Y22-7003-ZR_Drawings.pdf

PDF 29 MB Posted

Attached to
Force Main Lake Underhill at Chickasaw Trail
Solicitation number
Y22-7003-ZR
Issued by
Orange County, Orlando City, Florida

About this file

The document is a set of construction drawings for the Lake Underhill Force Main Replacement project by the Orange County Utilities Department, located in Orlando, Florida. The project involves replacing approximately 1,357 linear feet of existing force main pipeline using 16-inch and 12-inch PVC and HDPE pipes along Lake Underhill Road. The construction drawings, dated August 2021, provide detailed plans for pipeline replacement, including specific stations, valves, fittings, and air release valve locations. The project includes removing existing force mains, installing new pipes via open trench and directional drilling methods, and implementing a complex construction sequencing plan to minimize service interruptions.

The project is funded through Orange County's Capital Improvement Program (CIP Funding Code: 1539-0051) with an estimated cost of $1,248,770. The corresponding state and local contract opportunity requires electronic submission via the OpenGov e-Procurement Platform by 4:00 pm EST on Tuesday, June 14, 2022. The project involves careful coordination with existing utilities, including water, wastewater, gas, electric, and telecommunications infrastructure. Key technical requirements include maintaining continuous service, protecting existing infrastructure, using approved materials and installation methods, and following strict notification and safety protocols during construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .