WOPS Lakeshore Improvements bid docs.pdf
PDF 1 MB Posted
- Attached to
- Lakeshore Elementary Improvements
- Solicitation number
- RFP-WOP-250000001275-2
- Issued by
- Ottawa County, Michigan
About this file
This is a bid invitation package from West Ottawa Public Schools and Fritz Wahlfield Construction for improvements to Lakeshore Elementary School located at 3765 N 168th Ave, Holland, MI 49424. The project includes various improvements across 14 bid categories including sitework, concrete, masonry, metals, general trades, roofing systems, glazing, LPDA, flooring, painting, fire protection, mechanical and electrical work. Bids are due February 20, 2025 at 10:00 AM at the West Ottawa Public Schools Administration Office, with a pre-bid walk-through scheduled for February 13, 2025 at 4:00 PM. Construction is scheduled to begin June 6, 2025 with substantial completion required by August 6, 2025.
The project includes two alternates: one for electric water coolers and related services, and another for Pine Creek Elementary improvements. A 5% bid bond is required with all bids, along with sworn familial disclosure and Iran disclosure documentation. The successful bidder will be required to provide performance, labor and material bonds. Pre-purchased equipment by the owner will be included in some bid categories for contractor installation. This is not a prevailing wage project. The bid package includes detailed scopes of work for each trade category, insurance requirements, and a comprehensive project schedule outlined in Gantt chart format.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 001 - 346-024 Lakeshore Elementary Improvements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID INVITE
INVITE DETAILS
PROJECT: Lakeshore Elementary Improvements
OWNER: West Ottawa Public Schools
A&E FIRM: GMB
BIDS DUE: February 20, 2025 @ 10:00 A.M.
PRE-BID WALK THRU: February 13, 2025 @ 4:00 P.M.
CONTACT: Fritz Wahlfield III, Ph: (616) 784.5833, Email: f3@wahlfieldconstruction.com
PROJECT DETAILS
PROJECT LOCATION: 3765 N 168th Ave, Holland, MI 49424
PROJECT DESCRIPTION: Improvements to existing Elementary School. Includes 2 Alternates
BID TRADES: Sitework, Concrete, Masonry, Metals, General Trades, Metal Roofing/Metal Panel Systems, Membrane Roofing, Aluminum Storefronts/Glazing, LPDA, Flooring, Painting, Fire Protection, Mechanical, Electrical
PROJECT SCHEDULE: Summer 2025 (See Attached Schedule)
INVITE RESPONSE
(PLEASE FILL OUT INVITE AND RETURN TO: amanda@wahlfieldconstruction.com)
Company
Contact Name Phone
Please check one: ( ) We will be submitting a budget for this project.
( ) We will NOT be submitting a budget for this project mailto:f2@wahlfieldconstruction.com mailto:amanda@wahlfieldconstruction.com
00 11 13 ADVERTISEMENT FOR BIDS
BID PROPOSAL
Sealed bids, in triplicate, for West Ottawa Public Schools, Lakeshore Elementary Improvements, will be received at
West Ottawa Public Schools Administration Office, 1138 136 th Ave., Holland, MI 49424 on February 20, 2025 at
10:00 AM. Any bids received after this date and time will not be accepted or considered. All bids will be opened and read publicly. FAXED OR EMAILED BIDS WILL NOT BE ACCEPTED.
This project is not a prevailing wage project.
All bids must be accompanied by the following;
1. 5% Bid Bond/ Security
2. Sworn and Notarized Familial Disclosure
3. Iran Disclosure Act
SITE INSPECTION
A Pre-bid meeting will be Wednesday, February 13, 2025 @ 4:00 P.M. This meeting will take place at Lakeshore
Elementary School located at 3765 N 168th Ave., Holland, MI 49424. This pre-bid walk thru is highly recommended.
There will be no other time available to view the site.
BID DOCUMENTS
Bidding documents may be viewed and/or requested via the following:
GMB Architecture + Engineering 85 East Eighth St., Suite 200 Holland, MI 49423 Ph: (616) 796-0200
West Michigan Builders Exchange
678 Front St. NW, Grand Rapids, MI 49504
(616) 949-8650
Please note that vendors are responsible to review information on all drawings and specifications.
BIDDER QUALIFICATIONS
Bidders submitting a proposal for this project shall have the following qualifications:
1. At least (10) years’ experience under the current company’s name.
2. Licensed and insured to perform work in the State of Michigan.
3. Shall have financial resources to complete work under this scope
BID SECURITY
All bids are required to have a bid security or bid bond in the amount of 5% of the bid being submitted. This shall secure the Owner from loss or damage by reason in the occurrence a bid is withdrawn or failure of the successful bidder not entering into Contract with the Owner if the Bid is accepted by the Owner.
The Successful bidder will be asked to secure a Performance, Labor, and Material bond for all work under contract.
Please keep this cost separate on the bid form provided. All bonds shall be from a surety company with an ‘A’ rating.
00 41 00 BID FORM
SUBMIT IN TRIPLICATE
BID TO: West Ottawa Public Schools 1138 136 th Ave.
Holland, MI 49424
ATTENTION: Mr. Chris LaHaie, Assistant Superintendent of Business Services
BID FROM: _______________________________________________________
PROJECT: Lakeshore Elementary Improvements
The undersigned has familiarized themselves with the local conditions with the cost of the work by having examined the site conditions, and Bidding Documents prepared by GMB Architecture & Engineering (85 East Eighth St. (Suite
200), Holland, MI 49423), and hereby proposes to furnish all labor, materials, taxes, equipment, and services needed for the completion of the work category submitted. All Addendums that have been issued for this project have been recognized and included. The cost for performing work is:
Bid Category Number: _________________
Bid Category Description: ____________________________________________________________
Base Bid Amount: ____________________________________________________________ Dollars
ALLOWANCES: Base Bid includes all allowance cost(s) set forth in Section 01.2100 of the General Requirements and identified in the Instruction to Bidders.
TAXES: Base Bid includes all applicable taxes, including Michigan Sales Tax.
COST OF BONDS: Bond Cost for Performance, Labor, and Material Bond Cost. This cost must be included in the
Base Bid. Please list the cost of the bond below.
Lakeshore Elementary Improvements:
PLM Bond Amount ____________________________________________________________ Dollars
ACKNOWLEDGEMENT OF ADDENDA
The following addenda have been received and acknowledged with their execution is included in the base bid cost:
Addendum No. _____ Dated __________ Addendum No. _____ Dated __________
Addendum No. _____ Dated __________ Addendum No. _____ Dated __________
ALTERNATES (MANDATORY TO PROVIDE PRICING AS NEEDED WITH BASE BID)
The following alternates are an add to the Base Bid Cost.
Alternate No. P-1: Provide all costs associated with the provision and installation of electric water coolers including all related services.
Cost: Add/ Delete $___________________________________
Alternate No. Pine Creek Elementary: Provide all costs associated with the Pine Creek Elementary drawings attached to this Bid Package.
VOLUNTARY ALTERNATES
The following is a list of Voluntary Alternates. The owner reserves the right to accept or reject and voluntary alternates.
1. ______________________________________________________________________________
2. ______________________________________________________________________________
UNIT PRICE
1. Unit Price No. 1: NA
BID BOND
Accompanying this bid as required by the instructions to Bidders, is a bid security if the form of (Certified Check, Cashier’s Check, or Bid Bond) in the amount of:
Bid Bond Amount ____________________________________________________________ Dollars
CONSTRUCTION SCHEDULE
The undersigned acknowledges the construction schedule set in the bid documents and that they must be met.
ADDITIONAL WORK
1. There will be a fee of 10% applied to the total cost of materials purchased and work completed by a contractor's own forces. This includes both overhead and profit.
2. There will be a fee of 5% applied to the total cost of work completed by a subcontractor. This includes both overhead and profit.
CREDIT FOR WORK DELETED FROM CONTRACT
All work deleted from this contract by the Owner should be credited 100% back to the Owner.
AGREEMENT
In submitting this bid, it is understood that the Owner reserves the right to accept or reject any/all bids for any reason.
This bid is valid 60 days from the date of the opening.
