XTLF 21-1031 Repair Natural Gas Bid Form.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Repair Natural Gas Phase 1 and Phase 2 Base Wide, Vance AFB, OK
Solicitation number
XTLF-21-1031
Issued by

About this file

This is a Bid Form template for the XTLF 21-1031 Repair Natural Gas project at Vance AFB, Oklahoma. The bid form consists of nine separate sections covering eight distinct project phases (PA through PH) plus a combined Phase 1 and Phase 2 bid option. Phase 1 (PA) is the base bid with a 150-day performance period, while Phases 2 through H are alternate bids with additional performance periods ranging from 45 to 120 days if awarded. The combined bid option (Phases 1 and 2) establishes a maximum total contract length of 240 days.

Each phase requires contractors to provide pricing for eight standard line items: General Conditions, MDPE piping and valves (in varying sizes of 6", 4", and 2"), gas regulators, gas meters, boring/trenching, and demolition work. Contractors must complete Bid Forms PA, PB, and the Combined form at minimum, along with technical specifications documenting product and service details, a detailed labor and material cost breakdown aligned with the bid form pricing, and qualifications demonstrating relevant experience. Each bid form section includes fields for contractor company name, point of contact information, address, phone number, email address, and acknowledgment of any addendums received. This is a Firm-Fixed Price solicitation for commercial services with no funds currently available for award.

View the file

Other files

File Type Posted
8.2026 General Provisions and FAR Flowdown Provisions for Commercial.docx DOCX document
Q-A2.xlsx XLSX spreadsheet
Q-A1.xlsx XLSX spreadsheet
Site Visit Attendees.pdf PDF
OK28WD.pdf PDF
XTLF 21-1031 Repair Natural Gas Specifications.pdf PDF
XTLF 21-1031 Repair Natural Gas Drawings.pdf PDF
Q-A.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID FORM PA

Project Name: XTLF 21-1031PA Repair Natural Gas Phases 1 Bid Form

ITEMDESCRIPTIONTOTAL
1General Conditions
28" MDPE piping and valves
34" MDPE piping and valve
42" MDPE piping and valves
5Gas regulators
6Gas meters
7Boring/Trenching
8Demolition
9Total Cost (Sum of lines 1 through 8)

Contractor's Acknowledgement of addendums received

Time: The Phase 1 total contract length is 150 days

Contractor's Company Name:

Contractor's Point of Contact

Address:

Phone Number:

E-mail address:

&"-,Bold"&16BASE BID FORM

BID FORM PB

Project. Name: XTLF 21-1031PB Repair Natural Gas Phases 2 Bid Form

ITEMDESCRIPTIONTOTAL
10General Conditions
116" MDPE piping and valves
124" MDPE piping and valve
132" MDPE piping and valves
14Gas regulators
15Gas meters
16Boring/Trenching
17Demolition
18Total Cost (Sum of line 10 through 17)

Contractor's Acknowledgement of addendums received

Time: If Phase 2 is awarded an additional 90 days will be added to the phase 1 performance period.

Contractor's Company Name:

Contractor's Point of Contact

Address:

Phone Number:

E-mail address:

&"-,Bold"&16ALTERNATE BID FORM

BID FORM PC

Project. Name: XTLF 21-1031PC Repair Natural Gas Phases C Bid Form

ITEMDESCRIPTIONTOTAL
19General Conditions
206" MDPE piping and valves
214" MDPE piping and valve
222" MDPE piping and valves
23Gas regulators
24Gas meters
25Boring/Trenching
26Demolition
27Total Cost (Sum of line 19 through 26)

Contractor's Acknowledgement of addendums received

Time: If Phase C is awarded an additional 120 days will be added to the performance period.

Contractor's Company Name:

Contractor's Point of Contact

Address:

Phone Number:

E-mail address:

&"-,Bold"&16ALTERNATE BID FORM

BID FORM PD

Project. Name: XTLF 21-1031PD Repair Natural Gas Phases D Bid Form

ITEMDESCRIPTIONTOTAL
28General Conditions
296" MDPE piping and valves
304" MDPE piping and valve
312" MDPE piping and valves
32Gas regulators
33Gas meters
34Boring/Trenching
35Demolition
36Total Cost (Sum of line 28 through 35)

Contractor's Acknowledgement of addendums received

Time: If Phase D is awarded an additional 120 days will be added to the performance period.

Contractor's Company Name:

Contractor's Point of Contact

Address:

Phone Number:

E-mail address:

&"-,Bold"&16ALTERNATE BID FORM

BID FORM PE

Project. Name: XTLF 21-1031PE Repair Natural Gas Phases E Bid Form

ITEMDESCRIPTIONTOTAL
37General Conditions
386" MDPE piping and valves
394" MDPE piping and valve
402" MDPE piping and valves
41Gas regulators
42Gas meters
43Boring/Trenching
44Demolition
45Total Cost (Sum of line 37 through 44)

Contractor's Acknowledgement of addendums received

Time: If Phase E is awarded an additional 90 days will be added to the performance period.

Contractor's Company Name:

Contractor's Point of Contact

Address:

Phone Number:

E-mail address:

&"-,Bold"&16ALTERNATE BID FORM

BID FORM PF

Project. Name: XTLF 21-1031PF Repair Natural Gas Phases F Bid Form

ITEMDESCRIPTIONTOTAL
46General Conditions
476" MDPE piping and valves
484" MDPE piping and valve
492" MDPE piping and valves
50Gas regulators
51Gas meters
52Boring/Trenching
53Demolition
54Total Cost (Sum of line 46 through 53)

Contractor's Acknowledgement of addendums received

Time: If Phase F is awarded an additional 90 days will be added to the performance period.

Contractor's Company Name:

Contractor's Point of Contact

Address:

Phone Number:

E-mail address:

&"-,Bold"&16ALTERNATE BID FORM

BID FORM PG

Project. Name: XTLF 21-1031PG Repair Natural Gas Phases G Bid Form

ITEMDESCRIPTIONTOTAL
55General Conditions
566" MDPE piping and valves
572" MDPE piping and valves
58Gas regulators
59Gas meters
60Boring/Trenching
61Demolition
62Total Cost (Sum of line 55 through 61)

Contractor's Acknowledgement of addendums received

Time: If Phase G is awarded an additional 60 days will be added to the performance period.

Contractor's Company Name:

Contractor's Point of Contact

Address:

Phone Number:

E-mail address:

&"-,Bold"&16ALTERNATE BID FORM

BID FORM PH

Project. Name: XTLF 21-1031PH Repair Natural Gas Phases H Bid Form

ITEMDESCRIPTIONTOTAL
63General Conditions
646" MDPE piping and valves
654" MDPE piping and valve
662" MDPE piping and valves
67Gas regulators
68Gas meters
69Boring/Trenching
70Demolition
71Total Cost (Sum of line 63 through 70)

Contractor's Acknowledgement of addendums received

Time: If Phase H is awarded an additional 45 days will be added to the performance period.

Contractor's Company Name:

Contractor's Point of Contact

Address:

Phone Number:

E-mail address:

&"-,Bold"&16ALTERNATE BID FORM

BID FORM COMBINE

Project. Name: XTLF 21-1031 Repair Natural Gas, Phase 1 and Phase 2

ITEMDESCRIPTIONTOTAL
19Phase A line Item 9
20Phase B line item 18
21Total Cost (Sum of line 19 and 20)

Contractor's Acknowledgement of addendums received

Time: The maximum total contract length is 240 days

Contractor's Company Name:

Contractor's Point of Contact

Address:

Phone Number:

E-mail address:

&"-,Bold"&16SUMMARY BID FORM