DOCX document 18 KB Posted
- Solicitation number
- 140L2623Q0084
About this file
This work statement outlines requirements for a hazardous materials storage building for the Bureau of Land Management in Twin Falls, Idaho. The building must have explosion proof lighting and ventilation, a 120V electrical panel, secondary containment sump with drain, adjustable metal shelving, fire suppression system, and be constructed to meet factory built building codes. Bidders must deliver and install the completed building by the point of contact's specified delivery date at the provided address in Twin Falls.
The related federal contract opportunity is solicitation number 140L2623Q0084 for hazardous materials storage buildings in Twin Falls and Salmon, Idaho. The Department of the Interior Bureau of Land Management Idaho Region is the contracting agency. The solicitation is for the products and services specified in the work statement to meet the Bureau's hazardous materials storage needs at the described locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Work_Statement_Salmon.docx | DOCX document | |
| Sol_140L2623Q0084.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAZMAT Storage Building Bureau of Land Management Twin Falls, Idaho
Building Size: 8'6"H x 22'W x 9'D exterior dimensions Existing Concrete pad is 25’.6” x 16’.
Power already supplied is 120v
Required Features:
1) Explosion proof lighting and exhaust ventilation. The interior side of exhaust ventilation fan will have louvers that automatically close when the fan is off and open when the fan is on. The intake for exhaust ventilation is to be mounted no more than 12 inches above the bottom of the secondary containment sump. Lighting to be LED explosion proof fixture.
2) Weatherproof and explosion proof lighting and ventilation switches mounted on the storage building exterior wall next to the door with a pilot light to show the ventilation is on. Switches to be mounted on the exterior wall on the doorknob side of the door within eight inches of the knob allowing the lighting and ventilation to be easily turned on prior to opening the door.
3) Electrical distribution panel single-phase, to be 3-wire, 120V, 100 AMP Load Center (NEMA 3R) with a main breaker and separate circuit breakers for the heater(s), air conditioner(s), and lighting, and one exterior GFCI outlet to be located on the exterior rear wall. The enclosure to be located on the back side of the building to keep it away from fuel dispensing that may occur in the front of the building. All electrical conduit, junction boxes, and panels boxes associated with the interior building electrical system to be explosion proof.
4) Ventilation to be controlled by a manually adjustable explosion proof thermostat. The intake for exhaust ventilation is to be mounted no more than 12 inches above the bottom of the sump. Thermostat to be initially set to automatically turn on the ventilation when the interior temperature reaches 80°F. The exterior vent switches shall “over-ride” the thermostat when turning on the ventilation system. When the ventilation switch is in the “off” position the thermostat shall control the system as described above.
5) Fresh air intakes to be located just below the ceiling level on a different wall(s) than the exhaust fan. Intakes to be a UL-listed fire damper design with removable insect screens that will allow the damper to close when exposed to fire. Fusible link to melt at 165ºF. Size the explosion proof mechanical ventilation and air intakes to provide at least six air changes an hour, but not less than 150 cubic feet per minute of exhaust. Exhaust vent to have louvered dampers that automatic open when the fan is in operation and close when the fan is off. Exhaust vents are also to be equipped with a weather protective shroud. The exterior side of the intakes should be equipment with hinged panels that may be positively latched in the closed position of over each intake in the winter and latch flat against the side of the building in the open position during the warmer times of the year.
6) Secondary containment for the hazardous material storage area. Sump to have a total capacity of at least 120-gallons. Vertical sump walls to have a two-hour fire rating. The metal sump floor is not required to have a two-hour fire rating. Sump to be covered with metal or fiberglass grating that is designed to hold 100 pounds per square foot. Easily removable brackets are to be used to secure the grating in place over the sump. Grating sections to be easily removable by two people and easily fit through the door. The weight of each section of grating shall not exceed 40 pounds. Each section of grating will be completely framed on all sides with the frame as wide as the depth of the grating eliminating sharp edges and burrs allowing the grating to be lifted without cutting an individual’s hand. The sump will have a drain on it that discharges to grade so allow any spill to be easily removed and allow the sump to be washed out. The sump will slope towards the drain which is in the sump floor. The steel drainpipe will extend to within 2-inches of the edge of an exterior wall. The discharge end of drainpipe will be capped off with a threaded cap.
7) Adjustable metal shelving 16-inches deep with a 2-inch lip to contain spills on each shelf and prevent stored items from easily being displaced. At least 2 shelves along the whole back side are to be provided in the storage area. The shelving and its brackets must be capable of supporting at least 50 pounds per square foot.
8) One and a half hour fire rated UL-listed double doors with a UL-listed fusible link door closures and synchronizers that will secure the doors in the open position, but will allow the door to securely close in the proper order in the event of a fire when temperature exceeds 165ºF.
9) Two-hour rated fire wall construction for the entire building including but not limited to its walls, roof, and vertical walls of the sump.
10) Dry chemical fire suppression system with an audible alarm capable of at least 90dB measure 20 feet away. Alarm to sound when suppression system is activated.
11) The building delivered to: 2878 Addison Ave. E, Twin Falls, ID 83301
12) The unit is to be compatible with the 120/208 volt, 3 phase power available at the site.
13) Building manufacturer to comply with all State regulations on the manufacturing of factory-built buildings (FBB) including, but not limited to the following:
(a) obtaining a license from the State to construct FBBs;
(b) submission of drawings, specifications, and quality assurance plans to the State and/or authorized representative;
(c) inspection by the State or authorized representative of the BFF prior to its shipment
(d) obtaining certifications/stickers from the State demonstrating compliance with its regulations;
(e) obtaining a permit from the State for the installation of the FBB on site; and
(f) payment of any fees for licensing, reviewing, inspecting, and permitting those costs to be included in the bid price
14) Price for building includes the cost for transportation, off loading and set up of the structure at the 2878 Addison Ave E, Twin Falls, ID 83301 and all fees and inspections associated with obtaining approval from all State or local building code/building safety offices that have jurisdiction related to the design/construction of the prefabricated buildings in that state. The building must receive all required approvals prior to delivery to the site. A copy of the license the manufacturer has to construct a factory built building (FBB) from the State in which the FBB will be located is to be provided with their bid.
15) Point of contact:
Eddie Sanchez Bureau of Land Management Twin Falls District Engineer 208-308-0846