Firm: _______________________________________________________________
Date: __________________
By: _____________________________________________________
Signature: ________________________________________________________
Title: ______________________________
Phone: (_______) _____________________
Email: ______________________________________________________
CONTACT INFORMATION
Please list contact information for the person(s) that should receive communication regarding THIS submitted bid, including Post-Bid Invites. (If Additional contacts should also receive communication, please attach a separate sheet listing a Name, Title, Email and Phone Number for each contact)
Name: ___________________________________________________
Title: ____________________________________________________
Email: ___________________________________________________
Phone: (________) ____________________________
FAMILIAL DISCLOSURE STATEMENT
In accordance with Section 1267 of the Revised School Code this bid must be accompanied by a sworn and notarized statement disclosing the familial relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools.
(_____) No, there is no relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools.
(_____) Yes, there is a relationship between the Owner or any employee of the Bidder and any member of West Ottawa Public Schools Board of Education or Superintendent of West Ottawa Public Schools. Please list the relationship below.
BIDDER BOARD OF EDUCATION MEMBER OR SUPERINTENDENT
Subscribed and sworn this _______________________ day of ___________________________________, 2025.
In the County of ______________________________ In the State of ___________________________________.
By ___________________________________________________________________________
Notary Public Signature
My Commission Expires on: ________________________________ Seal or Stamp:
AFFIDAVIT OF COMPLIANCE IRAN ECONOMICS SANCTIONS ACT
Michigan Public Act No. 517 of 2012
The undersigned, the owner, or authorized officer of the below-named company (the “Contractor”), pursuant to the compliance certification requirement provided in West Ottawa Public Schools Request for Proposal (the “RFP”), hereby certifies, represents, and warrants that the Contractor (which includes its officers, directors and employees) is not an “Iran Linked Business” within the meaning of the Iran Economic Sanctions Act, Michigan Public Act No. 517 of
2012 (the “Act”), and that in the event the Contractor is awarded a contract by the West Ottawa Public Schools as a result of the aforementioned RFP, the Contractor is not and will not become an “Iran Linked Business” at any time during the course of performing any services under the Contract.
The Contractor further acknowledges that any person who is found to have submitted a false certification is responsible for a civil penalty of not more than $250,000.00 or two (2) times the amount of the contract or proposed contract for which the false certification was made, whichever is greater, the cost of the School Districts investigation, and reasonable attorney fees, in addition to the fine. Moreover, any person who submitted a false certification shall be ineligible to bid on a request for proposal for three (3) years from the date that it is determined that the person has submitted the false certification.
Contractor: _____________________________________________________
By: _______________________________________________ Title: ____________________________________
Date: __________________________________________________________
This instrument was acknowledged before me on the __________________ day of _____________________, 2025
In the County of ______________________________ In the State of ___________________________________.
By ___________________________________________________________________________
Notary Public Signature
My Commission Expires on: ________________________________ Seal or Stamp:
REQUEST FOR INFORMATION (RFI) DURING BIDDING PHASE
Requests For Information (RFI’s) will ONLY be accepted through a completed RFI form provided on page 9 in the front ends of this project.
Pre-Bid RFI’s deadline: FEBRUARY 14, 2025 by 12:00 P.M.
Please email the completed RFI form to both:
amanda@wahlfieldconstruction.com f3@wahlfieldconstruction.com
The CM will review the RFI before submitting to the AE firm.
Any questions not submitted following this process prior to the deadline will not be answered.
REQUEST FOR INFORMATION (RFI) FORM
Project: Lakeshore Elementary Improvements Date: ________________
Deadline: FEBRUARY 14, 2025 by 12:00 P.M. Action Requested:
______ Clarification
Attn: Fritz Wahlfield III, Fritz Wahlfield Construction (CM) ______ Direction
______ Approval
Company: __________________________________________________ ______ Alternate
Contact: ___________________________________________________ ______ Other
Email: _____________________________________________________
Phone No:__________________________________________________
Reference Drawing No: __________________________ Detail No: ___________ Spec. Section: ___________
Request Information:
RFI #: _________
CM Recommendation:
By: _______________________________ Date: ________________
AE Recommendation:
By: _______________________________ Date: ________________
BID CATEGORIES INDEX
1. Sitework
2. Concrete
3. Masonry
4. Metals
5. General Trades
6. Metal Roofing/Metal Panel Systems
7. Membrane Roofing
8. Aluminum Storefronts/Glazing
9. LPDA
10. Flooring
11. Painting
12. Fire Protection
13. Mechanical
14. Electrical
BID CATEGORY NO. 01 - SITEWORK
INCLUDE:
1. Complete Sitework and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
2. CONSTRUCTION DRAWINGS: CONTRACTOR IS RESPONSIBLE FOR REVIEWING ALL
CONSTRUCTION DRAWING PAGES AND BECOMING FAMILIAR WITH THE COMPLETE SET TO
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. All Excavating as shown on pages C1.01, C2.02, C4.01, C4.02, C4.03, C4.04.
4. Compacting any imported soils as required to meet compaction requirements of soils for future footings, foundations, slab on grade, and/or backfill material.
5. Responsibility of the contractor to contact Miss Dig at least 36 hours prior to start of work.
6. The CM will provide a one time staking of grades, building footprint, and misc. locations.
a. Additional staking will be at the cost of the contractor.
7. Furnish and Install as shown:
a. Site demolition and site clearing as shown on C1.01
b. Standard Duty Pavement as shown on C2.01
c. Lift Pump Station Work as shown
8. Concrete or asphalt cutting to complete work in this scope.
9. Any dewatering necessary to complete this scope of work.
10. Dust control measures for all work in this Bid Category.
11. Daily clean-up at work areas.
12. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
13. All work must be done in accordance with MIOSHA Regulations.
14. Warranties as specified.
15. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
16. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
BID CATEGORY NO. 02 - CONCRETE
1. Complete Concrete and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
03.3000 CAST-IN-PLACE CONCRETE
07.2100 THERMAL INSULATION
07.9200 JOINT SEALANTS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all reinforcement as shown.
4. Provide Sealer and Vapor Barrier as specified.
5. Furnish and install all interior & exterior concrete MEP pads as shown.
6. Furnish and install joint sealants at all new exterior concrete paving as shown and specified.
7. Dust control measures for all work in this Bid Category.
8. Daily clean-up at work areas.
9. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
10. All work must be done in accordance with MIOSHA Regulations.
11. Warranties as specified.
12. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
13. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
14. Alternate No. Pine Creek Elementary: Provide all costs associated with the Pine Creek Elementary drawings attached to this Bid Package.
BID CATEGORY NO. 03 - MASONRY
1. Complete Masonry and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
04.0511 MASONTRY MORTARING AND GROUTING
04.2000 UNIT MASONRY
07.2100 THERMAL INSULATION
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. All masonry reinforcement, grout fill, loose fill or cavity wall insulation, etc., as shown and/or specified.
4. Grouting solid of new hollow metal frames in masonry.
5. Clean all new masonry.
6. Furnish and Install complete Masonry as shown and specified.
7. Furnish and Install all reinforcement as shown.
8. Demo masonry openings at new louvers as called out in note 21 on pages A1.1A, A1.1B, & A1.1C.
9. All new masonry units need to be rubbed of debris and/or mortar and ready for paint.
10. Furnish and Install all necessary flashing as shown.
a. Masonry membrane flashing as shown.
11. Flashing and weep holes concealed in masonry work. Includes pre-finished flashings.
12. Cavity wall insulation, this includes all spray insulation at all new exterior walls.
13. Joint Sealants at all CMU wall CJs.
14. Fire safe-ing, fire resistant caulking, sound attenuation blankets and acoustical sealants being an integral part of the all system, where shown. Include fire safe-ing at existing masonry walls where shown. See code compliance plans for locations.
15. Install lintels as provided for new openings.
16. Provided rebar caps for all exposed rebar ends installed by this contractor.
17. This contractor is responsible for the disposal of excess masonry and masonry related items. I.e., rubble, cut blocks, mortar, etc., into concrete dumpster. Coordinate this with Construction Manager. It is the responsibility of this contractor to provide its own dumpsters as necessary.
