Y22-106_Specifications.pdf
PDF 5 MB Posted
- Solicitation number
- Y22-106
- Issued by
- Orange County, Orlando City, Florida
About this file
This document is a technical specifications manual for a Wastewater Gravity Cleaning and CCTV Term Contract issued by Orange County Utilities Department in Florida. The contract, identified as Y22-106, solicits services for cleaning and closed circuit televising (CCTV) of wastewater gravity mainlines and laterals throughout the Orange County Utilities Sanitary Sewer system. The project is estimated to cost $3,699,463.00, with sealed offers to be accepted until 4:00 pm EST on March 8, 2022. The term contract is structured as a unit price contract with delivery orders issued for specific projects, and the County is not obligated to purchase a minimum or maximum amount during the contract term.
The contract will be awarded to a contractor with specific qualifications, including a minimum of 500,000 linear feet of sanitary sewer cleaning and CCTV inspection experience within the past ten years. The contractor must provide specialized equipment including pan and tilt CCTV cameras, lateral cameras, digital video capture systems, and GPS coordinate collection tools. Payment will be based on unit prices for various tasks such as cleaning mains and laterals, CCTV inspections, and GPS coordinate collection. The contractor will be responsible for all aspects of the work, including maintaining traffic, preventing environmental disruption, and ensuring high-quality documentation of the sewer system's condition using NASSCO Pipeline Assessment Certification Program (PACP) standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Y22-106.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WASTEWATER GRAVITY CLEANING AND CCTV
TERM CONTRACT
ORANGE COUNTY UTILITIES DEPARTMENT
00004 - 1 of 3
Orange County Utilities Field Services
TABLE OF CONTENTS
DIVISION 1 - GENERAL REQUIREMENTS
01001 General Work Requirements
01010 Summary of Work
01025 Measurement and Payment
01065 Permits and Fees
01070 Abbreviations and Symbols
01091 Reference Specifications
01101 Special Requirements (Gravity Inspection Only)
01400 Quality Control
01516 Collection System Bypass
01560 Erosion and Sedimentation Control
01570 Maintenance of Traffic
01580 Project Identification and Signs
01610 Delivery, Storage, and Handling
01740 Warranties and Bonds
DIVISION 2 - SITE WORK
02100 Temporary Erosion and Sedimentation Control
02140 Dewatering
02215 Finish Grading
02220 Excavating, Backfilling and Compacting
Roadwork
02570 Stabilized Subgrade
02571 Limerock Base
02572 Soil Cement Base
02573 Asphalt Pavement Removal and Replacement
02576 Concrete Sidewalks and Driveways
02578 Solid Sodding
Pressure Pipe (Not Used)
Wastewater Gravity System Inspection
02761 Cleaning Sanitary Sewer Systems
02762 Televising Sanitary Sewer Systems
00004 - 2 of 3
APPENDIX
APPENDIX A (NOT USED)
APPENDIX B (NOT USED)
APPENDIX D List of Approved Products (title sheet)
Appendix D Orange County Utilities - List of Approved Products (February 11, 2011)
APPENDIX H Lateral GPS Data Schema (title sheet)
Appendix H Lateral GPS Data Schema
APPENDIX F (NOT USED)
APPENDIX G (NOT USED)
00004 - 3 of 3
THIS PAGE LEFT BLANK INTENTIONALLY
01001 - 1 of 18
SECTION 01001
GENERAL WORK REQUIREMENTS
PART 1 - GENERAL
1.01 NOTICES
A. All notices or other papers required to be delivered by the Contractor to the County shall be delivered to the office of the Field Services Division, Orange County Utilities
Department, 8100 Presidents Drive, Suite A, Orlando, FL 32809.
1.02 TERM CONTRACT
A. The Contract is a term contract.
B. The Contract is a Unit Price contract with the total estimated base bid equal to the sum of the pay item totals from the Bid Schedule. All quantities on the Bid Schedule are estimates and the County is not obligated to purchase a minimum or maximum amount during the Contract term.
C. Projects will be authorized by issuance of a numbered Delivery Order. The Delivery
Order will specify the location, description and completion time for the Project. Delivery
Orders will be emailed to the Contractor. The emailed copy of the Delivery Order shall be the official Notice to Proceed.
1.03 METHOD OF ORDERING
A. Routine Orders:
1. The County will initiate a Work Request which shall include, but not be limited to, the following: Date of request, an asset listing of work to be completed with estimated quantities, map(s) of the work area. The Work Request will be emailed to the Contractor, however, due to size limitations, some maps will need to be picked up at 8100 Presidents Drive Orlando, FL 32809.
2. Upon receiving the Work Request(s) from the County, the Contractor shall visit the site and familiarize themselves with the site conditions and the requested Work. At this time, the Contractor shall consider any bypass requirements, private pump stations affecting the work area, and any other considerations that need to be made and coordinated prior to executing the Work. If multiple Work Requests are submitted simultaneously, the Contractor shall provide an individual quote for each
Work Request.
