Work Items_Optional Items.pdf
PDF 104 KB Posted
- Solicitation number
- 1240LN21Q0019
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 001.pdf | ||
| Standard Drawings.pdf | ||
| 1240LN21Q0019.pdf | ||
| Vicinity Map.pdf | ||
| Signed Cover Sheet.pdf | ||
| Standard Specifications for Trails.pdf | ||
| Work Items.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P o r c u p i n e I b e x T r a i l # 2 6 7 R e l o c a t i o n P r o j e c t - P h a s e 3 .
O P T I O N A L L O O P W o r k I t e m s
Custer Gallatin National Forest Page 1
Beg Sta End Sta Description of Work Drawing # Spec SPS Pay Item Unit Quantity
0+00 Begin work on Ibex optional Loop Trail at the intersection of station 38+00 on trail #267 near the center of section 14. Install post where staked.
952-1 952 952(01)
EA
0+00 173+51 Clear trail for duration of contract 911-1 982 982(01) MI 3.3
0+00 173+51 Construct 20 Drain Dips where staked and drained to daylight; Leadoff ditches incidental.
912-5 912 912(06) EA 20
0+00 173+51 Construct 17,351 LF of new stock trail. Includes clearing, grubbing and unclassified excavation.
Rock may need blasting or hammering, incidental.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
17,351
17,351
51+75 Armor stream crossing 912-5 912 912(06)c EA 1
92+00 Armor stream crossing 912-5 912 912(06)c EA 1
101+00 Install one 15”x15’ PE culvert without headwalls with outlet ditch to daylight (ditching incidental to
921(01)a
921-2 921 921(01)b LF 15
173+51 Intersection with existing trail #267 at station
59+50 in the north center of section 14. Install post where staked. End of Project.
952-1 952 952(01)