Statement of Work

TITLE: Shelter System, 20’ Wide x 21’ Long x 10’ High Type 01

I. Project Objectives: Design, build, and deliver 7 air beam soft shelter systems, 20 feet wide x 21 feet Long x 10 feet long with air beam supports structures and a 260 CFM Blower. Supply operational manuals.

I. Scope of Work: Vendor will design, build and deliver a total of 7 EACH Air-beam soft shelters, two each for Maynard MERS and one to each of the detachments listed in the deliverables section.

III. Deliverables: Seven (7) each shelter systems, with air beam support units used for disaster response. Shelters must be able to withstand winds of 55 MPH with Gusts up to 65 MPH and withstand snow loads up to 10lbs/Sq. Inch. Must be able to be deployed by 1 person. Each of these shelters will replace the old Western Shelters. Shelters will be delivered to MERS locations in (2EA) MERS Maynard, MA; (1EA) MERS Thomasville, GA; (1EA) MERS Denver, CO; (1EA) MERS Denton, TX; and (1EA) MERS Bothell, WA; (1EA) MERS Frederick, MD.

IV. Vendor

Responsibilities:

General:

• Build and deliver portable air beam soft shelter systems with air beam supports structure to facility locations specified, cost will be included in the quote.

Construction:

• Air beam soft shelter system must be, 20’Wide x 21' Long x 10'

High, Type 01

• Include Air beam support structure airframe, with 3 Air beam

Arches

• Interior Floor size 20’ x 18.7’x 10.3’= 420 Sq. Ft.

• Packing Dimensions- 39W x 72L x 39H inches (Rolled Up)

• 2 Person Set Up

• Weight 500 Lbs.

• Integrated removable floor

• 2 End Doors

• 4 Windows

• Side ECU Ports

• Integrated Plenum

• Storage bag

• Anchor Tie down points

Miscellaneous equipment and features

• Inflator, 260 CFM, Blower Compressor High Pressure 110V, 1 PH, 60 Hz

• Light Kit for Shelter System

• Step by step operational manual

• Staking kit

• Repair kit

V. Purchaser Responsibilities: Perform Official Government Acceptance Test

(OGAT) and inspection.