Work Items.pdf
PDF 129 KB Posted
- Solicitation number
- 1240LN21Q0019
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 001.pdf | ||
| Standard Drawings.pdf | ||
| 1240LN21Q0019.pdf | ||
| Vicinity Map.pdf | ||
| Signed Cover Sheet.pdf | ||
| Standard Specifications for Trails.pdf | ||
| Work Items_Optional Items.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P o r c u p i n e I b e x T r a i l # 2 6 7 R e l o c a t i o n P r o j e c t - P h a s e 3 .
B a s e W o r k I t e m s
Custer Gallatin National Forest Page 1
Beg Sta End Sta Description of Work Drawing # Spec SPS Pay Item Unit Quantity
0+00 Begin work on Trail #267 at the Ibex trailhead just north of the Ibex cabin in the Crazy Mountains.
Install post where staked.
952-1 952 952(01)
EA
0+00 234+06 Clear trail for duration of contract 911-1 982 982(01) MI 4.4
0+00 234+06 Construct 50 Drain Dips where staked and drained to daylight; Leadoff ditches incidental.
912-5 912 912(06) EA 50
0+00 12+50 Construct 1,250 LF of new stock trail. Includes clearing, grubbing and unclassified excavation.
Rock may be encountered and may need blasting or hammering, incidental.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
1,250
1,250
12+50 Intersection with old trail #267. Oblit 600 LF of old trail south up to trailhead.
954-1 954 954(02) LF 600
12+50 19+50 Follow existing trail.
19+50 22+00 Construct 250 LF of new stock trail. Includes clearing, grubbing and unclassified excavation.
Rock may be encountered and may need blasting or hammering, incidental.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
22+00 Oblit 250 LF of old trail 267 south up to intersection with new trail.
954-1 954 954(02) LF 250
22+00 23+00 Restore 100 LF of trail to specification as staked. 915-1 915 915(01)a LF 100
23+00 36+50 Construct 1,350 LF of new stock trail. Includes clearing, grubbing and unclassified excavation.
Rock may be encountered and may need blasting or hammering, incidental.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
1,350
1,350
36+50 Intersection with old trail #267. Oblit 500 LF of old trail south up to intersection with new trail.
954-1 954 954(02) LF 500
36+50 60+50 Follow existing trail. Restore 500 LF of trail to specification as staked.
915-1 915 915(01)a LF 500
36+75 Armor Stream Crossing. 912-5 912 912(06)c EA 1
38+00 Intersection with OPTIONAL LOOP trail to right.
Custer Gallatin National Forest Page 2
59+25 Intersection with OPTIONAL LOOP trail to right.
60+50 72+50 Construct 1200 LF of new stock trail. Includes clearing, grubbing and unclassified excavation.
Rock may be encountered and may need blasting or hammering, incidental.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
72+50 Intersection with old trail #267. Oblit 500 LF of old trail south up to intersection with new trail.
954-1 954 954(02) LF 500
72+50 78+75 Follow existing trail. Restore 100 LF of trail to specification as staked.
915-1 915 915(01)a LF 100
78+75 Private Property boundary
Install post where staked.
78+75 91+00 Follow existing trail through private property.
Restore 100 LF of trail to specification as staked.
915-1 915 915(01)a LF 100
80+00 Armor stream crossing 912-5 912 912(06)c EA 1
88+50 Road intersects from right. Install post where staked.
90+00 Road intersects from left. Install post where
90+50 Armor stream crossing 912-5 912 912(06)c EA 1
91+50 Install post where staked. 952-1 952 952(01)
91+50 94+00 Construct 250 LF of new stock trail through private property. Includes clearing, grubbing and unclassified excavation. Rock may be encountered and may need blasting or hammering, incidental.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
94+00 99+00 Follow existing trail. Restore 100 LF of trail to specification as staked.
915-1 915 915(01)a LF 100
99+00 134+50 Construct 3550 LF of new stock trail through private property. Includes clearing, grubbing and unclassified excavation. Rock may be encountered and may need blasting or hammering, incidental.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
Custer Gallatin National Forest Page 3
99+00 Install post where staked. 952-1 952 952(01)
111+50 Intersection with existing road. Install post where
134+50 Intersection with existing road. Install post where
134+50 163+00 Follow existing road through private property.
Restore 300 LF of trail to specification as staked.
915-1 915 915(01)a LF 300
151+00 Intersection with existing road to left. Install post where staked.
154+50 Armor stream crossing 912-5 912 912(06)c EA 1
163+00 216+50 Construct 5350 LF of new stock trail. Includes clearing, grubbing and unclassified excavation.
Rock may be encountered and may need blasting or hammering, incidental.
911-1
912-1
912-2
911(02)
912(01)
LF
LF
163+00 Install post where staked. 952-1 952 952(01)
181+75 Fence. District build gate.
186+00 Construct 6’ radius switchback, unclassified excavation, with max 8% grades throughout, including approaches, incidental to
912(01).
912-9 912 EA 1
216+50 Intersection with existing road. Install post where
216+50 234+06 Follow existing road.
234+06 Intersection with existing trail from Phase 2. End of Project. Install post where staked.