18. All work must be done in accordance to the new Silica Regulations.
19. Furnish and install masonry toothing as required for all new openings as shown. Openings may include, but not limited to: doors, windows, louvers, chases and masonry openings for new MEP work.
20. Installation of anchor bolts at top of wall for wood blocking.
21. Dust control measures for all work in this Bid Category.
22. Daily clean-up at work areas.
23. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
24. All work must be done in accordance with MIOSHA Regulations.
25. Warranties as specified.
26. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
27. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
28. Alternate No. P-1: Provide all costs associated with the provision and installation of electric water coolers including all related services.
29. Alternate No. Pine Creek Elementary: Provide all costs associated with the Pine Creek Elementary
BID CATEGORY NO. 04 - METALS
1. Complete Metals and related work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
05.1200 STRUCTURAL STEEL FRAMING
05.3100 STEEL DECKING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
3. Furnish all steel lintels as shown.
4. Demolition of Existing Deck and Joist as shown for new mechanical equipment.
5. Furnish and Install Structural Steel Framing and reinforcement as shown.
6. Furnish and Install Steel Joist Framing as shown.
7. Furnish and Install Steel Decking as shown.
8. All onsite welding must be done by certified welders.
9. Provide Fire Watch for work completed above.
10. Dust control measures for all work in this Bid Category.
11. Daily clean-up at work areas.
12. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
13. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
14. Warranties as specified.
15. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
16. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 05 - GENERAL TRADES
1. Complete General Trades work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
06.1000 ROUGH CARPENTRY
07.9200 JOINT SEALANTS
08.1113 HOLLOW METAL DOORS AND FRAMES
08.1416 FLUSH WOOD DOORS
08.7100 DOOR HARDWARE (Forthcoming)
10.2800 TOILET, BATH, AND LAUNDRY ACCESSORIES
10.5113 METAL LOCKERS
12.3200 MANUFACTURED WOOD CASEWORK
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Schedule, take delivery, inventory, and store and install all items noted as “Install Only” above. Provide a list of material received each day to the Construction Manager’s Superintendent. All items not noted are to be furnished and installed.
4. Furnish and Install Floor Protection in Areas; Corridors A101, A127, & C101. Vestibules A100, A128, C102, C109, & C112.
a. Floor protection to be One layer of Water Resistant (WR) Hardboard by Protect in area of coverage. Thickness to be 44mil.
i. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.
5. Furnish and Install Floor Protection in Area Gymnasium A131
a. Floor Protection to be one layer of ½” O.S.B over 6 mil clear poly plastic in area of coverage.
i. This is to be installed prior to construction starting and removed at the end of the construction project as directed by the CM.
6. Demo as shown on pages A1.1A, A1.1B, A1.1C
a. Notes 1-5, 7-9, 12 - 20, and 22.
b. Furnish and Install temporary enclosures at all new exterior openings for doors, windows, and MEP openings. Make enclosures secure from outside and shed water.
7. Furnish and erect all blocking shown on drawings or as specified in Miscellaneous Carpentry. Include all blocking not shown but incidental to your scope of work.
a. Top of wall blocking.
b. Casework and furnishings blocking as required.
c. Any doors or window bucks as needed/shown.
8. All lumber to be treated as specified.
9. Joint Sealants at all new door frames, casework, and countertops and any application where drywall meets
CMU walls.
10. Furnish and Install all Hollow Metal Door Frames and Window Frames as shown.
11. Furnish and Install all Hollow Metal and Wood Doors as shown.
12. Furnish and Install all new Door Hardware as shown.
13. Furnish and Install all new Casework and Countertops as shown.
14. Furnish and Install all new Bath Accessories as specified and shown.
15. Furnish and Install all new Toilet Partitions as specified and shown.
16. Furnish and Install new metal lockers as shown.
17. Dust control measures for all work in this Bid Category.
18. Daily clean-up at work areas.
19. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
20. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
21. Warranties as specified.
22. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
23. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
24. Alternate No. P-1: Provide all costs associated with the provision and installation of electric water coolers including all related services.
