Q-A1.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Repair Natural Gas Phase 1 and Phase 2 Base Wide, Vance AFB, OK
Solicitation number
XTLF-21-1031
Issued by

About this file

This is a Questions and Answers (Q&A) document for solicitation XTLF-21-1031, addressing contractor inquiries regarding the Repair Natural Gas Phase 1 & 2 project at Vance Air Force Base, Oklahoma. The Q&A clarifies scope, technical requirements, and administrative procedures for this firm-fixed-price natural gas distribution system repair project.

The project scope is limited to Phase A (Phase 1) and Phase B (Phase 2) only, with a combined maximum contract duration of 240 days. Key deliverables include underground polyethylene gas main and service line installation, including 8-inch and 4-inch MDPE piping with associated valves, regulators, and meters equipped with pulse output (though meters will not be connected to monitoring systems). The contractor must handle all exterior connections to buildings, including risers, valving, regulators, and meters, with base personnel handling internal gas reactivation. Existing polyethylene materials match SDR 11 PE 2708 specifications. Critical requirements include pneumatic testing at working pressure for 24 hours, 24-inch minimum cover below grade, warning tape for open-cut installations, and tracer wire for both open-cut and horizontal directional drill (HDD) methods. The contractor bears responsibility for all testing, ODEQ stormwater permits, material sourcing, and off-base disposal of excess excavated material. Performance bond at 100 percent and payment bond at 50 percent are mandatory; no bid bond is required. Working hours are 0700-1645 weekdays with coordinator approval required for extended hours, weekends, or holidays. All permits, utility locates, and escorts are government-provided. The project is tax-exempt as a government undertaking under Oklahoma law.

View the file

Other files

File Type Posted
8.2026 General Provisions and FAR Flowdown Provisions for Commercial.docx DOCX document
Q-A2.xlsx XLSX spreadsheet
Site Visit Attendees.pdf PDF
XTLF 21-1031 Repair Natural Gas Bid Form.xlsx XLSX spreadsheet
OK28WD.pdf PDF
XTLF 21-1031 Repair Natural Gas Specifications.pdf PDF
XTLF 21-1031 Repair Natural Gas Drawings.pdf PDF
Q-A.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questionnaire

COMMENT / QUESTION FORM
XTLF-21-1031 - Repair Natural Gas Phase 1 & 2 - Vance AFB, OK
All submitted questions will be added to this document once received and reviewed by the requester. Once questions are answered, they will be posted by the indicated date.
Question #Reference DocumentQuestionResponse
1Solicitation / OtherPlease provide or identify the complete solicitation document and proposal instructions governing this procurement. The files provided include specifications, drawings, bid forms, a wage determination, and the Q&A form, but do not identify the solicitation number, proposal due date/time, submission method, required proposal contents, evaluation basis, or award terms.This information is clearly provided in the solicitation in SAM.gov Notice ID XTLF-21-1031
2Solicitation / OtherPlease confirm all documents and forms that must be submitted with the bid, including whether the completed bid form is the entire price proposal and whether any technical narrative, schedule, representations/certifications, subcontracting information, bonds, or other attachments are required at bid.Technical, schedule, representations should be included for evaluation. Bonds will be mandatory for the awardee.
3Bid FormThe bid workbook contains separate forms for Projects PA through PH (Phases 1 through 8), while the Summary of Work states that each of eight zones is complete and usable independently. Please confirm which phase/zone bid forms offerors must complete and whether the Government may award each phase separately, award multiple phases, or make a single aggregate award.This is for Phase A & B only.
4Bid FormThe 'BID FORM COMBINE' includes only Phase A line item 9 and Phase B line item 18, labels those entries as Items 19 and 20, and totals them as Item 21; however, Items 19 through 21 are also used on the Phase C form. Please issue a corrected combined bid form and confirm the intended item numbering and total evaluated price.Bid Form Combine is for Phase A & B only, Phase C is not within the scope of the project
5Bid FormPlease confirm the intended phase naming convention and mapping: Phase 1 = XTLF 21-1031PA through Phase 8 = XTLF 21-1031PH. The bid forms alternate between numeric and alphabetic phase labels, including 'Phases C' on the PC form.Naming convension is standard for Vance AFB. The phasing convension aligns the numerical values with the alphebetical value. Phace C is not within the scope of the project.
