WPA - RFP - Parking Lot Replacement 2026 [Addendum #01].pdf
PDF 59 KB Posted
- Attached to
- Parking Lot Replacement 2026
- Solicitation number
- RFP WPRA 260000002456 3
- Issued by
- Wayne County, Detroit City, Michigan
About this file
This is an Addendum #01 to a Request for Proposal (RFP) issued by the State of Michigan for parking lot replacement services in 2026. The addendum modifies the original RFP requirements and specifications for the project. Key details regarding response procedures, submission requirements, evaluation criteria, or other substantive modifications contained within the addendum would be outlined to clarify or amend the terms established in the base RFP document. The addendum serves to provide additional guidance or corrections to potential bidders prior to proposal submission.
Without access to the specific content details within the addendum document itself, further information regarding pricing structures, set-asides, incumbent contractors, funding sources, contract terms, renewal options, and project timelines cannot be definitively summarized. Prospective bidders should review both the original RFP and this addendum in their entirety to ensure full compliance with all current requirements and deadlines.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTON PREPARATORY ACADEMY
22930 Chippewa St Detroit, MI 48219
August 10,2026
ADDENDUM #01
TO
REQUEST FOR PROPOSALS
FOR
PARKING LOT REPLACEMENT 2026
[RFP #2602]
The items(s) of this addendum shall modify and become a part of the contractual documents for this project as of this date. (Failure to acknowledge this addendum will be grounds for rejection of quote.)
ADDENDUM DESCRIPTION
SPECIFICATION CLARRIFICATIONS:
1) Request for Proposal – This is not an offer or order (Pg #2):
The School district is soliciting sealed proposals for removal of 4-inches (+/-) of existing bituminous asphalt pavement (38,000 SF) (37,614 SF) and concrete (910 SF) (210 SF), provide undercutting of base (as needed) grade, compact & place 4 inches of new asphalt pavement including striping.
2) Exhibit A – Parking Lot Specifications (Pg #9):
1.3.1 – Furnish and install a 2-inch lift (5,561 tons (+/-) (485 tons +/-) of MDOT #4E1 commercial base course of hot mix asphalt (HMA) including compaction.
1.3.3 - Furnish and install a 2-inch lift (5,561 tons (+/-) (485 tons +/-) of MDOT #4E1 commercial wearing course of hot mix asphalt (HMA) including compaction.
3) General Note: The parking lot and driveway approaches (between the sidewalk & street) shall be replaced with HMA as part of this project.
ATTACHMENTS
1) Exhibit B – Revised to include location of concrete replacement.
Acknowledgement of the following addenda is hereby made:
Addendum #1, Dated:____________________Initials___________________
Company__________________________________________
NOTE: THIS ADDENDUM SHALL BE ACKNOWLEDGED ON THE QUOTE FORM,
FAILURE TO ACKNOWLEDGE ADDENDUM MAY BE GROUNDS FOR REJECTION
OF QUOTE.
File details come from the government source that posted it. Updated .