25. Alternate No. Pine Creek Elementary: Provide all costs associated with the Pine Creek Elementary
BID CATEGORY NO. 06 - METAL ROOFING/METAL PANEL SYSTEMS
1. Complete Metal Roofing/Metal Panel Systems as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
07.2500 WEATHER BARRIERS
07.4113 METAL ROOF PANELS
07.4213 METAL WALL PANELS
07.6200 SHEET METAL FLASHING AND TRIM
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Demolition of Existing Standing Seam roof as shown on pages A2.3A, A2.3B, and A2.3C.
a. Make area water sealed prior to installation of new standing seam roof system.
4. Furnish and Install all joint sealants for related work in this scope.
5. Furnish and Install complete roofing system as shown.
a. Standing Seam Metal Roofing System.
i. This includes all metal flashing and copings.
6. Furnish and Install ½” Coverboard with (2) layers of 2.6” Rigid Insulation underneath the Metal Roof System.
7. Daily clean-up at work areas.
8. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/ or Civil Engineer
9. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
10. Warranties as specified.
11. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
12. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 07 - MEMBRANE ROOFING
1. Complete Membrane Roofing as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
07.2100 THERMAL INSULATION
07.5300 ELASTOMERIC MEMBRANE ROOFING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
3. Demolition of existing Membrane roof and insulation as shown on page A2.3B.
4. Furnish and install new membrane roof system as shown on page A2.3B.
a. This includes all metal flashings and copings related to this work.
5. Furnish and Install ½” coverboard with (2) layers of 2.6” Insulation fastened to the metal deck.
a. This includes the tapered insulation as shown on the drawings.
6. Furnish and Install all joint sealants for related work in this scope.
7. Daily clean-up at work areas.
8. Contractor to Meet Project Schedule, this includes weekend work or Daily overtime.
9. Furnish and install complete roofing system as shown.
10. Tie into the existing roofing system as necessary.
11. Provide all warranties as specified.
BID CATEGORY NO. 08 - ALUMINUM STOREFRONTS & GLAZING
1. Complete Aluminum Storefronts & Glazing as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
07.9200 JOINT SEALANTS
08.1116 ALUMINUM DOORS AND FRAMES
08.7100 DOOR HARDWARE (Forthcoming)
08.8000 GLAZING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all Aluminum Frames and Doors as shown.
a. Including all Door Hardware related to this scope of work.
4. Furnish and Install all Glass and Glazing as shown.
5. Furnish and Install Mirrors as shown.
6. Furnish and Install all joint sealants for related work in this scope.
7. Glass cleaning at substantial completion of the entire project.
8. Furnish and install all storefront systems as shown and specified.
9. Contractor responsible for all field measurements for this scope of work.
10. Provide all hardware specified under this scope.
11. Furnish and install any break metal necessary to complete this scope.
12. Furnish and install egress stickers at all new egress openings.
13. Furnish and install all glazing films as shown.
14. Daily clean-up at work areas.
15. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
16. All work must be done in accordance with MIOSHA Regulations.
a. Provide lifting plan for any crane work.
17. Warranties as specified.
18. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
19. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 09 - LPDA
1. Complete LPDA work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
05.4000 COLD-FORMED METAL FRAMING
07.8400 FIRESTOPPING
09.2116 GYPSUM BOARD ASSEMBLIES
09.2216 NON-STRUCTURAL METAL FRAMING
09.5100 ACOUSTICAL CEILINGS
09.8430 SOUND-ABSORBING WALL AND CEILING UNITS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all new metal studs as shown.
a. This includes cold form metal framing and non structural metal framing.
4. Engineered drawings required to be provided for cold form metal framing.
5. Furnish and Install all Gypsum boards as shown.
a. All Gypsum board must be finished as specified for painting.
6. Furnish and Install new Ceilings and Grid as shown on the drawings.
7. Furnish and Install new drywall bulkheads as shown.
8. Furnish and Install all batt insulation as shown on interior partitions as well as any exterior metal stud walls as shown.
9. Furnish and Install sound absorbing wall and ceiling units.
10. Furnish and Install firestopping at all rated assemblies as shown on the drawing.
11. Coordinate layout and elevations with the Construction Manager prior to install.
12. Dust control measures for all work in this Bid Category.
13. Daily clean-up at work areas.
14. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
15. All work must be done in accordance with MIOSHA Regulations.
16. Warranties as specified.
17. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
18. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 10 - FLOORING
1. Complete Flooring work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
09.6500 RESILIENT FLOORING
09.6700 FLUID-APPLIED FLOORING
09.6813 TILE CARPETING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
3. Demo of Existing flooring and base as shown in note 10 on pages A1.1A, A1.1B, and A1.1C.
4. Furnish and Install new flooring as shown on the drawings.
a. This includes All Resilient Flooring (including base), Tile Carpeting, and Fluid-Applied Flooring.
5. Minor floor prep as needed.
6. Furnish and Install Entrance Floor Mats and Frames as shown.
7. Coordinate layout and elevations with the Construction Manager prior to install.
8. Dust control measures for all work in this Bid Category.
9. Daily clean-up at work areas.
10. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
11. All work must be done in accordance with MIOSHA Regulations.
12. Warranties as specified.
13. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
14. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
15. Alternate No. P-1: Provide all costs associated with the provision and installation of electric water coolers including all related services.
16. Alternate No. Pine Creek Elementary: Provide all costs associated with the Pine Creek Elementary
BID CATEGORY NO. 11 - PAINTING
1. Complete Painting work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
09.9000 PAINTING AND COATING
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Furnish and Install all painting as shown and specified in the Construction Documents for this project.
4. Painting of Steel Lintels at New Louver Locations.
5. Contractor responsible for final touch-up.
6. Fire barrier signage/ stenciling on fire walls within concealed space above ceiling per Barrier Free
Dimensions.
7. Dust control measures for all work in this Bid Category.
8. Daily clean-up at work areas.
9. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
10. All work must be done in accordance with MIOSHA Regulations.
11. Warranties as specified.
12. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
13. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
Resubmit”, contractor shall reissue the second time with the revisions clouded.
14. Alternate No. P-1: Provide all costs associated with the provision and installation of electric water coolers including all related services.
15. Alternate No. Pine Creek Elementary: Provide all costs associated with the Pine Creek Elementary
BID CATEGORY NO. 12 - FIRE PROTECTION
1. Complete Fire Protection work as shown on the drawings and as specified in the following sections:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
07.8400 FIRESTOPPING
21.0001 FIRE PROTECTION SUMMARY OF WORK
21.0500 COMMON WORK RESULTS FOR FIRE SUPPRESSION
21.1300 FIRE-SUPPRESSION SPRINKLER SYSTEMS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Rework complete Fire Protection System as shown and specified on Page P2.00.
4. Include all sealed drawings for permitting and approvals.
5. Include all permits required for this scope of work. Provide the CM with a copy of the permit(s).
6. Include Fire Caulking/ Fire rating at all penetrations in fire rated assemblies created by this scope of work.
7. Include all tie ins and draining of the existing system as required to complete work.
8. It is the responsibility of this contractor to cut in all fire protection heads into the acoustical ceiling pads.
9. All work to be completed to meet industry standards.
10. Dust control measures for all work in this Bid Category.
11. Daily clean-up at work areas.
12. Contractor to meet Project Schedule, this includes weekend work or daily overtime.
a. Project Manager/Project Foreman required to attend the following meetings:
i. Pre-Construction Kick Off
ii. Bi-Weekly Progress Meeting
iii. Any meetings required by the Local Ordinance, Architect, and/or Civil Engineer
13. All work must be done in accordance with MIOSHA Regulations.
14. Warranties as specified.
15. Submit shop drawings to scale so they can be accurately commented on/coordinated with other trades.
16. When shop drawings are returned from the Architect to Contractor marked “Rejected” or “Revise and
BID CATEGORY NO. 13 - MECHANICAL
1. Complete Mechanical work as shown on the drawings and as specified in the following categories:
SPECIFICATION MANUAL AND FRONT ENDS
00.0110 TABLE OF CONTENTS
00.0115 LIST OF DRAWING SHEETS
00.4323 ALTERNATES FORM
00.1113 ADVERTISEMENT FOR BIDS
00.4100 BID FORM
00.4323 ALTERNATES FORM
01.0000 GENERAL REQUIREMENTS
01.0001 ELECTRONIC MODEL/DRAWING FILE EXCHANGE AGREEMENT
01.1000.0 SUMMARY
01.1000.1 ABBREVIATIONS
01.1010.1 WORK COVERED BY CONTRACT DOCUMENTS
01.1010.2 SCHEDULING
01.1010.3 CONTRACTOR USE OF PREMISES
01.1010.4 SUBSTANTIAL COMPLETION
01.2200 UNIT PRICES
01.2300 ALTERNATES
01.3000 ADMINISTRATIVE REQUIREMENTS
01.3000.1 SUBMITTALS
01.3113 INSURANCE REQUIREMENTS
01.4000 QUALITY REQUIREMENTS
01.4533 CODE REQUIRED SPECIAL INSPECTIONS
01.4100 REGULATORY REQUIREMENTS
01.4533 CODE-REQUIRED SPECIAL INSPECTIONS
01.5000 TEMPORARY FACILITIES AND CONTROLS
01.5100 TEMPORARY UTILITIES
01.5713 TEMPORARY EROSION AND SEDIMENT CONTROL
01.7329 CUTTING AND PATCHING
01.7700 CLOSE OUT PROCEDURES
01.9113 GENERAL COMMISSIONING REQUIREMENTS
01.9114 COMMISSIONING AUTHORITY RESPONSIBLITIES
02.4119 DEMOLITION
22.0517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING
22.0523 GENERAL DUTY VALVES FOR PLUMBING PIPING
22.0529 HANGERS AND SUPPORTS PLUMBING PIPING AND EQUIPMENT
22.0553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22.0719 PLUMBING PIPING INSULATION
22.0719.11 UNDER-LAVATORY PIPE AND SUPPLY COVERS
22.1005 PLUMBING PIPING
22.1006 PLUMBING PIPING SPECIALTIES
22.4000 PLUMBING FIXTURES
23.0500 HVAC SUMMARY OF WORK
23.0513 COMMON MOTOR REQUIREMENTS FOR HVAC PIPING
23.0517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING
23.0519 METERS AND GAGES FOR HVAC PIPING
23.0523 GENERAL-DUTY VALVES FOR HVAC PIPING
23.0529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23.0548 VIBRATION AND SEISMIC CONTROLS FOR HVAC
23.0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23.0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23.0713 DUCT INSULATION
23.0719 HVAC PIPING INSULATION
23.0800 COMMISSIONING OF HVAC
23.0913 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23.0923 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC
23.0934 VARIABLE-FREQUENCY MOTOR CONTROLLERS FOR HVAC
23.0993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
23.1123 FACILITY NATURAL-GAS PIPING
23.2113 HYDRONIC PIPING
23.2116 HYDRONIC PIPING SPECIALTIES
23.2300 REFRIGERANT PIPING
23.2500 HVAC WATER TREATMENT
23.3100 HVAC DUCTS AND CASINGS
23.3300 AIR DUCT ACCESSORIES
23.3423 HVAC POWER VENTILATORS
23.3600 AIR TERMINAL UNITS
23.3700 AIR OUTLETS AND INLETS
23.4000 HVAC AIR CLEANING DEVICES
23.6213 PACKAGED AIR-COOLED REFRIGERANT COMPRESSOR AND
CONDENSER UNITS
23.7313 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS
23.7433 DEDICATED OUTDOOR AIR UNITS
23.8126.13 SMALL-CAPACITY SPLIT-SYSTEM AIR-CONDITIONERS
23.8200 CONVECTION HEATING AND COOLING UNITS
SATISFY THE SCOPE OF WORK RELATED TO THE BID CATEGORY.
a. DRAWING INDEX CAN BE FOUND ON TITLE PAGE.
3. Plumbing and Mechanical Demo as shown on pages P2.00, M1.1A, M1.1B, M1.1C, and M1.80.
4. Furnish and Install exterior louvers as shown.
5. Furnish and Install all plumbing and HVAC as specified and shown.
a. All equipment as specified.
b.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .