This is a technical plan document for the West Municipal Garage Beam Replacement project located in Green Bay, Wisconsin, prepared by Berners-Schober Associates, Inc. The project involves HVAC system modifications including the demolition and replacement of an existing power roof ventilator (PRV), ductwork reconfiguration, and associated structural work. Key deliverables include removal of existing ducts and dampers to accommodate beam replacement, installation of new ductwork with a Greenheck GB-220 exhaust fan rated at 4,000 CFM with 0.50 HP, roof penetration work with an 18-inch tall insulated curb, masonry wall modifications, and electrical reconnection work. The plan specifies coordination requirements with multiple trades including structural, general contractor, firestopping, and roofing contractors. The project is identified as an alternate bid item with control damper or backdraft damper provisions dependent on existing fan configurations.
The project requires coordination of fire-rated wall penetrations, confirmation of existing motor voltage specifications in the field, and compliance with firestopping requirements for multiple penetrations in the same opening. Work includes patching and restoration by the general trade, with the fan schedule noting provisions for disconnect switches, control dampers, and sheave changes following system balancing. The bid document references standard construction specifications including selective demolition, unit masonry work, metal fabrications, roof patching, and joint sealants. The project was issued for owner review on April 11, 2023, with a bid document date of May 9, 2023. Additional contractual documentation referenced includes AIA Document A105-2017 for the agreement form and insurance requirements per Exhibit A.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WSG 1-23_NTC.pdf | ||
| WSG 1-23_SPEC.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY PLAN
PROJECT LOCATION
AREA OF
WORK
N
ON P
24x12
16.5"x16.5"-UP
TO EF#5
16.5"x16.5"-UP
TO EF#6
x1
648x24
REMOVE DUCT NECESSARY TO ACHIEVE
ACCESS FOR BEAM (STRUCTURE WORK).
REINSTALL DUCT AFTER STRUCTURE
WORK IS COMPLETE.
REMOVE DUCT
GENERAL PRIME CONTRACTOR
TO INFILL MASONRY WALL
REMOVE DUCT
EXISTING PRV. DISCONNECT ELECTRICAL
CONNECTION TO PRV. REUSE EXISTING
STARTER. SALVAGE A PORTION OF THE
CONDUIT AND CONDUCTORS FOR EXTENSION
TO NEW LOCATION.
REMOVE DAMPER AND CONTROLS
AT TOP OF CHASE. TOP 6 COURSES
OF MASONRY TO BE REMOVED BY
G.C. LOWER DAMPER TO REMAIN.
DEMO EXISTING PRV. CONTROL/DAMPER
INTERLOCKS TO BE RECONNECTED. FAN
OPERATIONS TO REMAIN UNCHANGED.
ON P
24x12
16.5"x16.5"-UP
TO EF#5
16.5"x16.5"-UP
TO EF#6
REINSTALLED
DUCT
PROVIDE (3) 8" LONG 14x8 DUCTS
MAKE NEW CONNECTION TO DUCT
THROUGH ROOF. EXTEND DUCT AND
STOP 10" BELOW ROOF DECK.
WITH 1x1 MESH OVER OPENINGS
F-001 ON ROOF ABOVE. EXPAND DUCTWORK TO FIT TIGHT TO INSIDE OF
CHASE (APPROXIMATELY 48x24). EXTEND DUCT INTO CHASE APPROXIMATELY
ONE FOOT AND SEAL DUCT TO CHASE AIR TIGHT.
ONE ROOF JOIST, APPROXIMATELY IN THE MIDDLE OF THE CHASE WILL
EXTEND THROUGH THE DUCTWORK. SANDWICH PANEL THE JOIST WITH
SHEET METAL AND SEAL DUCT AROUND IT, AIR TIGHT.
EXTEND THE 3/4" RIGID CONDUIT AND #12 CONDUCTORS TO THE NEW
LOCATION. PROVIDE NEW SPLICE BOX, #12 CONDUCTORS AND 3/4" RIGID
CONDUIT AS REQUIRED.
24x24 DUCT-UP THRU ROOF, 30x30 MAX ROOF OPENING, 34x34 CURB.
STRUCTURE
ATTACH TO
ALL AROUND
1/4" NEOPRENE GASKET
BY GENERAL TRADE. GENERAL TRADE
ANGLE FRAMING AND WOOD BLOCKING
ROOF CEMENT.
THRU CURB WITH
SEAL ALL PENETRATIONS
FASTENERS @ 8" 0/C
FLASHING WITH
METAL COUNTER
(CANT BY GENERAL TRADE)
INSULATED ROOF CURB
2 X 2 (ACQ) TREATED WOOD NAILER
" O
R
AS
N O
TE
D
SHALL SAWCUT HOLES THRU ROOF, SET CURB,
AND PATCH INSULATION AND ROOFING
TO MATCH ROOF)
(PROVIDE PITCHED CURB
INTO EXISTING SYSTEM.
H.T.S.
DUCT + 4"
INSTALL 2x TREATED WOOD
BLOCKING IN FLUTES OF METAL
DECK AT EACH FASTENER LOCATION.
PROVIDE CONTINUOUS TREATED
2x4 AT OPPOSITE SIDES.
3x3x1/4" ANGLE FRAME
ALL 4 SIDES OF OPENING
BY GENERAL TRADE.
ROOF CONSTRUCTION.
SEE ARCHITECTURAL
FOR TYPE.
POWER ROOF VENTILATOR
SECURE TO CURB WITH
(2) 2" CADMIUM PLATED
LAG SCREWS ON EA. SIDE
VENT SIZE
PREFABRICATED
INSULATED ROOF CURB
12x12 AD ROOF CONSTRUCTION.
SEE ARCHITECTURAL
DRAWINGS FOR TYPE.
DUCT TO EXTEND THRU CURB
AND ATTACH TO NAILER
BACKDRAFT DAMPER
OR CONTROL DAMPER
AS SCHEDULED
EXTERNAL INSULATION FROM
ROOF PENETRATION TO TOP
OF MASONRY CHASE
G11 M101 scharney22CGB1400M101WF01
FI
R
ST
F
LO
O
R P
LA
N
S
M101
Date:
Revisions:
No.
Sh ee t T itl e:
Description:
Pi ne
S tre et
G re en B ay , W
I 5
0-
2-w w w .b er ne rs sc ho be r.c om
PROJECT
NUMBER
DATE
ISSUED
SHEET
NUMBER
BID DOCUMENT SET
22CGB14.00
C
BE
R N
ER
S-
SC
H
O
BE
R A
SS
O
C
IA
TE
S, IN
C
W
ES
T M
U N
IC
IP
A L
G A
R A
G E
B
EA
M R
EP
LA
C
EM
EN
T
MAY 9, 2023
S.
O ne id a St
, G re en B ay , W
I 5
04/11/20231. Issued for Owner Review
4'0" 2' 8' 12' M101
A1 FIRST FLOOR PLAN - DEMOLITION
1/8" = 1'-0"
N
4'0" 2' 8' 12'
N
M101
A7 FIRST FLOOR PLAN - NEW WORK
1/8" = 1'-0"
M101
G11 PREFABRICATED ROOF CURB
NO SCALE
M101
E11 POWER ROOF VENTILATOR
NO SCALE
ITEM LOCATION SERVICE TYPE MANUFACTURER/
MODEL OR SIZE CFM BHP HP VFD V/HZ/PH RPM OUTLET
VELOCITY (FPM) TS ESP
("WG) NOTES DETAIL REMARKS
F-001 ROOF EXHAUST PRV GREENHECK GB-220 4,000 0.42 0.50 NO 208/60/1 581 1,274 3,651 0.20" 1, 2, 3, 4, 5 E11/M101 FAN IS ALT BID
NOTES
1. CONFIRM EXISTING MOTOR VOLTAGE IN FIELD. NEW FAN SHALL MATCH V/HZ/PH OF EXISTING.
2. PROVIDE CONTROL DAMPER (VOLTAGE TO MATCH EXISTING). IF EXISTING FAN DOES NOT HAVE A CONTROL DAMPER, PROVIDE BACKDRAFT DAMPER IN LIEU OF CONTROL DAMPER.
3. PROVIDE DISCONNECT SWITCH.
4. PROVIDE 18" TALL ROOF CURB.
5. PROVIDE SHEAVE CHANGE - REPLACE ADJUSTABLE SHEAVE WITH PERMANENT ONCE BALANCING IS COMPLETED.
FAN SCHEDULE
- CUT EXISTING WALLS FOR NEW WORK. PATCHING OFWALL BY
GENERAL TRADE.
- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR
EXISTING CONDITIONS AND COORDINATED INSTALLATIONS.
THIS WORK IS AN ALT BID.
- REFERENCE GENERAL TRADE PARTITION SCHEDULE FOR WALL
THICKNESS AND RATINGS AS REFERENCED ON THE REFLECTED
CEILING PLANS AND ARCHITECTURAL PLANS. DUCTWORK AND PIPING
MUST PASS THRU FIRE RATED WALLS IN PERPENDICULAR POSITION
AND SHALL BE COORDINATED WITH THE FIRESTOPPING TRADE TO
ALLOW FOR MINERAL WOOL/FIRE STOPPING TO BE INSTALLED ABOVE
DUCTWORK LOCATED AGAINST THE STRUCTURE. WHERE MULTIPLE
PENETRATIONS OCCUR IN THE SAME OPENING, THEY MUST BE
APPROVED BY THE FIRESTOPPING TRADE PRIOR TO INSTALLATION.
UNAPPROVED COMBINATION OF PENETRATIONS WILL BE
RE-INSTALLED INTO SEPARATE APPROVED PENETRATIONS AT
CONTRACTOR'S EXPENSE.
PLAN KEYED NOTES
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
ONEIDA STREET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text G
AutoCAD SHX Text F
AutoCAD SHX Text D
AutoCAD SHX Text E
| Title |
| Table of Contents |
| 00 11 00 Notice to Contractors |
| 00 21 00 Instructions to Bidders |
| Bidder's Proposal |
| Disclosure of Ownership |
| Affidavit of Compliance |
| 00 52 00 Agreement Form |
| AIA Document A105 - 2017 Standard Short Form of Agreement Between Owner and Contractor |
| Exhibit A Insurance Requirements |
| 01 00 00 General Requirements |
| 01 23 00 Alternates |
| 01 50 00 Temporary Facilities and Controls |
| 01 70 00 Execution and Closeout Requirements |
| 02 41 19 Selective Demolition |
| 04 20 00 Unit Masonry |
| 05 50 00 Metal Fabrications |
| 07 50 00 Roof Patching |
| 07 92 00 Joint Sealants |
| 09 96 00 High Performance Coatings |
File details come from the government source that posted it. Updated .