6Period of PerformancePlease confirm the contract duration for each possible award combination and whether phase durations are cumulative or may run concurrently. The forms state 150 days for PA; add 90 days for PB; add 120 days each for PC and PD; add 90 days each for PE and PF; add 60 days for PG; and add 45 days for PH, while the combined PA/PB form states a maximum total duration of 240 days.This solicitation is only for phase PA and PB so 240 days is correct.
7Solicitation / OtherIs a bid bond required? If so, please provide the required bid-guarantee percentage, maximum dollar amount, acceptable bond form, and whether the guarantee is based on the total of all phases offered or another evaluated amount.No bid bond is required.
8Solicitation / OtherPlease confirm the Performance and Payment Bond requirements, including the percentage required, the amount against which each bond will be calculated, and the timing for submission after award.Performance 100%, Payment Bond 50%.
9Solicitation / OtherPlease confirm whether liquidated damages apply and, if so, provide the daily rate and clarify whether damages apply by phase/zone, at substantial completion, at final completion, or to the overall contract completion date.NA
10Solicitation / OtherPlease confirm whether this project is exempt from Oklahoma sales and use taxes. If exempt, please provide the applicable exemption documentation and clarify whether the prime contractor may extend the exemption to subcontractors and material suppliers.This project is a government project therefore is tax exempt.
11Wage DecisionThe provided wage determination is General Decision OK20260038 for Building construction in Garfield County. Please confirm that Building is the correct Davis-Bacon construction type for this base-wide underground natural-gas distribution project and that this is the wage determination offerors must use.The wage determination listed in the solicitation is the correct one.
12SpecificationsSection 01 00 00 states that attendance at the pre-bid conference/site visit is recommended. Please confirm the site visit is not mandatory to submit a responsive bid, confirm whether the sign-in sheet is the official attendance record, and provide the sign-in sheet.Bids will be considered. Sign in sheet is attached in SAM.
13Solicitation / OtherPlease confirm whether the Government will activate the Interested Vendors module in SAM.gov for this procurement.It is activated.
14SpecificationsSections 01 00 00 and 01 14 00 identify regular hours as 0700 through 1645 each weekday, but Section 01 14 00 describes this as a 9-1/2-hour period even though the stated window is 9 hours 45 minutes. Please confirm the allowable daily working window and whether an unpaid meal period is required within it.Per Specifications, working hours are commonly from 0700 to 1645. Contractor must submit a request to the Construction Manager to work beyond specified work hours. It is up to the Contractor to determine appropriate break periods for lunch, this is not determined by Vance.
15SpecificationsPlease confirm weekend and night-work restrictions and identify any mission-sensitive blackout periods or no-work windows by phase, area, roadway, or affected facility. Please also confirm whether planned gas cutovers may be performed on Saturdays, Sundays, or Government holidays when approved.Contractor will be notified of any upcoming mission related blackouts. Contractor must submit a request to the Construction Manager to work during weekends and holidays.
16DrawingsPlease identify the approved laydown, temporary office-trailer, staging, contractor parking, material-storage, dumpster, and storage-container areas. Please confirm whether trailers, dumpsters, and containers may remain onsite overnight and whether parking permits are required.Sheet G002 specifiies the laydown area widely used for projects on base, Contractor to coordinate with Construction Manager for additional laydown areas during construction. Equipment is allowed to remain onsite.
17SpecificationsSection 01 00 00 states that reasonable water and electrical power will be made available by the Government. Please confirm these utilities will be provided without charge, identify the available connection points/capacities, and confirm the Contractor remains responsible only for distribution from the approved source.Yes reasonable water and power will be provided. This will be identified by the construction mananager once awarded.
