Addendum 001 - 346-024 Lakeshore Elementary Improvements.pdf
PDF 8 MB Posted
- Attached to
- Lakeshore Elementary Improvements
- Solicitation number
- RFP-WOP-250000001275-2
- Issued by
- Ottawa County, Michigan
About this file
This is an addendum to a construction bid package for the Lakeshore Elementary School Improvements project for West Ottawa Public Schools in Holland, Michigan. The project includes building improvements, mechanical/electrical upgrades, roofing work, door hardware replacements, and related renovations. Bids are due February 20, 2025 at 10:00 AM at the West Ottawa Public Schools Administration Office, with a pre-bid meeting scheduled for February 13, 2025 at 4:00 PM at Lakeshore Elementary. Construction is scheduled to begin June 6, 2025 with substantial completion required by August 6, 2025. Mandatory post-bid interviews will be held February 24-26, 2025.
The project includes two alternates: P-1 for electric water cooler installations and a Pine Creek Elementary alternate covering additional work at that facility. A 5% bid bond is required with submissions, and successful bidders must provide performance, labor and material bonds. The project requires proof of insurance with minimum coverage limits specified. The project is not prevailing wage. Bid categories include sitework, concrete, masonry, metals, general trades, roofing, aluminum/glazing, LPDA, flooring, painting, fire protection, mechanical and electrical work. The Construction Manager is Fritz Wahlfield Construction and the Architect/Engineer is GMB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WOPS Lakeshore Improvements bid docs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Date: 2.12.2025
Owner: West Ottawa Public Schools
Project Name: Lakeshore Elementary School Improvements
Location: 3765 N 168th Ave., Holland, MI
CM No.: 346-024
A/E No.: 5-6248
ADDENDUM NO. 1
SPECIAL NOTE:
The Notice to Bidders, Instruction to Bidders, General Conditions of the Contract Construction, Supplementary
Conditions of the Contract for Construction, and all modifications and previously issued Contract Documentation are a part of the Addendum.
SCOPE OF WORK:
The following items are changes, additions, deletions, clarifications and/or errors and omissions in the plans and specifications and shall be considered by each Bidder regarding their proposal submitted. This document and all its entirety shall be considered part of the Contract Documents.
NOTICE TO ALL BIDDERS:
It is the responsibility of the Bidder to take note of all items covered in this Addendum. It is the responsibility of the
Bidder to review all work in total regarding their contract work/ scope and any work that will interface with their work/ scope.
ATTACHMENTS:
Specifications: GMB Addendum 001
Drawings: GMB Addendum 001
Other: Front Ends
West Ottawa Public Schools
Lakeshore Elementary School Improvements
SPECIFICATIONS CLARIFICATIONS / REVISIONS:
(Refer to A/E Remarks)
SHEET CLARIFICATIONS / REVISIONS:
(Refer to A/E Remarks)
OTHER:
ITEM NO. 1: FRONT ENDS (ALL CHANGES NOTED IN BOLDED RED/YELLOW)
Refer to scope of work changes noted in this Addendum which includes clarifications to the scheduled Pre-Bid meeting, alternates, and other clarifying items to the following Bid
Category’s scope of work: Sitework, General Trades, Mechanical, Electrical
West Ottawa Public Schools
Lakeshore Elementary School Improvements
ADDENDUM
WEST OTTAWA PUBLIC SCHOOLS ADDENDUM 001
LAKESHORE ELEMENTARY IMPROVEMENTS FEBRUARY 11, 2025
A/E PROJECT 5-6248 PAGE 1 OF 5
SECTION 00 91 11.00 - ADDENDUM 001
OWNER WEST OTTAWA PUBLIC SCHOOLS
PROJECT LAKESHORE ELEMENTARY IMPROVEMENTS
A/E PROJECT 5-6248
PURPOSE THIS ADDENDUM SHALL FORM PART OF THE
BIDDING DOCUMENTS. CHANGES, ADDITIONS,
CLARIFICATION OR DELETIONS HEREIN
SUPERSEDE THE DRAWINGS AND
SPECIFICATIONS. BIDDERS SHALL INCLUDE
ON THE PROPOSAL FORM
ACKNOWLEDGEMENT OF THE RECEIPT OF
THIS ADDENDUM.
ATTACHMENTS NEW SPECIFICATIONS: 08 71 00
REISSUED SPECIFICATIONS: TOC, 01 23 00
NEW SHEETS: S7.01, E5.11
LAKESHORE REISSUED SHEETS: G0.00, S3.1A,
A1.1A, A1.1B, A1.1C, A2.1B, A2.1C, A2.3A, A2.3B, A2.3C, A5.01, E1.1A, E2.1A, E2.1B, E2.1C, E5.10
PINE CREEK REISSUED SHEETS: G0.00, G0.01,
A0.01, A1.1B, A1.1C, A2.1B, A2.1C, P0.01, P2.00 E0.01, E2.1A, E2.1B, E2.1C
LAKESHORE ELEMENTARY IMPROVEMENTS FEBRUARY 11, 2025
A/E PROJECT 5-6248 PAGE 2 OF 5
ARCHITECT-ENGINEER GMB
616.796.0200
WWW.GMB.COM
CONSTRUCTION MANAGER FRITZ WAHLFIELD CONSTRUCTION
616.784.5833
WWW.WAHLFIELDCONSTRUCTION.COM
LAKESHORE ELEMENTARY IMPROVEMENTS FEBRUARY 11, 2025
A/E PROJECT 5-6248 PAGE 3 OF 5
SPECIFICATION CLARIFICATIONS / REVISIONS
1.1 TABLE OF CONTENTS-TOC (REISSUED)
A. Updated Table of Contents to reflect new section added and revised naming.
1.2 SECTION 01 23 00 ALTERNATES ( REISSUED )
A. See new Pine Creek Elementary alternate clarification.
1.3 SECTION 08 71 00 DOOR HARDWARE ( NEW )
A. New specification section.
LAKESHORE ELMENTARY
SHEET CLARIFICATIONS / REVISIONS
3.1 SHEET G0.00 - COVER SHEET (REISSUED)
A. See Electrical Sheet Legend for new sheet E5.11.
3.2 SHEET S3.1A - UNIT 'A' FLOOR AND LOW ROOFING FRAMING PLAN (REISSUED)
A. See sheet for added equiptment pad.
3.3 SHEET S7.01 - STRUCTURAL DETAILS (NEW)
A. See sheet for details.
3.4 SHEET A1.1A - UNIT 'A' DEMOLITION PLAN (REISSUED)
A. See Demolition Notes for new keynote 23 and 24.See plan for classroom intercom demolition locations.
B. See plan for classroom intercom demolition locations.
C. See plan for louver removal and patching approach notes.
3.5 SHEET A1.1B - UNIT 'B' DEMOLITION PLAN ( REISSUED )
A. See Demolition Notes for new keynote 23 and 24.
B. See plan for indicated door leaf removal.
C. See plan for classroom intercom demolition locations.
D. See plan for louver removal and patching approach notes.
3.6 SHEET A1.1C - UNIT 'C' DEMOLITION PLAN ( REISSUED )
A. See Demolition Notes for new keynote 23 and 24.
B. See plan for indicated door leaf removal.
C. See plan for classroom intercom demolition locations.
D. See plan for louver removal and patching approach notes.
3.7 SHEET A2.1B - UNIT 'B' FLOOR PLAN (REISSUED)
A. See plan for indicated door leaf replacement.
3.8 SHEET A2.1C - UNIT 'C' FLOOR PLAN (REISSUED)
A. See plan for indicated door leaf replacement.
3.9 SHEET A2.3A - UNIT 'C' FLOOR PLAN (REISSUED)
A. See roof plan for revisions to roof area notes.
LAKESHORE ELEMENTARY IMPROVEMENTS FEBRUARY 11, 2025
A/E PROJECT 5-6248 PAGE 4 OF 5
3.10 SHEET A2.3B - UNIT 'B' ROOF PLAN (REISSUED)
A. See roof plan for revisions to roof area notes.
3.11 SHEET A2.3C - UNIT 'C' ROOF PLAN (REISSUED)
A. See roof plan for revisions to roof area notes.
3.12 SHEET A5.01 - DOOR & FRAME SCHEDULES (REISSUED)
A. See all schedules on sheet for hardware set numbers.
3.13 SHEET E1.1A - UNIT 'A' FIRST FLOOR ELECTRICAL DEMOLITION PLAN (REISSUED)
A. Refer to reissued sheet for electrical work realated to electrical water coolers.
3.14 SHEET E2.1A - UNIT 'A' FIRST FLOOR POWER AND COMMUNICATIONS PLAN (REISSUED)
A. Refer to reissued sheet for electrical work realated to electrical water coolers.
3.15 SHEET E2.1B - UNIT 'B' FIRST FLOOR POWER AND COMMUNICATIONS PLAN (REISSUED)
A. Refer to reissued sheet for electrical work realated to electrical water coolers.
3.16 SHEET E2.1C - UNIT 'C' FIRST FLOOR POWER AND COMMUNICAITON PLAN (REISSUED)
A. Refer to reissued sheet for electrical work realated to electrical water coolers.
3.17 SHEET E5.10 - LIGHTING FIXTURE SCHEDULE (REISSUED)
