of this document are not considered sign and sealed and the SHA authentication code must be verified on any electronic copies.
/2
/2
:0 :0
A
M
C
U s e rs
\r y a n \D o c u m e n ts
\M E
-O C
C C
-P E
N T
H O
U S
E C
H W
-1 p ry a n E
C .r v t
720 N. Maitland Ave., Suite 102 Maitland, FL 32751
(407) 622-2050 Office Fax
OCCC N/S BUILDING
PENTHOUSE CHW
VALVES
9800 International Dr Orlando, FL 32819
MECHANICAL
NOTES, LEGENDS,
AND
ABBREVIATIONS
M-001
06/25/2021
20G0032
SAN
LY
SAN
100% CD
1. BEFORE SUBMITTING PROPOSAL, CONTRACTOR SHALL VISIT THOSE
PORTIONS OF THE BUILDING AND SITE AFFECTED BY THIS WORK SO AS TO
BECOME FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT
MAY AFFECT EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL
DENOTES THAT SUCH EXAMINATION HAS BEEN MADE AND CLAIMS FOR
LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES
ENCOUNTERED MAY NOT BE RECOGNIZED.
2. ALL DUCT SIZES INDICATED ON THE DOCUMENTS ARE NET FREE AREA
DIMENSIONS.
3. CONCEAL ALL PIPING AND DUCT ABOVE CEILING OR IN NEW WALLS,
UNLESS SPECIFICALLY NOTED AS EXPOSED OR SURFACE MOUNTED.
CONTRACTOR TO PAINT ALL EXPOSED PIPING TO MATCH CORRESPONDING
EXPOSED AREAS.
4. WORK SHALL BE PERFORMED IN COMPLIANCE WITH THE ESTABLISHED
WORK SCHEDULE SET FORTH BY OWNER. COORDINATE ALL WORK WITH
GENERAL CONTRACTOR.
5. ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND SHALL BE UL LISTED
WHERE APPLICABLE.
6. PENETRATION OF THE FLOOR DECK WILL NOT BE ACCEPTABLE FOR
SUPPORT OF DUCTWORK, PIPING EQUIPMENT OR ANY OTHER DEVICES.
ALL SUPPORTS SHALL SPAN BETWEEN THE STRUCTURAL ELEMENTS TO
SUPPORT THE MECHANICAL EQUIPMENT.
7. IN GENERAL, PLANS AND DIAGRAMS ARE SCHEMATIC ONLY AND SHOULD
NOT BE SCALED. COORDINATE EXACT LOCATION OF ALL CEILING MOUNTED
EQUIPMENT SO ALL SERVICEABLE COMPONENTS CAN BE EASILY
ACCESSED. REMOVAL OR RELOCATION OF LIGHTING FIXTURES FOR
SERVICE ACCESS IS NOT ACCEPTABLE. THE CONTRACTOR SHALL
REINSTALL EQUIPMENT THAT HAS INADEQUATE OR UNSAFE
ACCESSIBILITY. LOCATE ALL OTHER EQUIPMENT WITH MANUFACTURER
RECOMMENDED ACCESS FOR OPERATION AND MAINTENANCE.
8. COMPLY WITH DIVISION 26 OF THE CONTRACT SPECIFICATIONS
REFERRING TO MOTORS, STARTERS, VFD’S, ETC.
9. WHENEVER A REFERENCE IS MADE TO A STANDARD, THE WORK SHALL
COMPLY WITH THE LATEST PUBLISHED EDITION OF THE STANDARD AT THE
TIME THE PROJECT IS BID UNLESS OTHERWISE SPECIFIED.
10. ALL MATERIAL STORED ON SITE SHALL BE PROPERLY PROTECTED FROM
INJURY OR DETERIORATION. MATERIAL SHALL NOT BE STORED IN
CONTACT WITH THE GROUND. ALL DUCTWORK AND EQUIPMENT,
WHETHER INSTALLED OR NOT, SHALL BE SEALED AT ANY OPENING.
11. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2020 (7TH ED.) FLORIDA
BUILDING CODE, FLORIDA PLUMBING CODE, AND FLORIDA MECHANICAL
CODE & STANDARDS (WITH SUPPLEMENTS) AS REFERENCED
THROUGHOUT THE SPECIFICATIONS.
12. REFER TO DIVISION 23 SPECIFICATIONS FOR ADDITIONAL INFORMATION
AND ALL REQUIREMENTS NOT INDICATED ON THE DRAWINGS. IF THERE
ARE ANY APPARENT CONFLICTS BETWEEN THE SPECIFICATIONS AND
DRAWINGS, THE MORE STRINGENT REQUIREMENTS SHALL APPLY.
13. ALL EQUIPMENT AND PIPING SHALL HAVE IDENTIFICATION LABELS AND
TAGS PER SPECIFICATION SECTION 23 05 53.
14. BID ADDITIVE: DATA CENTER EQUIPMENT (POWER, HVAC, IT SERVER
RACKS) MUST REMAIN OPERATIONAL AND ACCESSIBLE TO THE OWNER’S
PERSONNEL THROUGHOUT THE ENTIRE PROJECT. ADDITIONS AND
MODIFICATIONS TO THE HVAC SYSTEM, INCLUDING EQUIPMENT,
DUCTWORK, PIPING, AND CONTROLS MUST BE ACCOMPLISHED IN A
MANNER TO ENSURE PROPER COOLING THROUGHOUT THE DATA CENTER
AT ALL TIMES. THE PHASING PLAN ISSUED BY THE ENGINEER IS A GENERAL
GUIDELINE BASED ON THE OWNER’S REQUIREMENTS TO MAINTAIN
COOLING AND OPERATIONS. CONTRACTOR SHALL DRAFT A DETAILED
CONSTRUCTION PHASING PLAN FOR THE WORK PRIOR TO WORK
COMMENCEMENT AND SUBMIT TO THE OWNER AND ENGINEER FOR THEIR
REVIEW.
15. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ALL COSTS
ASSOCIATED WITH UTILIZING LINE-STOPS IN ORDER TO CUT IN NEW
VALVES AND FLOW METERS AFFECTED UNDER THIS PROJECT.
16. CONTRACTOR SHALL COORDINATE ANY AND ALL SHUT-DOWNS OF
CHILLED WATER SERVICE WITH ORLANDO UTILITIES COMMISSION (OUC)
AND OCCC. NOTIFICATION SHALL BE GIVEN A MINIMUM OF 72 HOURS PRIOR
TO SCHEDULED SHUT-DOWN.
GENERAL NOTES
EXPOSED AREAS INCLUDES SPACES EXPOSED TO THE PUBLIC AS WELL AS MECHANICAL / ELECTRICAL ROOMS.
INSULATION MUST MEET THE REQUIREMENTS OF IECC-2018, SECTION C403.11.3
REFER TO SPECIFICATION SECTION 230719 FOR MORE INFORMATION REGARDING PIPING INSULATION.
NOTES:
ABOVE GRADE CHILLED WATER PIPING (≥8") 3.7 1" CLOSED CELL ELASTOMERIC OR MINERAL-FIBER
PROVIDE WITH ALUMINUM JACKET FOR EXTERIOR
PIPING AND PVC JACKETING FOR INTERIOR PIPING
HYDRONIC PIPING
SERVICE
MINIMUM R-VALUE
(FT² x °F x h / BTU)
MINIMUM
THICKNESS
MATERIAL NOTES
PIPING INSULATION SCHEDULE
CONTROLS GENERAL
NOTES
1. THE BAS CONFIGURATION IS BASED UPON JCI CONTROLS. NO ALTERNATE
MANUFACTURERS WILL BE ACCEPTED. THE INSTALLATION SHALL BE PERFORMED BY
TRANE CONTROLS.
2. THE BAS CONTRACTOR SHALL NOT SUBMIT OR INSTALL ANY HARDWARE OR
SOFTWARE THAT IS PLANNED FOR END-OF-RUN OR OBSOLESCENCE WITHIN 36
MONTHS OF THE START OF THE WARRANTY PERIOD.