18SpecificationsSection 01 00 00 states that the Construction Manager will designate haul routes, and Drawing G-002 depicts a project location/haul route. Please confirm the required haul routes and identify any restricted roads, vehicle-size/weight limits, escort requirements, or delivery-hour restrictions.Contractor shall haul materials through the industrial gate. There are no vehicle weight limits. Contractors are required to get a pass from the Visitors Center to enter Vance AFB. Deliveries of materials and equipment are to be performed during normal work hours. Contractor may contact the Construction Manager to schedule deliveries outside of normal construction hours.
19Solicitation / OtherPlease confirm whether anticipated adverse-weather days are included in each stated contract duration and whether any seasonal shutdown or non-performance period applies.Adverse-weather is accounted for in the performce period.
20SpecificationsPlease provide available as-built drawings, base utility records, utility surveys, leak/condition reports, and GIS data for the existing natural-gas system and other utilities within the work areas. Please identify the format and datum that will be provided for existing and final GIS data.Existing utilities are identified on the construction plans. GIS data will not be provided.
21SpecificationsSection 01 00 00 identifies possible TCE, benzene, vinyl chloride, and TCLP VOC/semivolatile contamination. Please provide available environmental surveys, plume maps, sampling results, hazardous-material reports, and known contaminated-soil locations affecting the eight phases.Any contaminated soil is found at 6' deep or deeper, this project will have nothing that deep.
22SpecificationsPlease clarify responsibility for sampling, laboratory analysis, containerization, transportation, manifests, and disposal of suspected or confirmed contaminated soil. Confirm whether these costs are to be included in the bid and provide estimated quantities or an allowance/unit-price mechanism for conditions that cannot be quantified before award.Any sampling and testing is at the Contractors Expense.
23Solicitation / OtherPlease confirm whether Controlled Unclassified Information (CUI), Federal Contract Information (FCI), DFARS 252.204-7012/-7020/-7021/-7025, CMMC, SPRS, or NIST SP 800-171 requirements apply to proposal preparation or contract performance. If applicable, identify the covered documents/systems and clarify the flow-down and verification requirements for subcontractors, suppliers, consultants, and proposal support personnel.The FAR flowdowns document will be attached within the Q&A responses
24SpecificationsSections 01 30 00, 01 35 26, and 01 45 00.10 20 permit the Superintendent, QC Manager, and SSHO roles to be combined in various pairings. Please confirm that one qualified individual may serve concurrently as Superintendent, QC Manager, and SSHO, provided that individual meets all qualifications and remains onsite whenever work or testing is performed.This is allowed.
25SpecificationsPlease confirm that the SSHO (or qualified alternate/designated representative as permitted) and QC Manager (or qualified alternate) must be onsite at all times when their respective work or testing activities are being performed, and clarify whether proposed personnel qualifications must be submitted with the bid or only after award.Qualified individuals must be on site during their respective work ar testing is being performed. It is acceptable to provide names after award.
26SpecificationsSection 01 00 00 requires utility interruptions to be coordinated 21 days in advance; Section 01 35 26 requires outage requests at least 10 days in advance; and Section 33 51 15 requires 10 days' notice for gas connections. Please confirm the governing notice period and required approval process for natural-gas outages and tie-ins.A 10 day workday notification to the Construction Manager is required. 21 Days will be reduced to 10.
27SpecificationsSection 01 00 00 requires temporary facilities to maintain essential services during utility interruptions. Please identify each facility that must remain continuously supplied with natural gas and confirm whether temporary gas service, alternate fuel, or other temporary systems are required during each cutover.There are no temporary facilities within Phases A & B.
28SpecificationsSection 33 51 15 assigns certain final connections, disconnections, purging, capping, and reactivation activities to either the Utility or the Government depending on system ownership. Please identify the gas-system owner/operator and clearly delineate which tie-in, valve operation, purge, cap, abandonment, testing, and reactivation activities will be Government/Utility-performed versus Contractor-performed.The contractor will handle all connections to the building. The base personnel will handle all gas related reactivation inside the buildings.