3. The Contractor shall submit their Job Cost Proposal (quote) on company letterhead with, at minimum, the following information:
a. Quote number
b. Contract number and title
c. Date of quote
01001 - 2 of 18
d. Estimated days to complete the requested Work
e. Line item number and description
f. Quantity – Contractor to confirm estimated quantities before submitting quote
g. Unit of measure
h. Unit price
i. Total cost per line
j. Overall job total
4. The Job Cost Proposal shall be emailed to the County within five (5) calendar days following the date of emailed Work Request.
5. The County will review and approve the Contractor’s submitted Job Cost Proposal and process a Delivery Order. If the submitted Job Cost Proposal contains quantities different from the estimated quantities, the County will work with the Contractor to confirm actual quantities before issuing the Delivery Order.
B. Emergency Orders:
1. Contractor shall be available to commence emergency Work on an on-call basis.
2. Emergency Work may be required on a twenty-four (24) hour, seven (7) day/week basis, as requested. Emergency Work Requests shall be responded to no later than two (2) hours after notification to the Contractor, by the County, so the Contractor can begin to assess the needs for the emergency Work Request. The emergency Work shall begin as agreed on by the Project Manager or Designee and be continuous until all emergency Work is complete. The County may waive cost estimates and the issuance of a Delivery Order prior to the start of emergency Work. The Contractor shall be required to submit a formal quote using the appropriate Bid Schedule line items to include quantities with pricing used in the completion of the emergency
Work as soon as possible, but no more than two (2) days after emergency Work commences. A Delivery Order will then be processed based on that quote after it has been reviewed and approved by the Project Manager or Designee.
1.04 INVOICING
A. When invoices are submitted to the County for payment, the following is a list of the minimum requirements for an invoice to be considered a Proper Invoice. The list is in no particular order. Any attachment included with the invoice packet must list the relevant invoice number.
1. Company name and address
2. Valid Orange County Delivery Order number
3. Invoice number
01001 - 3 of 18
4. Invoice date
5. Amount Payable
6. A cumulative count of products or services rendered
7. List of individual asset(s) serviced and dates serviced
a. This may be included as an attachment in the form of a work log or similar
8. Release of Lien
9. Payee name, address, and telephone number
B. Line item number and description of each item invoiced shall mirror the Contract Bid
Schedule. Invoices against this Contract are authorized only at the prices stated in the Bid
Response, unless otherwise provided in the Invitation for Bid.
C. Invoices shall be submitted in a timely manner once the County accepts the Work
D. Invoices will require acceptance by the County representative prior to payment to ensure the contracted services were performed as specified in the Contract. Payment will be made in accordance with Florida Statute 218, Local Government Prompt Payment Act.
E. Payment for accepted services shall be accomplished by submission of a hardcopy invoice, in duplicate, to:
Orange County Utilities Department
Attention: Fiscal & Operational Support
8100 Presidents Drive, Suite D
Orlando, Florida 32809
1.05 WORK TO BE DONE
A. The Contractor shall furnish all labor, materials, equipment, tools, services, and incidentals to complete all Work required by these specifications and as shown on the
Drawings, at a rate of progress which will ensure completion of the Work within the
Contract Time stipulated.
B. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, clean up, replacements, and restoration required as a result of damages caused during this construction.
C. The Contractor shall comply with all City, County, State, Federal, and other codes, which are applicable to the proposed Work.
D. All newly constructed Work shall be carefully protected from injury in any way. No wheeling, walking, or placing of heavy loads on it shall be allowed and all portions damaged shall be reconstructed by the Contractor at his own expense.
E. Scope of Work: See Section 01010, Summary of Work, and the Bid Schedule for details.
01001 - 4 of 18
1.06 DRAWINGS AND PROJECT MANUAL
A. The Work shall be performed in accordance with the Drawings and Specifications prepared by the County. All work and materials shall conform to the Orange County
Utilities Standards and Construction Specifications Manual, latest edition or as indicated in these Specifications or Drawings.
B. The Contractor shall verify all dimensions, quantities and details shown on the Drawings, Supplementary Drawings, Schedules, Specifications or other data received from the
County, and shall notify same, in writing, of all errors, omissions, conflicts, and discrepancies found therein. Failure to discover or correct errors, conflicts, or discrepancies shall not relieve the Contractor of full responsibility for unsatisfactory work, faulty construction or improper operation resulting there from, nor from rectifying such conditions at his own expense.
C. All schedules are given for the convenience of the County and the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for the making of estimates of the size, kind, and quantity of materials and equipment included in the
Work to be done under this Contract.
1.07 PROTECTION AND RESTORATION
A. The Contractor shall be responsible for the preservation of all public and private property and shall use every means of protection necessary to prevent damage thereto. If any direct or indirect damage is done to public or private property by or on account of any act, omission, neglect, or misconduct in the execution of the Work on the part of the
Contractor, such property shall be restored by the Contractor, at no additional cost to the
County, and to a condition similar or equal to that existing before the damage was done, or the Contractor shall make good the damage in another manner acceptable to the
County.
B. Protection of Trees and Shrubs
1. Protect with boxes or other barricades.
2. Do not place excavated material so as to injure trees or shrubs.
3. Install pipelines in short tunnels between and under root systems.
4. Support trees to prevent root disturbance during nearby excavation.
C. Tree and Limb Removal
1. Tree limbs, which interfere with equipment operation and are approved for pruning, shall be neatly trimmed and the tree cut coated with tree paint.
