This document is a comprehensive set of specifications for a Parking Lot Addition project at Collin College in Wylie, Texas, involving multiple engineering and construction disciplines. The project includes electrical, civil, and utility systems specifications, covering electrical infrastructure, site preparation, grading, paving, pavement markings, and storm drainage utilities. The specifications are prepared by multiple professional engineering firms, including RLK Engineering, Inc. and a professional engineer named Rene Miguel Valle, with documentation dated October 15, 2025. The project involves installing new parking lot infrastructure, including electrical conduits, lighting, site grading, concrete paving, pavement markings, and storm drainage systems.
The specifications detail technical requirements for materials, installation methods, quality assurance, and execution standards, with strict adherence to TXDOT Standards, ASTM specifications, and local jurisdiction requirements. Materials specifications include detailed requirements for electrical conductors, concrete, PVC pipes, storm drainage pipes, and other construction materials. The project emphasizes compliance with energy conservation codes, requires specific testing and commissioning procedures, and mandates warranty provisions. Contractors are required to submit detailed documentation, including material certificates, mix designs, shop drawings, and provide warranties ranging from one to five years depending on the system or component.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Parking Lot Addition Collin College Wylie, Texas
TABLE OF CONTENTS TOC -1
Electrical Specifications Table of Contents:
DIVISION 26__________________________________________________________________________
26 00 00 Electrical 26 05 19 Low Voltage Electrical Power Conductors and Cables 26 05 20 Cable Connections 26 05 26 Grounding and Bonding for Electrical Systems 26 05 32 Raceways 26 51 02 Exterior Lighting 26 51 05 Networked Lighting Controls
STATE O F TE X AS
P R
O F E S S I O N A L E N G I N E E R
LI C E N S E D
83705
RENE MIGUEL VALLE
10/15/2025
Wylie, Texas
ELECTRICAL 26-00-00 -1
SECTION 26 00 00 - ELECTRICAL
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. This Division and all Electrical sections contained hereinafter are subject to the Contract Documents of Division 1 whether attached or not, the various Divisions of the General Construction specifications and Division 23 of the Construction specifications and respective plans.
B. All drawings, material in other Divisions of these specifications, addenda, and other pertinent documents are considered to be a part of the technical requirements of this Division of the specifications insofar as they are applicable.
C. The material contained in this section shall be applicable to other sections of the specifications under this Division.
1.2 DEFINITIONS
A. The following definitions shall apply to all sections of this Division:
1. "Owner" shall mean the Owner or his designated representative.
1.3 SCOPE OF WORK
A. This Division and all electrical sections of the specifications include all labor and material to complete all electrical systems as specified or shown on the Drawings.
B. All work shown and specified shall be completely installed and connected in a workmanlike manner by mechanics properly qualified to perform the work required. All work shall be left in a satisfactory operating condition as determined by the Owner.
C. Provide all services and perform all operations required in connection with or properly incidental to the construction of complete and fully operating systems with all accessories as herein specified or shown on the Drawings.
1.4 GENERAL
A. The accompanying plans show diagrammatically the location of the various light fixtures, devices, conduits and equipment items, and methods of connecting and controlling them. It is not intended to show every connection in detail or all fittings required for a complete system.
The Contractor shall carefully lay out his work at the site to conform to the conditions, to avoid obstructions and provide proper routing of raceways. Exact locations of light fixtures, devices, equipment, and connections thereto shall be determined by reference to the accompanying Plans, etc., by field measurement at the project, and in cooperation with other Contractors and Sub-Contractors, and in all cases shall be subject to the approval of the Owner. Minor relocations necessitated by the conditions at the site or directed by the Owner shall be made without any additional cost to the Owner.
B. These specifications and the accompanying drawings are intended to describe and illustrate systems which will not interfere with the structures, which will fit into available spaces, and which will ensure complete and satisfactorily operating installations. The Contractor shall be
Wylie, Texas
ELECTRICAL 26-00-00 -2
responsible for the proper fittings of his material and apparatus into the building and shall prepare installation drawings for all critical areas illustrating the installation of his work as related to the work of all other trades. Interferences with other trades or with the building structures shall be corrected by the Contractor before the work proceeds. Should any changes become necessary due to failure to comply with these stipulations, the Contractor shall make such necessary changes at his own expense.
C. All work shall be run parallel or perpendicular to the lines of the building unless otherwise noted on the Drawings.
D. It is the intent of the Contract Documents to provide an installation complete in every respect.
In the event that additional details or special construction may be required for work indicated or specified in this section or work specified in other sections, it shall be the responsibility of the Contractor to provide those details or special construction as well as to provide material and equipment usually furnished with such systems or required to complete the installation.
E. The Contractor, by submitting a bid on this work, sets forth that he has the necessary technical training and ability and that he will install his work in a satisfactory manner which is up to the best standards of the trade, complete and in good working order. If any of the requirements of the Drawings and Specifications are impossible to perform, or if the installation when made in accordance with such requirements will not perform satisfactorily, he shall report such occurrences to the Owner promptly after discovery of the discrepancy.
F. No extra compensation will be allowed for extra work or changes caused by failure to comply with the above requirements.
1.5 INSPECTION OF THE SITE
A. The Contractor shall visit the site, verifying all existing items indicated on the Drawings or specified, and familiarize himself with the existing work conditions, hazards, grades, actual formations, soil, conditions, and local requirements. The submission of bids shall be deemed evidence of such visit.
B. All proposals shall take these existing conditions into consideration, and the lack of specific information on the Drawings shall not relieve the Contractor of any responsibility.
C. All site visits shall be coordinated and scheduled with the Owner.
1.6 CUTTING AND PATCHING
A. When cutting or patching becomes necessary to permit the installation of any work under this contract, or should it become necessary to repair any defects that may appear in patching up to the expiration of the guarantee, such cutting shall be done under the supervision of the Architect by the trade or Contractor whose work is to be disturbed. After the necessary work has been completed, damage shall be repaired by the Contractor or trade whose work has been disturbed. The cost of all such cutting and patching shall be paid by the Contractor requiring it to be done.
1. Refer to Division 1 requirements.
B. The Contractor shall do all necessary cutting and drilling of present walls, floors, ceilings, etc.
for the installation of new work or for modifications to the existing work, but no structural work
Wylie, Texas
ELECTRICAL 26-00-00 -3
shall be cut unless specifically approved by the Architect. Patching and painting of services as required shall be by the General Contractor unless specified otherwise hereinafter.
C. Locations of the various existing services, walls, and equipment to be altered, removed, or connected to have been taken from plans of the existing building and other substantially reliable sources and are offered as a general guide only, without guarantee as to their accuracy. This Contractor shall examine the site and shall verify to his own satisfaction the location of all existing work and shall adequately inform himself as to their relation to and effect on the work before entering into a contract. Submission of a bid shall constitute evidence that the submitting Contractor has inspected the site of the proposed work.
D. The Contractor shall examine the existing building and plans for the new work and note the sizes of the openings available and shall be responsible for any cutting, patching, and alterations required to place new equipment in the building.
E. Where walls, acoustical tile, suspended ceilings, etc., not scheduled to be re-worked or re-finished under the general contract are damaged during installation of new raceways, or other work, etc., such walls, tiles, etc., shall be replaced by the General Contractor at the expense of the Contractor.
F. All damage done to the existing equipment, services, etc., incurred in the execution of this contract shall be repaired and restored to its original conditions by the Contractor.
G. Holes through concrete shall be drilled with "Mole", or "Core-It", or equal diamond point hole saw.
1.7 CODE REQUIREMENTS
A. All work shall comply with the provisions of these specifications, as illustrated on the accompanying drawings, or as directed by the Architect, and shall satisfy all applicable local codes, ordinances, or regulations of the governing bodies, and all authorities having jurisdiction over the work, or services thereto. In all cases where alterations to, or deviations from, the drawings and specifications are required by the authority having jurisdiction, report the same in writing to the Architect and secure his approval before proceeding. Upon completion of the work, furnish a statement from the inspecting authority stating that the installation has been accepted and approved. Provide complete utility service connections as directed, and submit, as required, all necessary drawings; secure all permits and inspections necessary in connection with the work and pay all legal fees on account thereof. In the absence of other applicable local codes acceptable to the Architect, the National Electrical Code shall apply to this work.
1.8 RECORD DRAWINGS
A. The Contractor shall, during the execution of the work, maintain a complete set of drawings upon which all locations of equipment, panels, and all deviations and/or changes in the work shall be recorded. All underground and overhead utilities provided under, or affected by, work of this Division shall be accurately located by dimensions. These "Record" drawings shall be delivered to the Architect in good condition upon the completion and acceptance of the work and before final payment is made.
1. Refer to Division 1 requirements.
Wylie, Texas
ELECTRICAL 26-00-00 -4
1.9 RECORDS AND INSTRUCTIONS FOR OWNER
A. The Contractor shall accumulate, during the project's progress, the following sets, prepared in neat brochures or packet folders and turned over to the Architect for checking and subsequent delivery to the Owner:
1. All warranties and guarantees and manufacturer's directions on equipment and material covered by the Contractor.
2. Approved equipment brochures, wiring diagrams and control diagrams.
3. Copies of reviewed Shop Drawings.
4. Operating instructions for all systems. Operating instructions shall include recommended maintenance procedures.
5. Any and all other data and drawings required during construction.
6. Repair parts lists of all major items and equipment including name, address, and telephone number of local supplier or agent.
B. All of the above data shall be submitted to the Architect for review at such time as the Contractor makes application for final payment, but in no case less than two weeks before final observation.
C. The Contractor shall also give not less than two (2) days of operating instructions, during the adjustment and testing period, to the Owner's operating personnel in order to familiarize them with the proper care and operation of the equipment. The written operating instructions referred to in the above paragraphs shall be used as a basis for this on-the-job instruction.
1. Refer to Division 1 requirements.
1.10 SHOP DRAWINGS AND SUBMITTALS
A. The Contractor shall submit, to the Architect, shop drawings and catalog data on all equipment and materials designated on the Drawings and specified herein.
B. The submittal will be reviewed for compliance with general requirements of design and arrangement only; it is not a contract document and acknowledgement of compliance does not relieve the Contractor from responsibility for performance of the work in compliance with all provisions and requirements of the Contract Documents. Job measurements and the coordination of all the dimensions for proper fit of all parts of the work and performance of all equipment supplies to meet specification requirements are and remain specific responsibilities of the Contractor.
C. Shop Drawings shall be furnished by the Contractor for the work involved after receiving approval on the make and type of material and in sufficient time so that no delay or changes will be caused. This is done in order to facilitate progress on the job, and failure on the part of the Contractor to comply shall render him liable to stand the expense of any and all delays, changes in construction, etc., occasioned by his failure to provide the necessary detailed drawings. Also, if the Contractor fails to comply with this provision, the Architect reserves the right to go directly to the manufacturer he selects and secure any details he might deem necessary and should there be any charges in connection with this, they shall be borne by the Contractor.
D. The Shop Drawings submitted shall not consist of manufacturers' catalogues or tear sheets therefrom that contain no indication of the exact item offered. Rather, the submission on individual items shall designate the exact item offered.
Wylie, Texas
ELECTRICAL 26-00-00 -5
E. Shop Drawings submitted without indicating markings or Contractor's stamp shall not be reviewed and will be returned to the Contractor for correction of such discrepancies.
F. The Shop Drawings are not intended to cover detailed quantitative lists of electrical specialties, and similar items, as the plans and specifications illustrate and describe those items, and it is the Contractor's responsibility to procure the proper sizes and quantities required to comply with the established requirements.
G. Any Shop Drawings prepared to illustrate how equipment can be fitted into available spaces will be examined under the assumption that the Contractor has verified all the conditions, and obtained any approval thereon shall not relieve the Contractor of responsibility in the event the material cannot be installed as shown on those Drawings.
H. Various material submissions of such as raceways, switches, panelboards, and related items shall be assembled in brochures or in other suitable package form and shall not be submitted in a multiplicity of loose sheets.
I. Each Contractor shall process his submitted data to ensure that it conforms to the requirements of the plans and specifications and that there are no omissions, errors, or duplications.
J. Shop Drawings shall be accompanied by certification from this Contractor that Shop Drawings have been checked by him for compliance with Contract Drawings.
K. Samples of various products or mock-ups of particular details or systems may be required by various sections of this Specification.
L. Refer to Division 1 requirements.
1.11 PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES
A. Seal voids around ducts and pipes penetrating fire-rated assemblies and partitions using fire-stopping materials and methods in accordance with provisions in Division 1.
1.12 DRAWINGS
A. The drawings show diagrammatically the locations of the various conduits, fixtures, and equipment, and the method of connecting and controlling them. It is not intended to show every connection in detail and all fittings required for a complete system. The systems shall include, but are not limited to, the items shown in the drawings. Exact locations of these items shall be determined by reference to the general plans and measurements at the building and in cooperation with other trades and, in all cases, shall be subject to the approval of the Architect.
The Architect reserves the right to make any reasonable change in the location of any of this work without additional cost to the Owner.
B. Should any changes be deemed necessary in items shown on the contract drawings, the shop drawings, descriptions, and the reason for the proposed changes shall be submitted to the Architect for approval.
C. Exceptions and inconsistencies in plans and specifications shall be brought to the Architect's attention before bids are submitted; otherwise, the Contractor shall be responsible for the cost of any and all changes and additions that may be necessary to accommodate his particular apparatus.
Wylie, Texas
ELECTRICAL 26-00-00 -6
D. Lay out all work maintaining all lines, grades, and dimensions according to these drawings with due consideration for other trades and verify all dimensions at the site prior to any fabrication or installation; should any conflict develop or installation be impractical, the Architect shall be notified before any installation or fabrication and the existing conditions shall be investigated and proper changes effected without any additional cost.
E. Titles of Sections and Paragraphs in these specifications are introduced merely for convenience and are not to be construed as a correct or complete segregation or tabulation of the various units of material and/or work. The Architect does not assume any responsibility, either direct or implied, for omissions or duplications by the Contractor due to real or alleged error in the arrangement of matter in the Contract Documents.
1.13 COOPERATION
A. All work under these specifications shall be accomplished in conjunction with other trades on this project in a manner which will allow each trade adequate time at the proper stage of construction to fulfill his work.
B. Maintaining contact and being familiar with the progress of the general construction and the timely installation of sleeves and inserts, etc., before concrete is placed shall be the responsibility of this trade as will the installation of the required systems in their several stages, at the proper time to expedite this contract and avoid unnecessary delays in the progress of other contracts.
C. Should any question arise between trades as to the placing of lines, ducts, conduits, or equipment, or should it appear desirable to remove any general construction which would affect the appearance or strength of the structure, reference shall be made to the Architect for instructions.
1.14 MATERIALS AND EQUIPMENT
A. All materials purchased for this Project shall be new.
B. Where specified product is not manufactured, manufacturer's current product meeting specification shall be substituted, subject to written approval of Engineer.
C. Space allocations in electrical spaces are based on equipment scheduled in each case. Should the Contractor offer equipment of another make, he shall verify that such equipment will fit in the spaces allowed.
D. Manufacturers' names are listed herein to establish a standard. The products of other manufacturers will be acceptable; if, in the opinion of the Architect, the substitute material is of a quality as good or better than the material specified, and will serve with equal efficiency and dependability, the purpose for which the items specified were intended.
E. It is fully the Contractor's responsibility to assemble and submit sufficient technical information to fully illustrate that the material or equipment proposed for substitution is equal or superior as the Architect or his Engineer is under no obligation to perform the service for the Contractor.
The proposal shall be accompanied by manufacturers' engineering data, specification sheet, and a sample, if practical or if requested. In no event shall a proposal for substitution be cause for delay of work.
Wylie, Texas
ELECTRICAL 26-00-00 -7
F. Should a substitution be accepted under the above provisions, and should the substitution prove defective or otherwise unsatisfactory for the intended service, within the warranty period, the Contractor shall replace the substitution with the equipment or material specified, and on which the specifications required him to base his proposal.
1.15 STORAGE AND PROTECTION OF MATERIALS
A. The Contractor shall provide his own storage space for protection and storage of his materials and assume complete responsibility for all losses due to any cause whatsoever. All storage shall be within the property lines of the building site, or as directed by the Owner's representative. In no case shall storage interfere with traffic conditions in any public or project thoroughfare.
B. All work and material shall be protected at all times. This Contractor shall make good any damage caused, either directly or indirectly, by his workmen. He shall be responsible for safe handling of all electrical equipment and shall replace, without charge, all items damaged prior to acceptance by the Owner.
1.16 EXCAVATION AND BACKFILLING
A. The Contractor shall do all necessary excavating and backfilling for the installation of his work.
Trenches for underground conduits shall be excavated to required depths with bell holes provided as necessary to ensure uniform bearing. Care shall be taken not to excavate below depth, and any excavation below depth shall be refilled with sand or gravel firmly compacted.
Where rock or hard objects are encountered, they shall be excavated to a grade six inches (6") below the lowermost part of the conduit and refilled to grade as specified. After the conduit has been installed and approved, the trenches shall be backfilled to grade with approved materials, well tamped or puddled compactly in place. Where streets, sidewalks, etc., are disturbed, cut, or damaged by this work, the expense of repairing same in a manner approved by the Architect shall be a part of this contract.
B. The Contractor shall bear sole responsibility for design and execution of acceptable trenching and shoring procedures, in accordance with State of Texas Regulations. On trench excavations in excess of five feet in depth, contractor shall pay a qualified engineer to prepare detailed plans and specifications directing Contractor in the safe execution of trenching and shoring. It is understood that trench safety systems constitute a means and method of construction for which the Architect, Engineer, and Owner are not responsible. Accordingly, such documents, when prepared, shall be separately issued by Contractor's Consultant, independent or project Contract Documents.
1.17 SCHEDULE OF WORK
A. The work under the various sections must be expedited and close coordination will be required in execution of the work. The various Contractors shall perform their work at such times as directed so as to ensure meeting scheduled completion dates, and to avoid delaying any other Contractor. The Architect will set up completion dates, schedule the times of work in the various areas involved, etc. This Contractor shall cooperate in establishing these times and locations and shall process his work so as to ensure the proper execution of it.
Wylie, Texas
ELECTRICAL 26-00-00 -8
1.18 CONTINUATION OF SERVICES
A. The Contractor shall realize that the existing building must continue in operation during the construction period, except as the Architect and the Owner may direct otherwise.
B. Under no conditions shall any work be done in the present building that would interfere with its natural use during the normal hours of occupancy unless special permission is granted by the Owner. This is particularly applicable where new connections are to be made to present services or items of equipment in the building or where present equipment items in the building are to be relocated or modified in any way.
C. Existing utility systems shall continue to function with a minimum of interruptions in service.
This Contractor shall install any temporary lines, connections, etc., required to place and maintain the electrical systems in operation unless otherwise directed by the Architect.
D. Arrange for and provide temporary electric and telephone services to the building where new construction conflicts with existing utility locations.
1.19 COMMISSIONING OF EQUIPMENT AND SYSTEMS
A. The Contractor shall provide qualified personnel, as requested by the Owner and Architect, to assist in all on-site testing and commissioning of all equipment.
1.20 CLEANING UP
A. The Contractor shall be responsible for cleaning up his work as specified in the General Requirements of these Specifications.
1.21 FINAL OBSERVATION
A. Schedule: Upon completion of the Contract, there shall be a final observation of the completed installation. Prior to this observation, all work under this Division shall have been completed, tested, and balanced and adjusted in final operating condition and the test report shall have been submitted to and approved by the Owner.
B. Qualified personnel representing the Contractor must be present during final observation to demonstrate the systems and prove the performance of the equipment.
1.22 CERTIFICATIONS
A. Before receiving final payment, the Contractor shall certify that all equipment furnished, and all work done is in compliance with all applicable codes mentioned in these Specifications.
B. Furnish, at the completion of the job, a final Inspection Certificate from the local inspecting authority.
1.23 GUARANTEE
A. The guarantee provision of this specification requires prompt replacement of all defective workmanship and materials occurring within one year of final job acceptance. This includes all work required to remove and replace the defective item and to make all necessary adjustments to restore the entire installation to its original specified operating condition and finish at the time of acceptance. The Contractor shall also guarantee that the performance of all equipment furnished and/or installed under this Division of the specifications shall be at least equal to the
Wylie, Texas
ELECTRICAL 26-00-00 -9
performance as called for in the specifications and as stated in the equipment submittals.
Should there be indication that the equipment and installation is not producing the intended conditions, the Contractor shall make further tests as the Engineer may direct to demonstrate that the equipment installed meets the specifications. If there is indication that the equipment does not meet the specifications, the Contractor shall, at his expense, institute a program to demonstrate the adequacy of the installation. This program shall include all necessary testing and testing equipment. Should the Contractor not have the equipment or technical skill to perform the tests, it shall be his responsibility to provide recognized experts to perform the tests and shall provide certified laboratory tests, certified factory reports and work sheets, or other certified data to support results of any tests required.
B. Refer to Division 1 requirements.
PART 2 - PRODUCTS
NOT USED
PART 3 - INSTALLATION
NOT USED
END OF SECTION
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26-05-19 –1
SECTION 26 05 19 - LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
PART 1 - GENERAL
1.1 REFERENCED DOCUMENTS
A. Comply with Division 1 - General Requirements and related documents.
B. Comply with all other Division 26 sections as applicable.
C. Refer to other Divisions for coordination of work with other portions of work.
1.2 DESCRIPTION
A. Provide systems of wires and cables for electric power, signaling and control.
B. Related work specified in other sections
1. 26 00 00 - Electrical
2. 26 05 20 - Cable Connections
3. 26 05 32 - Raceways
1.3 QUALITY ASSURANCE
A. The equipment supplied and installed shall meet the requirements of the National Electrical
Code and all applicable local codes and ordinances.
B. All equipment supplied shall be Underwriter’s Laboratories Inc. listed and so labeled.
1.4 REFERENCED STANDARDS
A. ICEA 5-61-402 Thermoplastic Insulated Wire and Cable
B. ICEA 5-66-524 Cross Linked Thermosetting Polyethylene Insulated Wires and Cables
C. ICEA 5-68-516 Ethylene Propylene Rubber Insulated Wire and Cable
D. ICEA 5-19-81 Rubber Insulated Wire and Cable
E. ANSI 1581 Standard of Electrical Wires, Cables, and Flexible Cords.
F. UL 83 Thermoplastic Insulated Wires and Cables
G. ASTM B3 Standard Specification for Soft or annealed Copper Wire
H. ASTM B8 Standard Specification for Concentric Lay Standard Copper Conductors
1.5 SUBMITTALS
A. Submit product data under provisions of section 26 00 00 Electrical.
B. Provide closeout documents as required in Division 1.
1.6 DELIVERY, STORAGE AND HANDLING
A. Deliver conductors and cable assemblies to the project in the manufacturer’s standard reels or boxes marked with conductor material, insulation type, conductor size and U.L. Label.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26-05-19 –2
B. Store conductors and cable assemblies in a clean, dry location to prevent damage from moisture, dust, personnel and equipment.
C. Handle conductors and cables in a manner to prevent damage to conductor, insulation, jackets, and identifying markings.
1.7 MANUFACTURERS
A. The material shall be the product of a manufacturer with a minimum of ten years experience in the manufacture of similar material.
B. Acceptable Manufacturers:
1. Encore Wire
2. General Cable
3. Southwire Company
1.8 WARRANTY
A. The material shall be warranted to be free from defect and in proper working order for one year following the date of final acceptance.
PART 2 - PRODUCTS
2.1 CONDUCTORS
A. Copper Conductors
1. Conductors shall be copper unless specifically noted otherwise on the Drawings.
2. Copper conductors shall be soft drawn annealed copper, minimum conductivity 98% of pure copper per ASTM ASTM-B3.
3. Sizes No. 10 AWG and smaller shall be solid conductor, single strand.
4. Sizes No. 8 AWG and larger shall be concentric lay Class B stranding.
5. Shall conform to the Conductor Properties proscribed in the NEC.
B. Insulation
1. Type THW: 600 volt moisture and heat resistant thermoplastic rated 75 Deg.C. in wet or dry loactions.
2. Type THW-2: 600 volt moisture and heat resistant thermoplastic rated 90 Deg.C. in wet or dry location.
3. Type THWN: 600 volt moisture and heat resistant thermoplastic rated 75 Deg.C. in wet or dry.
4. Type THWN-2: 600 volt moisture and heat resistant thermoplastic rated 90 Deg.C. in wet or dry locations.
5. Type XHHW: 600 volt moisture resistant cross linked polyethylene rated 75 Deg.C. in wet or dry locations.
6. Type XHHW-2: 600 volt moisture resistant cross linked polyethylene rated 90 Deg.C. in wet or dry locations.
PART 3 - EXECUTION
3.1 USES PERMITTED
A. Unless specifically noted on the drawings, permitted by the NEC and local codes and ordinances, wiring shall be Types THHN/THWN-2 or XHHW-2 installed in raceways as specified in 26 05 32, Raceways.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26-05-19 –3
3.2 COLOR CODING
A. Where available, insulation shall be color coded by factory pigmentation for each phase and each voltage system employed on the project.
B. 120/208 and 120/240 volt systems:
1. Phase A - Black
2. Phase B - Red
3. Phase C - Blue
4. Neutral - White
5. Ground - Green
C. 277/480 volt systems:
1. Phase A - Brown
2. Phase B - Orange
3. Phase C - Yellow
4. Neutral - Gray
5. Ground - Green
3.3 GROUNDING CONDUCTORS
A. All branch circuits and feeders shall include an insulated equipment grounding conductor.
Raceway systems shall not be used as the sole equipment grounding path without specific approval.
3.4 MULTIWIRE BRANCH CIRCUITS
A. Multiwire branch circuits shall not be permitted unless required by the device served, such as for connection to modular furniture systems or track lighting systems.
B. Where multiwire branch circuits are required, branch circuit breakers shall be two or three pole with common trip and one handle.
3.5 MINIMUM SIZE
A. Conductors shall be of the minimum size shown on the drawings, lighting and power branch circuit wiring shall be minimum No.12 AWG.
B. Feeder circuit wiring shall be sized to limit the effect of voltage drop, based on the actual installed conductor length to limit voltage drop to 2% of nominal system voltage.
C. Branch circuit wiring shall be size to limit the effect of voltage drop, based on the actual installed conductor length, to limit voltage drop to 3% or less of nominal system voltage.
D. Circuits shall be grouped in raceways and grouped together when passing through enclosures to have phases and neutral grouped together to minimize circuit reactance.
3.6 INSTALLATION
A. Examine the system in which the conductors are to be installed for defects in equipment and installation which may cause damage to the conductors, insulation, or jackets.
B. Pull a swab or mandrel through conduit systems immediately before pulling conductors to insure a full bore, clean raceway system.
LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 26-05-19 –4
C. Do not exceed the conductor manufacturer’s maximum pulling force or minimum bending radius.
D. Use pulling lubricant compound where necessary and recommended by the manufacturer.
E. Conductors or cables which have insulation or jackets damaged in the pulling process shall be removed and replace with new material.
3.7 FIELD QUALITY CONTROL
A. Test all wiring insulation with a megohm meter prior to energization:
1. Phase to ground
2. Phase to phase
3. Phase to neutral
4. Neutral to ground
B. Perform test in accordance with manufacturer’s recommendation and to meet manufacturer’s published minimum insulation values.
C. Correct all defects revealed by such tests including replacing material with new as required.
CABLE CONNECTIONS 26-05-20 -1
SECTION 26 05 20 - CABLE CONNECTIONS
PART 1 - GENERAL
1.1 REFERENCED DOCUMENTS
A. Comply with Division 1- General Requirements and related documents.
B. All sections of this Specification.
1.2 DESCRIPTION
A. Work Included: Provide wire connections and devices to be readily identifiable, mechanically and electrically secure wiring system.
B. Related work specified in other sections:
1. 26 05 19 - Low Voltage Electrical Power Conductors and Cables
1.3 QUALITY ASSURANCE
A. The equipment supplied and installed shall meet the requirements of the National Electrical
Code and all applicable local codes and ordinances.
B. All equipment supplied shall be Underwriter’s Laboratories Inc. listed and so labeled.
1.4 DELIVERY, STORAGE AND HANDLING
A. Connections shall be made in atmospheres that are free from dirt, moisture, and elements which may be damaging.
1.5 MANUFACTURERS
A. The materials shall be the product of a manufacturer with a minimum ten years experience in the manufacture of similar materials.
B. Acceptable manufacturers are listed with the products.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Spring Connectors: Ideal "Wingnut" 3M-Scotch, Buchanan, and Thomas and Betts.
B. Terminal Connectors: O-Z/Gedney, Burndy, and Thomas and Betts.
C. Splice Connectors: O-Z/Gedney or Burndy with insulating cover.
D. "T" and Parallel Connectors: O-Z/Gedney or Burndy with insulating cover.
E. Vinyl Plastic Tape: 3M-Scotch #33 or #88, Plymouth and Okonite.
F. Rubber Tape: Okonite, 3M-Scotch and Plymouth.
G. Colored Tape: 3M-Scotch, Plymouth.
H. Wire Ties: Thomas and Betts "Ty-Rap", Ideal and Panduit.
CABLE CONNECTIONS 26-05-20 -2
I. Tie Mounts, Plates, Anchors: Thomas and Betts, Ideal, and Panduit.
J. Wire Tags: Self-laminating, cloth, wrap-on type by Thomas and Betts, Ideal, and Brady.
K. Terminal Strips: Nylon; 600 volt; modular plug-on construction; tubular compression slip-in terminals properly sized; complete with mounting track, end clips, and anchors by Allen-
Bradley, Square D, and Buchanan.
L. Cable and Cord Fittings: Crouse-Hinds with wire mesh grip or Appleton.
PART 3 - EXECUTION
3.1 INSPECTION
A. Examine wires to be joined, tapped, spliced, terminated, and their connecting devices for defects which may affect the mechanical and electrical integrity of the connection.
B. Do not proceed until defects are corrected.
3.2 PREPARATION
A. Remove proper amount of insulation necessary for connection, clean conductors.
3.3 INSTALLATION
A. No. 10 Wire and Smaller: Connect with spring connectors, terminate at terminal strips.
B. No. 8 Wire and Larger: Connect and terminate with above specified tape half -lapped to produce a dielectric value equal to wire insulation.
C. Train, hold, clamp, and tag wiring in cabinets, pull boxes, panels, and junction boxes with above specified devices.
D. Splices in feeders and mains may only be made where designated on the drawings and where prior approval is obtained from the Architect.
E. Install terminal strips in enclosures without means for termination of wiring.
F. Install cable and cord grips on all cables and cords, entering enclosures. Use wire mesh grips where necessary for strain relief.
3.4 FIELD QUALITY CONTROL
A. Test: Connections shall be resistance tested with megohm meter as specified for wire.
3.5 ADJUSTMENTS
A. Assure that wire connections made by others in equipment furnished by others are mechanically and electrically sound prior to energization.
Wylie, Texas
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26-05-26 –1
SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 REFERENCED DOCUMENTS
A. Comply with Division 1 - General Requirements and related documents.
B. Comply with all other Division 26 sections as applicable.
C. Refer to other Divisions for coordination of work with other portions of work.
1.2 DESCRIPTION
A. Provide a grounding electrode for the facility and a ground electrode conductor system to connect to the electric service main equipment.
1.3 QUALITY ASSURANCE
A. The equipment supplied and installed shall meet the requirements of the National Electrical Code and all applicable local codes and ordinances.
B. All equipment supplied shall be Underwriter’s Laboratories Inc. listed and so labeled.
1.4 REFERENCED STANDARDS
A. National Electrical Code, NFPA 70.
B. EIA/TIA Standard 607
C. IEEE - Standard 142 - Recommended Practice for Grounding of Industrial and Commercial Power Systems.
D. IEEE Standard 81 - Guide for Measuring Earth Resistivity.
1.5 SUBMITTALS
A. Samples: Provide samples upon specific request.
B. Submit product data under provisions of section 26 00 00 Electrical.
C. Provide closeout documents as required in Division 1.
1.6 DELIVERY, STORAGE AND HANDLING
A. Deliver conductors and cable assemblies to the project in the manufacturer’s standard reels or boxes marked with conductor material, insulation type, conductor size and U.L. Label.
B. Store conductors and cable assemblies in a clean, dry location to prevent damage from moisture, dust, personnel and equipment.
C. Handle conductors and cables in a manner to prevent damage to conductor, insulation, jackets, and identifying markings.
Wylie, Texas
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26-05-26 –2
1.7 MANUFACTURERS
A. The materials shall be the products of a manufacturer with a minimum of ten years experience in the manufacture of similar material.
B. Acceptable manufacturers shall be as listed with the material descriptions.
1.8 WARRANTY
A. The material shall be warranted to be free from defect and in proper working order for a period of one year following the date of final acceptance.
PART 2 - PRODUCTS
2.1 GROUND RODS
A. Standard ground rods shall be 3/4 inch diameter, 10 foot length, copper clad steel, equal to Thompson Company.
2.2 CONDUCTORS
A. Conductors buried in contact with the earth shall be bare copper, solid for sizes up to No. 6 AWG, concentric lay strand for sizes No. 8 AWG and larger.
B. All other grounding conductors shall be copper conductor, Type THWN 600 volt 90 Deg.C.
thermoplastic insulation, green color where available.
2.3 CONNECTIONS
A. All connections made below grade, in inaccessible locations, and all connections and splices in the grounding electrode conductor system shall be made by exothermic weld process equal to Cadweld. Provide polyethylene inspection well covers and lids equal to Erico #T416B.
B. All other connections shall be hydraulically crimped irreversible connectors equal to Thomas and Betts 54000 Series.
2.4 CONDUITS
A. Provide malleable iron conduit grounding bushings where:
1. Metallic raceways terminate at metal housings without mechanical and electrical connection to housing.
2. At each end of metallic conductors for grounding conductors where conduits are electrically non-continuous.
PART 3 - EXECUTION
3.1 EQUIPMENT GROUNDING CONDUCTORS
A. Bond the non-current carrying parts of the electric power system to the grounding electrode conductor at the service disconnecting means. From this point forward, all non-current carrying parts of the electric power system shall be electrically connected and continuous by means of:
1. Electrically continuous equipment enclosures, metallic boxes and metallic raceways connected with U.L. Listed connectors and couplings.
Wylie, Texas
GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 26-05-26 –3
2. Equipment grounding conductors supplementary to metallic raceway systems where shown on the Drawings.
3. Equipment grounding conductors in non-metallic raceway systems and in flexible metal conduit systems.
3.2 TESTING
A. Grounding Electrode:
1. The earth resistance of the main ground electrode shall be not more than 5 ohms.
2. Perform a measurement of ground resistance by one of the means described in IEEE
Standard 81, Guide for Measuring Earth Resistivity.
3. Provide written certification of the ground resistance measurements upon request.
B. Grounding Continuity:
1. Provide continuity tests and checks of equipment grounding and isolated grounding conductor systems to ensure electrical continuity.
2. Provide written certification of continuity checks upon requests.
Wylie, Texas
RACEWAYS 26-05-32 –1
SECTION 26 05 32 - RACEWAYS
PART 1 - GENERAL
1.1 REFERENCED DOCUMENTS
A. Comply with Division 1 - General Requirements and related documents.
B. Comply with all other Division 26 sections as applicable.
C. Refer to other Divisions for coordination of work with other portions of work.
1.2 DESCRIPTION
A. Work Included: Provide a mechanically and electrically complete conduit system.
B. Related work specified in other sections:
1. 26 00 00 - Electrical
2. 26 05 19 - Low Voltage Electrical Power Conductors and Cables
1.3 QUALITY ASSURANCE
A. The equipment supplied and installed shall meet the requirements of the National Electrical Code and all applicable local codes and ordinances.
B. All equipment supplied shall be Underwriter’s Laboratories Inc. listed and so labeled.
1.4 SUBMITTALS
A. Samples: Provide samples upon specific request.
B. Submit product data under provisions of section 26 00 00 Electrical.
C. Certificates:
1. Labels of Underwriters' Laboratories, Inc. affixed to each item of material.
2. If materials are by manufacturers other than those specified, submit certification that material meets applicable Underwriters' Laboratories, Inc. Standards.
D. Provide closeout documents as required in Division 1.
1.5 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Protect conduits and finishes from damage.
1.6 MANUFACTURER
A. The materials shall be the products of a manufacturer with a minimum of ten years experience in the manufacture of similar equipment.
B. Acceptable Manufacturers
1. Metallic Conduits: Allied, and Wheatland.
2. Nonmetallic Conduits: Cantex, and SEDCO.
Wylie, Texas
RACEWAYS 26-05-32 –2
1.7 WARRANTY
A. The materials shall be warranted to be in proper working condition for a period of one year following the date of final acceptance.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Rigid Metal Electrical Conduit: Hot-dipped galvanized steel with zinc coated threads and an outer coating of zinc bichromate, complete with one coupling and one end thread protector.
Intermediate metal conduit (IMC) is not allowed.
B. Electrical Metallic Tubing: Welded, electro-galvanized thin wall steel tubing.
C. Rigid Nonmetallic Electrical Conduit: Schedule 40 heavy wall polyvinylchloride, high impact resistant.
D. Elbows and Bends:
1. All Types: Size 1-1/4 inch and larger shall be factory manufactured.
E. Bushings:
1. 1-1/4" and Smaller: Same material as the conduit with which they are installed.
2. 1-1/2" and Larger: Hot-dipped galvanized with thermosetting phenolic insulation, 150
Deg.C.
F. Locknuts:
1. 1-1/2" and Smaller: Zinc plated heavy stuck steel, O-Z/Gedney.
2. 2" and Larger: Cadmium plated malleable iron, O-Z/Gedney.
G. Hubs: Cadmium plated malleable iron, tapered threads, neoprene "O" ring, insulated throat, O- Z/Gedney.
H. E.M.T. Compression Connectors: Gland compression type, zinc plated steel body, cadmium plated, malleable iron nut, insulated throat, O-Z/Gedney.
I. E.M.T. Compression Couplings: Gland compression type, zinc plated steel body, cadmium plated malleable iron nut, O-Z/Gedney.
J. Liquidtight Conduit Connectors: Cadmium plated malleable iron body and nut, cadmium plated steel ferrule, insulated throat, integrally cast external ground lug, O-Z/Gedney.
K. Seals for Watertight Wall and Floor Penetrations: Malleable iron body, oversize sleeve, sealing ring, pressure clamp and rings and sealing grommet, hex head cap screws, O-Z/Gedney.
L. Seals for Penetrations through Existing Walls: Thunderline Corporation Link-Seal watertight sleeves, complete with wall and casing seals.
M. Fire Seals: Galvanized iron pipe sleeves sealed with approved foam type fireproofing.
N. Expansion Fittings: Hot-dipped galvanized malleable iron with bonding jumpers selected for linear or linear with deflection, as required.
O. Escutcheons: Chrome plated sectional floor and ceiling plates, Crane No. 10.
Wylie, Texas
RACEWAYS 26-05-32 –3
P. Accessories: Reducers, bushings, washers, etc., shall be cadmium plated malleable iron on the forms and dimensions best suited for the application.
Q. Identifying Tape for Underground Conduits: Polyethylene tape, 6 inches wide, with continuous printing along length, Brady Identoline:
1. For Electric Power Conduits: Yellow with black letters.
2. For Other Services: Green with black letters.
R. Sleeves: 22 gauge galvanized steel sleeves where conduits pass through walls and floors.
Standard galvanized steel pipe where conduits pass through beams, outside walls, or structural members.
PART 3 - EXECUTION
3.1 INSPECTION
A. Examine surfaces to which conduits are to be secured for:
1. Defects which will adversely affect the execution and quality of work.
2. Deviations from allowable tolerances for the building material.
B. Do not start work until defects and deviations are corrected.
3.2 INSTALLATION
A. Size conduits as indicated on the drawings and as required by the NEC for the number and sizes of wires to be drawn into conduit. Do not use conduit sized less than 3/4" unless specified otherwise.
B. Conceal conduits from view in all areas except mechanical and electrical equipment rooms and crawl spaces. Should it appear necessary to expose any conduit:
1. Bring to the attention of the Architect, immediately, and
2. Rearrange the work to facilitate an approved installation.
C. Install all conduits at elevations and locations to avoid interference with grading of other work, the structure, finished ceilings, walls. Avoid causing cutting of masonry units.
D. To prevent displacement, securely support and hold in place all conduits installed in advance of other work and to be concealed in the building structure.
E. Carefully lay out conduits run within the structure, such as floors, beams, walls, to avoid densities excessive for the construction. Relocate those conduits when excessive densities occur.
F. Ream, remove burrs, and swab inside conduits before conductors are pulled in.
G. Cap or plug conduits with standard manufactured accessories as soon as the conduits have been permanently installed in place.
H. Bends and offsets in 1" and smaller conduits may be done with approved bending devices. Do not install conduits which have had their walls crushed and deformed and their surface finish damaged due to bending.
I. Where space conditions prohibit the use of standard ells, elbows, and conduits, use cast ferrous alloy fittings of such forms and dimensions as best required for the application.
Wylie, Texas
RACEWAYS 26-05-32 –4
J. Make all conduit joints mechanically tight, electrically continuous, and watertight. Pitch conduits in a manner to avoid creating moisture traps.
K. Install insulated throat threaded hubs on conduits entering enclosures without threaded hubs where exposed to damp or wet locations.
L. Connect and couple E.M.T. with compression type fittings. Do not use indentor and set screw fittings.
M. Install and neatly rack exposed conduits parallel with and perpendicular to the building walls.
Do not install exposed diagonal conduit runs.
N. Route and suspend conduits crossing expansion joints to permit expansion, contraction, and deflection utilizing approved fittings to prevent damage to the building, conduits, and supporting devices in accordance with the National Electrical Code.
O. Do not place conduits in close proximity to equipment, systems, and service lines, such as hot water supply and return lines, which could be detrimental to the conduit and its contents.
Maintain a minimum 3" separation, except in crossing, which shall be a minimum 1".
P. Conduit sleeves shall be sized to permit insertion of conduit with adequate clearance for movement due to expansion and contraction. Where conduits pass through outside walls, watertight fittings, as specified herein, shall be used.
Q. Provide pullstring in each empty conduit. Label pullstring when conduit termination is not obvious.
3.3 USES PERMITTED
A. Rigid Metal Conduit:
1. Exterior conditions above grade.
B. Schedule 40 PVC:
1. Below grade exterior to the building.
C. Electrical Metallic Tubing:
1. All uses above grade interior to the building, except as limited elsewhere in this section.
Wylie, Texas
EXTERIOR LIGHTING 26-51-02 –1
SECTION 26 51 02 - EXTERIOR LIGHTING
PART 1 - General
1.1 REFERENCED DOCUMENTS
A. Comply with Division 1 - General Requirements and related documents.
B. Comply with all other Division 26 sections as applicable.
C. Refer to other Divisions for coordination of work with other portions of work.
1.2 DESCRIPTION
A. Work Included:
1. Exterior luminaires with lamps and ballasts.
2. Poles and accessories.
B. Related work specified in other Sections:
1. 26 00 00 - Electrical
2. 26 05 19 - Low Voltage Electrical Power Conductors and Cables
3. 26 05 26 - Grounding and Bonding for Electrical Systems
4. 26 05 32 - Raceways
5. 26 51 05 - Networked Lighting Controls
1.3 STRUCTURAL ANALYSIS CRITERIA FOR POLE SELECTION
A. Dead Load: Weight of luminaire and its horizontal and vertical supports, lowering devices, and supporting structure, applied as stated in AASHTO LTS-4.
B. Live Load: Single load of 500 lbf, distributed as stated in AASHTO LTS-4.
C. Ice…