This is a Statement of Work (SOW) for comprehensive renovation and repair services at Residence X-140 (Urbanizacion Laguna Club Mz 13 Solar 1-117) operated by the U.S. Consulate in Guayaquil, Ecuador. The project consists of four integrated subprojects: roof repair, kitchen cabinetry renovation, interior and exterior painting services, and sanitary and rainwater drainage system repairs. The work must be completed within six weeks (45 calendar days) from the Notice to Proceed. All four subprojects require separate pricing with costs for labor, materials, insurance, and transportation included in the firm fixed price. Value Added Tax (VAT) is billed separately at 15% for roof and drainage work and 12% for kitchen and painting work, calculated on portions subject to local VAT law.
The contractor must possess at least five years of experience in similar projects and conduct a mandatory site visit prior to bid submission. A qualified Contracting Officer's Representative (COR) will oversee quality assurance, and the contractor must submit a detailed construction work schedule, quality control and safety plan, personnel list with identification numbers, Activity Hazard Analysis (AHA), and evidence of Defense Base Act (DBA) insurance and property damage insurance ($5,000 per occurrence/$50,000 cumulative) within specified timeframes. All workers must be affiliated with the Ecuadorian Social Security Institute (IESS) and obtain security clearance badges. The contractor is responsible for all materials, equipment, tools, safety measures, waste disposal, and any damage to the premises resulting from work performance. Specific technical requirements include CCTV inspection for drainage systems, root barrier installation, use of approved Sherwin-Williams paint products delivered directly to the site, RH melamine cabinetry, scaffolding and fall protection for roof work, confined space entry procedures, and compliance with OSHA and Ecuadorian occupational safety standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19EC3026Q0004 RFQ Letter.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of State Bureau of Overseas Buildings Operations
STATEMENT OF WORK
FOR
RESIDENCE X-140
URBANIZACION LAGUNA CLUB MZ 13 SOLAR 1-117
1.-ROOF REPAIR PROJECT
2.- KITCHEN CABINETRY RENOVATION
3.- INTERIOR AND EXTERIOR PAINTING SERVICES
4.- SANITARY AND RAINWATER DRAINAGE SYSTEM REPAIRS
Facility Management Section U.S. Consulate- Guayaquil
Ecuador
AUGUST 2026
SCOPE OF WORK
RESIDENCE X-140
URBANIZACION LAGUNA CLUB MZ 13 SOLAR 1-117
1.-ROOF REPAIR PROJECT
2.- KITCHEN CABINETRY RENOVATION
3.- INTERIOR AND EXTERIOR PAINTING SERVICES
4.- SANITARY AND RAINWATER DRAINAGE SYSTEM REPAIRS
1.- PROJECT OVERVIEW
The U.S. Consulate in Guayaquil requires the hiring of a specialized team experienced in comprehensive renovation and repair services for residence X-140. This project consists of four integrated subprojects that will restore and improve the property's structural integrity, functionality, and appearance. All work shall be performed in a safe, professional, and workmanlike manner in accordance with the requirements set forth herein.
2.- PRICES AND PERIOD OF PERFORMANCE
The work shall be executed in a diligent manner within the approved performance period and fixed-priced proposal provided by the contractor.
The price listed below shall include labor, materials, transportation, an insurance policy with coverage for damages to third parties, DBA- Defense Base Act - Insurance Cost covering employees, and any additional fees associated with this service.
3.- VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. The amount of VAT to be charged is 15%. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected in each performance period. Full VAT amount is charged on all aspects of the contract.
4.- PRICING
The Contractor shall complete all work, including furnishing all labor, material, equipment, and services required under this contract for the following firm fixed price and within the time specified.
This price shall include all labor, materials, all insurance, transportation, overhead and profit.
4.1.- This project is composed of 4 parts, and for each of these, the contractor must note down the price of each one
• ROOF REPAIR PROJECT
• KITCHEN CABINETRY RENOVATION
• INTERIOR AND EXTERIOR PAINTING SERVICES
• SANITARY AND RAINWATER DRAINAGE SYSTEM REPAIRS
4.2.- TOTAL COST OF PROJECT
The firm fixed price for the period of the contract is the sum of the four parts:
TOTAL COST………………. = $ _________________ plus 15% VAT
5.- SCOPE OF WORK
The scope of work considered for this job is the following:
5.1.- PROJECT SCOPE
This comprehensive renovation project includes the following four parts:
• Roof Repair Services - Complete assessment and repair of the residence roof system to ensure structural integrity and prevent water infiltration.
• Kitchen Cabinetry Renovation - Renovation and modernization of kitchen cabinetry to improve functionality and aesthetics.
• Interior and Exterior Painting Services - Professional painting of both interior and exterior surfaces to restore and protect the property.
• Sanitary and Rainwater Drainage System Repairs - Repair and restoration of plumbing drainage systems and rainwater management infrastructure to ensure proper water flow and prevent damage.
The selected contractor must demonstrate expertise across all four areas and coordinate these subprojects efficiently to minimize disruption and ensure timely completion of the overall renovation project.
Each part is described in detail below.
The contractor shall provide the labor, equipment, materials, and all tools for performing the work, and perform all work within a fixed-price contract.
5.2.-GENERAL REQUIREMENTS
The work will consist of the following:
This Scope of Work describes the repair and restoration services required for a residential roof comprising fiber-cement tiles and decorative clay tiles. Identified deficiencies include improper tile sealing, deteriorated gutter sealant, contaminated downspouts, broken decorative clay tiles, gaps at roof-to-wall junctions, and bat intrusion. All work shall be performed in a safe, professional, and workmanlike manner in accordance with the requirements set forth herein.
5.3.- ROOF REPAIR PROJECT
5.3.1.- PROJECT OVERVIEW
This Scope of Work describes the repair and restoration services required for a residential roof comprising fiber-cement tiles and decorative clay tiles. Identified deficiencies include improper tile sealing, deteriorated gutter sealant, contaminated downspouts, broken decorative clay tiles, gaps at roof-to-wall junctions, and bat intrusion. All work shall be performed in a safe, professional, and workmanlike manner in accordance with the requirements set forth herein.
The roof of residence X-140 requires comprehensive repair services to address existing damage and prevent future water infiltration. This subproject includes a thorough inspection of the current roof condition, identification of all damaged areas, and complete repair or replacement of compromised materials. Work will include repair of roof structure, replacement of damaged tiles or roofing materials, sealing of all penetrations, repair of flashing around chimneys and vents, and ensuring proper water drainage. The contractor shall use high-quality materials suitable for the local climate and guarantee all work against defects. All debris shall be removed from the site, and the work area shall be left clean and safe upon completion.
5.3.2.-GENERAL CONTRACTOR REQUIREMENTS
• All competing vendors must physically inspect and measure the complete roof area, including all surfaces where repair, sealing, tile replacement, and re-grouting tasks will be performed, prior to submitting a bid.
• The Contractor is responsible for transporting all materials and labor to and from the work site; performing all repair work as specified herein; cleaning all work areas upon completion of daily activities; and removing all materials, debris, and waste from the premises by the end of each workday.
• The Contractor shall be fully liable for any damage to the premises, utilities, or existing finishes resulting from the performance of this work. All such damage must be repaired within the 20-calendar-day project completion period.
• The Contractor shall provide color samples, product data sheets, and material catalogues for approval by the American Consulate General Guayaquil prior to commencing any work.
All samples shall be submitted at the Contractor’s expense together with the bid proposal.
• Upon completion of all work, the Contractor shall notify the U.S. Consulate to schedule a final inspection and obtain formal written approval.
5.3.3.- EXISTING CONDITIONS ON SITE
The roof has already reached the end of its useful life and has been affected by sun, rain, and UV rays, and has leaks and holes through which bats and birds get in
5.3.4.- SCOPE OF REPAIR WORK
5.3.4.1.- Fiber-Cement Tile Roof – Sealing
• Inspect the entire fiber-cement tile roof surface and identify all areas with inadequate sealing, cracked caulking, open joints, or gaps between tiles.
• Clean all surfaces to be sealed, remove dirt, moss, algae, and loose material prior to application of sealant.
• Apply a high-quality, weather-resistant, flexible sealant appropriate for fiber-cement substrates to all identified joints, overlaps, and penetrations.
• Sealant application shall be continuous, uniform, and free of voids or gaps. All sealed areas shall be watertight upon completion.
5. 3.4.2.- Decorative Clay Tile Replacement
• Inspect all decorative clay tiles and identify broken, cracked, or structurally compromised tiles. Based on the current assessment, approximately 40% of decorative clay tiles require replacement.
• Remove all damaged clay tiles carefully to avoid disturbing adjacent intact tiles or the underlying substrate.
• Supply and install new decorative clay tiles matching the profile, dimensions, color, and finish of the existing tiles. Tile samples must be approved by the American Consulate General Guayaquil prior to procurement.
• Re-bed and re-point all replaced tiles using a mortar mix compatible with the existing substrate. All replacement tiles shall be properly aligned, firmly seated, and sealed against water infiltration.
Gutter Restoration
• Remove and dispose of all existing deteriorated, brittle, or glassy sealant from all gutter joints, end caps, and connections.
• Clean gutter interior surfaces thoroughly, removing all dirt, rust, algae, and residue.
• Apply new high-quality, UV-resistant, flexible polyurethane or silicone-based sealant to all gutter joints and connections. Sealant shall be rated for exterior exposure and compatible with the gutter material.
• Inspect all gutter brackets and hangers; replace any that are corroded, bent, or improperly pitched. Gutters shall maintain a minimum slope of 1:500 toward downspouts upon completion.
5. 3.4.3.- Downspout Cleaning and Restoration
• Flush and clean all downspouts to remove accumulated dirt, debris, moss, and biological growth.
• Inspect all downspout sections for corrosion, holes, or structural damage; replace any defective sections.
• Verify that all downspouts are securely fastened to the wall and properly connected to the drainage system. Re-secure any loose sections using appropriate fasteners.
• All downspouts shall be free of obstructions and shall discharge water away from the building foundation upon completion.
5.3.4.4.- Roof-to-Wall Junction Sealing and Bat Exclusion
• Conduct a thorough inspection of all areas where the roof structure meets cement walls, parapets, and other vertical surfaces to identify all gaps, holes, and openings.
• Prior to sealing, ensure that no bats or other wildlife remain inside sealed cavities. Bat exclusion measures shall be implemented in accordance with humane wildlife management practices, allowing bats to exit but not re-enter before final sealing.
• Seal all identified gaps and holes using a combination of mortar, appropriate backer rod, and a durable exterior-grade sealant. Openings larger than 25 mm shall be packed with mortar or cement before final sealant application.
• All sealed junctions shall be watertight and vermin-proof upon completion. The Contractor shall warrant that the treated areas are free of bat entry points at the time of final inspection.
NOTE: If active bat colonies are discovered during inspection, the Contractor must notify the Contracting Officer’s Representative (COR) immediately before proceeding. Applicable wildlife protection regulations must be observed.
5.3.4.5.- PERFORMANCE SCHEDULE
• All roof repair services shall be completed within fifteen (15) working days of the issuance of the Notice to Proceed.
• The Contractor shall submit a detailed work schedule to the Contracting Officer’s Representative (COR) within three (3) working days of the Notice to Proceed, indicating the sequence and duration of each task.
• Upon completion of all work, the Contractor shall notify the U.S. Consulate to schedule the final inspection and obtain written approval.
5.3.5.- SAFETY REQUIREMENTS – WORK AT HEIGHTS
All work performed at height is subject to the following mandatory safety requirements. The Contractor shall comply fully with all applicable OSHA standards and Ecuadorian occupational health and safety regulations. Non-compliance may result in immediate work stoppage.
5.3.5.1.- Scaffolding
• The Contractor must provide and erect certified modular scaffolding for all work areas that cannot be safely accessed by ladder. Scaffolding shall be:
a. Designed, erected, and dismantled by a competent person as defined under OSHA 29
CFR 1926.451.
b. Equipped with standard guardrails (top rail, mid-rail, and toe board) on all open sides and ends.
c. Capable of supporting at least four (4) times the maximum intended load.
d. Inspected by a competent person before each work shift and after any event that could affect structural integrity.
5.3.5.2.- Ladders
• All ladders used on-site must be in good condition, free of defects, and rated for the intended load.
• Extension ladders shall extend at least 1 meter (3 feet) above the landing surface and be secured at the top and base.
• Ladders shall be positioned at the correct angle (approximately 75 degrees from horizontal, or a 4:1 ratio of height to base distance).
• Damaged or defective ladders shall be removed from service immediately and tagged “DO
NOT USE.”
5.3.5.3.- Personal Fall Protection Equipment
• All workers performing tasks at heights of 1.8 meters (6 feet) or greater above a lower level must be protected by an approved fall protection system.
• Acceptable fall protection systems include personal fall arrest systems (full-body harness, lanyard, and anchor point), guardrail systems, or safety net systems, as appropriate to the task.
• All fall protection equipment must meet ANSI Z359 standards or equivalent and must be inspected before each use.
• Anchor points for personal fall arrest systems shall be capable of supporting a minimum load of 5,000 lbs (22.2 kN) per attached worker.
• The Contractor shall provide all fall protection equipment at its own expense and ensure all workers are trained in its proper use.
5.3.5.4.- Working at Heights Certification
• The Contractor must hold and provide upon request a current, valid Working at Heights certificate issued by a recognized occupational health and safety authority.
• All workers assigned to tasks at height must have completed accredited working-at-heights training within the past two (2) years.
• Copies of all relevant certifications shall be submitted to the Contracting Officer’s Representative (COR) prior to the commencement of any work.
5.3.5.5- Site Safety Plan
• Prior to mobilization, the Contractor shall submit a written Site Safety Plan (SSP) to the COR for review and approval. The SSP shall include, at minimum:
a. Identification of all work-at-height tasks and associated hazards.
b. Description of fall protection measures and equipment to be used.
c. Scaffolding erection and inspection procedures.
d. Emergency response and rescue procedures for a fallen worker.
e. Names and certifications of the competent person(s) responsible for safety oversight.
5.3.5.6.- APPLICABLE STANDARDS AND REGULATIONS
The Contractor shall comply with all of the following standards and regulations, as applicable:
Standard / Regulation Description
OSHA 29 CFR 1926.451 General Requirements for Scaffolding
OSHA 29 CFR 1926.452 Additional Requirements Applicable to Specific Types of Scaffolding
OSHA 29 CFR 1926.453 Aerial Lifts
OSHA 29 CFR 1926.502 Fall Protection Systems Criteria and Practices
OSHA 29 CFR 1926.503 Training Requirements for Fall Protection
ANSI/ASSE A10.8 Scaffolding Safety Requirements
Ecuador IESS – Decreto
Reglamento de Seguridad y Salud de los Trabajadores (Art. 32, 34, 35 – Work at Heights)
Ecuador NTE INEN 2-266 Transportation, Storage and Handling of Hazardous Materials
Ecuador Acuerdo Ministerial 220
Guía para Elaboración de Reglamentos Internos de SSO – trabajos en altura
NOTE: Where Ecuadorian national regulations establish a higher or more stringent standard than OSHA, the more stringent requirement shall apply.
5.3.5.7.- DESIGN REQUIREMENTS
Designs are not requested.
5.4.-KITCHEN CABINETRY RENOVATION
5.4.1.- PROJECT SCOPE
The kitchen cabinetry at residence X-140 requires renovation to restore functionality and improve aesthetics. This subproject includes assessment of existing cabinet condition, repair or replacement of damaged cabinet boxes, installation of new cabinet doors and drawer fronts, replacement of hinges and hardware, and refinishing or painting as needed. Work will also include ensuring proper alignment and operation of all doors and drawers, installation of modern handles and pulls, and any necessary adjustments to accommodate existing appliances. The contractor shall provide samples of materials and finishes for approval prior to installation. All work shall be completed with minimal disruption to kitchen operations.
5.4.2.- PRICES AND PERIOD OF PERFORMANCE
The contractor shall perform kitchen cabinetry renovation for a residence owned by the U.S.
Consulate General located at Urbanizacion Laguna Club Mz. 13 solar 1-117, Guayaquil. The price listed below shall include labor, materials, transportation and any additional fee included on this service. The Government will pay the Contractor the fixed price for standard services that have been satisfactorily performed.
Standard Services. The firm fixed price for the period of the contract is:
DESCRIPTION OF AREA
sq.
meters Unit Price
Total Price
Decommission old cabinets Fabricates new cabinets Installation of new cabinets Installation of new countertops Install new sink and faucet Install new garbage disposal
TOTAL COST
VAT
TOTAL
5.4.3.- VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. The amount of VAT to be charged is 12%. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. Full VAT amount is charged on all aspects of the contract.
5.4.4.- EXISTING CONDITIONS ON SITE
The kitchen cabinets have already reached the end of their useful life and need renovation.
5.4.5.- SCOPE OF WORK
5.4.5.1.-Site Inspection All competing vendors must conduct a thorough on-site inspection of the complete area where repairs and installations will be performed prior to submitting a quote.
5.4.5.2.-Measurements and Appliance Coordination the Contractor shall verify and confirm all field measurements. The U.S. Government will provide specifications for all kitchen appliances so that the Contractor may incorporate them into the cabinetry configuration.
5.4.5.3.-Cabinet Fabrication and Installation the Contractor shall fabricate and install new kitchen cabinets throughout the entire work area. Cabinet materials shall be RH melamine finish, 15 millimeters thick, white color for interiors, and a color to be defined by the Contracting Officer's Representative (COR) for exteriors.
5.4.5.4.- Sink, Faucet, and Garbage Disposal Replacement the Contractor shall remove and replace the existing kitchen sink, faucet, and garbage disposal with new units.
5.4.5.5.- Countertop Replacement the Contractor shall remove the existing granite countertop and supply and install a new granite countertop. The color and finish shall be defined and approved by the COR prior to procurement.
5.4.5.6.- Logistics, Painting, and Cleanup the Contractor shall be responsible for all transportation of materials and labor to and from the work site, painting of all affected areas, thorough cleaning of all premises where work was performed, and removal of all materials, leftover supplies, and debris from the premises upon project completion.
5.4.5.7.- Protection of Property the Contractor shall take all necessary measures to protect existing furnishings and property within the premises, including but not limited to floors, doors, door frames, windows, electrical outlets, and landscaped areas, throughout the duration of the project.
5.4.5.8.- Damage Liability the Contractor shall be fully responsible for any damage to the premises resulting from work performed under this contract. Restoration of any such damage shall be completed within five (5) calendar days of the occurrence, within the overall project period.
5.4.5.9.- Submittals Prior to commencing work, and together with their quote submission, the Contractor shall provide — at the Contractor's expense — drawings, material samples, color catalogues, and any other relevant documentation for review and approval by the U.S. Consulate.
5.4.5.10.- Performance Schedule The project shall be fully completed within twenty (20) working days from the date the Notice to Proceed (NTP) is issued.
5.4.5.11.- Final Inspection and Acceptance Upon completion of all work, the Contractor shall notify the U.S. Consulate to schedule a final inspection. Work shall be deemed accepted only upon written approval by the Contracting Officer's Representative.
5.4.5.12.- DESIGN REQUIREMENTS
Designs are requested.
5.5.-INTERIOR AND EXTERIOR PAINTING SERVICES
5.5.1.- GENERAL REQUIREMENTS
Residence X-140 requires professional painting services for both interior and exterior surfaces to restore appearance and provide protective coating. This subproject includes surface preparation (cleaning, scraping, sanding, and priming), repair of minor wall imperfections, application of high-quality paint to all designated interior walls, ceilings, trim, and doors, as well as exterior walls, eaves, fascia, and other exterior surfaces. The contractor shall use premium-grade paints suitable for tropical climate conditions and provide color samples for approval. All furniture and fixtures shall be properly protected, and the work area shall be cleaned daily. The contractor shall ensure even coverage, clean lines, and a professional finish throughout.
All competing vendors must measure the complete work area — including all surfaces to be painted, partial ceiling repairs, and re-grouting areas — prior to submitting a bid.
5.5.2.- PROCUREMENT REQUIREMENTS
• All Sherwin-Williams products must be purchased exclusively at: Sherwin-Williams Tienda Vía a la Costa, Blue Coast, Local 7-8.
• When purchasing Sherwin-Williams products, the Contractor must identify the purchase to the store as the “X-140 Paint Project.”
• All Sherwin-Williams paint shall be delivered directly to the project site by Sherwin-Williams.
Delivery by the Contractor is not permitted.
• The Contractor must provide proof of purchase from the specified Sherwin-Williams location.
DESCRIPTION QTY
INTERIOR WALLS 913 SQM
EXTERIOR WALLS 547 SQM
EXTERIOR METAL DOORS 8
5.5.3.- EXISTING CONDITIONS ON SITE
The exterior and interior paint shows damage due to sun, rain, the end of its useful life and needs certain corrections
5.5.4.- EXTERIOR PAINTING
5.5.4.1.-Surface Preparation
• Remove all stickers from wall surfaces.
• Scrape all loose or deteriorated paint, sand surfaces, fill cracks and voids, identify and correct all sources of moisture infiltration, seal humidity-affected areas, apply primer, and smooth surfaces with an elastomeric base primer prior to finish coat application.
5.5.4.2.- Paint Specifications – Exterior Walls
• Product: Sherwin-Williams high-quality elastomeric paint, distributed by Tienda Vía a la Costa, Blue Coast, Local 7-8.
• Finish: Matte.
• Color: To match existing exterior wall colors (samples to be submitted and approved prior to application).
• Requirements: Paint must be free of lead and mercury, anti-fungal, and water-resistant.
• Application: Paint shall be applied undiluted and must achieve complete, opaque coverage with no underlying colors visible through the finish coat.
5.5.4.3.- Paint Specifications – Metal Elements (Doors, Security Grills, Window Fences)
• All metal surfaces must be thoroughly cleaned and all rust fully removed prior to painting.
• Product: Sherwin-Williams Domino anti-corrosive paint.
• Color: To match existing colors of each respective metal element.
5.5.5.- INTERIOR PAINTING
5.5.5.1.- Surface Preparation
• Scrape all loose or deteriorated paint, sand surfaces, fill cracks and voids, identify and correct all sources of moisture infiltration, seal humidity-affected areas, and smooth surfaces with Sherwin-Williams LOXON latex base primer prior to finish coat application.
5.5.5.2.- Paint Specifications – Interior Walls
• Product: Sherwin-Williams water-based semi-gloss paint.
• Finish: Semi-gloss.
• Color: Off-white, matching existing interior colors (samples to be submitted and approved by the American Consulate General Guayaquil prior to application).
• Requirements: Paint must be free of lead and mercury, water-based, and anti-fungal.
• Application: Paint shall be applied in accordance with the manufacturer’s instructions and must achieve complete, opaque coverage with no underlying colors visible through the finish coat.
5.5.5.3.- PERFORMANCE SCHEDULE
• All interior and exterior painting services, partial ceiling repairs, and re-grouting tasks shall be completed within fifteen (15) working days of the issuance of the Notice to Proceed.
• The Contractor shall notify the U.S. Consulate upon completion of all work to schedule the
5.5.5.4.- DESIGN REQUIREMENTS
Designs are not requested.
5.6.-SANITARY AND RAINWATER DRAINAGE SYSTEM
5.6.1.- PROJECT OVERVIEW
This Scope of Work describes the inspection, repair, and rehabilitation services required for the residential drainage system, which has sustained damage caused by root intrusion from Ficus and palm trees located on the property. Affected systems include underground sanitary drainpipes, underground rainwater drainpipes, and interior plumbing drain lines. All work shall be performed in a safe, professional, and workmanlike manner in accordance with the requirements set forth herein.
The sanitary and rainwater drainage systems at residence X-140 require repair to ensure proper water flow and prevent property damage. This subproject includes inspection of all drainage lines, repair or replacement of damaged pipes, clearing of blockages, repair of roof gutters and downspouts, ensuring proper slope and drainage flow, repair of catch basins and drainage grates, and testing of the complete system. Work will address both the sanitary wastewater system and the rainwater collection and discharge system. The contractor shall identify the root cause of any drainage issues and provide permanent solutions. All excavated areas shall be properly backfilled and restored, and the system shall be tested to ensure proper operation before final acceptance.
5.6.2.- GENERAL CONTRACTOR REQUIREMENTS
• All competing vendors must physically inspect the complete drainage system, including all accessible cleanouts, manholes, and interior drain lines, prior to submitting a bid. Vendors shall measure and document all affected areas and pipe runs.
• The Contractor is responsible for transporting all materials, equipment, and labor to and from the work site; performing all repair work as specified herein; cleaning all work areas upon completion of daily activities; and removing all excavated soil, debris, root material, and waste from the premises by the end of each workday.
• The Contractor shall be fully liable for any damage to the premises, utilities, landscaping, hardscaping, or existing finishes resulting from the performance of this work. All such damage must be repaired within the 20-calendar-day project completion period.
• The Contractor shall provide product data sheets, material specifications, and pipe samples for approval by the American Consulate General Guayaquil prior to commencing any repair or replacement work. All samples shall be submitted at the Contractor’s expense together with the bid proposal.
• Upon completion of all work, the Contractor shall notify the U.S. Consulate to schedule a final inspection and obtain formal written approval.
5.6.3.- EXISTING CONDITIONS ON SITE
The drainage system has sustained damage caused by root intrusion from ficus and palm trees located on the property. Affected systems include underground sanitary drainpipes, underground rainwater drainpipes, and interior plumbing drain lines.
5.6.4.- SCOPE OF REPAIR WORK
5. 6.4.1.- CCTV Pipeline Inspection
• Prior to commencing any repair work, the Contractor shall perform a closed-circuit television (CCTV) inspection of all underground sanitary drainpipes, underground rainwater drainpipes, and accessible interior plumbing drain lines.
• The CCTV inspection shall be conducted using a manual/remote operated camera system capable of producing clear, continuous video footage of the full interior pipe circumference.
• The Contractor shall provide a complete written inspection report and video recording documenting all findings, including the location, nature, and severity of each defect (root intrusion, cracks, offsets, collapses, or blockages). Pipe chainage and GPS coordinates shall be referenced where applicable.
• The CCTV inspection report shall be submitted to the Contracting Officer’s Representative (COR) for review and approval before any repair or excavation work begins. The approved report forms the basis for the final repair scope.
NOTE: The Contractor shall not proceed with excavation or pipe repair until the CCTV report has been reviewed and written authorization has been issued by the COR.
5.6.4.2.- Root Cutting and Drain Clearing
• Following CCTV inspection, the Contractor shall mechanically cut and remove all tree root intrusions from affected pipe sections using a high-pressure water jetting system and/or mechanical root cutter appropriate for the pipe diameter and material.
• All dislodged root material, sediment, and debris shall be flushed from the pipe and removed from the site.
• A post-clearing CCTV pass shall be performed to confirm that all root obstructions have been fully removed and to document the pipe condition prior to repair.
5.6.4.3.- Pipe Repair and Patching
• Based on the findings of the approved CCTV inspection report, the Contractor shall repair all damaged pipe sections using methods appropriate to the type, location, and severity of damage, as follows:
Localized cracks, fractures, or joint defects: Repair using a CIPP (Cured-in-Place Pipe) liner patch or equivalent structural spot repair method, in accordance with ASTM F1216 or ASTM F2561.
Offset joints or minor misalignments: Re-align and seal using approved coupling sleeves or joint repair compounds compatible with the existing pipe material.
Sections with severe root damage, collapse, or structural failure: Excavate and replace the affected pipe section with new pipe of equivalent or greater diameter, material, and pressure rating. Replacement pipe joints shall be solvent-welded, gasketed, or mechanically coupled as appropriate.
• All repaired and replaced pipe sections shall be pressure-tested or subjected to a post-repair CCTV inspection to confirm structural integrity and watertightness prior to backfilling or reinstatement.
• All excavated areas shall be backfilled with compacted granular material in layers not exceeding 200 mm, and all surface finishes (paving, landscaping, concrete) shall be reinstated to match the pre-existing condition.
NOTE: All pipe materials and repair products used shall be compatible with the existing drainage system and shall meet or exceed applicable ASTM, IESS, or local municipal standards. Product data sheets must be submitted to the COR for approval prior to use.
5.6.4.4.- Tree Root Barrier Installation
• Following completion of all pipe repairs, the Contractor shall install physical root barrier systems along the pipe runs adjacent to all identified ficus and palm trees to prevent future root intrusion.
• Root barriers shall be constructed of high-density polyethylene (HDPE) or equivalent impermeable, root-resistant material, with a minimum depth of 600 mm below finished grade and a minimum thickness of 2 mm.
• Root barriers shall be installed continuously along the full length of the pipe run within the root influence zone of each identified tree, as determined by the CCTV inspection findings and site conditions.
• The Contractor shall submit a root barrier installation plan, including materials, dimensions, and layout, to the COR for approval prior to installation.
NOTE: The Contractor shall take all reasonable precautions to avoid severing major structural roots during excavation, as this may destabilize existing trees. Any concerns regarding tree stability must be reported to the COR immediately.
5.6.4.5.- Interior Plumbing Drain Lines
• The Contractor shall inspect all accessible interior plumbing drain lines, including floor drains, sink drains, and cleanouts, for root intrusion, blockages, and structural damage.
• All blockages in interior drain lines shall be cleared using mechanical rodding or high-pressure water jetting, as appropriate to the pipe size and location.
• Any cracked, broken, or root-damaged interior drainpipe sections identified during inspection shall be repaired or replaced using materials and methods compatible with the existing interior plumbing system.
• All repair work to interior drain lines shall be performed with minimal disruption to occupied areas. The Contractor shall protect all interior finishes, flooring, and fixtures during the work and shall restore any disturbed finishes to their original condition upon completion.
5.6.4.6.- PERFORMANCE SCHEDULE
• The CCTV inspection of all affected drainage systems shall be completed within five (5) working days of the issuance of the Notice to Proceed, and the inspection report shall be submitted to the COR within two (2) working days of completing the inspection.
• All repair, patching, root barrier installation, and reinstatement works shall be completed within fifteen (15) working days of the COR’s written approval of the CCTV inspection report.
• The Contractor shall submit a detailed work schedule to the COR within three (3) working days of the Notice to Proceed, indicating the sequence and estimated duration of each task.
• Upon completion of all work, the Contractor shall notify the U.S. Consulate to schedule the
6.- SAFETY REQUIREMENTS – EXCAVATION AND CONFINED SPACES
All work involving excavation, trenching, and entry into confined spaces (including manholes, inspection chambers, and underground vaults) is subject to the following mandatory safety requirements. The Contractor shall comply fully with all applicable OSHA standards and Ecuadorian occupational health and safety regulations. Non-compliance may result in immediate work stoppage.
6.1 Excavation and Trenching Safety
• All excavations deeper than 1.2 meters (4 feet) shall be protected by an approved shoring, sloping, benching, or trench box system designed and inspected by a competent person, in accordance with OSHA 29 CFR 1926.652.
• A competent person as defined by OSHA 29 CFR 1926.651 shall inspect all excavations at the start of each shift, after rainstorms, and after any event that could increase hazard potential.
• Spoil and excavated material shall be placed a minimum of 600 mm (2 feet) from the edge of any excavation to prevent cave-in and falling material hazards.
• Adequate means of egress (ladders or steps) shall be provided in all excavations deeper than
1.2 meters, located no more than 7.5 meters (25 feet) from any worker.
• Underground utilities shall be identified and marked prior to any excavation. The Contractor shall contact all relevant utility companies and obtain utility clearance before breaking ground.
6.2.- Confined Space Entry
• All manholes, inspection chambers, and enclosed drainage structures are to be treated as permit-required confined spaces in accordance with OSHA 29 CFR 1910.146 and ANSI/ASSE Z117.1.
• Prior to any confined space entry, the Contractor shall test the atmosphere for oxygen levels, flammable gases, and toxic vapors using a calibrated multi-gas detector. Entry is prohibited unless the atmosphere is confirmed safe.
• A written confined space entry permit shall be completed and signed before each entry. The permit shall identify the hazards, control measures, authorized entrants, attendants, and emergency rescue procedures.
• A trained attendant shall be stationed at the confined space entry point at all times during entry operations. The attendant shall not enter the space under any circumstances.
• All workers entering confined spaces shall be equipped with appropriate personal protective equipment (PPE), including supplied-air respirator or SCBA if required by atmospheric conditions, full-body harness, and retrieval system.
6.3.- Personal Protective Equipment (PPE)
• As a minimum, all workers on-site shall wear hard hats, high-visibility vest, safety glasses, steel-toed boots, and work gloves at all times.
• Workers involved in water jetting operations must additionally wear full-faced protection, waterproof clothing, and hearing protection.
• All PPE shall meet applicable ANSI, ASTM, or equivalent standards and shall be inspected before each use. Damaged or defective PPE shall be removed from service immediately.
6.4.- Site Safety Plan
• Prior to mobilization, the Contractor shall submit a written Site Safety Plan (SSP) to the COR for review and approval. The SSP shall include, at minimum:
◦ Identification of all excavation, confined space entry, and high-pressure water jetting hazards.
◦ Confined space entry permit procedures and atmospheric testing protocols.
◦ Excavation protective system design and inspection procedures.
◦ Utility identification and clearance procedures.
◦ Emergency response and rescue procedures.
◦ Names and certifications of the competent person(s) responsible for safety oversight.
6.5.- APPLICABLE STANDARDS AND REGULATIONS
The Contractor shall comply with all of the following standards and regulations, as applicable:
Standard / Regulation Description
OSHA 29 CFR 1926.651 General Requirements – Excavations
OSHA 29 CFR 1926.652 Requirements for Protective Systems in Excavations
OSHA 29 CFR 1910.146 Permit-Required Confined Spaces
OSHA 29 CFR 1926.502 Fall Protection Systems Criteria and Practices
OSHA 29 CFR 1926.503 Training Requirements for Fall Protection
ANSI/ASSE Z117.1 Safety Requirements for Confined Spaces
Ecuador IESS – Decreto 2393 Reglamento de Seguridad y Salud de los Trabajadores (Art. 51, 55 – Excavations & Confined Spaces)
Ecuador NTE INEN 2-266 Transportation, Storage and Handling of Hazardous Materials
Ecuador Acuerdo Ministerial
Guía para Elaboración de Reglamentos Internos de SSO
ASTM F1216 Standard Practice for Rehabilitation of Existing Pipelines by Pulled-in-Place Installation of CIPP
ASTM F2561 Standard Practice for Rehabilitation of a Sewer Service Lateral and Its Connection to the Main
6.6.- DESIGN REQUIREMENTS
Designs are requested.
The following applies to all 4 jobs/tasks that make up this SOW (Statement of Work)
7.- USE OF SPECIALIZED TOOLS
The use of the appropriate tools ensures that the work is done safely and correctly.
• Contractors will be in charge of transportation of their tools and labor force, to and from the working spaces, cleaning areas in facilities where work was performed, removal of all materials, leftovers and garbage from premises every day by the end of the day.
• Contractors must use all precautionary measures to protect pedestrians, by installing safety signals, yellow warning tapes around the areas where the job is performed, or barricades blocking accessibility.
• GOVERNMENT MATERIAL (GM)
Not applicable. All equipment and materials shall be supplied by the contractor
• Contractor will also be responsible of any damage to premises resulting from this job, and restoration of the damage will be expected to occur within the 20 calendar days of the period given to complete the job.
• The Contractor shall not conduct any work that is beyond this SOW (Scope of Work) unless directed in writing by the Contracting Officer. Any work done by the Contractor beyond this SOW without direction and approval from the CO, will be at the Contractor risk and NO Cost for the Consulate
• Contractor must specify in the Quote/Bid the term/ dateline when he/she is going to finish the job. After the Notice to Proceed is given, the project must be finished and completed within the established and agreed upon time frame that the Contractor specified in this SOW.
• Once job is finished, contractor will inform the U.S. Consulate to inspect and approve the work performed.
8.- SAFETY – ACCIDENT PREVENTION
The Contractor shall provide and maintain work environments and procedures that will:
• safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities.
For these purposes, the Contractor shall:
(a) Provide appropriate safety barricades, signs and signal lights.
(b) Comply with the standards issued by any local government authority having jurisdiction over occupational health and safety issues; and
8.1.- Records. The Contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in:
(1) death,
(2) traumatic injury,
(3) occupational disease, or
(4) damage to or theft or loss of property, materials, supplies, or equipment.
The Contractor shall report this data as directed by the Contracting Officer.
8.2.-Subcontracts. The Contractor shall be responsible for its subcontractors’ compliance with this clause.
8.3.-Written Program. Before starting the work, the Contractor shall:
(1) Submit a written proposal for implementing this clause.
(2) Submit activities with a list of tools, equipment, personnel and their role in the project.
(3) Meet with the Contracting Officer to discuss and develop a mutual understanding of the overall safety program.
9.- SAFETY REQUIREMENTS
The Contractor shall be responsible for oversight all safety aspects.
The work shall be accomplished in a manner which conforms to the intent of all applicable Department of State (DOS) Safety, Health, and Environmental policies, standards, and regulations. The Contractor is responsible for Safety, Health and Environmental Protection and shall comply with all laws, regulations, and correct practices pertaining to labor, safety, and similar matters regarding the work to be performed.
The contractor shall visit the site to develop an Activity Hazard Analysis (AHA) in a timely manner.
The contractor shall submit to the COR a detailed AHA that discusses: Job Steps, hazard identification of each job step and controls for each identified hazard following the hierarchy for control of hazards: Elimination, Substitution, Engineering Controls, Warnings and Personal Protective Equipment. The plan shall be reviewed and must receive Post Occupational Safety and Health Officer (POSHO) approval prior to any work beginning. If aspects of the AHA are incomplete or disapproved, the Contractor shall have two (2) days to submit revisions or corrections. The Contractor shall submit Safety Data Sheets (SDS’s) of all chemical products involved in the project, as part of the AHA. Failure to adhere to the approved AHA may be cause for immediate cessation of all work until the situation is corrected. The Contractor shall promptly report all accidents resulting in lost time, disabling, fatal injuries or contamination to the COR.
US Government reserves the right to inspect the Contractor's work at any time to assure compliance with safety procedures. Should the Contractor violate any safety procedures or requirements, US Government reserves the right to issue a stop work order. The stop work order shall remain in effect until such time as the Contractor has resolved the violation. Responsibility for the stop work order shall rest solely with the Contractor with no cost or schedule impact to US Government.
Contractors shall provide or afford for each employee personal protective equipment (PPE) that will protect the employee from hazards. All PPE will be provided by the contractor to their employees at no cost or discount. At a minimum PPE shall consist of eye protection, hard hats, gloves, dust masks, respirators for chemical products, and safety footwear. If the workers arrive on-site with sandals or athletic shoes, the Contractor is expected to provide safety shoes to them or send them home. These items must be provided at the Contractor’s expense.
10.- SAFETY REQUIREMENTS – WORK AT HEIGHTS
All work performed at height is subject to the following mandatory safety requirements. The Contractor shall comply fully with all applicable OSHA standards and Ecuadorian occupational health and safety regulations. Non-compliance may result in immediate work stoppage.
10.1.- Scaffolding
• The Contractor must provide and erect certified modular scaffolding for all work areas that cannot be safely accessed by ladder. Scaffolding shall be:
e. Designed, erected, and dismantled by a competent person as defined under OSHA 29
CFR 1926.451.
f. Equipped with standard guardrails (top rail, mid-rail, and toe board) on all open sides and ends.
g. Capable of supporting at least four (4) times the maximum intended load.
h. Inspected by a competent person before each work shift and after any event that could affect structural integrity.
10.2.- Ladders
• All ladders used on-site must be in good condition, free of defects, and rated for the intended load.
• Extension ladders shall extend at least 1 meter (3 feet) above the landing surface and be secured at the top and base.
• Ladders shall be positioned at the correct angle (approximately 75 degrees from horizontal, or a 4:1 ratio of height to base distance).
• Damaged or defective ladders shall be removed from service immediately and tagged “DO
NOT USE.”
10.3.- Personal Fall Protection Equipment
• All workers performing tasks at heights of 1.8 meters (6 feet) or greater above a lower level must be protected by an approved fall protection system.
• Acceptable fall protection systems include personal fall arrest systems (full-body harness, lanyard, and anchor point), guardrail systems, or safety net systems, as appropriate to the task.
• All fall protection equipment must meet ANSI Z359 standards or equivalent and must be inspected before each use.
• Anchor points for personal fall arrest systems shall be capable of supporting a minimum load of 5,000 lbs (22.2 kN) per attached worker.
• The Contractor shall provide all fall protection equipment at its own expense and ensure all workers are trained in its proper use.
10.4.- Working at Heights Certification
• The Contractor must hold and provide upon request a current, valid Working at Heights certificate issued by a recognized occupational health and safety authority.
• All workers assigned to tasks at height must have completed accredited working-at-heights training within the past two (2) years.
• Copies of all relevant certifications shall be submitted to the Contracting Officer’s
Representative (COR) prior to the commencement of any work.
Before starting the job, The Contractor must submit the following forms:
11.-SAFETY PLANS
The contractor’s general safety plan should outline the scope of work and indicate the company’s safety policies and practices to abord work related hazards and associated risks throughout the project. It should also establish the procedure in case of an emergency. The safety plan is valid for the length of the project.
Prior to mobilization, the Contractor shall submit a written Site Safety Plan (SSP) to the COR for review and approval. The SSP shall include, at minimum:
◦ Identification of all excavation, confined space entry, and high-pressure water jetting hazards.
◦ Confined space entry permit procedures and atmospheric testing protocols.
◦ Excavation protective system design and inspection procedures.
◦ Utility identification and clearance procedures.
◦ Emergency response and rescue procedures.
◦ Names and certifications of the competent person(s) responsible for safety oversight.
12.- ACTIVITY HAZARD ANALYSIS (AHA)
The AHA must detail in chronological order all activities performed during the project, identifying for each activity work related hazards, stablishing appropriate controls (use hierarchy of controls for abording hazards), and assessing the risk per hazard (use RISK ASSESTMENT CODE MATRIX (RAC)). An AHA is required to be submitted when activities change, and contractors are responsible for including all activities involved in the project.
See ATTACHMENT #2 at the end of the Scope of Work.
All safety standards, controls and procedures named must be applied and used during the project.
NOTE: Both documents need to be approved in order to start the job. Please submit at least 48 hours in advance to avoid any delays. An AHA format and a safety plan example are attached at the end of this Scope of Work.
a) Contractors must comply with all U.S. Safety Regulations stablished in but not limited to the following: US Army Corps of Engineers EM 385-1-1 (Safety and health requirements manual), OSHA Standards as well as other inherent safety, health and environmental standards (i.e. NFPA 70E, EPA, etc.) and applicable local regulations. The most restringing control will apply.
Contractors must provide their workers with all required PPE (Personal Protective Equipment). PPE assignation depends on the activity to be performed and should meet or be equivalent to standards developed by the American National Standards Institute (ANSI). US Consulate Guayaquil will not provide or lend safety materials, equipment or
PPE.
For the use of heavy machinery (if needed) or equipment Contractors must present attached to the AHA the following:
• Certificate of maintenance updated and according to the technical data sheet.
• Technical data sheet of the equipment/machinery
• A valid and appropriate license and training certificate that validates the qualification of the personnel who will operate the equipment/machinery.
• An inspection checklist of the equipment.
• Contractor cannot start the job if he does not submit these Certificates to the
Consulate’s Safety Inspector.
b) Contractors must read and instruct their workers to follow the following safety procedures, where applicable to this project:
a. General Safety requirements
b. Barricading and Warning Signs
c. Personal protective equipment PPE
d. Safety Inspection Requirements
e. Hand and power tools
f. Emergency Response Requirements
g. High risk Requirements
h. Electrical Safety
i. Fall protection Requirements.
j. Scaffolding Requirements if needed.
k. Requirements for Chemicals Substances Managements as paint and primers
l. Requirement for lifting heavy loads.
m. Covid -19
Contractor must be aware that all this training for his staff will have a cost that he has to assume. All this training is mandatory for his staff. All the Certificate’s information must be included when they send the offer.
c) For long-term or…