WRF_Premit.pdf

PDF 3 MB Posted

Attached to
Water Reclamation Facility Process Evaluation
Solicitation number
24-022UO-HK-RFQ
Issued by
Hillsborough County, Florida

About this file

This document is a Florida Department of Environmental Protection (FDEP) domestic wastewater facility permit for the City of Plant City Water Reclamation Facility (WRF), issued with permit number FL0026557. The permit, dated October 24, 2013, covers a wastewater treatment facility located at 1500 W. Victoria Street in Plant City, Hillsborough County, with a current permitted capacity of 10 million gallons per day (MGD). The permit authorizes the facility to operate a Type I activated sludge domestic wastewater treatment plant, including surface water discharge, reclaimed water reuse systems (public access and industrial), and land application of residuals.

The facility's treatment processes include multiple stages such as headworks, grit removal, oxidation ditches, final clarifiers, filtration, and chlorination, with the ability to handle both domestic and industrial wastewater. The permit specifies detailed monitoring requirements for effluent quality, including parameters like BOD, total suspended solids, nitrogen, phosphorus, pH, fecal coliform, and whole effluent toxicity. The facility can direct reclaimed water to two primary reuse systems: R-001 (public access with 3.3 MGD capacity) and R-002 (industrial reuse with 3.4 MGD capacity), with an ultimate system capacity of approximately 20 MGD applied over 7,000 acres. The permit is valid until April 28, 2015, with specific requirements for residuals management, including Class B pathogen reduction and vector attraction reduction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

October 24, 2013

Mr. Frank I. Coughenour, P.E.

Utilities Director

City of Plant City

1500 W. Victoria St.

Plant City, FL 33564 fcoughenour@plantcitygov.com

Re: Minor Revision

City of Plant City WRF

PA File No. FL0026557-015-DW1/MR

Hillsborough County

Dear Mr. Coughenour:

The Department has completed a minor revision of the City of Plant City WRF permit, FL0026557. In accordance with Rule 62-620.325(2), Florida Administrative Code, the permit and associated Discharge

Monitoring Reports (DMRs) were revised to replace the following ground water monitoring wells:

MWB-01, MWC-01, MWC-02 and MWC-03.

The revised Permit and DMRs are attached and replace the previous documents in their entirety. Please note that the original permit issuance and expiration dates still apply.

If you have any questions, you may contact Frank L. Fulghum III, at (813) 470-5735, or via email at frank.fulghum@dep.state.fl.us

Sincerely, for Mauryn McDonald, P.E.

Water Facilities Program Administrator

Southwest District

MM/ff

Attachments cc: Steve Saffels, City of Plant City, ssaffels@plantcitygov.com

John E. Delashaw, P.E., Madrid Engineering Group, Inc., jdelashaw@madridengineering.com

Byron Bartlett, HCEPC, bartlett@epchc.org

Edward Watson, FDEP SWD, edward.watson@dep.state.fl.us

Elaine Gracik, FDEP SWD, elaine.gracik@dep.state.fl.us

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

RICK SCOTT

GOVERNOR

HERSCHEL T. VINYARD JR.

SECRETARY

mailto:fcoughenour@plantcitygov.com mailto:ssaffels@plantcitygov.com mailto:jdelashaw@madridengineering.com mailto:bartlett@epchc.org mailto:edward.watson@dep.state.fl.us mailto:elaine.gracik@dep.state.fl.us

STATE OF FLORIDA

DOMESTIC WASTEWATER FACILITY PERMIT

PERMITTEE: PERMIT NUMBER: FL0026557 (Major)

PA FILE NUMBER: FL0026557-013-DW1P/NR

City of Plant City ISSUANCE DATE: April 29, 2010

PA FILE NUMBER:

REVISION DATE:

EXPIRATION DATE:

FL0026557-015-DW1/MR

October 24, 2013

April 28, 2015

RESPONSIBLE AUTHORITY:

Mr. Frank I. Coughenour, P.E.

Utilities Director

1500 W. Victoria Street

Plant City, FL 33564 fcoughenour@plantcitygov.com

(813) 757-9191

FACILITY:

City of Plant City WRF

1500 W. Victoria Street

Plant City, FL 33563

Hillsborough County

Water Body Identification (WBID) No. 1518

Latitude: 28° 01’ 18” N Longitude: 82° 08’ 16” W

This permit is issued under the provisions of Chapter 403, Florida Statutes (F.S.), and applicable rules of the Florida

Administrative Code (F.A.C.) and constitutes authorization to discharge to waters of the state under the National

Pollutant Discharge Elimination System. This permit does not constitute authorization to discharge wastewater other than as expressly stated in this permit. The above named permittee is hereby authorized to operate the facilities in accordance with the documents attached hereto and specifically described as follows:

TREATMENT FACILITIES:

An existing 10.0 mgd annual average daily flow (AADF) Type I activated sludge domestic wastewater treatment plant consisting of: a headworks structure including a mechanically cleaned fine bar screen, a backup manual bar screen, a Pista grit removal system, and a Parshall flume flow measurement system, with an associated odor control system; a master pumping station with six pumps; an anoxic tank subdivided into three parallel trains with a total volume of 376,000 gallons, three oxidation ditches with a combined volume of approximately 12.5 million gallons

(with an ultimate treatment capacity of 12.0 mgd); one splitter box for flow distribution from the oxidation ditches to the final clarifiers; three final clarifiers providing a combined volume of approximately 5.25 million gallons and a combined surface area of approximately 39,825 ft2; one reject storage system including three concrete basins of 2.5 million gallons and one 15-acre pond with a total capacity of 29 million gallons, for a combined working capacity of

12.5 million gallons; one pond transfer pumping station on standby; thirteen Parkson continuous backwash upflow filter cells with a combined surface area of 3,250 ft2, one four-channel chlorine contact chamber with a total volume

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

Southwest District Office

13051 North Telecom Parkway

Temple Terrace, Florida 33637-0926

RICK SCOTT

GOVERNOR

HERSCHEL T. VINYARD JR.