2. The County may order the Contractor, for the convenience of the County, to remove trees along the line or trench excavation. The Contractor shall obtain any permits required for removal of trees. Ordered tree removal shall be paid for under the appropriate Contract items.
01001 - 5 of 18
D. Trees or shrubs destroyed by negligence of the Contractor or his employees shall be replaced by the Contractor with new stock of similar size and age, at the proper season and at no additional cost to the County.
E. Lawn Areas: All lawn areas disturbed by construction shall be replaced with like kind to a condition similar or equal to that existing before construction. Where sod is to be removed, it shall be carefully removed, and the same re-sodded, or the area where sod has been removed shall be restored with new sod in the manner described in Section 02578, Solid Sodding.
F. Where fencing, walls, shrubbery, grass strips or area must be removed or damaged incident to the construction operation, the Contractor shall, after completion of the Work, replace or restore to the original condition.
G. The cost of all labor, materials, equipment, and restoration work shall be deemed included in the appropriate Contract item(s), or if no specific item is provided therefore, as part of the overhead cost of the Work, and no additional payment will be made therefore.
1.08 PUBLIC NUISANCE
A. The Contractor shall not create a public nuisance including, but not limited to, encroachment on adjacent lands, flooding of adjacent lands, or excessive noise.
B. Sound levels measured by the County shall not exceed 45 dBA from 8 p.m. to 8 a.m. or
55 dBA from 8 a.m. to 8 p.m. This sound level shall be measured at the exterior of the nearest exterior wall of the nearest residence. Levels at the equipment shall not exceed 85 dBA at any time. Sound levels in excess of these values are sufficient cause to have the work halted until equipment can be quieted to these levels. Work stoppage by the County for excessive noise shall not relieve the Contractor of the other portions of this specification including, but not limited to, completion dates and bid amounts.
C. No extra charge may be made for time lost due to work stoppage resulting from the creation of a public nuisance.
1.09 CONTRACTOR’S PAYMENTS TO COUNTY FOR OVERTIME WORK
A. County Inspector Work Hours: Normal work hours for the County’s inspector(s) are defined as any eight (8) hour period between the hours of 7:00 a.m. and 4:00 p.m. on the weekdays of Monday through Friday. Any County Inspector(s) work beyond the aforementioned normal work hours shall be requested in writing forty-eight (48) hours in advance. All overtime, County holidays, or weekend work compensation for the County’s
Inspector(s) to work beyond the normal working hours are considered overtime compensation and shall be paid for by the Contractor. The overtime pay rate will be
$51.00 per hour or the most current rate as listed in the County Fee Directory prepared by the Office of Management and Budget, in section “Orange County Utilities Engineering
& Construction”, under the heading of “Inspection Fee other than Normal Working
Hours”. The Contractor agrees that the County shall deduct charges for work outside normal work hours and for overtime pay from payments due the Contractor.
01001 - 6 of 18
B. The County will determine if an inspector needs to be onsite during the timeframe listed in the request.
1.10 MAINTENANCE OF SERVICE
A. Unless noted otherwise on the plans, the operation of the existing water, reclaimed water or wastewater facility on each of the respective locations shall remain in service until the transfer of service has been completed. The Contractor shall, prior to interrupting any utility service (water, sewer, etc.) for the purpose of making cut-ins to the existing lines or for any other purposes, contact the County and make satisfactory arrangements with the County regarding the interruption.
B. Utility lines that are damaged during construction shall be repaired by the Contractor and service restored within four (4) hours of the breakage. The County retains the option of repairing any damage to utility pipes in order to expedite service to the customers. The
Contractor shall remain responsible for all costs associated with the repair.
1.11 TRANSFER OF SERVICE
A. When the County has accepted a proposed facility and placed it into operation, the transfer of service is complete. The Contractor may begin the work of removing the existing or temporary facilities.
1.12 LABOR
A. Supervision: The Contractor shall supervise and direct the Work efficiently and with his best skills and attention. The Contractor shall have a competent, English speaking superintendent or representative, who shall have full authority by the Contractor to direct the performance of the Work and make arrangements for all necessary materials, equipment, and labor without delay.
B. Employee Uniforms and PPE: The Contractor shall provide uniforms, shirts, and/or safety vests to employees with the Contractor’s name on it. As a representative of the
County, no apparel that would be offensive to the public shall be permitted. The
Contractor shall provide and require the proper use of the appropriate Personal Protective
Equipment (PPE) for each of its employees performing work under this agreement as required by O.S.H.A. and the County. If the Contractor’s employees fail to properly wear the appropriate PPE, they will be given an opportunity to immediately correct the issue. If they cannot correct the issue immediately or they are not in possession of their PPE, then they will not be authorized to work at the site.
C. Jurisdictional Disputes: It shall be the responsibility of the Contractor to pay all costs that may be required to perform any of the Work shown on the Drawings or specified herein to avoid any work stoppages due to jurisdictional disputes. The basis for subletting work in question, if any, shall conform to precedent agreements and decisions on record with the Building and Construction Trades Department, AFL-CIO, dated June, 1973, including any amendments thereto.
D. Apprenticeship: The Contractor shall comply with all of the requirements of the State of
Florida Statutes, Chapter 446, for all contracts in excess of $25,000 excluding roadway, 01001 - 7 of 18 highway or bridge contracts and the Contractor agrees to insert in any subcontract under this Contract the requirements of this Article.
1.13 MATERIALS AND EQUIPMENT
A. MANUFACTURER
1. All transactions with the manufacturers or Subcontractors shall be through the
Contractor, unless the Contractor and the County request that the manufacturer or
Subcontractor communicate directly with the County. Any such transactions shall not in any way release the Contractor from his full responsibility under this Contract.
2. All workmanship and materials shall be of the highest quality. The equipment shall be the product of manufacturers who are experienced and skilled in the field with an established record of research and development. No equipment will be considered unless the manufacturer has designed and manufactured equipment of comparable type and size and have demonstrated sufficient experience in such design and manufacture.
3. No material shall be delivered to the Site without prior approval of the County.
4. All apparatus, mechanisms, equipment, machinery, and manufactured articles for incorporation into the Project shall be the new (most current production at time of bid) and unused standard products of recognized reputable manufacturers.
5. Manufactured and fabricated products:
a. Design, fabricate, and assemble in accord with the best engineering and shop practices.
b. Manufacture like parts of duplicate units to standard sizes and gauges, to be interchangeable.
c. Any two or more pieces of material or equipment of the same kind, type, or classification, and being used for identical types of service, shall be made by the same manufacturer.
d. Products shall be suitable for service conditions as specified and as stated by manufacturer.
e. Equipment capacities, sizes and dimensions shown or specified shall be adhered to unless variations are specifically approved in writing.
f. Do not use material or equipment for any purpose other than that for which it is designed or specified.
1.14 MANUFACTURER'S SERVICE
A. Where service by the manufacturer is specified to be furnished as part of the cost of the item of equipment, the work shall be at the Contractor's expense.
B. The services provided shall be by a qualified manufacturer's service representative to
01001 - 8 of 18 check and verify the completed installation, place the equipment in operation, and instruct the County's operators in the operation and maintenance procedures. Such services are to be for the period of time and for the number of trips specified. A working day is defined as a normal eight (8) hour working day on the job and does not include travel time.
C. The services shall further demonstrate to the County’s complete satisfaction that the equipment will satisfactorily perform the functions for which it has been installed.
1.15 INSPECTION AND TESTING
A. General
1. All materials and equipment furnished by the Contractor shall be subject to the inspection, review, and acceptance of the County and meet the requirements as outlined in the Orange County Utilities Standards and Construction Specifications
Manual. If in the testing of any material or equipment it is ascertained by the County that the material or equipment does not comply with the Contract, the Contractor shall be notified thereof, and the Contractor shall be directed to refrain from delivering said material or equipment, or to remove it promptly from the Site or from the Work. The material or equipment will not be accepted by the County and shall be replaced by the
Contractor with acceptable material or equipment, at no additional cost to the County.
2. Tests of electrical and mechanical equipment and appliances shall be conducted in accordance with recognized ANSI, ASME, or IEE test codes, except as may otherwise be stated herein.
3. The Contractor shall give notice in writing to the County sufficiently in advance of his intention to commence the manufacture or preparation of materials especially manufactured or prepared for use in or as part of the permanent construction. Such notice shall contain a request for inspection, the date of commencement, and the expected date of completion of the manufacture or preparation of materials. Upon receipt of such notice, the County shall arrange to have a representative present at such times during the manufacture as may be necessary to inspect the materials; or the County will notify the Contractor that the inspection will be made at a point other than the point of manufacture; or the County will notify the Contractor that inspection will be waived.
4. When inspection is waived or when the County so requires, the Contractor shall furnish authoritative evidence to the County, in the form of Certificates of
Manufacture, demonstrating the materials to be used in the Work have been manufactured and tested in conformity with the Contract. These certificates shall be notarized and shall include five (5) copies of the results of physical tests and chemical analysis, where necessary, that have been made directly on the product or on similar products of the manufacturer.
5. The Contractor must comply with these provisions before shipping any material. Such inspections by the County shall not release the Contractor from the responsibility for furnishing materials meeting the requirements of the Contract Documents.
01001 - 9 of 18
B. Costs
1. The County shall employ and pay for the services of an independent testing laboratory to perform testing indicated in the Contract, or at the County’s discretion to ensure conformity with the Contract.
2. The cost of field leakage and pressure tests and shop tests of materials and equipment specifically called for in the Contract shall be borne by the Contractor. Such costs shall be deemed to be included in the Contract price.
3. The Contractor shall notify the County laboratory a minimum of forty-eight (48) hours in advance of operations for scheduling of tests. When tests or inspections cannot be performed after such notice, the Contractor shall reimburse the County for expenses incurred.
4. The Contractor shall pay for all work required to uncover, remove, replace, retest, etc., any work not tested due to the Contractor's failure to provide the forty-eight (48) hours advance notice or due to failed tests. The Contractor shall also provide compensation for the County’s personnel for required re-testing due to failed or rescheduled testing.
C. Shop Testing
1. Each piece of equipment for which pressure, duty, capacity, rating, efficiency, performance, function or special requirements are specified shall be tested in the shop of the manufacturer in a manner which shall conclusively prove that its characteristics comply fully with the requirements of the Contract. No such equipment shall be shipped to the worksite until the County notifies the Contractor, in writing, that the results of such tests are acceptable.
2. The manufacturing company shall provide five (5) copies of the manufacturer's actual shop test data and interpreted results signed by a responsible official of the manufacturing company and notarized, showing conformity with the Contract as a prerequisite for the acceptance of any equipment. The cost of shop tests (excluding cost of County's representative) and of furnishing manufacturer's preliminary and shop test data of operating equipment shall be borne by the Contractor and shall be included in the Contract price.
D. Field Testing
1. The County shall employ and pay for services of an independent testing laboratory to perform testing specifically indicated in the Contract. Employment of the laboratory shall in no way relieve Contractor's obligations to perform the Work of the Contract.
The Contractor shall provide compensation for retesting of all failed tests.
2. The County may at any time during the progress of the Work, request additional testing beyond that which is specified in the Contract. This testing will be at the
County's expense. Contractor shall:
a. Cooperate with laboratory personnel and provide access to the Project.
01001 - 10 of 18
b. Secure and deliver to the laboratory adequate quantities of representative samples of materials proposed to be used and which require testing.
c. Provide to the laboratory the preliminary design mix proposed to be used for concrete, and other material mixes, which require control by the testing laboratory.
E. Demonstration Tests: Upon completion of the Work and prior to final payment, all equipment and piping installed under this Contract shall be subjected to acceptance or demonstration tests as specified or required to provide compliance with the Contract. The
Contractor shall furnish all labor, fuel, energy, water, and other equipment necessary for the demonstration tests, at no additional cost to the County.
F. Final Inspection: Prior to preparation of the final payment application, a final inspection will be performed by the County to determine if the Work is properly and satisfactorily constructed in accordance with the requirements of the Contract. See also Section 01700
"Project Closeout”.
G. Inspection by Existing Utility Owners: The Contractor shall pay for all inspections during the progress of the Work as required and provided by the owner of all existing public utilities paralleling or crossing the Work, as shown on the Drawings. All such inspection fees shall be deemed included in the appropriate Contract item(s), or if no specific item is provided therefore, as part of the overhead cost of the Work, and shall be at no additional cost to the County.
H. Inspection by Other Agencies: The Florida Department of Transportation, the Florida
Department of Environmental Protection, and other authorized governmental agencies shall have free access to the site for inspecting materials and work, and the Contractor shall afford them all necessary facilities and assistance for doing so. Any instructions to the Contractor resulting from these inspections shall be given through the County. These rights of inspections shall not be construed to create any contractual relationship between the Contractor and these agencies.
1.16 PROJECT SITE AND ACCESS
A. Right-of-Way And Easements
1. The use of public streets and alleys shall be such as to create a minimum of inconvenience to the public and to other traffic. Any earth or other excavated material shall be removed by the Contractor and the streets cleaned to the satisfaction of the
County.
2. The Contractor shall not enter or occupy private land outside of easements, except by written permission of the property owner.
3. At the time of the Pre-Construction meetings, the Contractor shall become fully acquainted with the status of all easements. Should easements not be acquired by the
County in specific areas of the Work, the Contractor shall sequence and schedule his work therein so as not to interfere with the progress of work in other areas of the
Project. Any rescheduling of work due to easement acquisitions shall be performed
01001 - 11 of 18 by the Contractor at no additional cost to the County. The County agrees that it will make every effort to acquire all remaining easements with all speed and diligence possible so as to allow the completion of the Work within the Contract time.
B. Access
1. Neither the material excavated, nor the materials or equipment used in the construction of the Work, shall be so placed as to prevent free access to all fire hydrants, valves, or manholes
2. Access to businesses located adjacent to the project site must be maintained at all times. Contractor may prearrange the closing of business access with the business owner. Such prearranged access closing shall not exceed two (2) hours. Property drainage and grading shall be restored and all construction debris removed within forty-eight (48) hours of backfilling the trench.
3. The Contractor agrees that representatives of the County and all other governmental agents will have access to the Work wherever it is in preparation or progress and that the Contractor shall provide facilities for such access and inspection.
1.17 UTILITIES
A. Utility Construction
1. Public utility installations and structures shall be understood to include all poles, tracks, pipes, wires, conduits, house service connections, vaults, manholes, and all other appurtenances and facilities pertaining thereto, whether owned or controlled by governmental bodies or privately owned by individuals, firms or corporations, used to serve the public with transportation, traffic control, gas, electricity, telephone, sewerage, drainage, or water. Other public or private property, which may be affected by the Work, shall be deemed included hereunder.
2. All open excavations shall be adequately safeguarded by providing temporary barricades, caution signs, lights, and other means. The Contractor shall, at his own expense, provide suitable and safe bridges and other crossings for accommodating travel by pedestrians and workmen. Bridges provided for access to private property during construction shall be removed when no longer required.
3. The length of an open trench will be controlled by the particular surrounding conditions, but shall always be confined to the limits described by the County. If any excavation becomes a hazard, or if it excessively restricts traffic at any point, the
County may require special construction procedures. As a minimum, the Contractor shall conform to the following restoration procedures:
a. Interim Restoration: All excavations shall be backfilled and compacted, as specified, by the end of each working day. For excavations within existing paved areas, limerock base or soil cement base (match existing) shall be spread and compacted to provide a relatively smooth surface free of loose aggregate material.
At the end of each workweek, the S-I asphaltic surface course shall be completed and opened to traffic. The Contractor shall coordinate his construction activity, 01001 - 12 of 18 including density tests and inspections, to allow sufficient time to achieve this requirement. All driveway cuts shall be backfilled, compacted, and limerock base spread and compacted immediately after installation. Contractor shall coordinate with the individual property owners prior to removing the driveway section. Any utility crossing an existing roadway, parking lot, or other paved area shall be patched by the end of the working day.
b. All pipe and fittings shall be neatly stored in a location so as to cause the least disturbance to the public. All debris shall be removed and properly disposed of by the end of each working day.
c. Final Restoration Overlay: After completing all installations, and after testing of the pipe (but no sooner than 30-days after applying the S-I asphaltic surface), final restoration shall be performed. In no event shall final restoration begin after substantial completion. Final restoration shall provide for base and asphaltic overlay as specified by the requirements of the Florida Department of
Transportation permit issuer or the Public Works Utilization of Right of Way specifications, in an uninterrupted continuous operation until completion. Any additional restoration required after testing shall be repaired in a timely manner at no additional cost to the County.
d. Maintenance of all restored facilities shall be the Contractor’s responsibility. This maintenance shall be performed on an on-going basis during the course of construction. The Contractor’s Progress Schedule shall reflect the above restoration requirements.
e. Additional Restoration for Work in Business or Commercial Districts: The
Contractor shall restore all private property damaged by construction to its original condition. Access to businesses located adjacent to the project site must be maintained at all times. Contractor may prearrange the closing of business accesses with the business owner. Such prearranged access closing shall not exceed two (2) hours. Property drainage and grading shall be restored within twenty-four (24) hours of backfilling the trench.
B. Existing Utilities
1. The locations of all existing underground piping, structures, and other facilities are shown based on information received from the respective owner. The locations are shown without express or implied representation, assurance, or guarantee that they are complete or correct or that they represent a true picture of underground piping, conduit, and cables to be encountered. It is the Contractor’s responsibility to verify all existing underground piping, structures, and other facilities.
2. The Contractor shall, at all times, employ acceptable methods and exercise reasonable care and skill so as to avoid unnecessary delay, injury, damage, or destruction of existing utility installations and structures; and shall, at all times in the performance of the Work, avoid unnecessary interference with, or interruption of, utility services;
and shall cooperate fully with the owners thereof to that end.
3. When existing facilities are found to be in conflict with the Work, the County
01001 - 13 of 18 reserves the right to modify alignments to avoid interference with existing facilities.
4. All utilities which do not interfere with the Work shall be carefully protected against damage. Any existing utilities damaged in any way by the Contractor shall be restored or replaced by the Contractor at his expense and as directed by the County.
Any existing facilities which require operation to facilitate repairs shall be operated only by the owner of the respective utility.
5. It is the responsibility of the Contractor to ensure that all utilities and/or poles, the stability of which may be endangered by the proximity of excavation, be temporarily stayed and/or shored in position while work proceeds in the vicinity of the pole and that the utility or other companies concerned be given reasonable advance notice of any such excavation.
C. Notices
1. All governmental utility departments and other owners of public utilities which may be affected by the Work shall be informed of the Work, in writing, by the Contractor, no more than two (2) weeks after the execution of the Contract(s) covering the Work.
Such notice shall be sent out in general and directed to the attention of the governmental utility departments and other owners of public utilities for such installations and structures as may be affected by the Work.
2. The Contractor shall comply with Florida Statute 553.851 regarding protection of underground gas pipelines. Evidence of notification to the gas pipeline owner shall be furnished to the County immediately, as needed.
3. It shall be the Contractor's responsibility to contact utility companies at least seventy-two (72) hours in advance of breaking ground in any area or on any unit of the Work, so maintenance personnel may locate and protect facilities, if required by the utility company.
4. The Contractor shall give a minimum five (5) working day notice to utility personnel prior to interrupting a utility service (water, sewer, etc.).
D. Exploratory Excavations
1. Exploratory excavations shall be conducted by the Contractor for the purpose of locating underground pipelines or structures in advance of the construction. Test pits shall be excavated in areas of potential conflicts between existing and proposed facilities and at piping connections to existing facilities a minimum of forty-eight (48) hours or 1,000-feet in advance of work. If there is a potential conflict, the Contractor shall notify the County immediately. Information on the obstruction to be furnished by the Contractor shall include: Location, Elevation, Utility Type, Material and Size.
Test pits shall be backfilled immediately after their purpose has been satisfied and the surface restored and maintained in a manner satisfactory to the County.
E. Utility Crossings
1. It is intended that wherever existing utilities must be crossed, deflection of the pipe
01001 - 14 of 18 within specified limits and cover shall be used to satisfactorily clear the obstruction unless otherwise indicated on the Drawings. However, when in the opinion of the
County this procedure is not feasible, the County may direct the use of fittings for a utility crossing or conflict transition as detailed on the Drawings.
F. Relocations
1. Relocations shown on the Drawings: Public utility installations or structures, including but not limited to poles, signs, fences, piping, conduits, and drains that interfere with the positioning of the Work, which are shown on the Drawings to be removed, relocated, replaced, or rebuilt by the Contractor shall be considered as part of the general cost of doing the Work and shall be included in the prices bid for the various Contract items. No separate payment shall be made therefore.
2. Relocations not shown on the Drawings
a. Where public utility installations or structures are encountered during the course of the Work, and are not indicated on the Drawings or in the Specifications, and when, in the opinion of the County, removal, relocation, replacement, or rebuilding is necessary to complete the Work, such work shall be accomplished by the utility having jurisdiction, or such work may be ordered, in writing by the
County, for the Contractor to accomplish. If such work is accomplished by the utility having jurisdiction, it will be carried out expeditiously and the Contractor shall give full cooperation to permit the utility to complete the removal, relocation, replacement or rebuilding, as required.
b. If such work is accomplished by the Contractor, it will be paid for as a Change
Order.
3. All existing castings, including valve boxes, junction boxes, manholes, hand holes, pull boxes, inlets and similar structures in the areas of construction that are to remain in service and in areas of trench restoration and pavement replacement, shall be adjusted by the Contractor to bring them flush with the surface of the finished work.
4. All existing utility systems which conflict with the construction of the Work herein, which can be temporarily removed and replaced, shall be accomplished at the expense of the Contractor. Work shall be done by the utility unless the utility approves in writing that the work may be done by the Contractor.
G. Traffic Maintenance
1. Refer to Section 01570, Maintenance of Traffic
2. The Contractor shall immediately cart away all offensive matter; exercising such precaution as may be directed by the County. All material excavated shall be so disposed of as to inconvenience the public and adjacent tenants as little as possible and to prevent injury to trees, sidewalks, fences, and adjacent property of all kinds.
H. Barriers and Lights
1. The Contractor shall exercise extreme care in the conduct of the Work to protect the
01001 - 15 of 18 health and safety of the workers and the public. The Contractor shall provide all protective measures and devices necessary, in conformance with applicable local, state and federal regulations. Protective measures shall include, but are not limited to, barricades, warning lights/flashers, and safety ropes.
2. All equipment and vehicles operating within ten ( 10) feet of the roadway shall have flashing strobe lights attached.
I. Dewatering and Flotation
1. The Contractor, with his own equipment, shall do all pumping necessary to dewater any part of the work area during construction operations to insure dry working conditions. The Contractor shall take the necessary steps to protect on-site and off-site structures. Damage to any structures due to dewatering shall be repaired or the structures replaced at the Contractor's expense.
2. The Contractor shall be completely responsible for any tanks, wetwells, or similar structures that may become buoyant during the construction and modification operations due to the ground water or floods and before the structure is put into operation. The proposed final structures have been designed to account for buoyancy;
however, the Contractor may employ methods, means, and techniques during construction, which may affect the buoyancy of structures. The Contractor shall take the necessary steps to protect structures. Damage to any structures due to floating or flooding shall be repaired or the structures replaced at the Contractor's expense.
3. Contractor shall be responsible for any required permits for the discharge of ground water.
J. Dust and Erosion Control
1. The Contractor shall prevent dust nuisance from his operations or from traffic.
2. Contractor is responsible for providing effective temporary erosion and sediment control measures during construction or until final controls become effective.
3. Temporary erosion controls include, but are not limited to, grassing, mulching, netting, watering, and reseeding on-site surfaces and soil and borrow area surfaces and providing interceptor ditches at ends of berms and at those locations, which will ensure that erosion during construction will be either eliminated or maintained within acceptable limits as established by the County, FDEP, and any other agency having jurisdiction.
4. Temporary sedimentation controls include, but are not limited to, silt dams, traps, barriers, and appurtenances at the foot of sloped surfaces, which will ensure that sedimentation pollution will be either eliminated or maintained within acceptable limits as established by the County, FDEP, and any other agency having jurisdiction.
5. The construction of temporary erosion and sedimentation control facilities shall be in accordance with the technical provision of Section 104 “Prevention, Control, and
Abatement of Erosion and Water Pollution” of the FDOT Standard Specifications for
01001 - 16 of 18
Road and Bridge Construction, latest edition.
K. Lines And Grades
1. All Work under this Contract shall be constructed in accordance with the lines and grades shown on the Drawings, or as given by the County.
2. When the location of the Work is dimensioned on the Drawings, it shall be installed in that location; when the location of the Work is shown on a scaled drawing, without dimensions, the Work shall be installed in the scaled location unless the County approves an alternate location for the piping. Where fittings are noted on the
Drawings, such notation is for the Contractor's convenience and does not relieve the
Contractor from laying and jointing different or additional items where required. The
County may require detailed pipe laying drawings and schedules for project control.
3. The Contractor shall, at his own expense, establish all working or construction lines and grades as required from the project control points set by the County, and shall be solely responsible for the accuracy thereof.
4. Water mains and force mains shall be installed to provide long uniform gradient or slope to pipe to minimize air pockets and air release valves. The stationing shown on the Drawings for air and vacuum release valve assemblies are approximate and the
Contractor shall field adjust these locations to locate these valves at the highest point in the pipeline installed. All locations must be accepted by the County.
5. To insure a uniform gradient for gravity pipe and pressure pipe, all lines shall be installed using the following control techniques as a minimum:
a. Gravity lines; continuous control, using laser beam technology.
b. Pressure lines; control stakes set at 50-foot intervals using surveyors’ level instrument.
L. Temporary Construction
1. Temporary fences: If, during the course of the Work, it is necessary to remove or disturb any fencing, the Contractor shall provide a suitable temporary fence, which shall be maintained until the permanent fence is replaced, at no additional cost to the
County.
2. Responsibility for temporary structures: In accepting the Contract, the Contractor assumes full responsibility for the sufficiency and safety of all temporary structures or work and for any damage which may result from their failure or their improper construction, maintenance or operation.
M. Cleaning
1. During construction
a. During construction of the Work, the Contractor shall, at all times, keep the Site free from material, debris, and rubbish as practicable and shall remove the same
01001 - 17 of 18 from any portion of the Site if, in the opinion of the County, such material, debris, or rubbish constitutes a nuisance or is objectionable.
b. The Contractor shall provide on-site containers for the collection of waste materials, debris, and rubbish and remove such from the Site periodically by disposal at a legal disposal area away from the Site.
c. The Contractor shall clean interior spaces prior to the start of finish painting and continue cleaning on an as-needed basis until painting is finished.
d. The Contractor shall use cleaning materials which will not create hazards to health or property and which will not damage surfaces. The Contractor shall use only those cleaning materials and methods recommended by the manufacturer of the surface material and shall schedule operations so that dust and other contaminants resulting from cleaning processes will not fall on wet or newly coated surfaces.
e. The Contractor shall remove from the site all surplus materials and temporary structures when no longer necessary to the Work or at the direction of the County.
2. Final cleaning
a. At the conclusion of the Work, all equipment, tools, temporary structures, and materials belonging to the Contractor shall be promptly taken away, and the
Contractor shall remove and promptly dispose of all water, dirt, rubbish, or any other foreign substances.
b. The Contractor shall employ skilled workmen to thoroughly clean all installed equipment and materials to a bright, clean, polished, and new appearing condition; to remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels, and other foreign materials from sight-exposed interior and exterior surfaces; to broom clean exterior paved surfaces; and to rake clean other surfaces of the grounds.
c. The Work shall be left in a condition as shown on the Drawings and the remainder of the site shall be restored to a condition equal to or better than what existed before the Work.
d. Prior to final completion, or County occupancy, the Contractor shall conduct an inspection of interior surfaces, exterior surfaces, and all other work areas to verify that the entire Work is clean. The County will determine if the final cleaning is acceptable.
1.18 CONSTRUCTION NOT PERMITTED
A. Use of Explosives
1. No blasting shall be done except as approved by the County and the governmental agency or political subdivision having jurisdiction.
01001 - 18 of 18
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION
01010 - 1 of 2
SECTION 01010
SUMMARY OF WORK
PART 1 - GENERAL
1.01 WORK COVERED BY CONTRACT DOCUMENTS
A. This Contract comprises the cleaning and closed circuit televising of wastewater gravity mainlines and laterals throughout the Orange County Utilities Sanitary Sewer system.
The Work consists of furnishing all labor, equipment and materials for the cleaning and closed circuit televising of wastewater gravity mains and laterals. Project objectives include cleaning and televising a vast underground network of sanitary sewer piping, obtaining GPS coordinate data, identifying areas in need of repair or rehabilitation, identification of infiltration points, determination of acceptance for newly built infrastructure known as bond work and post repair inspection work, and to provide an opportunity for continuous improvement to Orange County Utilities Geographical
Information System with the information provided as a result of the Work covered by this
Contract. Work covered by this Contract includes, but is not limited to, cleaning and televising wastewater gravity mainlines and laterals throughout the Orange County
Utilities Sanitary Sewer system. Work includes all associated site work and restoration.
B. The Contractor shall furnish all labor, equipment, tools, services and incidentals to complete all Work required by these Specifications and as shown on the Drawings, the
Job Quotation Form, and the Delivery Order. The Contractor shall have experience with sanitary sewer cleaning and closed circuit televising.
C. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements and restoration required as a result of disruption or damages caused during this Work.
D. All materials, equipment, skills, tools, and labor which are reasonably and properly inferable and necessary for the proper completion of the Work in a substantial manner and in compliance with the requirements stated or implied by these Specifications, Drawings, Job Quotation Form, and Delivery Order shall be furnished and installed by the Contractor without additional compensation, whether specifically indicated in the
Contract Documents or not.
E. The Contractor shall comply with all Municipal, County, State, Federal, and other codes which are applicable to this Project.
F. The Contractor shall furnish all labor, equipment, tools, services, and incidentals to complete all Work required by these Specifications and as shown on the Drawings. If conflicts arise between these specifications and the latest Orange County Utilities
Standards and Construction Specification Manual, then the Orange County Utilities
Standards and Construction Specification Manual shall govern.
01010 - 2 of 2
G. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements, and restoration required as a result of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .