This document contains responses to contractor questions regarding a request for proposals for cured-in-place pipe lining on the Wyman Ave water main in Norfolk, Virginia. The solicitation is issued by the Naval Facilities Engineering Command for water main repair work. The contractor questions and government responses provide clarification on the cured-in-place pipe lining specifications, allowing inversion installation, pre-impregnation of liner material at a contractor's facility subject to government inspection, and internal mechanical end seals to seal liner extremities. Hot air or steam curing will not be permitted during installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4008520B2559 Amendment 2.pdf | ||
| Attach 3_Technical Specs_Revised 9.30.20.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP N4008520B2559 RFIs 01
22 05 83.63 Cured-in-place pipe (CIPP)
1. Section 2.1- Request the ability to install the CIPP by inversion as well per ASTM F1216 procedures.
Also, request that hot air or circulating team be permitted as a curing option.
Response: The use of hot air or circulating steam shall not be permitted during installation process.
2. Section 2.6- Request the CIPP tube may consist of one or more layers of absorbent woven and/or non-woven synthetic fiber, with glass or woven fiber reinforcement as an approved equal to the currently stated two concentric, tubular, woven and seamless polyester jackets with a seamless polymeric membrane bonded to the interior. The approved equal will meet the design criteria of both the specifications and ASTM F1216 and F1743.
Response: Please see the revised Specification Section 22 05 83.66 Cured-in-place-pipe (CIPP)
Lining.
3. Section 2.18- Request that internal end seals may be used to provide water tightness at the pipeline re-assembly. Suggest language to second sentence: Internal mechanical end seals may be used to seal the extremities of the liner.
Response: This specification section will not be modified.
4. Section 3.1, first paragraph- request that a controlled facility be permitted to be used for the liner material “wet out” procedure. Suggested language to be added after the first sentence of the first paragraph: The liner material may be impregnated (wet out) with resin under permanent facility-controlled conditions. The contractor shall allow the Owner to inspect the materials and procedures used to impregnate the liner material.
Response: The contractor may elect to impregnate the liner at their shop, but must provide for access by government for quality assurance inspection. Please see the revised Specification
Section 22 05 83.66 Cured-in-place-pipe (CIPP) Lining.
5. Section 3.1, third paragraph, first sentence- request the inversion be permitted for installation.
Suggested language: The resin impregnated liner material shall be inserted into the water main being reconstructed through the insertion point by the pull-in-place or inversion method, as recommended by the manufacturer.
Response: The inversion method will be allowed. Please refer to section 2.1. Please see the revised Specification Section 22 05 83.66 Cured-in-place-pipe (CIPP) Lining.
6. Section 3.1, last sentence- request the replacement of “shall not” with “may”. Suggested language:
Use of hot air or circulating steam may be permitted during installation process.
Response: This specification section will not be modified. The use of hot air or circulating steam shall not be permitted during installation process.