SECRETARY

FACILITY: City of Plant City WRF PERMIT NUMBER: FL0026557

PERMITTEE: City of Plant City

PA File No. FL0026557-015-DW1P/MR 2 of 332,000 gallons; three reclaimed water ground storage tanks with a combined capacity of 12.0 million gallons;

and one high service pumping station. All disinfection is accomplished using liquid chlorination. The permitted capacity of the water reclamation facility will remain at 8.0 mgd until such time as the City establishes the actual reuse capacity of the master reuse service area to assimilate the reclaimed water throughout the area.

The solids treatment consists of four aerobic sludge digesters with a combined capacity of 2.8 million gallons, and two belt filter presses with a capacity of 2,000 pounds of dry residuals per hour. The stabilized residuals are land applied.

A dechlorination/reaeration facility is located at the Loyd Nursery south of Knights Griffin Road for additional treatment prior to discharge. Dechlorination is accomplished by the addition of sulfur dioxide.

Filter backwash will be drained to the treatment facility headworks. Ferric sulfate is injected into the plant process stream at the effluent end of splitter box with optional injection at the clarifier stilling wells to aid in phosphorous removal. Polymer chemical feed is available on a standby status for solids control. Effluent quality is continuously monitored 24 hours per day through the plant SCADA system for turbidity as a measure of TSS and chlorine residual as a measure of disinfection effectiveness. Effluent failing to meet Part III public access quality standards is directed to the reject storage system, the polishing/storage pond noted above, or to either the industrial user R002 or the surface water discharge D002 described below.

Effluent which does meet Part III quality standards is transferred to the Plant City public access Master Reuse

System R001 described below. The storage, discharge, and reject functions are controlled, sequenced and operated according to procedures set forth in the plant Operating Protocol in order to assure maximum reliability and safeguards on the quality of the reclaimed water. Plant alarm systems are monitored by plant operational personnel

24 hours per day through the plant SCADA system. Standby emergency power is provided by four generators, three auto start and one manual with a total capacity of 5686 KW.

DISPOSAL:

Surface Water Discharge: D-001 is inactive.

Surface Water Discharge: An existing 2.68 MGD annual average daily flow (AADF) permitted discharge to East

Canal to Hillsborough River (Class III fresh waters, WDIB # 1518) at Discharge Location (D-002). The point of discharge is located approximately at latitude 28 o 04' 42" N, longitude 82 o 07' 19" W.

Intermittently discharging storm water storage ponds for Part III Reclaimed Water:

D-003 – Reclaimed water is stored in storm water storage lake system STM-01 at D-003, Walden Lake Golf Course

North Pond which intermittently discharges into a drainage ditch system routed to Spartman Branch, which flows to

Pemberton Creek, Baker Creek and into Lake Thonotosassa.

D-004 – Reclaimed water is stored in storm water storage lake system STM-02 at D-004, Walden Lake Golf Course

South Pond which intermittently discharges into a drainage ditch system routed to Spartman Branch, which flows to

Pemberton Creek, Baker Creek and into Lake Thonotosassa.

REUSE:

Land Application Part III – Public Access Reuse R-001: An existing 3.3 MGD annual average daily flow

(AADF) permitted capacity Part III slow-rate public access reuse system (R-001) consisting of a Master Reuse

System serving the City of Plant City and surrounding county areas as described in permit Condition IV., and as shown on the Reclaimed Water Conceptual Master Plan map prepared by the City of Plant City Engineering

Division, dated May 23, 2002. Ultimate capacity of the system including existing, proposed and potential major and minor users is approximately 20.0 mgd AADF applied over 7,000 acres.

Land Application Part IV – Industrial Reuse R-002: An existing 3.4 MGD annual average daily flow (AADF) permitted capacity Part VII industrial reuse system (R-002). R-002 consists of Open Cooling Tower System located approximately at latitude 28 o 10' 05" N, longitude 82 o 09' 17" W. This system is directly connected with R-001 and

PA File No. FL0026557-015-DW1P/MR 3 normally will accept Part III quality reclaimed water for industrial usage; however it may also accept secondary treated effluent.

IN ACCORDANCE WITH: The limitations, monitoring requirements and other conditions set forth in Pages 1 through 36 of this permit.

PA File No. FL0026557-015-DW1P/MR 4

I. RECLAIMED WATER AND EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS

A. Surface Water Discharges

1. During the period beginning on the issuance date and lasting through the expiration date of this permit, the permittee is authorized to discharge effluent to Outfall D-

002. Such discharge shall be limited and monitored by the permittee as specified below and reported in accordance with Condition I.C.8:

Reclaimed Water Limitations Monitoring Requirements

Parameter Units Max/Min Annual

Average

Monthly

Average

Weekly

Average

Single

Sample

Monitoring

Frequency Sample Type

Monitoring

Location Site

Number Notes

Flow, To D-002 MGD Maximum 2.68 Report - - Continuous Recording flow meters and totalizers

FLW-01 See

Cond.I.A.4.

BOD, Carbonaceous 5 day, 20C MG/L Maximum 5.0 6.25 7.5 10.0 5 Days/Week 24-hr FPC EFD-01

Solids, Total Suspended MG/L Maximum 5.0 6.25 7.5 10.0 5 Days/Week 24-hr FPC EFD-01

Nitrogen, Total (as N) MG/L Maximum 3.0 3.75 4.5 6.0 5 Days/Week 24-hr FPC EFD-01

Phosphorus, Total (as P) MG/L Maximum 1.0 1.25 1.5 2.0 5 Days/Week 24-hr FPC EFD-01 pH SU Range - - - 6.0 to 8.5 Continuous Meter EFA-01 See

Cond.I.A.3.

Coliform, Fecal #/100ML Maximum 14 14

(Median)

- 86 5 Days/Week Grab EFA-01 See

Cond. I.A.5.

Total Residual Chlorine (For

Disinfection)

MG/L Minimum - - - 1.0 Continuous Meter EFA-01 See Cond.I.A.

3. & 6.

Total Residual Chlorine (For

Dechlorination)

MG/L Maximum - - - 0.01 7 Days/Week Grab EFD-01

Oxygen, Dissolved (DO) MG/L Minimum - - - 5.0 7 Days/Week Grab EFD-01

Specific Conductance UMHO/CM Maximum - - - 1275 7 Days/Week Grab EFD-01

Nitrogen, Total (as N) Tons/Year Maximum 21.0

(Ann.