3. THE SYSTEM SHALL COMMUNICATE WITH EXISTING SERVERS AT OCCC. EXISTING
ON-SITE BAS OPERATING SOFTWARE SHALL BE UPDATED AS REQUIRED FOR
GRAPHICAL DISPLAY, MONITORING, TRENDING, ALARMS AND SUPERVISORY
CONTROL FOR THE SYSTEM, TO INCLUDE ANY AND ALL UPGRADES OF EXISTING
HARDWARE/SOFTWARE CONNECTED TO THOSE SYSTEMS, AND/OR INSTALLATION
OF NEW SOFTWARE.
4. THE WORK SHALL INCLUDE, BUT NOT BY WAY OF LIMITATION, MICROPROCESSOR
BASED CONTROLLERS, SENSORS, PANELS, CONDUIT, WIRING, PROGRAMMING,
ROUTERS, HUBS, REPEATERS, GATEWAYS, FILE SERVER, WORKSTATION SYSTEM
GRAPHICS, TERMINATIONS, COMMUNICATIONS WIRING/CABLING, CALIBRATION,
ACTIVATION, DE-BUGGING, COMMISSIONING, DEMONSTRATIONS AND TRAINING.
5. WHERE DELAYS, RANGES AND SET POINTS ARE LISTED THEY SHALL BE FULLY
ADJUSTABLE AT THE OPERATORS’ REMOTE WORKSTATION.
6. DEMONSTRATE ALL SEQUENCES OF OPERATION IN THE PRESENCE OF THE OWNER
FOR ALL CONTROLLED EQUIPMENT, TO INCLUDE GENERATION OF ALARMS GENERAL
EQUIPMENT FAILURES.
7. CONTROLS POINTS LISTS, SEQUENCES OF OPERATION, AND CONTROLLER
SOFTWARE REQUIREMENTS SHALL BE CONSIDERED COMPLEMENTARY. THE
CONTRACTOR SHALL COORDINATE THESE REQUIREMENTS AND PROVIDE A
COMPLETE SYSTEM WITH ALL OF THE FEATURES, FUNCTIONS AND SEQUENCES
SPECIFIED, NOTED INDICATED AND/OR REQUIRED.
8. ALL CONDUIT, WIRING, ACCESSORIES AND WIRING CONNECTIONS REQUIRED FOR
THE INSTALLATION OF THE BUILDING AUTOMATION SYSTEM, AS HEREIN SPECIFIED,
SHALL BE PROVIDED BY THE BAS CONTRACTOR UNLESS SPECIFICALLY SHOWN ON
THE ELECTRICAL DRAWINGS UNDER DIVISION 26 ELECTRICAL. ALL WIRING SHALL
COMPLY WITH THE REQUIREMENTS OF APPLICABLE PORTIONS OF DIVISION 26 AND
ALL LOCAL AND NATIONAL ELECTRIC CODES, UNLESS SPECIFIED OTHERWISE IN THIS
SECTION. ALL INSULATED WIRE TO BE COPPER CONDUCTORS, UL LABELED FOR 90°C
MINIMUM SERVICE.
9. THE SIZING, TYPE AND PROVISION OF CABLE, CONDUIT, CABLE TRAYS, AND
RACEWAYS SHALL BE THE DESIGN RESPONSIBILITY OF THE BAS CONTRACTOR. IF
COMPLICATIONS ARISE, HOWEVER, DUE TO THE INCORRECT SELECTION OF CABLE,
CABLE TRAYS, RACEWAYS AND/OR CONDUIT BY THE BAS CONTRACTOR, THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS INCURRED IN REPLACING
THE SELECTED COMPONENTS.
10. ALL CLASS 2 (24VAC OR LESS) WIRING SHALL BE INSTALLED IN CONDUIT UNLESS
OTHERWISE SPECIFIED. CONDUIT IS NOT REQUIRED FOR CLASS 2 WIRING IN
CONCEALED ACCESSIBLE LOCATIONS. CLASS 2 WIRING NOT INSTALLED IN CONDUIT
SHALL BE SUPPORTED EVERY 5’ FROM THE BUILDING STRUCTURE UTILIZING METAL
HANGERS DESIGNED FOR THIS APPLICATION. WIRING SHALL BE INSTALLED
PARALLEL TO THE BUILDING STRUCTURAL LINES. ALL WIRING SHALL BE INSTALLED
IN ACCORDANCE WITH LOCAL CODE REQUIREMENTS. CLASS 2 SIGNAL WIRING AND
24VAC POWER CAN BE RUN IN THE SAME CONDUIT. POWER WIRING 120VAC AND
GREATER CANNOT SHARE THE SAME CONDUIT WITH CLASS 2 SIGNAL WIRING.
11. PROVIDE FOR COMPLETE GROUNDING OF ALL APPLICABLE SIGNAL AND
COMMUNICATIONS CABLES, PANELS AND EQUIPMENT SO AS TO ENSURE SYSTEM
INTEGRITY OF OPERATION. GROUND CABLING AND CONDUIT AT THE PANEL
TERMINATIONS. AVOID GROUNDING LOOPS.
12. A GRAPHIC OF EACH SYSTEM SHALL BE PROVIDED. GRAPHICS SHALL ALSO DISPLAY
ITEMS SUCH AS SEQUENCE OPERATING MODE AND A BUILDING WIDE SUMMARY
ALARM SCREEN.
13. THE CONTROL OF MODULATING VALVES, SHALL UTILIZE PROPORTIONAL-INTEGRAL-
DERIVATIVE (PID) CONTROL LOOPS. THE CONTRACTOR SHALL TUNE THE LOOPS TO
PROVIDE STABLE OPERATION.
14. ALL ROOM NAMES AND NUMBERS USED FOR PROGRAMMING, GRAPHICS, LABELING
AND SHOP DRAWINGS SHALL BE COORDINATED WITH THOSE ACTUALLY USED,
WHICH MAY DIFFER FROM THE NAMES/NUMBERS ON THE DOCUMENTS.
15. ALL HVAC CONTROLLERS, ROUTERS, REPEATERS, DC AND 24 VAC POWER SOURCES
AND RELAYS SHALL BE LOCATED WITHIN CONTROL PANELS. ALL WIRING TO AND
FROM THE CONTROL PANEL SHALL FIRST BE LANDED ON SEPARATE TERMINAL
STRIP TYPE CONNECTOR(S) MOUNTED WITHIN THE CONTROL PANEL. TERMINAL
STRIP CONNECTORS OR THE ENDS OF THE WIRE SHALL BE LABELED FOR
IDENTIFICATION PURPOSES. WIRING WITHIN PANELS SHALL BE RUN PARALLEL AND
PERPENDICULAR TO THE PANEL, ARRANGED NEATLY, USING WIRING DUCT FOR
MULTIPLE CONDUCTOR RUNS AND SPIRAL WRAPPING OF WIRE BUNDLES. CONTROL
PANELS SHALL BE WALL OR STAND MOUNTED.
FCU-R
AHU-S3.1
AHU-S1.1
AHU-S1.2
6"CHWS/R
24"CHWS
24"CHWR
24" CHWS/R
DOWN
6" CHWS/R 1-1/4" CHWS/R
2-1/2" CHWS
3" CHWR
2-1/2" CHWS/R
1-1/2" CHWR
1-1/2" CHWR DOWN
6" CHWS/R
1-1/4" CHWS/R
M
M
CONTRACTOR SHALL PLACE THE NEW MOTORIZED ISOLATION VALVE IN THE
VERTICAL POSITION ABOVE THE EXISTING 24" MANUAL ISOLATION VALVES (TO
REMAIN). COORDINATE POWER REQUIREMENTS WITH ELECTRICAL
DRAWINGS.
CONTRACTOR SHALL PLACE THE NEW INLINE FLOW METER(S) IN THE VERTICAL
POSITION. FLOW METER SHALL BE PLACED ABOVE THE NEW 24" MOTORIZED
ISOLATION VALVE. COORDINATE POWER REQUIREMENTS WITH ELECTRICAL
DRAWINGS.
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
This item has been digitally signed and sealed by Scott Neuner P.E. on the date listed using a digital signature.
Printed copies of this document are not considered sign and sealed and the SHA authentication code must be verified on any electronic copies.
/2
/2
:1
:4
A
M
M E
-O C
C C
-P E
N T
H O
U S
E C
H W
-1 d e ta c h e d .r v t
Office Street Address Office City State Zip Office Phone Office Fax
OCCC N/S BUILDING
PENTHOUSE CHW
VALVES
9800 International Dr Orlando, FL 32819
FOURTH FLOOR
PIPING - SOUTH
PENTHOUSE
ENLARGED PLAN
M-101
6/25/2021
09625-01
SAN
LY
SAN
100% CD
1. REFER TO MECHANICAL GENERAL NOTES ON SHEET M-001.
2. REFER TO SPECIFICATIONS.
3. AIR HANDLING UNITS AND FAN COIL UNITS SHOWN ARE EXISTING TO REMAIN,
SHOWN FOR REFERENCE ONLY.
4. VALVE SIZING SHOWN ON THESE PLANS ARE PER THE AS-BUILT
DOCUMENTATION PROVIDED TO ENGINEER. CONTRACTOR SHALL FIELD
VERIFY CORRECT SIZE AT EACH LOCATION PRIOR TO ORDERING.
5. RELOCATE EXISTING GAUGES AS NECESSARY FOR NEW DEVICE
INSTALLATIONS.
GENERAL SHEET NOTES
SHEET KEYNOTES
SCALE: 1/4" = 1'-0"1
FOURTH FLOOR PIPING - SOUTH PENTHOUSE
0 2' 4' 8'
KEY PLAN - N.T.S.
NORTH PENTHOUSE
CENTER PENTHOUSE
SOUTH PENTHOUSE
NORTH
APPROXIMATE LOCATION OF THE
NEW MOTORIZED ISOLATION VALVES
EXISTING MANUAL ISOLATION
VALVES TO REMAIN
SOUTH PENTHOUSE EXISTING CHILLED WATER RISER
APPROXIMATE LOCATION OF THE
NEW INLINE FLOW METERS
FCU-Q
AHU-M1.1 AHU-M1.2 AHU-M1.3
24" CHWS/R
DOWN
6" CHWS/R
6" CHWS/R
6" CHWS/R
1-1/4" CHWS/R
8" CHWS/R
1-1/4" CHWS/R
M
1 M
CONTRACTOR SHALL PLACE THE NEW MOTORIZED ISOLATION VALVE IN THE
HORIZONTAL POSITION. COORDINATE POWER REQUIREMENTS WITH
ELECTRICAL DRAWINGS.
CONTRACTOR SHALL PLACE THE NEW INLINE FLOW METER(S) IN THE VERTICAL
POSITION. COORDINATE POWER REQUIREMENTS WITH ELECTRICAL
DRAWINGS.
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
This item has been digitally signed and sealed by Scott Neuner P.E. on the date listed using a digital signature.
Printed copies of this document are not considered sign and sealed and the SHA authentication code must be verified on any electronic copies.
/2
/2
:3
:5
A
M
M E
-O C
C C
-P E
N T
H O
U S
E C
H W
-1 d e ta c h e d .r v t
Office Street Address Office City State Zip Office Phone Office Fax
OCCC N/S BUILDING
PENTHOUSE CHW
VALVES
9800 International Dr Orlando, FL 32819
FOURTH FLOOR
PIPING - CENTER
PENTHOUSE
ENLARGED PLAN
M-102
6/25/2021
09625-01
SAN
LY
SAN
100% CD
1. REFER TO MECHANICAL GENERAL NOTES ON SHEET M-001.
2. REFER TO SPECIFICATIONS.
3. AIR HANDLING UNITS AND FAN COIL UNITS SHOWN ARE EXISTING TO REMAIN,
SHOWN FOR REFERENCE ONLY.
4. VALVE SIZING SHOWN ON THESE PLANS ARE PER THE AS-BUILT
DOCUMENTATION PROVIDED TO ENGINEER. CONTRACTOR SHALL FIELD
VERIFY CORRECT SIZE AT EACH LOCATION PRIOR TO ORDERING.
5. RELOCATE EXISTING GAUGES AS NECESSARY FOR NEW DEVICE
INSTALLATIONS.
SHEET KEYNOTES
SCALE: 1/4" = 1'-0"1
FOURTH FLOOR PIPING - CENTER PENTHOUSE
0 2' 4' 8'
GENERAL SHEET NOTES
KEY PLAN - N.T.S.
NORTH PENTHOUSE
CENTER PENTHOUSE
SOUTH PENTHOUSE
NORTH
FCU-P
20"CHWR
20"CHWS
AHU-N1.1
AHU-N3.1
1-1/2" CHWR
6" CHWS/R6" CHWS/R
2" CHWS/R
6" CHWS/R
1" CHWS/R
DOWN
1" CHWS/R
20" CHWS/R
DOWN
M
M
CONTRACTOR SHALL PLACE THE NEW MOTORIZED ISOLATION VALVE IN THE
VERTICAL POSITION BELOW THE EXISTING 20" MANUAL ISOLATION VALVES (TO
REMAIN). COORDINATE POWER REQUIREMENTS WITH ELECTRICAL
DRAWINGS.
CONTRACTOR SHALL PLACE THE NEW INLINE FLOW METER(S) IN THE VERTICAL
POSITION. FLOW METER SHALL BE PLACED BELOW THE NEW 20" MOTORIZED
ISOLATION VALVE. COORDINATE POWER REQUIREMENTS WITH ELECTRICAL
DRAWINGS.
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
This item has been digitally signed and sealed by Scott Neuner P.E. on the date listed using a digital signature.
Printed copies of this document are not considered sign and sealed and the SHA authentication code must be verified on any electronic copies.
/2
/2
:1
:3
A
M
M E
-O C
C C
-P E
N T
H O
U S
E C
H W
-1 d e ta c h e d .r v t
Office Street Address Office City State Zip Office Phone Office Fax
OCCC N/S BUILDING
PENTHOUSE CHW
VALVES
9800 International Dr Orlando, FL 32819
FOURTH FLOOR
PIPING - NORTH
PENTHOUSE
ENLARGED PLAN
M-103
6/25/2021
09625-01
SAN
LY
SAN
100% CD
1. REFER TO MECHANICAL GENERAL NOTES ON SHEET M-001.
2. REFER TO SPECIFICATIONS.
3. AIR HANDLING UNITS AND FAN COIL UNITS SHOWN ARE EXISTING TO REMAIN,
SHOWN FOR REFERENCE ONLY.
4. VALVE SIZING SHOWN ON THESE PLANS ARE PER THE AS-BUILT
DOCUMENTATION PROVIDED TO ENGINEER. CONTRACTOR SHALL FIELD
VERIFY CORRECT SIZE AT EACH LOCATION PRIOR TO ORDERING.
5. RELOCATE EXISTING GAUGES AS NECESSARY FOR NEW DEVICE
INSTALLATIONS.
SHEET KEYNOTES
SCALE: 1/4" = 1'-0"1
FOURTH FLOOR PIPING - NORTH PENTHOUSE
0 2' 4' 8'
GENERAL SHEET NOTES
KEY PLAN - N.T.S.
NORTH PENTHOUSE
CENTER PENTHOUSE
SOUTH PENTHOUSE
NORTH
APPROXIMATE LOCATION OF THE
NEW MOTORIZED ISOLATION VALVES
EXISTING MANUAL ISOLATION
VALVES TO REMAIN
NORTH PENTHOUSE EXISTING CHILLED WATER RISER
APPROXIMATE LOCATION OF THE
NEW INLINE FLOW METERS
AIR TO DISCHARGE TOWARDS
THE EQUIPMENT LOCATED
IN THE AREAS OF CONCERN
TEMPORARY RETURN
DUCTWORK TO RISE ABOVE
THE FINISHED FLOOR AND
HELD IN PLACE
AREA OF CONCERN
AREA OF CONCERN
AREA OF CONCERN
CLIENT ROOM
6-139
TEL-COM MDF
6-137
MDR
6-138
TEL-COM
OFFICES
6-141
WOMEN
6-134
CORRIDOR
6-138.1
CONTRACTOR TO PROVIDE 35-TON TEMPORARY A/C UNIT, SIMILAR TO
TRANE VOYAGER CSDX0035. PLACE TEMPORARY COOLING UNIT OUTSIDE
THE SPACE BEING SERVED. UNIT SHALL BE PLACED ON LEVEL GROUND
AND IN A SECURE/WELL VENTILATED AREA. ROUTE CONDENSATE LINE TO
NEAREST STORM DRAIN.