29SpecificationsPlease provide the existing and required natural-gas operating pressure, MAOP, available inlet pressure, building/service loads, meter sizes, regulator settings, and required outlet pressures for each phase and facility. Confirm whether the Contractor is responsible for final meter and regulator sizing.Existing regulator information is provided on C501. Contractor is resposible for matching existing regulator or determining final meter and regulator sizing.
30SpecificationsSections 33 11 23 and 33 51 15 require gas meters with pulse output and connection to an energy monitoring/data-collection system. Please identify the existing UMCS/advanced-metering platform, available data-gathering devices and connection points, required signal/protocol, cybersecurity requirements, and the party responsible for controls wiring, programming, integration, licensing, and end-to-end testing.The meters will not be connected to any monitoring system in this project.
31DrawingsDrawing G-001 lists UFC 3-430-09 (2004), NFPA 54 (2018), International Fuel Gas Code (2015), and ASTM D2513 (2009), while the specifications cite later editions, including NFPA 54 (2021), ASME B31.8 (2022), and ASTM D2513 (2018a). Please confirm the governing code and standard editions; where requirements conflict, confirm the latest cited specification edition governs unless otherwise directed.Yes, latest cited specifications govern unless otherwise directed.
32SpecificationsThe specifications include both Section 33 11 23, Natural Gas and Liquid Petroleum Piping, and Section 33 51 15, Natural-Gas Distribution. Please clarify the limits of applicability of each section and state which section governs underground mains, service lines, valves, meters, regulators, tie-ins, testing, and abandonment where the two sections differ.Follow 33 51 15 for most areas except for the service line to the building.
33SpecificationsSection 33 11 23 specifies PE valves using Class C PE 2306 or PE 3406, while Section 33 51 15 requires polyethylene materials and valves conforming to current ASTM D2513/D3350 classifications and matching pipe material/SDR. Please confirm the required PE material designation (including cell classification), DR/SDR, pressure rating, and acceptable valve material for each pipe size.The base has existing poly gas line and gas valves. The existing valves which we want to match is SDR 11 PE 2708
34DrawingsDrawing general notes require 85 percent compaction in natural-ground areas, while Section 31 00 00 generally requires at least 90 percent maximum density for cohesive material or 95 percent relative density for cohesionless material, and Detail C502 requires 95 percent Standard Proctor in ditches/drainage flowlines. Please confirm the governing compaction standard and test method for natural ground, drainage areas, pavement subgrades, and trench backfill.85% compaction is allowable for natural ground areas. Follow specifications for pavement crossings.
35SpecificationsSection 33 51 15 limits the duration from pressurization through depressurization for pneumatic testing of PE piping to 8 hours, but the Test Performance paragraph requires testing to continue for at least 24 hours. Please confirm the required test pressure, medium, stabilization period, and test duration for the new MDPE mains and service lines.We want to test the system at working pressure and and for 24 hours.
36DrawingsSheet GI101 identifies 'GAS PHASE 1 PLAN XTLF 21-1021PA,' while Drawing G-001 and the Phase A bid form identify the project as XTLF 21-1031PA. Please confirm XTLF 21-1031PA is correct and issue a corrected drawing if required.Yes the correct number should be XTLF 21-1031PA.
37DrawingsDrawing G-001 describes eight phases/zones, but the civil sheet index includes plan sheets C101 through C116 for Areas 1 through 16. Please provide a clear matrix mapping each plan area and sheet to bid Phases PA through PH and confirm the limits included in each separately priced phase.There are 8 phases but to show all details sheets were broken down into smaller areas. please refer to GI001 for phase map.
38SpecificationsPlease identify all permits, base clearances, utility-locate services, escorts, inspections, and fees required for excavation, boring, road/sidewalk closures, hot work, environmental work, and gas-system tie-ins, and clarify which are Government-provided versus Contractor-obtained and paid.All permits, clearances, locates and escorts are Government provided. Contractor will be responsible to pay for testing as required per specifications. Contractor will also be required to submit and pay for ODEQ stormwater permits if required by the state.
39The specifications include both Section 33 11 23, Natural Gas and Liquid Petroleum Piping, and Section 33 51 15, Natural-Gas Distribution. Please clarify the limits of applicability of each section and state which section governs underground mains, service lines, valves, meters, regulators, tie-ins, testing, and abandonment where the two sections differ.Follow 33 51 15 for most areas except for the service line to the building.
40Please provide a bid form with quantities for the following: Pavement Removal, Sidewalk Removal, Trenching, Boring, 8" MDPE Piping and Valves, 4"MDPE Piping and valves, Gas Regulators, Gas Meters, Flowable Fill, Sand Base, Odot Type A Aggerate, Concrete Replacement, Asphalt Replacement, Sod Replacement, and Erosion Control. This will allow the contractor to compare these to the contract Drawings.The line items on the bid form are already set.
41DrawingsCan the Government provide drawings with dimensions? And verify the scale that is shown on the drawing.The drawings are drawn at scale and scale is shown.
42DrawingsPlease indentify where paving is being removed and replaced.This is shown on the drawings.
43BID FORM PA / N/ABID FORM PA contains blank line items 2 and 4 between General Conditions and the identified piping/regulator/meter items. Please confirm whether these are intentionally unused or provide the missing descriptions, units, and pricing requirements.Bid Form PA does not contain blank line items for 2 and 4.
44All Zones / 33 05 23.13 §2.2.1.1Section 33 05 23.13 identifies 8-, 6-, 4-, and 2-inch polyethylene pipe for HDD work; however, the bid forms do not identify an 8-inch pipe line item. Please confirm whether 8-inch gas pipe is required. If required, provide the applicable zone(s), locations, approximate/plan quantities, installation method, and bid item under which it is to be priced.Bid form phase 1 has 8" line item, phase 2 does not have any 8" therefore no line item for it.
45N/A / VariousThe specifications reference sections that are not included in the provided specification package, including 01 33 29, 01 78 23, 02 41 00, 02 81 00, 05 05 23.16, 07 84 00, 09 90 00, 23 03 00.00 20, 23 11 20, 25 05 11, 31 10 00, and 31 23 00.00 20. General Provisions also refer to Section 01 70 00 while the included closeout section is 01 78 00. Please provide all applicable referenced sections or confirm which references are not applicable to this project.These specifications are not applicable to this project.
46Building Services / 33 51 15 §1.1; 23 11 20 referencedSection 33 51 15 states the distribution pipeline terminates at the isolation valve, service regulator, or meter approximately 5 feet from the facility and refers downstream facility gas piping to missing Section 23 11 20. Please define the exact contract scope limit at each building and confirm whether any exterior or interior facility gas piping downstream of the meter/regulator is included.This project will only be exterior work, the scope includes riser, valving, regulator & meter. This is depicted on Sheet C501
47All Zones / 33 51 15 §3.14; 02 41 00 referencedThe bid forms include Demolition, and Section 33 51 15 addresses abandonment, but the referenced demolition section and drawings are not provided. Please identify, by zone/location, all existing mains, services, meters, regulators, risers, valves, valve boxes/vaults, pavement, and appurtenances to be removed versus abandoned in place, and identify items to be salvaged to the Government.All piping in paved area is to be demolished in place, all others are to be demolished.
48Tie-In Locations / 33 51 15 §§3.3-3.4, 3.14Please provide a tie-in/service schedule showing the location, nominal size, material (PE, PA-11, steel, or other), DR/schedule, operating pressure/MAOP, and active/abandoned status of each existing main or service to which new work connects. The specifications require different materials and transition fittings where existing PA-11 or steel systems are encountered.Existing regulator information is provided on C501. Contractor is resposible for matching existing regulator or determining final meter and regulator sizing.
49Building Services / 33 11 23 §§2.4-2.5; 33 51 15 §§2.4-2.5, 3.12-3.13Please provide a complete meter and regulator schedule for each building/service connection, including quantity, required capacity (CFH), inlet pressure, outlet/set pressure, meter type/size, regulator type/size, overpressure protection, strainer requirements, and any required bypass or pressure-relief arrangement.Existing regulator information is provided on C501. Contractor is resposible for matching existing regulator or determining final meter and regulator sizing.
50Building Services / 33 11 23 §2.5.2; 33 51 15 §2.5.2The specifications require using an existing pulse output where available, adding a pulse kit where possible, or replacing the meter if a pulse kit cannot be added. Please identify the existing condition at each service location: existing meter make/model/size, whether a pulse output is present, whether a compatible pulse kit is available, and whether a new meter is required.Currently there is no digital reading of meters. This project will just provide the meter with pulse output but will not connect it to anything.
51Building Services / 33 11 23 §3.1.4.1; 33 51 15 submittals/productsPlease confirm whether an excess-flow valve and automatic shutoff device are required at every new or replaced service. If not universal, provide the locations, sizes, capacities, and device requirements for each service where these components are required.No excess-flow or automatic shutoff devices are included in this project.
52All Zones / 33 51 15 §§2.9, 3.7.2, 3.17; 33 11 23The specifications reference electrically isolated joints, cathodic protection, test stations, and cathodic-protection O&M information, but no cathodic-protection design is included. Please define the cathodic-protection scope for new and modified metallic piping, including anodes, test stations, bonds, insulating joints, rectifier modifications, testing, and required commissioning/reporting.This project will not have any Cathodic protection systems.
53All Zones / 33 51 15 §§2.10, 3.16Section 33 51 15 includes natural-gas compressor requirements “as shown on the design drawings,” but compressors are not identified in the bid-form scope provided. Please confirm that no natural-gas compressors are required, or provide the quantity, location, capacity, performance criteria, utilities, controls, and installation details for any required compressors.No Natural gas compressors are required.
54All Zones / 33 51 15 §§2.6, 3.12.1Please confirm whether any main distribution pressure-regulating stations, reinforced-concrete regulator boxes, bypass arrangements, or telemetering/recording pressure gauges are included in the project. If required, provide locations, quantities, capacities, setpoints, box details, venting, controls, and monitoring interface requirements.This is not required.
55All Zones / 01 00 00 §§1.26-1.28; 01 30 00 §1.4The specifications defer construction phasing and traffic/work-area logistics until the preconstruction conference. For bid pricing, please provide required zone sequence, whether multiple zones/work fronts may proceed concurrently, any limit on open excavations or simultaneous outages, and any facility/mission restrictions that constrain production.This is something that will be discussed once the project is awarded but we see no limit on open excavation. The outages will have to be worked with construction manager to not cause undue hardship on base personnel based on the season or the building function.
56Bore Crossings / 33 05 23.13 §§1.2, 3.2-3.4Please provide a bore schedule and plan/profile information for every horizontal directional drill, including pipe size, bore length, entry/exit locations, required minimum cover, horizontal/vertical alignment, crossing feature, casing requirements, allowable bend radius, entry/exit work-space limits, and any required bore pits or receiving pits.This will be up to the contractor, the plans allow boring or
57All Zones / 31 00 00; 33 05 23.13The earthwork/HDD requirements reference expected soil conditions, but no geotechnical report or boring logs are included. Please provide available geotechnical investigations, boring logs, groundwater information, known rock or refusal conditions, and any soil/environmental data applicable to the planned trench and HDD alignments.Historical data indicates the upper 6 feet of soil at Vance Air Force Base is predominately lean-clays.
58Bore Crossings / 33 05 23.13 §3.3.2Section 33 05 23.13 requires maintaining drill-bit location information at least every 2 inches along the drill path. Please confirm that the “2 inches” interval is intentional. If not, provide the required tracking/recording interval and the information that must be recorded for the as-built bore log.Common HDD practices should be used.
59Bore Crossings / 33 05 23.13The HDD specification permits drilling-fluid disposal on Government property only with written approval; otherwise disposal is off base. For bidding, please confirm whether a Government-approved on-base drilling-fluid/spoils disposal location will be available, and provide acceptance criteria, haul route, testing requirements, and any volume limitations.A temporary drilling fluid disposal may be on site at a location determined by the construction manager The contractor will be responsible for constructing dykes or other means to contain the fluid. Prior to contract completion, contractor will be responsible for hauling off all disposed material and bringing the temporary location back to original condition.
60All Zones / 33 05 23.13 closeout; 01 00 00 §1.15HDD record drawings must be tied to project survey control, and project as-builts must show covered utilities. Please provide project control points, horizontal and vertical datum/coordinate system, required survey accuracy, GIS/attribute requirements, and confirm whether a licensed land surveyor is required for construction layout and/or record drawings.These points will be collected by the Base GIS data manager. The contractor will notifiy construction manager prior to covering any piping.
61Disturbed Areas / 01 11 00 §1.1.1; 01 00 00 §3.9; 01 50 00 §3.10The contract documents variously refer to sodding and seeding for disturbed-area restoration. Please state where sod versus seed is required and provide turf species/mix, topsoil source and thickness, fertilizer/mulch requirements, erosion-control/stabilization requirements, watering, establishment period, and acceptance criteria.Sod is required for all distrurbed areas. The grass must be watered to ensure that the sod takes hold.
62All Trenches / 31 00 00 §3.9Section 31 00 00 contains an incomplete requirement stating “Moisture condition fill and backfill material to .” Please provide the required moisture range relative to optimum and any different moisture requirements for bedding, trench backfill, pavement subgrade/base, and structural fill.Moisture condition fill and backfill material to achieve specified compaction.
63All Zones / 01 00 00 §1.5; 31 00 00 §3.12Please reconcile the testing-laboratory qualification requirements in Sections 01 00 00 and 31 00 00 and provide the required frequency for field density/moisture, gradation, Proctor, and other material tests for non-roadway trenches, roadway trenches, service lines, HDD pits, pavement repairs, and landscaped areas. Confirm which tests are Contractor-paid versus Government-paid.Contractor to pay for all tests.
64All Zones / 31 00 00 §3.2; 01 00 00 §1.34.4Please identify approved or available sources for bank sand/select bedding, trench backfill, pavement base, imported fill, and topsoil. Confirm whether Government stockpiles may be used, what materials/quantities are available, whether they are provided at no cost, and what testing/processing is required before use.Contractor will be responsible for locating material sources. Government stockpiles may not be used.
65All Zones / 01 00 00 §§1.17.1, 1.34.3Section 01 00 00 states that excess excavated soil is to be transported off base as directed, while the contaminated-soil provisions state that uncontaminated excavated material is to be placed on the base topsoil pile. Please provide the definitive disposal/stockpile requirement for clean excess soil, including location, haul distance, acceptance/testing requirements, and whether off-base disposal should be included in the bid.For bidding purposes, figure all excess material to be hauled off base.
66All Zones / 01 00 00 §1.22.2; 01 50 00 §§2.3, 3.5.2Section 01 00 00 states that the project site and laydown/staging areas are to be enclosed with 6-foot chain-link fencing and brown screening, while Section 01 50 00 also permits temporary safety fencing around work/excavations. Please define where 6-foot screened chain-link fence is required versus orange/safety fence, and confirm whether the entire active utility alignment must be enclosed or only staging/storage and specific work areas.The laydown area does not have to have a 6' chainlink fence. The work areas need to have a construction fence to provide safety to base personnel.
67All Zones / 01 74 19 §1.2Section 01 74 19 states “Divert a minimum of percent by weight” but does not provide a percentage. Please provide the required minimum construction-and-demolition waste diversion percentage and identify any mandatory material-specific recycling/salvage requirements applicable to this project.all materials should be recycled as much as possible, but no minimum number is required by the base.
68All Zones / 01 14 00; 01 00 00 §§1.28-1.30Please identify which planned work areas are within controlled, restricted, flightline, or other mission-sensitive areas and provide the associated access/escort requirements, badging lead times, vehicle/equipment restrictions, FOD controls, work windows, aircraft-operation constraints, and any requirement for dedicated escorts or spotters that must be included in the bid.Phase 2 has the only work that would be in the controlled area. This includes Building 129, 119, 125, 121, 116. This area will require a UEAL form to be completed for contractor to work unescorted in this area. The form is completed by the construction manager with names of contractor to be working in the area.
69Existing Facilities / 01 00 00 §1.18; 02 81 00 referencedThe specifications address potential lead-based paint and asbestos and reference a hazardous-material disposal section that is not included. Please provide available hazardous-material surveys for existing piping, coatings, meters/regulators, vaults/boxes, and affected building penetrations, and define whether sampling, abatement, packaging, transport, and disposal are included in the Contractor’s bid or handled by the Government.No asbestos is anticitpated on this project. Lead based paint maybe present, wet cut any suspected lead based paint and recycle the pipe. No abatement is required for lead based paint.
70Crossings / 33 11 23 §2.8; 33 51 15 §3.7.2The specifications require steel casing “where indicated” at crossings, but the crossing/casing schedule is not provided. Please identify each location requiring casing and provide carrier-pipe size, casing diameter, casing material/coating, wall thickness/schedule, length, installation method, insulating spacer requirements, end seals/bushings, vent requirements, and minimum cover.The steel casing is shown on the drawings.
71All Trenches / Services / 31 00 00 §3.10.1; 33 11 23 §§3.1.2.3, 3.1.4.1; 33 51 15 §3.7.2The specifications contain conflicting minimum-cover requirements: Section 33 11 23 states buried PE piping is to be 24 inches below finished grade, while its service-line paragraph allows 18 inches; Section 33 51 15 states 24 inches for mains and 18 inches for services; and Section 31 00 00 states 18 inches in rock and 24 inches in other excavation. Please provide the governing minimum cover for each main/service size and installation condition (normal soil, rock, pavement/roadway, HDD, casing, and building approaches), and identify any locations requiring greater cover or encasement.Proceed with 24" below grade.
72All Zones / 31 00 00 §§2.1-2.2, 3.8.1-3.8.2; 33 05 23.13 §§2.2.4, 3.2.7; 33 51 15 §3.7.2Please reconcile the buried identification requirements for new plastic gas piping. The documents variously require detectable warning tape, detection/tracer wire, and HDD-specific minimum #12 AWG copper tracer wire, while the earthwork section describes detection-wire termination at manholes/valve pits that may not exist on this gas system. Confirm whether both warning tape and tracer wire are required for open-cut and HDD installations, and provide required wire gauge/type/insulation, vertical placement, termination/access or test-box locations, bonding/grounding requirements, and requirements at casings, risers, and valve boxes.Warning tape is only required for open-cut, however tracer wire is required for both open-cut and HDD.
73All Zones / 01 57 19 §§1.4, 3.1.1-3.1.1.4Section 01 57 19 requires Construction General Permit coverage, a project-specific SWPPP, NOI/permit fees, BMP inspections, and reporting as applicable, but the current package does not establish total disturbed acreage by zone or how multiple-zone awards will be permitted. Please provide the anticipated disturbed acreage for each zone and confirm whether Construction General Permit coverage is required for this procurement. If required, state whether one or separate NOI/SWPPP packages are required by zone/award, who will be the permittee, who is responsible for permit fees, and the required inspection frequency and inspector qualification requirements.Contractor will be responsible for all ODEQ permits and fees. Contractor needs to figure SF of disturbed area based on whether they will open trench or bore. One permit is acceptable per award. Contractor will work with ODEQ for permit required inspections.
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

File details come from the government source that posted it. Updated .