Total)

Report

(Mo Total)

- - Monthly Calculation EFD-01 See

Cond.I.A.8.

Nitrogen, Total (as N) Tons/Year Maximum 10.5

(5Yr

Avg.)

- - - Monthly Calculation EFD-01 See

Cond.I.A.8.

Chronic Whole Effluent

Toxicity

% Min - - - 100 Every Three Months 24-hr FPC EFD-1 See

Cond.I.A.10.

PA File No. FL0026557-015-DW1P/MR 5

2. Reclaimed water samples shall be taken at the monitoring site locations listed in Permit Condition I. A.

1. and as described below:

Monitoring Location

Site Number

Description of Monitoring Location

EFA-01 After disinfection and prior to discharge to reuse system or dechlorination system.

EFD-01 After dechlorination and prior to discharge to outfall D-002 and the East Canal.

FLW-01 Flow meter, recorder and totalizer immediately prior to dechlorination.

3. Hourly measurement of pH and total residual chlorine for disinfection during the period of required operator attendance may be substituted for continuous measurement. [Chapter 62-601, Figure 2]

4. Recording flow meters and totalizers shall be utilized to measure flow and calibrated at least annually.

[62-601.200(17) and .500(6)]

5. The arithmetic mean of the monthly fecal coliform values collected during an annual period shall not exceed 14 per 100 mL of effluent sample. The median value of the fecal coliform values for a minimum number of 10 samples of effluent each collected on a separate day during a period of 30 consecutive days (monthly) shall not exceed 14 per 100 mL of sample. No more than 10 percent of the samples collected (the 90th percentile value) during a period of 30 consecutive days shall exceed 43 fecal coliform values per 100 mL of sample. Any one sample shall not exceed 86 fecal coliform values per 100 mL of sample. Note: To report the 90th percentile value, list the fecal coliform values obtained during the month in ascending order. Report the value of the sample that corresponds to the

90th percentile (multiply the number of samples by 0.9). For example, for 30 samples, report the corresponding fecal coliform number for the 27th value of ascending order. [62-600.440(6)(c)]

6. A minimum of 1.0 mg/L total residual chlorine must be maintained for a minimum contact time of 15 minutes based on peak hourly flow. [62-600.440(5)(b) and (6)(b)]

7. Delivery of reclaimed water to the lakes listed in the table below shall only occur when the elevation of the water in the lakes is less than the corresponding control elevation listed in the table below. A list of all days during a month on which discharges from the lakes to the receiving water bodies occurred shall be attached to the DMR form. For each day on which discharge occurred, the approximate number of hours of discharge shall be noted. [62-610.830(1) and (3)]

Monitoring

Location

Name of Storage Lake/Description of Monitoring

Location

Control Elevation

(in. M.S.L.)

Receiving Water

Body

STM-01 Walden Lake Golf Course North Storage Lake (D-003) 109.74 Lk Thonotosassa

STM-02 Walden Lake Golf Course South Storage Lake (D-004) 121.69 Lk Thonotosassa

8. In accordance with the load allocations for the Tampa Bay Reasonable Assurance, the Total Maximum

Daily Load for Total Nitrogen shall be calculated from the monthly average Total Nitrogen concentrations. The Total Nitrogen loading shall be calculated as a twelve-month rolling total and shall not exceed 21.0 tons/year and the five year average of the annual totals shall not exceed 10.5 tons/year.

The permittee may submit a permit revision to modify this TMDL based on the results of the nitrogen loading allocations under development by the Tampa Bay Nitrogen Management Consortium, per the

Department's Reasonable Assurance Update approval dated May 28, 2008. Pursuant to Rule 62-

620.325, F.A.C., the Department may revise this permit to incorporate the final findings.

The Rolling Annual Total value is the sum of the monthly totals beginning on first day of the second month following permit issuance. During the first 60 months following permit issuance, the 5-year average of the annual totals is the sum of the monthly totals divided by 5. In the 61st month and beyond, the 5-year average of the annual totals shall become a rolling 5-year average of the annual totals calculated from the monthly totals.

PA File No. FL0026557-015-DW1P/MR 6

Monthly Total (Mt)

Mt = (Monthly Average Total Nitrogen Concentration, mg/l)(Total Monthly Flow, MG)(8.3454)

2000 lbs

Mt = Tons/Month

Mt1 = Monthly Total for the 1 st Month

Mtn = Monthly Total for the n th

Month

Annual Total (At)

Annual Total at the end of the 2nd Month: At2 = Mt1 + Mt2 (1st month total + 2nd month total)

Annual Total at the end of the 12 th

Month: At12 = Mt1 + Mt2 … Mt12

Annual Total at the end of the 13 th

Month: At13 = Mt2 + Mt3 … Mt13 (Now a Rolling Total)

(Every Month Thereafter–a Rolling Total)

Annual Total at the end of the n th

Month: Atn = Mtn-11 + Mtn-10 … Mtn

5 Year Average of the Yearly Totals (5yr)

5yrn = (Mt1 + Mt2 … Mtn) / 5 (Prior to the 60 th

Month)

5yr60 = (Mt1 + Mt2 … Mt60) / 5 (After the 60 th

Month)

5yr61 = (Mt2 + Mt3 … Mt61) / 5 (After the 61 st Month – Now a Rolling Average)

5yrn = (Mtn-59 + Mtn-58 … Mtn) / 5 (Every Month Thereafter–a Rolling Average)

9. To support permit renewal, effluent testing information must be collected with a minimum of three samples taken within four and one half years prior to the expiration date of this permit. Values must be representative of the seasonal variation in the discharge from each outfall or represent best engineering estimates for new treatment and disposal systems in accordance with the instructions provided with

DEP Form 62-620.910(2). The results must be included in DEP Form 62-620.910(2) (Form 2A application) section 3.A.12, 13, and 14, as appropriate. [62-620.910(2)]

10. Chronic Whole Effluent Toxicity Testing

The permittee shall comply with the following requirements to evaluate chronic whole effluent toxicity of the discharge from outfall D-002.

a. Effluent Limitation

(1) Whole effluent chronic toxicity shall not exceed a 25 percent inhibition concentration (IC25) of less than 100% effluent in any test. [Rules 62-302.530(61) and 62-4.241(1)(b), F.A.C.]

