Work Items_Optional Items.pdf

PDF 104 KB Posted

Attached to
CUSTER GALLATIN NATIONAL FOREST - Porcupine-Ibex Trail #267 Relocation Project
Solicitation number
1240LN21Q0019
Issued by

View the file

Other files

File Type Posted
Amendment 001.pdf PDF
Standard Drawings.pdf PDF
1240LN21Q0019.pdf PDF
Vicinity Map.pdf PDF
Signed Cover Sheet.pdf PDF
Standard Specifications for Trails.pdf PDF
Work Items.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P o r c u p i n e I b e x T r a i l # 2 6 7 R e l o c a t i o n P r o j e c t - P h a s e 3 .

O P T I O N A L L O O P W o r k I t e m s

Custer Gallatin National Forest Page 1

Beg Sta End Sta Description of Work Drawing # Spec SPS Pay Item Unit Quantity

0+00 Begin work on Ibex optional Loop Trail at the intersection of station 38+00 on trail #267 near the center of section 14. Install post where staked.

952-1 952 952(01)

EA

0+00 173+51 Clear trail for duration of contract 911-1 982 982(01) MI 3.3

0+00 173+51 Construct 20 Drain Dips where staked and drained to daylight; Leadoff ditches incidental.

912-5 912 912(06) EA 20

0+00 173+51 Construct 17,351 LF of new stock trail. Includes clearing, grubbing and unclassified excavation.

Rock may need blasting or hammering, incidental.

911-1

912-1

912-2

911(02)

912(01)

LF

LF

17,351

17,351

51+75 Armor stream crossing 912-5 912 912(06)c EA 1

92+00 Armor stream crossing 912-5 912 912(06)c EA 1

101+00 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to

921(01)a

921-2 921 921(01)b LF 15

173+51 Intersection with existing trail #267 at station

59+50 in the north center of section 14. Install post where staked. End of Project.