Tent_SOW.pdf
PDF 26 KB Posted
- Attached to
- Design, Build and deliver 7 Airbeam Shelters
- Solicitation number
- WX02398Y2017T
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Parts_List.xlsx | XLSX spreadsheet | |
| BNJ_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
TITLE: Shelter System, 20’ Wide x 21’ Long x 10’ High Type 01
I. Project Objectives: Design, build, and deliver 7 air beam soft shelter systems, 20 feet wide x 21 feet Long x 10 feet long with air beam supports structures and a 260 CFM Blower. Supply operational manuals.
I. Scope of Work: Vendor will design, build and deliver a total of 7 EACH Air-beam soft shelters, two each for Maynard MERS and one to each of the detachments listed in the deliverables section.
III. Deliverables: Seven (7) each shelter systems, with air beam support units used for disaster response. Shelters must be able to withstand winds of 55 MPH with Gusts up to 65 MPH and withstand snow loads up to 10lbs/Sq. Inch. Must be able to be deployed by 1 person. Each of these shelters will replace the old Western Shelters. Shelters will be delivered to MERS locations in (2EA) MERS Maynard, MA; (1EA) MERS Thomasville, GA; (1EA) MERS Denver, CO; (1EA) MERS Denton, TX; and (1EA) MERS Bothell, WA; (1EA) MERS Frederick, MD.
IV. Vendor
Responsibilities:
General:
• Build and deliver portable air beam soft shelter systems with air beam supports structure to facility locations specified, cost will be included in the quote.
Construction:
• Air beam soft shelter system must be, 20’Wide x 21' Long x 10'
High, Type 01
• Include Air beam support structure airframe, with 3 Air beam
Arches
• Interior Floor size 20’ x 18.7’x 10.3’= 420 Sq. Ft.
• Packing Dimensions- 39W x 72L x 39H inches (Rolled Up)
• 2 Person Set Up
• Weight 500 Lbs.
• Integrated removable floor
• 2 End Doors
• 4 Windows
• Side ECU Ports
• Integrated Plenum
• Storage bag
• Anchor Tie down points
Miscellaneous equipment and features
• Inflator, 260 CFM, Blower Compressor High Pressure 110V, 1 PH, 60 Hz
• Light Kit for Shelter System
• Step by step operational manual
• Staking kit
• Repair kit
V. Purchaser Responsibilities: Perform Official Government Acceptance Test
(OGAT) and inspection.
File details come from the government source that posted it. Updated .