CONTRACTOR SHALL DUCT THE TEMPORARY SUPPLY DUCTWORK IN
THROUGH ONE OF THE OPENINGS OF MDF 6-137. DUCTWORK SHALL
TERMINATE UNDERNEATH THE RAISED FLOOR STRUCTURE AND
RECOMMENDED TO BE AS CLOSE TO THE SERVER RACKS AS POSSIBLE.
ALL TEMPORARY DUCTWORK TO BE BY UNIT SUPPLIER.
CONTRACTOR SHALL DUCT THE TEMPORARY RETURN DUCTWORK
THROUGH ONE OF THE OPENINGS OF MDF 6-137. DUCTWORK SHALL BE
MOUNTED IN THE SPACE AND JUST BELOW THE CEILING GRID TO ENSURE
CAPTURE OF WARM AIR. ALL TEMPORARY DUCTWORK TO BE BY UNIT
SUPPLIER.
CONTRACTOR SHALL SEAL EXTERIOR DOORS TO ENSURE LITTLE
MOISTURE AND HEAT INTRUSION TO SPACE.
CONTRACTOR TO PROVIDE MEANS OF RETURN AIR FROM MDR 6-138 TO
THE TEL-COM MDF 6-137. RECOMMEND PLACING 14" FLEX DUCT ABOVE
CEILING AND CONNECTING TWO 2'x2' RETURN AIR GRILLES.
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
/2
/2
:0 :0
A
M
C
U s e rs
\r y a n \D o c u m e n ts
\M E
-O C
C C
-P E
N T
H O
U S
E C
H W
-1 p ry a n E
C .r v t
720 N. Maitland Ave., Suite 102 Maitland, FL 32751
(407) 622-2050 Office Fax
OCCC N/S BUILDING
PENTHOUSE CHW
VALVES
9800 International Dr Orlando, FL 32819
BID ADDITIVE -
FIRST FLOOR -
TEMPORARY
COOLING SPACES
M-104
06/25/2021
20G0032
SAN
LY
SAN
100% CD
SCALE: 1/4" = 1'-0"1
BID ADDITIVE - FIRST FLOOR HVAC PLAN -
TEL-COM MDF 106-446
1. REFER TO MECHANICAL GENERAL NOTES ON SHEET M-001.
2. REFER TO SPECIFICATIONS.
3. REFER TO PHASING PLAN SHEET FOR MORE INFORMATION ON CHILLED
WATER SHUT-DOWN FOR THIS AREA.
4. ALL ELECTRICAL REQUIREMENTS ASSOCIATED WITH THE TEMPORARY
COOLING SPACES ARE TO BE COORDINATED WITH ORANGE COUNTY
CONVENTION CENTER.
SHEET KEYNOTES
GENERAL SHEET NOTES
0 2' 4' 8'
KEY PLAN - N.T.S.
S C
O
TT
ALLEN NEUN
E R
P R O F
E
SS IONAL E
NG
IN
E E R
F L O R I D
A
L I C E N S E
B
M .0
(HOLE 26"X26")(HOLE 26"X26")(HOLE 26"X26")(HOLE 26"X26")(HOLE 26"X26")(HOLE 26"X26")(HOLE 26"X26")(HOLE 26"X26")(HOLE 26"X26")
A/V RACK ROOM
301-433
A/V RECORDING
301-434
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
This item has been digitally signed and sealed by Scott Neuner P.E. on the date listed using a digital signature.
Printed copies of this document are not considered sign and sealed and the SHA authentication code must be verified on any electronic copies.
/2
/2
:0 :0
A
M
C
U s e rs
\r y a n \D o c u m e n ts
\M E
-O C
C C
-P E
N T
H O
U S
E C
H W
-1 p ry a n E
C .r v t
720 N. Maitland Ave., Suite 102 Maitland, FL 32751
(407) 622-2050 Office Fax
OCCC N/S BUILDING
PENTHOUSE CHW
VALVES
9800 International Dr Orlando, FL 32819
BID ADDITIVE -
THIRD FLOOR -
TEMPORARY
COOLING SPACE
M-105
06/25/2021
20G0032
SAN
LY
SAN
100% CD
SCALE: 1/4" = 1'-0"1
THIRD FLOOR HVAC PLAN - AV RECORDING
301-433
1. REFER TO MECHANICAL GENERAL NOTES ON SHEET M-001.
2. REFER TO SPECIFICATIONS.
3. REFER TO PHASING PLAN SHEET FOR MORE INFORMATION ON CHILLED
WATER SHUT-DOWN FOR THIS AREA.
4. ALL ELECTRICAL REQUIREMENTS ASSOCIATED WITH THE TEMPORARY
COOLING SPACES ARE TO BE COORDINATED WITH ORANGE COUNTY
CONVENTION CENTER.
SHEET KEYNOTES
GENERAL SHEET NOTES
CONTRACTOR TO PROVIDE 60,000 BTU/HR SPOT COOLER WITH INTEGRAL
CONDENSATE TANK AND OVERFLOW SWITCH. SIMILAR TO MOVIN COOL
OFFICE PRO 60. ENSURE CONDENSER EXHAUST AIR IS DUCTED TO SPACE
OUTSIDE OF 301-433, AND SUPPLY AIR IS DIRECTED TO SERVER RACKS.
KEY PLAN - N.T.S.
CONVENTION
SPACE
NORTH
FCU-F
AHU-M1.20 AHU-M1.21
1-1/2" CHWS/R
3/4" CHWS/R
8" CHWR
8" CHWS
AREA OF CONCERN AREA OF CONCERN
TEMPORARY RETURNAIR TO DISCHARGE TOWARDS
DUCTWORK TO RISE ABOVETHE EQUIPMENT LOCATED
THE FINISHED FLOOR ANDIN THE AREAS OF CONCERN
HELD IN PLACE
AREA OF CONCERN
CONTRACTOR TO PROVIDE 25-TON TEMPORARY A/C UNIT, SIMILAR TO TRANE
VOYAGER CSDX0025. PLACE TEMPORARY COOLING UNIT OUTSIDE THE
PENTHOUSE MAN DOOR. UNIT SHALL BE PLACED ON ROOF LEVEL. ROUTE
CONDENSATE LINE TO NEAREST STORM DRAIN.
CONTRACTOR SHALL DUCT THE TEMPORARY SUPPLY DUCTWORK IN
THROUGH THE PENTHOUSE MAN DOOR AND THROUGH ONE OF THE OPENINGS
OF ELECTRICAL 3-403. DUCTWORK SHALL TERMINATE AS CLOSE TO THE
AREAS OF CONCERN AS POSSIBLE. ALL TEMPORARY DUCTWORK TO BE BY
UNIT SUPPLIER.
CONTRACTOR SHALL DUCT THE TEMPORARY RETURN DUCTWORK THROUGH
THE PENTHOUSE MAN DOOR AND THROUGH ONE OF THE OPENINGS OF
ELECTRICAL 3-403. DUCTWORK SHALL TERMINATE ABOVE THE FINISHED
FLOOR TO ENSURE CAPTURE OF WARM AIR. ALL TEMPORARY DUCTWORK TO
BE BY UNIT SUPPLIER.
CONTRACTOR SHALL SEAL EXTERIOR DOORS TO ENSURE LITTLE MOISTURE
AND HEAT INTRUSION TO SPACE.
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
/2
/2
:0 :0
A
M
C
U s e rs
\r y a n \D o c u m e n ts
\M E
-O C
C C
-P E
N T
H O
U S
E C
H W
-1 p ry a n E
C .r v t
720 N. Maitland Ave., Suite 102 Maitland, FL 32751
(407) 622-2050 Office Fax
OCCC N/S BUILDING
PENTHOUSE CHW
VALVES
9800 International Dr Orlando, FL 32819
BID ADDITIVE -
FOURTH FLOOR -
TEMPORARY
COOLING SPACES
M-106
06/25/2021
20G0032
SAN
LY
SAN
100% CD
SCALE: 1/4" = 1'-0"1
FOURTH FLOOR HVAC PLAN - ELECTRICAL ROOM
3-407
1. REFER TO MECHANICAL GENERAL NOTES ON SHEET M-001.
2. REFER TO SPECIFICATIONS.
3. REFER TO PHASING PLAN SHEET FOR MORE INFORMATION ON CHILLED
WATER SHUT-DOWN FOR THIS AREA.
4. ALL ELECTRICAL REQUIREMENTS ASSOCIATED WITH THE TEMPORARY
COOLING SPACES ARE TO BE COORDINATED WITH ORANGE COUNTY
CONVENTION CENTER.
5. CONTRACTOR TO COORDINATE ALL RIGGING AND PLACEMENT OF
TEMPORARY UNIT ON THE ROOF ADJACENT TO THE SPACE.
GENERAL SHEET NOTES
SHEET KEYNOTES
0 2' 4' 8'
KEY PLAN - N.T.S.
S C
O
TT
ALLEN NEUN
E R
P R O F
ESSIONAL E
NG
IN
E E R
F L O R I D
A
L I C E N S E
M
N.O.
BO
BI
M
N.O.
BO
BI
20" CHW FROM BUILDING
20" CHW TO BUILDING
M
N.O.
BO
BI
M
N.O.
BO
BI
24" CHW FROM BUILDING
24" CHW TO BUILDING
M
N.O.
BO
BI
M
N.O.
BO
BI
24" CHW FROM BUILDING
24" CHW TO BUILDING
N O
R T
H P
E N
T H
O U
S E
C E
N T
E R
P
E N
T H
O U
S E
S O
U T
H
P
E N
T H
O U
S E
FM
FM
AI
AI
FM
AI
FM
AI
FM
AI
FM
AI
EXISTING VALVE
EXISTING VALVE
EXISTING VALVE
EXISTING VALVE
EXISTING VALVE
EXISTING VALVE
CHW TO AHU'S
CHW TO AHU'S
CHW TO AHU'S
CHW FROM AHU'S
CHW FROM AHU'S
CHW FROM AHU'S
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
This item has been digitally signed and sealed by Scott Neuner P.E. on the date listed using a digital signature.
Printed copies of this document are not considered sign and sealed and the SHA authentication code must be verified on any electronic copies.
/2
/2
:0 :0
A
M
C
U s e rs
\r y a n \D o c u m e n ts
\M E
-O C
C C
-P E
N T
H O
U S
E C
H W
-1 p ry a n E
C .r v t
720 N. Maitland Ave., Suite 102 Maitland, FL 32751
(407) 622-2050 Office Fax
OCCC N/S BUILDING
PENTHOUSE CHW
VALVES
9800 International Dr Orlando, FL 32819
CONTROLS
M-501
06/25/2021
20G0032
SAN
LY
SAN
100% CD
EXISTING CHW TERTIARY PUMP CONTROL SEQUENCE:
“A PID CONTROL LOOP WILL MODULATE THE SPEED OF THE PUMPS VFD BASED ON THE SET POINT OF A LOCAL DIFFERENTIAL PRESSURE SENSOR. THIS SENSOR'S SET POINT WILL BE CONTROLLED BY A RESET SCHEDULE THAT HAS AS ITS INPUT, FOUR REMOTELY LOCATED DIFFERENTIAL PRESSURE SENSORS. THE LOCAL SENSOR WILL BE RESET BY THE REMOTE SENSOR THAT IS SENSING THE LOWEST DIFFERENTIAL
PRESSURE.”
CONTRACTOR TO VERIFY THE EXISTING BUILDING AUTOMATION SYSTEM (BAS) ANY LOCAL / REMOTE DIFFERENTIAL PRESSURE SENSOR SETPOINTS AND RESET SCHEDULES AND PHYSICAL LOCATIONS
BEFORE AND AFTER ANY REQUIRED TEST AND BALANCE.
NEW CHW ISOLATION VALVE CONTROL SEQUENCE:
NEW ISOLATION VALVE (TYPICAL OF 6) RESPONSE TO NEW FLOW METER (TYPICAL OF 6) TO COMMUNICATE
WITH EXISTING BUILDING AUTOMATION SYSTEM (BAS) AS FOLLOWS:
FLOW METER:
THE BAS SHALL MONITOR CHILLED WATER SUPPLY AND RETURN WATER FLOW RATE (GPM).
IF THE CHILLED WATER SUPPLY AND RETURN WATER FLOW RATE (GPM) IS MORE THAN 10% (ADJ.)
DIFFERENT THEN THE BAS SHALL ENABLE AN ALARM – CHILLED WATER SUPPLY AND RETURN FLOW RATE
NOT EQUAL (CHILLED WATER LEAK).
ISOLATION VALVE:
THE BAS SHALL MONITOR AND COMMAND CHILLED WATER SUPPLY AND RETURN ISOLATION VALVE
POSITION (OPEN OR CLOSED) AND STATUS (NORMAL OR ALARM) RESPECTIVELY.
WHEN THE BAS COMMAND IS NOT EQUAL TO FEEDBACK POSITION A BAS CHILLED WATER ISOLATION VALVE ALARM (ISOLATION VALVE FAILURE - FEEDBACK NOT EQUAL TO COMMAND) SHALL BE ENABLED.
IF THE CHILLED WATER SUPPLY AND RETURN WATER FLOW RATE (GPM) IS MORE THAN 10% (ADJ.)
DIFFERENT AND THE BAS CHILLED WATER LEAK ALARM HAS BEEN ENABLED THEN:
• THE ISOLATION VALVE SHALL CLOSE.
• THE BAS SHALL ENABLE A CHILLED WATER ISOLATION VALVE ALARM – ISOLATION VALVE
ACTIVATED - CHILLED WATER LEAK).
• ONLY A BAS OPERATOR MANUAL COMMAND SHALL OPEN THE CHILLED WATER ISOLATION VALVE
AND DISABLE THE BAS ALARM. AFTER THE USER DEFINED TIME DELAY FOR REPAIR OF THE LEAK
OR CONFIRMATION OF RETURN TO NORMAL. THIS WILL REQUIRE A SECOND MANUAL
ACKNOWLEDGEMENT BY THE OPERATOR.
ISOLATION VALVE RESPONSE TO RESPECTIVE FLOW METER MEASURED FLOW IMBALANCE SHALL BE 30
SECONDS (ADJ.) MAXIMUM.
ALSO, THE ASSOCIATED REMOTE CHILLED WATER SUPPLY DIFFERENTIAL PRESSURE SENSOR
CONTROLLING CHILLED WATER SUPPLY PUMP MOTOR VFD SPEED SHALL BE DISABLED.18 SOUTH PENTHOUSE CHILLED WATER RETURN ISOLATION VALVE FEEDBACK X BI COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
17 SOUTH PENTHOUSE CHILLED WATER RETURN ISOLATION VALVE COMMAND X BO COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
16 SOUTH PENTHOUSE CHILLED WATER SUPPLY ISOLATION VALVE FEEDBACK X BI COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
15 SOUTH PENTHOUSE CHILLED WATER SUPPLY ISOLATION VALVE COMMAND X BO COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
SETPOINT + 10% CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
14 SOUTH PENTHOUSE CHILLED WATER RETURN FLOW RATE X AI 10 MIN
SETPOINT - 10%
GPM
CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
2 X X
SETPOINT + 10% CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
13 SOUTH PENTHOUSE CHILLED WATER SUPPLY FLOW RATE X AI 10 MIN
SETPOINT - 10%
GPM
CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
2 X X
12 CENTER PENTHOUSE CHILLED WATER RETURN ISOLATION VALVE FEEDBACK X BI COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
11 CENTER PENTHOUSE CHILLED WATER RETURN ISOLATION VALVE COMMAND X BO COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
10 CENTER PENTHOUSE CHILLED WATER SUPPLY ISOLATION VALVE FEEDBACK X BI COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
9 CENTER PENTHOUSE CHILLED WATER SUPPLY ISOLATION VALVE COMMAND X BO COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
SETPOINT + 10% CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
8 CENTER PENTHOUSE CHILLED WATER RETURN FLOW RATE X AI 10 MIN
SETPOINT - 10%
GPM
CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
2 X X
SETPOINT + 10% CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
7 CENTER PENTHOUSE CHILLED WATER SUPPLY FLOW RATE X AI 10 MIN
SETPOINT - 10%
GPM
CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
2 X X
6 NORTH PENTHOUSE CHILLED WATER RETURN ISOLATION VALVE FEEDBACK X BI COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
5 NORTH PENTHOUSE CHILLED WATER RETURN ISOLATION VALVE COMMAND X BO COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
4 NORTH PENTHOUSE CHILLED WATER SUPPLY ISOLATION VALVE FEEDBACK X BI COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
3 NORTH PENTHOUSE CHILLED WATER SUPPLY ISOLATION VALVE COMMAND X BO COV >1 MIN OPEN / CLOSED CHILLED WATER ISOLATION VALVE FAILURE (COMMAND NOT EQUAL TO FEEDBACK) 2 X X
SETPOINT + 10% CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
2 NORTH PENTHOUSE CHILLED WATER RETURN FLOW RATE X AI 10 MIN
SETPOINT - 10%
GPM
CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
2 X X
SETPOINT + 10% CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
1 NORTH PENTHOUSE CHILLED WATER SUPPLY FLOW RATE X AI 10 MIN
SETPOINT - 10%
GPM
CHILLED WATER SUPPLY AND RETURN FLOW RATE NOT EQUAL (CHILLED WATER LEAK)
2 X X
AI AO BI BOD
R
A W
IN
G
T A
G
POINT DESCRIPTION C
O
N T
R O
LL
E
D B
Y
(D R
A W
IN
G
T A
G
N E
W P
O
IN
T
A N
A
LO
G I
N P
U T
A N
A
LO
G O
U T
P U
T
B
IN
A R
Y I
N P
U T
B
IN
A R
Y O
U T
P U
T
TREND
INTERVAL
(ADJ)
SETPOINT / ALARM
CONDITION (ALL
SHOWN VALUES ARE
ADJ) UNITS ALARM MESSAGE A
LA
R M
L E
V E
L
H
IG
H
[M E
D
IU
M
LO
W
E M
A
IL
A
LA
R M
LO
G
A
LA
R M
CHILLED WATER (CHW) SYSTEM NEW POINTS
HARDWARE
POINTS
SOFTWARE POINTS (BACNET VALUE / TREND / SETPOINT / ALARM)
DIRECT DIGITAL CONTROL (DDC) POINTS SCHEDULE
neune02063 Rectangle neune02063 Rectangle neune02063 Line neune02063 Rectangle neune02063 Rectangle neune02063 Line
NOTE: SOME SYMBOLS SHOWN IN ELECTRICAL LEGEND MAY NOT APPLY
TO THIS PROJECT.