(2) Whole effluent acute toxicity shall not exceed a 96 hour LC50 of less than 100% effluent in any test. [Rule 62-302.500(1)(a)4. and 62-4.241(1)(a), F.A.C.]

b. Monitoring Frequency

(1) Routine toxicity tests shall be conducted every three months , the first starting within 90 days of the most current test and lasting for the duration of this permit.

c. Sampling Requirements

(1) For each routine test or additional follow-up test conducted, a total of three flow proportional

24-hour composite samples of final effluent shall be collected and used in accordance with the sampling protocol discussed in EPA-821-R-02-013, Section 8.

(2) The first sample shall be used to initiate the test. The remaining two samples shall be collected according to the protocol and used as renewal solutions on Day 3 (48 hours) and Day 5 (96 hours) of the test.

(3) Samples for routine and additional follow-up tests shall not be collected on the same day.

d. Test Requirements

(1) Routine Tests: All routine tests shall be conducted using a control (0% effluent) and a minimum of five test dilutions: 100%, 50%, 25%, 12.5%, and 6.25% final effluent.

(2) The permittee shall conduct a daphnid, Ceriodaphnia dubia, Survival and Reproduction Test and a fathead minnow, Pimephales promelas, Larval Survival and Growth Test, concurrently.

PA File No. FL0026557-015-DW1P/MR 7

(3) All test species, procedures and quality assurance criteria used shall be in accordance with

Short-term Methods for Estimating the Chronic Toxicity of Effluents and Receiving

Waters to Freshwater Organisms, 4th ed., EPA-821-R-02-013. Any deviation of the bioassay procedures outlined herein shall be submitted in writing to the Department for review and approval prior to use. In the event the above method is revised, the permittee shall conduct chronic toxicity testing in accordance with the revised method.

(4) The control water and dilution water shall be moderately hard water as described in EPA-821-

R-02-013, Section 7.

e. Quality Assurance Requirements

(1) A standard reference toxicant (SRT) quality assurance (QA) chronic toxicity test shall be conducted with each species used in the required toxicity tests either concurrently or initiated no more than 30 days before the date of each routine or additional follow-up test conducted.

Additionally, the SRT test must be conducted concurrently if the test organisms are obtained from outside the test laboratory unless the test organism supplier provides control chart data from at least the last five monthly chronic toxicity tests using the same reference toxicant and test conditions. If the organism supplier provides the required SRT data, the organism supplier’s SRT data and the test laboratory’s monthly SRT-QA data shall be included in the reports for each companion routine or additional follow-up test required.

(2) If the mortality in the control (0% effluent) exceeds 20% for either species in any test or does not meet “test acceptability criteria”, the test for that species (including the control) shall be invalidated and the test repeated. Test acceptability criteria for each species are defined in

EPA-821-R-02-013, Section 13.12 (Ceriodaphnia dubia) and Section 11.11 (Pimephales promelas). The repeat test shall begin within 21 days after the last day of the invalid test.

(3) If 100% mortality occurs in all effluent concentrations prior to the end of any test and the control mortality is less than 20% at that time, the test (including the control) shall be terminated with the conclusion that the test fails and constitutes non-compliance.

(4) Additional follow-up tests shall be evaluated for acceptability based on the observed dose-response relationship as required by EPA-821-R-02-013, Section 10.2.6., and the evaluation shall be included with the bioassay laboratory reports.

f. Reporting Requirements

(1) Results from all required tests shall be reported on the Discharge Monitoring Report (DMR) as follows:

(a) Routine and Additional Follow-up Test Results: The calculated IC25 for each test species shall be entered on the DMR.

(2) A bioassay laboratory report for each routine test shall be prepared according to EPA-821-R-

02-013, Section 10, Report Preparation and Test Review, and mailed to the Department at the address below within 30 days after the last day of the test.

(3) For additional follow-up tests, a single bioassay laboratory report shall be prepared according to EPA-821-R-02-013, Section 10, and mailed within 30 days after the last day of the second valid additional follow-up test.

(4) Data for invalid tests shall be included in the bioassay laboratory report for the repeat test.

(5) The same bioassay data shall not be reported as the results of more than one test.

(6) All bioassay laboratory reports shall be sent to:

Florida Department of Environmental Protection

Attention: Domestic Wastewater

Southwest District Office

13051 N. Telecom Parkway

Temple Terrace, Florida 33637-0926

g. Test Failures

(1) A test fails when the test results do not meet the limits in 9.a.(1).

(2) Additional Follow-up Tests:

(a) If a routine test does not meet the chronic toxicity limitation in 9.a.(1) above, the permittee shall notify the Department at the address above within 21 days after the last day of the failed routine test and conduct two additional follow-up tests on each species that failed the test in accordance with 9.d.

PA File No. FL0026557-015-DW1P/MR 8

(b) The first test shall be initiated within 28 days after the last day of the failed routine test.

The remaining additional follow-up tests shall be conducted weekly thereafter until a total of two valid additional follow-up tests are completed.

(c) The first additional follow-up test shall be conducted using a control (0% effluent) and a minimum of five dilutions: 100%, 50%, 25%, 12.5%, and 6.25% effluent. The permittee may modify the dilution series in the second additional follow-up test to more accurately bracket the toxicity such that at least two dilutions above and two dilutions below the target concentration and a control (0% effluent) are run. All test results shall be statistically analyzed according to the Appendices in EPA-821-R-02-013.

(3) In the event of three valid test failures (whether routine or additional follow-up tests) within a

12-month period, the permittee shall notify the Department within 21 days after the last day of the third test failure.

(a) The permittee shall submit a plan for correction of the effluent toxicity within 60 days after the last day of the third test failure.

(b) The Department shall review and approve the plan before initiation.

(c) The plan shall be initiated within 30 days following the Department’s written approval of the plan.

(d) Progress reports shall be submitted quarterly to the Department at the address above.

(e) During the implementation of the plan, the permittee shall conduct quarterly routine whole effluent toxicity tests in accordance with 9.d. Additional follow-up tests are not required while the plan is in progress. Following completion or termination of the plan, the frequency of monitoring for routine and additional follow-up tests shall return to the schedule established in 9.b.(1). If a routine test is invalid according to the acceptance criteria in EPA-821-R-02-013, a repeat test shall be initiated within 21 days after the last day of the invalid routine test.

(f) Upon completion of four consecutive, valid routine tests that demonstrate compliance with the effluent limitation in 9.a.(1) above, the permittee may submit a written request to the Department to terminate the plan. The plan shall be terminated upon written verification by the Department that the facility has passed at least four consecutive valid routine whole effluent toxicity tests.

If a test within the sequence of the four is deemed invalid, but is replaced by a repeat valid test initiated within 21 days after the last day of the invalid test, the invalid test will not be counted against the requirement for four consecutive valid tests for the purpose of terminating the plan.

(4) If chronic toxicity test results indicate greater than 50% mortality within 96 hours in an effluent concentration equal to or less than the effluent concentration specified as the acute toxicity limit in 9.(1)(b), the Department may revise this permit to require acute definitive whole effluent toxicity testing.

(5) The additional follow-up testing and the plan do not preclude the Department taking enforcement action for acute or chronic whole effluent toxicity permit limit violations.

[62-4.241, 62-620.620(3)]

11. Ambient Monitoring

The Permittee shall conduct an ambient monitoring program to evaluate the potential impacts of the discharge. The monitoring described below shall be conducted on a semi-annual basis, once during the wet season and once during the dry season, for the life of the permit.

a. Sampling Locations:

1. Effluent collected at the permit required compliance point.

2. 300 feet upstream of outfall. If access to site is not possible then 20 feet south side of

Knight Griffin bridge

3. 300 feet downstream of outfall. If access to site is not possible then 20 feet north of Knight

Griffin bridge.

b. Regime: Each monitoring event shall be conducted during a discharge event from the outfall.

PA File No. FL0026557-015-DW1P/MR 9

c. Sampling Depths: Top-depth, mid-depth and bottom depth samples shall be collected at the two ambient monitoring sites.

d. Sampling Parameters:

(1). Surface (at upstream and downstream sites): pH, dissolved oxygen, temperature and specific conductance shall be measured at 0.1 meters below the surface of the water.

If the stream depth is less than three feet at the time of sampling, only a mid-depth sample is required.

(2). Mid-depth (at upstream and downstream sites): pH, dissolved oxygen, temperature, specific conductivity, total Kjeldahl nitrogen, nitrite-nitrate, total ammonia nitrogen, total phosphorus, ortho-phosphorus.

(3). Bottom (at upstream and downstream sites): pH, dissolved oxygen, temperature and specific conductivity shall be measured at 0.1 meters above the bottom. If the stream depth is less than three feet at the time of sampling, only a mid-depth sample is required.

(4). Outfall (effluent): pH, dissolved oxygen, temperature, specific conductivity, total

Kjeldahl nitrogen, nitrite-nitrate, total ammonia nitrogen, total phosphorus, ortho-phosphorus.

e. Secchi Depth: Shall be measured at both ambient sites.

f. Ambient Conditions: The following ambient conditions shall be recorded at each location during sampling: air temperature, antecedent weather, rainfall, cloud cover and tidal flow.

g. Chain of Custody: Times and dates of sampling as well as the samplers' names should be noted on the Chain of Custody (COC).

PA File No. FL0026557-015-DW1P/MR 10

B. Reuse and Land Application Systems

1. During the period beginning on the issuance date and lasting through the expiration date, the permittee is authorized to direct reclaimed water to Reuse System R-001.

Such reclaimed water shall be limited and monitored by the permittee as specified below and reported in accordance with Condition I.C.8:

Reclaimed Water Limitations Monitoring Requirements

Parameter Units Max/Min Annual

Average

Monthly

Average

Weekly

Average

Single

Sample

Monitoring

Frequency Sample Type

Monitoring

Location Site

Number Notes

Flow, To R-001 MGD Maximum 3.3 Report - - Continuous Recording flow meters and totalizers

FLW-03 See

Cond.I.B.4.

BOD, Carbonaceous 5 day, 20C MG/L Maximum 20.0 30.0 45.0 60.0 5 Days/Week 24-hr FPC EFA-01

Solids, Total Suspended MG/L Maximum - - - 5.0 5 Days/Week Grab EFB-01 pH SU Range - - - 6.0 to 8.5 Continuous Meter EFA-01 See

Cond.I.B.3.

Coliform, Fecal, % less than detection

PERCENT Minimum - 75 - - Daily Grab EFA-01 See

Cond. I.B.5.

Coliform, Fecal #/100ML Maximum - - - 25 5 Days/Week Grab EFA-01 See

Cond. I.B.5.

Total Residual Chlorine (For

Disinfection)

MG/L Minimum - - - 1.0 Continuous Meter EFA-01 See

Cond.I.B.6.

Turbidity NTU Maximum Report Continuous Meter EFB-01 See

Cond. I.B.7.

Giardia CYSTS/10

0 L

Maximum - - - Report two years Filtered EFA-01

Cryptosporidium OOCYST

S/100 L

Maximum - - - Report two years Filtered EFA-01

PA File No. FL0026557-015-DW1P/MR 11

2. Reclaimed water samples shall be taken at the monitoring site locations listed in Permit Condition I. B. 1. and as described below:

Monitoring Location

Site Number

Description of Monitoring Location

EFA-01 After disinfection and prior to discharge to reuse system or dechlorination system.

EFB-01 After filtration and prior to disinfection.

FLW-02 Combined flow to Reuse R-001, R-002 and D-002 measured by flow meter after the Ground Storage Tanks.

FLW-03 Flow to Reuse System R-001, [ FLW-02 – (FLW-01 + FLW-04)]

3. Hourly measurement of pH during the period of required operator attendance may be substituted for continuous measurement. [Chapter 62-601, Figure 2]

4. Recording flow meters and totalizers shall be utilized to measure flow and calibrated at least annually. [62-601.200(17) and .500(6)]

5. Over a 30-day period, at least 75 percent of the fecal coliform values shall be below the detection limits. No sample shall exceed 25 fecal coliforms per 100 mL. No sample shall exceed 5.0 mg/L of total suspended solids (TSS) at a point before the application of the disinfectant. [62-600.440(5)(f)]

6. The minimum total chlorine residual shall be limited as described in the approved operating protocol, such that the permit limitation for fecal coliform bacteria will be achieved. In no case shall the total chlorine residual be less than 1.0 mg/L.

[62-600.440(5)(b); 62-610.460(2); and 62-610.463(2)]

7. The maximum turbidity shall be limited as described in the approved operating protocol, such that the permit limitations for total suspended solids and fecal coliforms will be achieved. [62-610.463(2)]

8. The treatment facilities shall be operated in accordance with all approved operating protocols. Only reclaimed water that meets the criteria established in the approved operating protocol(s) may be released to system storage or to the reuse system. Reclaimed water that fails to meet the criteria in the approved operating protocol(s) shall be directed to R-002, D-002 or the reject storage system. The operating protocol(s) shall be reviewed and updated periodically to ensure continuous compliance with the minimum treatment and disinfection requirements. Updated operating protocols shall be submitted to the Department for review and approval upon revision of the operating protocol(s) and with each permit application. [62-610.320(6) and 62-610.463(2)]

9. Instruments for continuous on-line monitoring of total residual chlorine and turbidity shall be equipped with an automated data logging or recording device. [62-610.463(2) & .865(8)(d)]

10. Intervals between sampling for Giardia and Cryptosporidium shall not exceed two years. Sampling results shall be reported on DEP Form 62-610.300(4)(a)4 which is attached to this permit (If additional sampling is required in accordance with the attached form, only one additional sampling event will be required within the two year monitoring frequency) . This form shall be submitted to the Department and to DEP’s Reuse Coordinator in Tallahassee. [62-

610.463(4)]

PA File No. FL0026557-015-DW1P/MR 12

B. Reuse and Land Application Systems

11. During the period beginning on the issuance date and lasting through the expiration date of this permit, the permittee is authorized to direct reclaimed water to Reuse

System R-002. Such reclaimed water shall be limited and monitored by the permittee as specified below and reported in accordance with Condition I.C.8:

Reclaimed Water Limitations Monitoring Requirements

Parameter Units Max/Min Annual

Average

Monthly

Average

Weekly

Average

Single

Sample

Monitoring

Frequency Sample Type

Monitoring

Location Site

Number Notes

Flow, To R-002 MGD Maximum 3.4 Report - - Continuous Recording flow meters and totalizers

FLW-04 See

Cond.I.B.14.

BOD, Carbonaceous 5 day, 20C MG/L Maximum 20.0 30.0 45.0 60.0 5 Days/Week 24-hour FPC EFA-01

Solids, Total Suspended MG/L Maximum 20.0 30.0 45.0 60.0 5 Days/Week 24-hour FPC EFA-01 pH SU Range - - - 6.0 to 8.5 Continuous Meter EFA-01 See

Cond.I.B.13.

Coliform, Fecal #/100M

L

Maximum 200 200

(Geo.Mea)

- 800 5 Days/Week Grab EFA-01 See

Cond. I.B.15.

Total Residual Chlorine (For

Disinfection)

MG/L Minimum - - - 0.5 Continuous Meter EFA-01 See

Cond.I.B.13.

& 16.

PA File No. FL0026557-015-DW1P/MR 13

12. Reclaimed water samples shall be taken at the monitoring site locations listed in Permit Condition I. B. 8. and as described below:

Monitoring Location

Site Number

Description of Monitoring Location

EFA-01 After disinfection and prior to discharge to reuse system or dechlorination system.

FLW-04 Flow to Industrial Reuse System R-002.

13. Hourly measurement of pH and total residual chlorine for disinfection during the period of required operator attendance may be substituted for continuous measurement. [Chapter 62-601, Figure 2]

14. Recording flow meters and totalizers shall be utilized to measure flow and calibrated at least annually. [62-601.200(17) and .500(6)]

15. The arithmetic mean of the monthly fecal coliform values collected during an annual period shall not exceed 200 per 100 mL of effluent sample. The geometric mean of the fecal coliform values for a minimum of 10 samples of effluent each collected on a separate day during a period of 30 consecutive days (monthly), shall not exceed 200 per 100 mL of sample. Any one sample shall not exceed 800 fecal coliform values per 100 mL of sample. [62-600.440(4)(c)]

16. A minimum of 0.5 mg/L total residual chlorine must be maintained for a minimum contact time of 15 minutes based on peak hourly flow. [62-600.440(4)(b)]

PA File No. FL0026557-015-DW1P/MR 14

C. Other Limitations and Monitoring and Reporting Requirements

1. During the period beginning on the issuance date and lasting through the expiration date of this permit, the treatment facility shall be limited and monitored by the permittee as specified below and reported in accordance with Condition I.C.8:

Limitations Monitoring Requirements

Parameter Units Max/Min Annual

Average

Monthly

Average

Weekly

Average

Single

Sample

Monitoring

Frequency Sample Type

Monitoring

Location Site

Number Notes

Flow, Total Plant MGD Maximum 8.0 Report - - Continuous Recording flow meters and totalizers

FLW-05 See

Cond.I.C.4.

Percent Capacity, (3RMADF/Permitted Capacity) x

PERCE

NT

Maximum - Report - - Monthly Calculation FLW-05

BOD, Carbonaceous 5 day, 20C MG/L Maximum - Report - - Weekly 24-hr FPC INF-01 See

Cond.I.C.3.

Solids, Total Suspended MG/L Maximum - Report - - Weekly 24-hr FPC INF-01 See

Cond.I.C.3.

PA File No. FL0026557-015-DW1P/MR 15

2. Samples shall be taken at the monitoring site locations listed in Permit Condition I. C. 1 and as described below:

Monitoring Location

Site Number

Description of Monitoring Location

FLW-05 Plant Influent Flow measured at the headworks.

INF-01 At headworks, prior to treatment and ahead of return activated sludge line.

3. Influent samples shall be collected so that they do not contain digester supernatant or return activated sludge, or any other plant process recycled waters. [62-601.500(4)]

4. Recording flow meters and totalizers shall be utilized to measure flow and calibrated at least annually.

[62-601.200(17) and .500(6)]

5. Parameters which must be monitored as a result of a surface water discharge shall be analyzed using a sufficiently sensitive method to assure compliance with applicable water quality standards and effluent limitations in accordance with 40 CFR (Code of Federal Regulations) Part 136. Parameters which must be monitored as a result of a ground water discharge (i.e., underground injection or land application system) shall be analyzed in accordance with Chapter 62-601, F.A.C. All monitoring shall be representative of the monitored activity. All monitoring shall be representative of the monitored activity. [62-620.320(6)]

6. The sample collection, analytical test methods and method detection limits (MDLs) applicable to this permit shall be in accordance with Rule 62-4.246, Chapters 62-160 and 62-601, F.A.C., and 40 CFR

136, as appropriate. The list of Department established analytical methods, and corresponding MDLs

(method detection limits) and PQLs (practical quantitative limits), which is titled "FAC 62-4 MDL/PQL

Table (April 26, 2006)" and is available at http://www.dep.state.fl.us/labs/library/index.htm. The MDLs and PQLs as described in this list shall constitute the minimum acceptable MDL/PQL values and the

Department shall not accept results for which the laboratory's MDLs or PQLs are greater than those described above unless alternate MDLs and/or PQLs have been specifically approved by the Department for this permit. Any method included in the list may be used for reporting as long as it meets the following requirements:

a) The laboratory’s reported MDL and PQL values for the particular method must be equal or less than the corresponding method values specified in the Department’s approved MDL and PQL list;

b) The laboratory reported MDL for the specific parameter is less than or equal to the permit limit or the applicable water quality criteria, if any, stated in Chapter 62-302, F.A.C. Parameters that are listed as “report only” in the permit shall use methods that provide a MDL, which is equal to or less than the applicable water quality criteria stated in 62-302, F.A.C.; and

c) If the MDLs for all methods available in the approved list are above the stated permit limit or applicable water quality criteria for that parameter, then the method with the lowest stated MDL shall be used.

When the analytical results are below method detection limit, the permittee shall report the actual laboratory MDL or the permit limit, whichever is less, on the applicable discharge monitoring report.

Where necessary, the permittee may request approval of alternate methods or for alternative MDLs or

PQLs for any approved analytical method. Approval of alternate laboratory MDLs or PQLs are not necessary if the laboratory reported MDLs and PQLs are less than or equal to the permit limit or the applicable water quality criteria, if any, stated in Chapter 62-302, F.A.C. Approval of an analytical method not included in the above-referenced list is not necessary if the analytical method is in accordance with 40 CFR 136. [62-4.246, 62-160]

7. The permittee shall provide safe access points for obtaining representative influent, reclaimed water, and effluent samples which are required by this permit. [62-601.500(5)]

PA File No. FL0026557-015-DW1P/MR 16

8. Monitoring requirements under this permit are effective on the first day of the second month following permit issuance. Until such time, the permittee shall continue to monitor and report in accordance with previously effective permit requirements, if any. During the period of operation authorized by this permit, the permittee shall complete and submit to the Department Discharge Monitoring Reports

(DMRs) in accordance with the frequencies specified by the REPORT type (i.e., monthly, toxicity, quarterly, semiannual, annual, etc.) indicated on the DMR forms attached to this permit. Monitoring results for each monitoring period shall be submitted in accordance with the associated DMR due dates below, unless specified otherwise in the permit.

REPORT Type Monitoring Period Due Date

Monthly or

Toxicity first day of month – last day of month th day of following month

Quarterly January 1

- March 31

April 1 – June 30

July 1 – September 30

October 1 – December 31

April 28

July 28

October 28

January 28

Semiannual January 1 – June 30

July 1 – December 31

July 28

January 28

Annual January 1 – December 31 January 28

DMRs shall be submitted for each required monitoring period including months of no discharge. The permittee may submit either paper or electronic DMR forms. If submitting paper DMR forms, the permittee shall make copies of the attached DMR forms, without altering the original format or content unless approved by the Department, and shall mail the completed DMR forms to the Department at the address specified in Permit Condition I.B. 12 by the twenty-eighth (28th) of the month following the month of operation.

[62-620.610(18)][62-601.300(1),(2), and (3)]

9. During the period of operation authorized by this permit, reclaimed water or effluent shall be monitored annually for the primary and secondary drinking water standards contained in Chapter 62-550, F.A.C., (except for turbidity, total coliforms, color, and corrosivity). Twenty-four hour composite samples, or grab samples where appropriate, shall be used to analyze reclaimed water or effluent for the primary and secondary drinking water standards. These monitoring results shall be reported to the Department annually on the DMR under monitoring group number RWS-01. During years when a permit is not renewed, a certification stating that no new non-domestic wastewater dischargers have been added to the collection system since the last reclaimed water or effluent analysis was conducted may be submitted in lieu of the report. The annual reclaimed water or effluent analysis report or the certification shall be completed and submitted in a timely manner so as to be received by the

Department by June 28 of each year. Approved analytical methods identified in Rule 62-620.100(3)(j), F.A.C., shall be used for the analysis. If no method is included for a parameter, methods specified in

Chapter 62-550, F.A.C., shall be used. [62-601.300(4)][62-601.500(3)]

10. The permittee shall submit an Annual Reuse Report using DEP Form 62-610.300(4)(a)2. on or before

January 1 of each year. [62-610.870(3)]

11. The permittee shall maintain an inventory of storage systems. The inventory shall be submitted to the

Department at least 30 days before reclaimed water will be introduced into any new storage system.

The inventory of storage systems shall be attached to the annual submittal of the Annual Reuse Report.

[62-610.464(5)]

PA File No. FL0026557-015-DW1P/MR 17

12. Unless specified otherwise in this permit, all reports and other information required by this permit, including 24-hour notifications, shall be submitted to or reported to, as appropriate, the Department's

Southwest District Office at the address specified below:

Southwest District Office

Attention: Domestic Wastewater

13051 N. Telecom Parkway

Temple Terrace, Florida 33637-0926

Email: firstname.lastname@dep.state.fl.us

Phone Number - 813-470-5700

FAX Number - 813-470-5993

All reports and other information shall be signed in accordance with the requirements of Rule 62-

620.305, F.A.C. [62-620.305]

II. RESIDUALS MANAGEMENT REQUIREMENTS

1. The method of residuals use or disposal by this facility is land application, transport to an RMF or disposal in a Class I solid waste landfill. Transportation of the residuals to an RMF does not require a permit modification, however, use of an RMF requires a copy of the agreement pursuant to Chapter 62-

640.880(1)(c) along with a written notification to the Department at least 30 days before transport of the residuals.

2. The permittee shall be responsible for proper treatment, management, use, and land application or disposal of its residuals. [62-640.300(5)]

3. The permittee will not be held responsible for violations resulting from land application of residuals if the permittee can demonstrate that it has delivered residuals that meet the parameter concentrations and appropriate treatment requirements of this rule and the applier (e.g. hauler, contractor, site manager, or site owner) has legally agreed in writing to accept responsibility for proper land application of the residuals. Such an agreement shall state that the applier agrees, upon delivery of residuals that have been treated as required by Chapter 62-640, F.A.C., that he will accept responsibility for proper land application of the residuals as required by Chapter 62-640, F.A.C., and that the applier agrees that he is aware of and will comply with requirements for proper land application as described in the facility’s permit.

[62-640.300(5)]

4. The permittee shall not be held responsible for treatment, management, use, or land application violations that occur after its residuals have been accepted by a permitted residuals management facility with which the source facility has an agreement in accordance with Rule 62-640.880(1)(c), F.A.C., for further treatment, management, use or land application. [62-640.300(5)]

5. Disposal of residuals, septage, and other solids in a solid waste landfill, or disposal by placement on land for purposes other than soil conditioning or fertilization, such as at a monofill, surface impoundment, waste pile, or dedicated site, shall be in accordance with Chapter 62-701, F.A.C. [62-

640.100(6)(k)3 & 4]

6. Land application of residuals shall be in accordance with the conditions of this permit, the approved

Agricultural Use Plan(s), and the requirements of Chapter 62-640, F.A.C. [62-640]

7. The domestic wastewater residuals for this facility are classified as Class B.

8. The permittee shall achieve Class B pathogen reduction by meeting the pathogen reduction requirements in section 503.32(b)(2) (Alternative 1, Monitoring of Fecal Coliform) of Title 40 CFR

Part 503, revised as of October 25, 1995. [62-640.600(1)(b)]

PA File No. FL0026557-015-DW1P/MR 18

9. The permittee shall achieve vector attraction reduction by meeting the vector attraction reduction requirements in section 503.33(b)(10) (Incorporate biosolids applied to or placed on the land surface within specified time periods after application to or placement on the land surface) of Title 40 CFR

Part 503, revised as of October 25, 1995. [62-640.600(2)(a)]

10. Alternative 1 requires that seven samples of treated sewage sludge (biosolids) be collected over a 2-week period and that the geometric mean fecal coliform density of these samples be less than 2 million

CFU or MPN per gram of biosolids (dry weight basis). This approach uses fecal coliform density as an indicator of the average density of bacterial and viral pathogens. Over the long term, fecal coliform density is expected to correlate with bacterial and viral pathogen density in biosolids treated by biological treatment processes.

11. Treatment of liquid residuals or septage for the purpose of meeting the pathogen reduction or vector attraction reduction requirements set forth in Rule 62-640.600, F.A.C., shall not be conducted in the tank of a hauling vehicle. Treatment of residuals or septage for the purpose of meeting pathogen reduction or vector attraction reduction requirements shall take place at the permitted facility. [62-

640.400(8)]

12. The permittee shall sample and analyze the parameters listed in the table below at least once every three months. All samples shall be representative of the residuals used or land applied and shall be taken after final treatment of the residuals but before use or land application.

Parameter Ceiling Concentrations

(Single Sample)

Cumulative Application

Limits

Fecal Coliform <2 million/gram CFU or MPN

Total Nitrogen (Report only) % dry weight

Not applicable

Total Phosphorus (Report only) % dry weight

Total Potassium (Report only) % dry weight

Arsenic 75 mg/kg dry weight 36.6 pounds/acre

Cadmium 85 mg/kg dry weight

34.8 pounds /acre

Copper 4300 mg/kg dry weight

1340 pounds/acre

Lead 840 mg/kg dry weight

268 pounds/acre

Mercury 57 mg/kg dry weight 15.2 pounds/acre

Molybdenum 75 mg/kg dry weight Not applicable

Nickel 420 mg/kg dry weight

375 pounds/acre

Selenium 100 mg/kg dry weight 89.3 pounds/acre

Zinc 7500 mg/kg dry weight

2500 pounds/acre pH (Report only) standard units

Total Solids (Report only) %

[62-640.650(1), 62-640.700(1), 62-640.700(3)(b), and 62-640.850(3)]

13. Residuals samples shall be taken at the monitoring site locations described below:

PA File No. FL0026557-015-DW1P/MR 19

Monitoring Location

Site Number

Description of Monitoring Location

RMP-B Effluent end of BFP prior to placement in the disposal trailer.

14. Sampling and analysis shall be conducted in accordance with Title 40 CFR Part 503, section 503.8 and the U.S. Environmental Protection Agency publication - POTW Sludge Sampling and Analysis

Guidance Document, 1989. In cases where disagreements exist between Title 40 CFR Part 503, section 503.8 and the POTW Sludge Sampling and Analysis Guidance Document, the requirements in

Title 40 CFR Part 503, section 503.8 will apply. [62-640.650(1), 62-640.700(1), 62-640.700(3)(b), and

62-640.850(3)]

15. Grab samples shall be used for pathogens and determinations of percent volatile solids. Composite samples shall be used for metals. [62-640.650(1)(e)]

16. Residuals shall not be land applied if a single sample result for any parameter exceeds the ceiling concentrations given in this permit. Monthly averages of parameter concentrations shall be determined by taking the arithmetic mean of all sample results for the month. [62-640.650(1)(f)]

17. The permittee shall submit the results of all residuals monitoring with the permittee’s Discharge

Monitoring Report under Chapter 62-601, F.A.C. The analytical results from each sampling event shall be submitted with the report for the month in which the sampling event occurs. [62-

640.650(3)(a)&(e)]

18. Class B residuals shall not be used on unrestricted public access areas. Use of Class B residuals is limited to restricted public access areas such as agricultural sites, forests, and roadway shoulders and medians. [62-640.600(3)(b)]

19. Plant nursery use of Class B residuals is limited to plants which will not be sold to the public for 12 months…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .