This document is a Statement of Work (SOW) for cleaning and maintenance of shipboard exhaust and ventilation systems for the U.S. Coast Guard Cutter (USCGC) Anthony Petit, located at the USCG Base in Ketchikan, Alaska. The SOW comprises three distinct work items: (1) Commercial cleaning of the Main Diesel Engine exhaust piping system, including disconnection, thorough cleaning of interior surfaces, debris removal, and reassembly; (2) Commercial cleaning of galley and pantry room vent ducts; and (3) Commercial cleaning of laundry room exhaust ventilation systems. The project is scheduled to commence on March 9, 2026, and requires detailed work plans, protective measures, operational testing, and compliance with specific Coast Guard drawings and standard specifications.

The accompanying federal contract opportunity is a Request for Information (RFI) seeking vendor capabilities for these exhaust and ventilation cleaning services. The U.S. Coast Guard is collecting information from commercial vendors to assist in planning and budgeting, with responses requested by 4 p.m. AKST on January 16, 2026. Interested vendors are asked to provide company details, capabilities, lead times, and estimated pricing information. Importantly, this RFI is for informational purposes only and does not constitute a commitment to contract, with responses to be submitted to Benjamin.R.Reedy@uscg.mil.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work: Cleaning and Maintenance of Shipboard Exhaust and Ventilation Systems

Place of Performance:

USCGC Anthony Petit USCG Base Ketchikan 1200 Stedman St Ketchikan, AK 99901 Project Commencement Date:

09March2026 Work Item 1 Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the Main Diesel Engine (MDE) exhaust piping system, including the associated stack uptakes.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 175 WLM 259-001, Rev A, Combustion Exhaust Diagram Coast Guard Drawing 175 WLM 259-005, Rev C, Combustion Exhaust A&D, Hull Block 970 Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

Other References Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3. (Interferences). Known interferences include, but are not limited to the following:

Access covers Exhaust stack

MDE

Piping Pipe insulation Vent ducting Wiring Exhaust pipe expansion joints Exhaust insulation blankets

3.2 Staging or scaffolding, netting. The Contractor must erect suitable staging or scaffolding in accordance with 29 CFR 1915, Subpart E (Scaffolds, Ladders and Other Working Surfaces) to facilitate work, as required.

3.2.1 Rig suitable safety netting as needed, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.

3.3 Work plan. The Contractor must develop and submit, to the COR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan must detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the MDE. The Contractor must perform this work upon receiving Coast Guard approval of the plan.

note Coast Guard personnel will operate all shipboard machinery and equipment.

3.4 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.5 Cleaning. The Contractor must clean the interior surfaces of the exhaust piping and stack uptakes to the MDE, shown on Coast Guard Drawings 175 WLM 259-001 and 175 WLM 259-005, to a condition free from soot, tar, and any other foreign matter as follows:

3.5.1 Disconnect the exhaust piping as necessary to facilitate cleaning.

3.5.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel. Clean all adjacent stack uptake surfaces. Ensure that all tar deposits, soot deposits, and all other surface contaminants are removed.

3.5.3 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.

3.5.4 Reassemble exhaust piping; renew all disturbed flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all disturbed fasteners.

3.6 Inspection and report. The Contractor must perform a visual inspection of the following components and submit a CFR:

Exhaust stack access hatches, including all associated studs and nuts.

All cleaned exhaust stack surfaces.

All exhaust expansion joints, including associated bolts.

3.6.1 Following cleaning of the interior of each exhaust pipe system, the Contractor must demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of exhaust piping cleaned according to the work plan.

3.7 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs.)

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.8 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR

4. NOTES

This section is not applicable to this work item.

Work Item 2 Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the designated shipboard ventilation systems.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 175 WLM 512-001, Rev E, HVAC Diagram Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2020, Clean Shipboard Ventilation Systems

Other References None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Ducting screens.

Electric pre-heaters.

Hot/Chill water coils.

Overhead sheathing/panels.

Ventilation covers..

note Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard Personnel perform an initial operational test of the ventilation systems included in this work item, to demonstrate existing operational condition. Submit a CFR.

NOTE

It is recommended that the Contractor conduct a ship check to verify dimensions in the table below.

3.3 Cleaning requirements. The Contractor must clean and inspect the following ventilation systems, shown on Coast Guard Drawing 175 WLM 512-001, in accordance with SFLC Std Spec 5100. Submit a CFR.

table – 1 system location

SYSTEM LOCATION
TYPE
SYSTEM No.
Gaylord hood
Exhaust
E02-68-2

3.4 Additional requirements. In addition to the above, the Contractor must accomplish the following:

3.4.1 Notification. Give written notification to the COR, 48 hours before starting ventilation cleaning work.

3.4.2 Additional protective covering. In addition to providing protective covering as specified in SFLC Std Spec 5100, subsection 3.1.3 (Protective measures), provide additional protective covering for all food preparation and serving surfaces in the immediate work area, as applicable, to prevent contamination.

note Coast Guard personnel will operate all shipboard machinery and equipment.

3.5 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems included in this work item to be in satisfactory operating condition. Submit a CFR.

4. NOTES

This section is not applicable to this work item.

51202_ESD_1021_FLT

REC_51200_FLT_175 WLM (ALL) (0512)

Work Item 3 Vent Ducts, Laundry Exhaust, Commercial Cleaning

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the designated shipboard ventilation systems.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings Coast Guard Drawing 175 WLM 512-001, Rev E, HVAC Diagram Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2020, Clean Shipboard Ventilation Systems

Other References None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

Ducting screens.

Electric pre-heaters.

Hot/Chill water coils.

Overhead sheathing/panels.

Ventilation covers..

note Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard Personnel perform an initial operational test of the ventilation systems included in this work item, to demonstrate existing operational condition. Submit a CFR.

3.3 Cleaning requirements. The Contractor must clean and inspect the following ventilation systems, shown on Coast Guard Drawing 175 WLM 512-001, in accordance with SFLC Std Spec 5100. Submit a CFR.

table 1 – system locations

SYSTEM LOCATION
TYPE
SYSTEM No.
Laundry room
Exhaust
E01-52-1

3.4 Notification. The Contractor must give written notification to the COR, 48 hours before starting ventilation cleaning work.

note Coast Guard personnel will operate all shipboard machinery and equipment.

3.5 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the ventilation systems included in this work item to be in satisfactory operating condition. Submit a CFR.

4. NOTES

This section is not applicable to this work .