SHEET NOTE. SEE THE SPECIAL NOTES ON
THAT SHEET FOR THE NOTE NUMBER
INDICATED IN THE HEXAGON.
DEMOLITION HATCHING - INDICATES ITEMS TO
BE REMOVED UNLESS OTHERWISE NOTED
ITEMS SHOWN DASHED AND RELATIVELY LIGHT
ARE EXISTING UNLESS NOTED OTHERWISE
REVISION CLOUD AND REFERENCE NUMBER
ROOM NUMBERS
SECTION/DETAIL DESIGNATIONS
EQUIPMENT DESIGNATION
TOP = EQUIPMENT TAG
X = SECTION (LETTER) OR DETAIL (NUMBER)
Y = SHEET WHERE DETAIL/SECTION IS REFERENCED
Z = SHEET WHERE DETAIL/SECTION IS SHOWN
BOTTOM = EQUIPMENT NUMBER
X
Z
X
Z
TAG
Y
ASC - APPLICATION SPECIFIC CONTROLLER
ATC - AUTOMATIC TEMPERATURE CONTROL
FAAP - FIRE ALARM ANNUNCIATOR PANEL
GAP - GENERATOR ANNUNCIATOR PANEL
FT - FOOT OR FEET
HP - HORSE POWER
FTU - FAN TERMINAL UNIT
GFI - GROUND FAULT INTERRUPTING
GND - GROUND
HZ - HERTZ (CYCLES PER SECOND)
FCU - FAN COIL UNIT
FLA - FULL LOAD AMPS
EM - EMERGENCY
EWC - ELECTRIC WATER COOLER
EWH - ELECTRIC WATER HEATER
EX - EXISTING
EXTR - EXISTING TO REMAIN
°F - DEGREES FAHRENHEIT
FACP - FIRE ALARM CONTROL PANEL
FATC - FIRE ALARM TERMINAL CABINET
EPO - EMERGENCY POWER OFF
CT - COOLING TOWER
dB - DECIBELS
EF - EXHAUST FAN
EDH - ELECTRIC DUCT HEATER
ELEC - ELECTRIC OR ELECTRICAL
°C - DEGREES CENTIGRADE/CELSIUS
C - CONDUIT
CB - CIRCUIT BREAKER
CCTV - CLOSED CIRCUIT TELEVISION
D/D - DUSK TO DAWN
CONC - CONCRETE
COND - CONDUCTOR
DN - DOWN
AC - ALTERNATING CURRENT
AFG - ABOVE FINISHED GRADE
ATS - AUTOMATIC TRANSFER SWITCH
BG - BELOW GRADE
ABCLG - ABOVE CEILING
APPROX - APPROXIMATELY
BLDG - BUILDING
A/C - AIR CONDITIONING
AHU - AIR HANDLING UNIT
AFF - ABOVE FINISHED FLOOR
AL - ALUMINUM
PTAC - PACKAGED TERMINAL AIR CONDITIONER
UNO - UNLESS NOTED OTHERWISE
WH - WATER HEATER
VAV - VARIABLE AIR VOLUME
VFD - VARIABLE FREQUENCY DRIVE
WP - WEATHERPROOF
TYP - TYPICAL
RLA - RUNNING LOAD AMPS
SHT - SHEET
SF - SUPPLY FAN
RTU - ROOF TOP UNIT
UGE - UNDERGROUND ELECTRIC
TTC - TELEPHONE TERMINAL CABINET
TTB - TELEPHONE TERMINAL BOARD
SCP - SECURITY CONTROL PANEL
R - RELOCATE
IDF - INTERMEDIATE DISTRIBUTION FRAME
MTD - MOUNTED
POAU - PACKAGED OUTDOOR AIR UNIT
OAU - OUTDOOR AIR HANDLING UNIT
P - PUMP
PH - PHASE
NTS - NOT TO SCALE
OHE - OVERHEAD ELECTRIC
NO - NORMALLY OPEN
NL - NIGHT LIGHT
NF - NON-FUSED
NIC - NOT IN CONTRACT
NC - NORMALLY CLOSED
LRA - LOCKED ROTOR AMPS
MCA - MINIMUM CIRCUIT AMPACITY
MIN - MINIMUM
REF - REFRIGERATOR
MAX - MAXIMUM
KW - KILOWATT
LA - LIGHTNING ARRESTOR
MH - MANHOLE
MDF - MAIN DISTRIBUTION FRAME
MB - MAIN BREAKER
IN - INCHES
MLO - MAIN LUGS ONLY
U.N.O. - UNLESS NOTED OTHERWISE
ST - SHUNT TRIP
ELECTRICAL SYMBOL LEGENDABBREVIATIONS
GENERAL SYMBOLS
ELECTRICAL SYMBOL NOTES
ALL DISTANCES ARE TO CENTER OF DEVICE OR EQUIPMENT UNLESS OTHERWISE
NOTED. DEVICES INDICATED AT 48" MAY NOT BE INSTALLED WITH ANY OPERABLE PART
HIGHER THAN 48". DEVICES MAY BE INSTALLED IN CONCRETE MASONRY UNITS WITH
THE TOP OF THE DEVICE AT 48".
** DISTANCE TO TOP OF EQUIPMENT OR DEVICE
T1
PP2
TRANSFORMERS. THE TRANSFORMER TYPE IS INDICATED BY A NUMBER
FOLLOWING THE UPPER CASE LETTER "T". SEE THE TRANSFORMER
SCHEDULE OR THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER
DESCRIPTION AND REQUIREMENTS. EXAMPLE: TRANSFORMER TYPE "T1".
PANELBOARDS. PANELBOARD DOORS MAY BE SHOWN TO INDICATE
OPENING SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD
IDENTIFICATION FOR DESIGNATION CODES.
CONDUIT SHOWN WITHOUT SLASH MARKS SHALL CONTAIN 2#12, 1#12G
CONDUCTORS IN 3/4" CONDUIT UNLESS SPECIFIC EQUIPMENT REQUIRES A
DIFFERENT SIZE.
HOME RUN TO BRANCH CIRCUIT PANELBOARD. THE PANELBOARD
DESIGNATION AND CIRCUITS ARE SHOWN ADJACENT TO THE HOME RUN
ARROW. CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN
IN THE PANELBOARD SCHEDULE WITH THE CORRESPONDING PANELBOARD
AND CIRCUIT DESIGNATION. EXAMPLE: HOME RUN TO PANELBOARD RP2;
CIRCUITS 1, 3, 5.
RP2-1,3,5
ELECTRICAL GENERAL NOTES
1. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2017 NATIONAL ELECTRICAL CODE, THE 2020 FLORIDA BUILDING CODE, THE NATIONAL FIRE CODES, STATE REQUIREMENTS AND ALL APPLICABLE LOCAL
CODES AND ORDINANCES.
2. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION AND ALL REQUIREMENTS NOT INDICATED ON THE
DRAWINGS.
3. IT IS THE INTENT OF THESE PLANS AND SPECIFICATIONS THAT A COMPLETE AND WORKABLE ELECTRICAL INSTALLATION BE PROVIDED FOR ALL THE EQUIPMENT DESCRIBED OR SHOWN AS BEING IN THIS CONTRACT. ANY ITEMS WHICH ARE CLEARLY NECESSARY FOR THE COMPLETION OF THE WORK OR ITS APPURTENANCES SHALL BE CONSIDERED A PORTION OF THE WORK AND SHALL BE PROVIDED AND
INSTALLED BY THE CONTRACTOR EVEN THOUGH NOT DIRECTLY SPECIFIED.
4. THE PLANS AND SPECIFICATIONS ARE COMPLIMENTARY, AND THAT WHICH IS CALLED FOR BY ONE SHALL BE AS BINDING AS IF CALLED FOR BY BOTH. IN THE EVENT THAT THE PLANS AND SPECIFICATIONS CONFLICT, THE HIGHER RANKING DOCUMENT (SPECIFICATIONS) SHALL APPLY. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE DESIGN PROFESSIONAL
PRIOR TO SUBMITTAL OF BID.
5. THE PLANS INDICATE THE GENERAL ARRANGEMENT OF THE WORK TO BE PERFORMED AND ARE DIAGRAMMATIC ONLY. ALL DIMENSIONS AND EQUIPMENT LOCATIONS SHALL BE VERIFIED IN THE
FIELD.
6. VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE BUILDING AND SITE AFFECTED BY THIS WORK BEFORE SUBMITTING PROPOSALS, SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT EXECUTION OF THE WORK. SUBMISSION OF A PROPOSAL WILL BE CONSTRUED AS EVIDENCE THAT SUCH EXAMINATION HAS BEEN MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WILL NOT BE
RECOGNIZED.
7. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE PROJECT TO ENSURE THAT ALL WORK SHALL MEET OR EXCEED THE ABOVE REQUIREMENTS. ANY ALLEGED DISCREPANCIES SHALL BE BROUGHT TO
THE OWNER'S AND ENGINEER'S ATTENTION PRIOR TO THE START OF WORK.
8. THE CONTRACTOR IS DIRECTED TO OBTAIN COPIES OF ALL RELATED PLANS, SPECIFICATIONS, SHOP
DRAWINGS AND ADDENDUM TO COORDINATE THE RELATED WORK AND SCHEDULING.
9. COORDINATE ELECTRICAL EQUIPMENT, LIGHTING FIXTURE AND DEVICE LOCATIONS WITH
ARCHITECTURAL PLANS AND EQUIPMENT OF ALL TRADES.
10. PROVIDE ACCESS PANELS IN WALLS AND CEILINGS WHERE REQUIRED FOR OPERATION, SERVICING, INSPECTION AND MAINTENANCE OF ALL EQUIPMENT.
11. VERIFY EXISTING CONDITIONS IN FIELD AND COORDINATE WITH ALL TRADES PRIOR TO INSTALLING OR
FABRICATING EQUIPMENT.
12. DRAWINGS ARE DIAGRAMMATIC IN NATURE. COORDINATE EXACT LOCATION OF ALL CEILING MOUNTED EQUIPMENT SO ALL SERVICEABLE COMPONENTS CAN BE EASILY ACCESSED. REMOVAL OR RELOCATION
OF LIGHTING FIXTURES FOR SERVICE ACCESS IS NOT ACCEPTABLE. THE CONTRACTOR SHALL
REINSTALL EQUIPMENT THAT HAS INADEQUATE OR UNSAFE ACCESSIBILITY. LOCATE ALL OTHER
EQUIPMENT WITH MANUFACTURER RECOMMENDED ACCESS FOR OPERATION AND MAINTENANCE.
13. PRIOR TO BID, COORDINATE ALL ELECTRICAL WORK WITH MECHANICAL WORK AND OTHER TRADES.
SEE SPECIFICATIONS FOR REQUIREMENTS.
14. CONTRACTOR SHALL NOT CONCEAL ANY WORK UNTIL INSPECTED BY ELECTRICAL INSPECTOR AND/OR ARCHITECT/ENGINEER. CONTRACTOR SHALL NOTIFY A/E OF A SCHEDULED INSPECTION TIME WITHIN 72
HOURS. GENERAL CONTRACTOR SHALL NOT CONCEAL WORK UNTIL APPROVED, REGARDLESS OF
SCHEDULE.
15. PRIME CONTRACTOR IS RESPONSIBLE TO HAVE LICENSED AND QUALIFIED SUBCONTRACTORS
PERFORMING ALL WORK.
16. ALL CHANGES MADE IN THE FIELD SHALL BE RECORDED BY THE CONTRACTOR(S) ON AS-BUILT
DRAWINGS, SHOP DRAWINGS, AND IN MAINTENANCE MANUALS.
17. THE SIZE, LOCATION AND ELECTRICAL REQUIREMENTS AND SERVICE CLEARANCES OF EQUIPMENT INSTALLED UNDER DIVISION 26, ELECTRICAL, SHALL BE COORDINATED WITH ALL OTHER TRADES.
18. WHERE CROWDED LOCATIONS EXIST OR WHERE THERE IS A POSSIBILITY OF CONFLICT BETWEEN
TRADES, CONTRACTOR SHALL MAKE COMPOSITE DRAWINGS SHOWING THE EXACT LOCATION OF
PANELBOARDS, SWITCHBOARDS, TRANSFORMERS, CONDUIT AND EQUIPMENT AND MECHANICAL PIPING, DUCTWORK, AND OTHER ARCHITECTURAL APPURTENANCES. DRAWINGS SHALL BE BASED ON FIELD
MEASUREMENTS AND, AFTER CONSULTATION AND AGREEMENT BETWEEN THE TRADES, SHALL BE
APPROVED BY THE ARCHITECT/ENGINEER PRIOR TO INSTALLATION OF THE WORK.
19. NOTIFY ARCHITECT/ENGINEER OF ANY CONFLICTS PRIOR TO PURCHASING EQUIPMENT AND PRIOR TO
CUTTING OPENINGS.
20. ALL BARE METAL SURFACES SHALL BE PRIMED AND PAINTED TO PREVENT ANY RUST, INCLUDING, BUT
NOT LIMITED TO, ANGLE FRAMING, UNIT SUPPORTS, MOUNTING HARDWARE, ETC.
21. ALL WORK SHALL BE CONSTRUCTED TO MEET ANY PHASING REQUIREMENTS OF THE PROJECT AS MAY
BE OUTLINED IN THE DRAWINGS AND/OR SPECIFICATIONS.
22. RACEWAYS AND ELECTRICAL EQUIPMENT HAVE BEEN LOCATED AND ARRANGED TO MINIMIZE THE
INTERFERENCE OF EQUIPMENT WITH THE STRUCTURE. THE CONTRACTOR SHALL THOROUGHLY
FAMILIARIZE THEMSELVES WITH THE WORK TO BE PERFORMED BY OTHER TRADES AND THE PHYSICAL CHARACTERISTICS OF THE STRUCTURE IN ORDER TO SCHEDULE AND INSTALL EQUIPMENT AND TO MINIMIZE POSSIBLE INTERFERENCE. FAILURE TO PROPERLY COMMUNICATE AND SCHEDULE WORK WITH OTHER TRADES RESULTING IN ADDITIONAL WORK AND MATERIAL, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE MODIFICATIONS REQUIRED TO RESOLVE THE CONFLICT SHALL BE DECIDED BY
THE OWNER AND THE COST OF THE MODIFICATIONS SHALL BE BORNE BY THE CONTRACTOR.
23. ALL PANELBOARDS SHALL BE PROVIDED WITH A PRINTED DIRECTORY SHOWING CIRCUIT NUMBERS AND
A COMPLETE DESCRIPTION OF EACH CIRCUIT.
24. MINIMUM TRADE SIZE CONDUIT PERMITTED SHALL BE 3/4 INCH UNLESS NOTED OTHERWISE. TYPE AC AND TYPE MC CABLE SHALL NOT BE PERMITTED FOR USE ANYWHERE EXCEPT FOR LIGHTING FIXTURE
WHIPS NOT EXCEEDING 6'-0" IN LENGTH.
25. ALL SECONDARY FEEDERS AND BRANCH CIRCUIT CONDUCTORS SHALL BE COPPER WITH 600 VOLT INSULATION TYPE THHN, THW OR THWN. (MINIMUM SIZE SHALL BE NO. 12 AWG.) CONTRACTOR SHALL PROVIDE AND INSTALL ALL PHASE (A, B, C, AS REQUIRED) CONDUCTORS, NEUTRAL CONDUCTORS, AND
GROUND CONDUCTORS AS NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM. NO INDIVIDUAL
CONDUCTOR SPECIFICATION SHALL BE CONSTRUED AS REQUIRING ONLY ONE CONDUCTOR. A
COMPLETE AND OPERABLE SYSTEM IS INTENDED BY THE CONSTRUCTION DOCUMENTS AND THE
CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY WIRING AND CONDUCTORS AS REQUIRED
TO DELIVER A COMPLETE AND OPERABLE ELECTRICAL SYSTEM TO THE OWNER. NO ADDITIONAL
COMPENSATION WILL BE MADE TO THE CONTRACTOR FOR UNDER-ESTIMATING AND/OR MIS-
CALCULATING THEIR WIRING AND CABLING RESPONSIBILITIES.
26. ALL ELECTRICAL WIRING DEVICES INDICATED TO BE INSTALLED IN MASONRY WALLS OR FLOORS SHALL
BE FLUSH MOUNTED, UNLESS OTHERWISE NOTED.
27. ALL CONDUIT RUNS SHALL BE CONCEALED UNLESS SPECIFICALLY NOTED OTHERWISE OR PRIOR
APPROVED BY OWNER FOR SURFACE MOUNTING.
28. ALL CONDUITS SHALL HAVE A SEPARATE GREEN GROUND CONDUCTOR INSTALLED FOR GROUNDING.
29. ALL FEEDER AND BRANCH CIRCUIT CONDUCTORS SHALL BE SIZED FOR THE MAXIMUM VOLTAGE DROP
ALLOWED IN ACCORDANCE WITH THE 2020 FLORIDA BUILDING CODE, ENERGY CONSERVATION,
CHAPTER 4, SECTION C405.7.3. THE ELECTRICAL CONTRACTOR SHALL CALCULATE VOLTAGE DROP AND
ADJUST CONDUCTORS AS NEEDED. FOR DESIGN LOADS, A MAXIMUM VOLTAGE DROP OF 2% IS
PERMITTED FOR FEEDER CONDUCTORS AND A MAXIMUM VOLTAGE DROP OF 3% IS PERMITTED FOR BRANCH CIRCUIT CONDUCTORS. CONTRACTOR SHALL NOT DECREASE CONDUCTOR SIZES NOTED ON PLAN. CONTRACTOR SHALL ONLY INCREASE CONDUCTOR SIZES NOTED IF NEEDED TO MEET MINIMUM
CODE REQUIREMENTS.
30. FOR MULTI-WIRE BRANCH CIRCUITS, ADD SEPARATE NEUTRALS OR PROVIDE & INSTALL MULTI-POLE
CIRCUIT BREAKERS PER 2017 NEC, ARTICLE 210.4.
31. THE CONTRACTOR SHALL PROVIDE AND INSTALL CHROME FINISHED METAL ESCUTCHEONS TO FINISH THE HOLES OR SLEEVES OFF, INCLUDING THE OUTSIDE AND INSIDE OF THE EXTERIOR WALLS AND ANY OTHER PLACE WHERE THE PENETRATION IS VISIBLE, FOR ALL ELECTRICAL PIPES, CONDUITS, AND PENETRATIONS MADE OR OTHERWISE NECESSARY FOR CONSTRUCTION OF THE ELECTRICAL SYSTEMS.
32. THE CONTRACTOR SHALL MAKE AND PERFORM ALL EXOTHERMIC WELDING PROCEDURES (CADWELD) IN ACCORDANCE WITH THE APPLICABLE ANSI STANDARDS INCLUDING SAFETY IN WELDING AND CUTTING, AND IN STRICT ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTALLATION AND HANDLING INSTRUCTIONS. ALL EXOTHERMIC WELDS (CADWELDS) SHALL BE INDIVIDUALLY DOCUMENTED AND CERTIFIED BY THE INSTALLING CONTRACTOR AND SHALL BE UNIQUELY RECORDED ON THE AS-BUILT
DRAWINGS. ALL DOCUMENTATION SHALL BEAR THE CONTRACTORS SIGNED CERTIFICATION OF
PROPERLY COMPLETED WELDS AND SHALL BE SUBMITTED TO THE OWNER FOR THEIR PERMANENT
RECORDS.
33. ALL ELECTRICAL EQUIPMENT FEEDERS, BRANCH CIRCUIT CONDUCTORS, AND DEVICE AND EQUIPMENT
TERMINATIONS SHALL BE RATED FOR A MINIMUM OF 75ºC UNLESS OTHERWISE NOTED.
34. GENERAL CONTRACTOR SHALL COORDINATE WITH THE OWNER (ORANGE COUNTY CONVENTION
CENTER) THE ELECTRICAL REQUIREMENTS FOR THE TEMPORARY HVAC UNITS THAT ARE TO BE USED
DURING CONSTRUCTION.
TAG-# OR
72"** CIRCUIT BREAKER PANEL
72"**
72"**
T1
POWER OR DISTRIBUTION PANEL
TRANSFORMER (TYPE DENOTED)
SPECIAL CABINET
GENERATOR (KVA DENOTED)25 KVA
VARIABLE FREQUENCY DRIVE
EQUIPMENT
VFD
SR
SYMBOL
LV
UE
EX
UHVE
OHE
OHT
HT AFF
CONDUIT TRANSITION DOWN
CONDUIT TRANSITION UP
BRANCH CIRCUIT HOME RUN (NUMBER AND
SIZE OF CONDUCTORS AS PER N.E.C. -
NUMBERS DENOTE PANEL AND CIRCUIT)
UNDERGROUND HIGH VOLTAGE ELECTRICAL
UNDERGROUND ELECTRICAL
LOW VOLTAGE POWER WIRING
EXISTING CONDUIT
OVERHEAD TELEPHONE
OVERHEAD ELECTRIC
CONDUIT EXPOSED
SURFACE RACEWAY
CONDUIT STUBBED OUT
CONDUIT CONCEALED BELOW FLOOR
CONDUIT CONCEALED IN WALL OR OVERHEAD
DESCRIPTION
UNDERGROUND TELEPHONEUT
UCOM UNDERGROUND COMMUNICATIONS
UTV UNDERGROUND CABLE TELEVISION (CATV OR CCTV)
UFIBR UNDERGROUND FIBER OPTIC
A-1, 3, 5
RACEWAY & CONDUCTORS
DEVICES
SYMBOLHT AFF DESCRIPTION
AS NOTED
72"**
72"** R
72"**
72"**
72"**
48"
72"**
72"**
BUS DUCT WITH PLUG UN DISCONNECT (FUSED)
ENCLOSED CIRCUIT BREAKER
RELAY
COMB. MOTOR STARTER (NON-FUSED)
MAG MOTOR STARTER OR CONTACTOR
SAFETY DISC SW (FUSED)
SAFETY DISC SW (NON-FUSED)
COMB MOTOR STARTER (FUSED)
MANUAL MTR STR (W/OVERLOADS)
MOTOR (SEE SCHEDULE)
DAMPER MOTOR
AS NOTED J J JUNCTION BOX
PULL BOXPB
SYMBOLHT AFF DESCRIPTION
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2020
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
This item has been digitally signed and sealed by Salvador Perez P.E. on the date listed using a digital signature.
Printed copies of this document are not considered sign and sealed and the SHA authentication code must…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .