About this file

This is a technical plan document for the West Municipal Garage Beam Replacement project located in Green Bay, Wisconsin, prepared by Berners-Schober Associates, Inc. The project involves HVAC system modifications including the demolition and replacement of an existing power roof ventilator (PRV), ductwork reconfiguration, and associated structural work. Key deliverables include removal of existing ducts and dampers to accommodate beam replacement, installation of new ductwork with a Greenheck GB-220 exhaust fan rated at 4,000 CFM with 0.50 HP, roof penetration work with an 18-inch tall insulated curb, masonry wall modifications, and electrical reconnection work. The plan specifies coordination requirements with multiple trades including structural, general contractor, firestopping, and roofing contractors. The project is identified as an alternate bid item with control damper or backdraft damper provisions dependent on existing fan configurations.

The project requires coordination of fire-rated wall penetrations, confirmation of existing motor voltage specifications in the field, and compliance with firestopping requirements for multiple penetrations in the same opening. Work includes patching and restoration by the general trade, with the fan schedule noting provisions for disconnect switches, control dampers, and sheave changes following system balancing. The bid document references standard construction specifications including selective demolition, unit masonry work, metal fabrications, roof patching, and joint sealants. The project was issued for owner review on April 11, 2023, with a bid document date of May 9, 2023. Additional contractual documentation referenced includes AIA Document A105-2017 for the agreement form and insurance requirements per Exhibit A.

View the file

Other files

File Type Posted
WSG 1-23_NTC.pdf PDF
WSG 1-23_SPEC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEY PLAN

PROJECT LOCATION

AREA OF

WORK

N

ON P

24x12

16.5"x16.5"-UP

TO EF#5

16.5"x16.5"-UP

TO EF#6

x1

648x24

REMOVE DUCT NECESSARY TO ACHIEVE

ACCESS FOR BEAM (STRUCTURE WORK).

REINSTALL DUCT AFTER STRUCTURE

WORK IS COMPLETE.

REMOVE DUCT

GENERAL PRIME CONTRACTOR

TO INFILL MASONRY WALL

REMOVE DUCT

EXISTING PRV. DISCONNECT ELECTRICAL

CONNECTION TO PRV. REUSE EXISTING

STARTER. SALVAGE A PORTION OF THE

CONDUIT AND CONDUCTORS FOR EXTENSION

TO NEW LOCATION.

REMOVE DAMPER AND CONTROLS

AT TOP OF CHASE. TOP 6 COURSES

OF MASONRY TO BE REMOVED BY

G.C. LOWER DAMPER TO REMAIN.

DEMO EXISTING PRV. CONTROL/DAMPER

INTERLOCKS TO BE RECONNECTED. FAN

OPERATIONS TO REMAIN UNCHANGED.

ON P

24x12

16.5"x16.5"-UP

TO EF#5

16.5"x16.5"-UP

TO EF#6

REINSTALLED

DUCT

PROVIDE (3) 8" LONG 14x8 DUCTS

MAKE NEW CONNECTION TO DUCT

THROUGH ROOF. EXTEND DUCT AND

STOP 10" BELOW ROOF DECK.

WITH 1x1 MESH OVER OPENINGS

F-001 ON ROOF ABOVE. EXPAND DUCTWORK TO FIT TIGHT TO INSIDE OF

CHASE (APPROXIMATELY 48x24). EXTEND DUCT INTO CHASE APPROXIMATELY

ONE FOOT AND SEAL DUCT TO CHASE AIR TIGHT.

ONE ROOF JOIST, APPROXIMATELY IN THE MIDDLE OF THE CHASE WILL

EXTEND THROUGH THE DUCTWORK. SANDWICH PANEL THE JOIST WITH

SHEET METAL AND SEAL DUCT AROUND IT, AIR TIGHT.

EXTEND THE 3/4" RIGID CONDUIT AND #12 CONDUCTORS TO THE NEW

LOCATION. PROVIDE NEW SPLICE BOX, #12 CONDUCTORS AND 3/4" RIGID

CONDUIT AS REQUIRED.

24x24 DUCT-UP THRU ROOF, 30x30 MAX ROOF OPENING, 34x34 CURB.

STRUCTURE

ATTACH TO

ALL AROUND

1/4" NEOPRENE GASKET

BY GENERAL TRADE. GENERAL TRADE

ANGLE FRAMING AND WOOD BLOCKING

ROOF CEMENT.

THRU CURB WITH

SEAL ALL PENETRATIONS

FASTENERS @ 8" 0/C

FLASHING WITH

METAL COUNTER

(CANT BY GENERAL TRADE)

INSULATED ROOF CURB

2 X 2 (ACQ) TREATED WOOD NAILER

" O

R

AS

N O

TE

D

SHALL SAWCUT HOLES THRU ROOF, SET CURB,

AND PATCH INSULATION AND ROOFING

TO MATCH ROOF)

(PROVIDE PITCHED CURB

INTO EXISTING SYSTEM.

H.T.S.

DUCT + 4"

INSTALL 2x TREATED WOOD

BLOCKING IN FLUTES OF METAL

DECK AT EACH FASTENER LOCATION.

PROVIDE CONTINUOUS TREATED

2x4 AT OPPOSITE SIDES.

3x3x1/4" ANGLE FRAME

ALL 4 SIDES OF OPENING

BY GENERAL TRADE.

ROOF CONSTRUCTION.

SEE ARCHITECTURAL

FOR TYPE.

POWER ROOF VENTILATOR

SECURE TO CURB WITH

(2) 2" CADMIUM PLATED

LAG SCREWS ON EA. SIDE

VENT SIZE

PREFABRICATED

INSULATED ROOF CURB

12x12 AD ROOF CONSTRUCTION.

SEE ARCHITECTURAL

DRAWINGS FOR TYPE.

DUCT TO EXTEND THRU CURB

AND ATTACH TO NAILER

BACKDRAFT DAMPER

OR CONTROL DAMPER

AS SCHEDULED

EXTERNAL INSULATION FROM

ROOF PENETRATION TO TOP

OF MASONRY CHASE

G11 M101 scharney22CGB1400M101WF01

FI

R

ST

F

LO

O

R P

LA

N

S

M101

Date:

Revisions:

No.

Sh ee t T itl e:

Description:

Pi ne

S tre et

G re en B ay , W

I 5

0-

2-w w w .b er ne rs sc ho be r.c om

PROJECT

NUMBER

DATE

ISSUED

SHEET

NUMBER

BID DOCUMENT SET

22CGB14.00

C

BE

R N

ER

S-

SC

H

O

BE

R A

SS

O

C

IA

TE

S, IN

C

W

ES

T M

U N

IC

IP

A L

G A

R A

G E

B

EA

M R

EP

LA

C

EM

EN

T

MAY 9, 2023

S.

O ne id a St

, G re en B ay , W

I 5

04/11/20231. Issued for Owner Review

4'0" 2' 8' 12' M101

A1 FIRST FLOOR PLAN - DEMOLITION

1/8" = 1'-0"

N

4'0" 2' 8' 12'

N

M101

A7 FIRST FLOOR PLAN - NEW WORK

1/8" = 1'-0"

M101

G11 PREFABRICATED ROOF CURB

NO SCALE

M101

E11 POWER ROOF VENTILATOR

NO SCALE

ITEM LOCATION SERVICE TYPE MANUFACTURER/

MODEL OR SIZE CFM BHP HP VFD V/HZ/PH RPM OUTLET

VELOCITY (FPM) TS ESP

("WG) NOTES DETAIL REMARKS

F-001 ROOF EXHAUST PRV GREENHECK GB-220 4,000 0.42 0.50 NO 208/60/1 581 1,274 3,651 0.20" 1, 2, 3, 4, 5 E11/M101 FAN IS ALT BID

NOTES

1. CONFIRM EXISTING MOTOR VOLTAGE IN FIELD. NEW FAN SHALL MATCH V/HZ/PH OF EXISTING.

2. PROVIDE CONTROL DAMPER (VOLTAGE TO MATCH EXISTING). IF EXISTING FAN DOES NOT HAVE A CONTROL DAMPER, PROVIDE BACKDRAFT DAMPER IN LIEU OF CONTROL DAMPER.

3. PROVIDE DISCONNECT SWITCH.

4. PROVIDE 18" TALL ROOF CURB.

5. PROVIDE SHEAVE CHANGE - REPLACE ADJUSTABLE SHEAVE WITH PERMANENT ONCE BALANCING IS COMPLETED.

FAN SCHEDULE

- CUT EXISTING WALLS FOR NEW WORK. PATCHING OFWALL BY

GENERAL TRADE.

- PROVIDE ADDITIONAL OFFSETS IN NEW WORK AS REQUIRED FOR

EXISTING CONDITIONS AND COORDINATED INSTALLATIONS.

THIS WORK IS AN ALT BID.

- REFERENCE GENERAL TRADE PARTITION SCHEDULE FOR WALL

THICKNESS AND RATINGS AS REFERENCED ON THE REFLECTED

CEILING PLANS AND ARCHITECTURAL PLANS. DUCTWORK AND PIPING

MUST PASS THRU FIRE RATED WALLS IN PERPENDICULAR POSITION

AND SHALL BE COORDINATED WITH THE FIRESTOPPING TRADE TO

ALLOW FOR MINERAL WOOL/FIRE STOPPING TO BE INSTALLED ABOVE

DUCTWORK LOCATED AGAINST THE STRUCTURE. WHERE MULTIPLE

PENETRATIONS OCCUR IN THE SAME OPENING, THEY MUST BE

APPROVED BY THE FIRESTOPPING TRADE PRIOR TO INSTALLATION.

UNAPPROVED COMBINATION OF PENETRATIONS WILL BE

RE-INSTALLED INTO SEPARATE APPROVED PENETRATIONS AT

CONTRACTOR'S EXPENSE.

PLAN KEYED NOTES

AutoCAD SHX Text

SCALE: NONE

AutoCAD SHX Text

ONEIDA STREET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text D

AutoCAD SHX Text E

Title
Table of Contents
00 11 00 Notice to Contractors
00 21 00 Instructions to Bidders
Bidder's Proposal
Disclosure of Ownership
Affidavit of Compliance
00 52 00 Agreement Form
AIA Document A105 - 2017 Standard Short Form of Agreement Between Owner and Contractor
Exhibit A Insurance Requirements
01 00 00 General Requirements
01 23 00 Alternates
01 50 00 Temporary Facilities and Controls
01 70 00 Execution and Closeout Requirements
02 41 19 Selective Demolition
04 20 00 Unit Masonry
05 50 00 Metal Fabrications
07 50 00 Roof Patching
07 92 00 Joint Sealants
09 96 00 High Performance Coatings

File details come from the government source that posted it. Updated .