A. Revised light fixture types S8, S8E, W4, AND W15.
3.18 SHEET E5.11- LIGHTING CONTROL & ENERGY SCHEDULES (NEW)
A. New Sheet.
PINE CREEK ELEMENTARY ALTERNATE
SHEET CLARIFICATIONS / REVISIONS
1.1 SHEET G0.00 - COVER SHEET (REISSUED)
A. See sheet for new Electrical Sheet Legend.
B. See sheet for revised General, Architecture and Plumbing sheet titles.
1.2 SHEET G0.01 - GENERAL NOTES DIMENSIONS AND LEGENDS (REISSUED)
A. See sheet for revised sheet title.
1.3 SHEET A0.01 - OVERALL FLOOR PLAN (REISSUED)
A. See sheet for revised sheet title.
1.4 SHEET A1.1B - UNIT 'B' FIRST FLOOR DEMOLITION PLAN (REISSUED)
A. See sheet for revised sheet title.
1.5 SHEET A1.1C - UNIT 'C' FIRST FLOOR DEMOLITION PLAN (REISSUED)
A. See sheet for revised sheet title.
1.6 SHEET A2.1B - UNIT 'B' FIRST FLOOR PLAN (REISSUED)
A. See sheet for revised sheet title.
1.7 SHEET A2.1C - UNIT 'C' FIRST FLOOR PLAN (REISSUED)
A. See sheet for revised sheet title.
LAKESHORE ELEMENTARY IMPROVEMENTS FEBRUARY 11, 2025
A/E PROJECT 5-6248 PAGE 5 OF 5
1.8 SHEET P0.01 - PLUMBING GENERAL INFORMATION (REISSUED)
A. See sheet for revised sheet title.
1.9 SHEET P2.00 - FIRST FLOOR PLUMBING PLAN (REISSUED)
A. See sheet for revised sheet title.
B. See sheet for revised plan title.
C. See sheet for revised legend title.
1.10 SHEET E0.01 - ELECTRICAL SYMBOL LEGENDS & GENERAL NOTES (NEW)
A. Refer to new sheet for electrical work.
1.11 SHEET E2.1A - UNIT ‘A’ FIRST FLOOR POWER & COMMUNICATIONS PLAN (NEW)
A. Refer to new sheet for electrical work related to new Electrical Water Coolers.
1.12 SHEET E2.1B - UNIT ‘B’ FIRST FLOOR POWER & COMMUNICATIONS PLAN (NEW)
A. Refer to new sheet for electrical work related to new Electrical Water Coolers.
1.13 SHEET E2.1C - UNIT ‘C’ FIRST FLOOR POWER & COMMUNICATIONS PLAN (NEW)
A. Refer to new sheet for electrical work related to new Electrical Water Coolers.
WEST OTTAWA PUBLIC SCHOOLS
LAKESHORE ELEMENTARY IMPROVEMENTS
A/E PROJECT 5-6248
Copyright GMB 2025 SECTION 00 01 10
TABLE OF CONTENTS
SECTION 00 01 10 - TABLE OF CONTENTS
(ADDENDUM 001)
PROCUREMENT AND CONTRACTING REQUIREMENTS
2.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 01 10 - Table of Contents B. 00 01 15 - List of Drawing Sheets C. 00 43 23 - Alternates Form
SPECIFICATIONS
3.1 DIVISION 01 -- GENERAL REQUIREMENTS
A. 01 00 01 - Electronic Model/Drawing File Exchange Agreement B. 01 23 00 - Alternates C. 01 40 00 - Quality Requirements D. 01 45 33 - Code-Required Special Inspections E. 01 73 29 Cutting and Patching F. 01 91 13 - General Commissioning Requirements G. 01 91 14 - Commissioning Authority Responsibilities
3.2 DIVISION 02 -- EXISTING CONDITIONS
A. 02 41 00 - Demolition
3.3 DIVISION 03 -- CONCRETE
A. 03 30 00 - Cast-in-Place Concrete
3.4 DIVISION 04 -- MASONRY
A. 04 05 11 - Masonry Mortaring and Grouting B. 04 20 00 - Unit Masonry
3.5 DIVISION 05 -- METALS
A. 05 12 00 - Structural Steel Framing B. 05 31 00 - Steel Decking C. 05 40 00 - Cold-Formed Metal Framing
3.6 DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
A. 06 10 00 - Rough Carpentry
3.7 DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
A. 07 21 00 - Thermal Insulation B. 07 25 00 - Weather Barriers C. 07 41 13 - Metal Roof Panels D. 07 42 13 - Metal Wall Panels E. 07 53 00 - Elastomeric Membrane Roofing F. 07 62 00 - Sheet Metal Flashing and Trim G. 07 84 00 - Firestopping
A/E PROJECT 5-6248
Copyright GMB 2025 SECTION 00 01 10
TABLE OF CONTENTS
H. 07 92 00 - Joint Sealants
3.8 DIVISION 08 -- OPENINGS
A. 08 11 13 - Hollow Metal Doors and Frames B. 08 11 16 - Aluminum Doors and Frames C. 08 14 16 - Flush Wood Doors D. 08 71 00 - Door Hardware E. 08 71 00 - Door Hardware F. 08 80 00 - Glazing
3.9 DIVISION 09 -- FINISHES
A. 09 21 16 - Gypsum Board Assemblies B. 09 22 16 - Non-Structural Metal Framing C. 09 51 00 - Acoustical Ceilings D. 09 65 00 - Resilient Flooring E. 09 67 00 - Fluid-Applied Flooring F. 09 68 13 - Tile Carpeting G. 09 84 30 - Sound-Absorbing Wall and Ceiling Units H. 09 90 00 - Painting and Coating - K-12 Education Facility Guide Specification - Sherwin-
Williams
3.10 DIVISION 10 -- SPECIALTIES
A. 10 21 13.17 - Phenolic Toilet Compartments B. 10 28 00 - Toilet, Bath, and Laundry Accessories C. 10 51 13 - Metal Lockers
3.11 DIVISION 11 -- EQUIPMENT
A. 11 68 13 - Playground Equipment
3.12 DIVISION 12 -- FURNISHINGS
A. 12 32 00 - Manufactured Wood Casework
3.13 DIVISION 21 -- FIRE SUPPRESSION
A. 21 00 01 - Fire Protection Summary of Work B. 21 05 00 - Common Work Results for Fire Suppression C. 21 13 00 - Fire-Suppression Sprinkler Systems
3.14 DIVISION 22 -- PLUMBING
A. 22 05 00 - Plumbing Summary of Work B. 22 05 17 - Sleeves and Sleeve Seals for Plumbing Piping C. 22 05 23 - General-Duty Valves for Plumbing Piping D. 22 05 29 - Hangers and Supports for Plumbing Piping and Equipment E. 22 05 53 - Identification for Plumbing Piping and Equipment F. 22 07 19 - Plumbing Piping Insulation G. 22 07 19.11 - Under-Lavatory Pipe and Supply Covers - Plumberex
A/E PROJECT 5-6248
Copyright GMB 2025 SECTION 00 01 10
TABLE OF CONTENTS
H. 22 10 05 - Plumbing Piping I. 22 10 06 - Plumbing Piping Specialties J. 22 40 00 - Plumbing Fixtures
3.15 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
A. 23 05 00 - HVAC Summary of Work B. 23 05 13 - Common Motor Requirements for HVAC Equipment C. 23 05 17 - Sleeves and Sleeve Seals for HVAC Piping D. 23 05 19 - Meters and Gauges for HVAC Piping E. 23 05 23 - General-Duty Valves for HVAC Piping F. 23 05 29 - Hangers and Supports for HVAC Piping and Equipment G. 23 05 48 - Vibration and Seismic Controls for HVAC H. 23 05 53 - Identification for HVAC Piping and Equipment I. 23 05 93 - Testing, Adjusting, and Balancing for HVAC J. 23 07 13 - Duct Insulation K. 23 07 19 - HVAC Piping Insulation L. 23 08 00 - Commissioning of HVAC M. 23 09 13 - Instrumentation and Control Devices for HVAC N. 23 09 23 - Direct-Digital Control System for HVAC O. 23 09 34 - Variable-Frequency Motor Controllers for HVAC P. 23 09 93 - Sequence of Operations for HVAC Controls Q. 23 11 23 - Facility Natural-Gas Piping R. 23 21 13 - Hydronic Piping S. 23 21 14 - Hydronic Specialties T. 23 23 00 - Refrigerant Piping U. 23 25 00 - HVAC Water Treatment V. 23 31 00 - HVAC Ducts and Casings W. 23 33 00 - Air Duct Accessories X. 23 34 23 - HVAC Power Ventilators Y. 23 36 00 - Air Terminal Units Z. 23 37 00 - Air Outlets and Inlets AA. 23 40 00 - HVAC Air Cleaning Devices BB. 23 62 13 - Packaged Air-Cooled Refrigerant Compressor and Condenser Units CC. 23 73 13 - Modular Indoor Central-Station Air-Handling Units DD. 23 74 33 - Dedicated Outdoor Air Units and Makeup Units EE. 23 81 26.13 - Small-Capacity Split-System Air Conditioners FF. 23 82 00 - Convection Heating and Cooling UnitsTerminal Heating and Cooling Units
3.16 DIVISION 26 -- ELECTRICAL
A. 26 05 00 - Common Results for Electrical
A/E PROJECT 5-6248
Copyright GMB 2025 SECTION 00 01 10
TABLE OF CONTENTS
B. 26 05 05 - Selective Demolition for Electrical C. 26 05 19 - Low-Voltage Electrical Power Conductors and Cables D. 26 05 26 - Grounding and Bonding for Electrical Systems E. 26 05 29 - Hangers and Supports for Electrical Systems F. 26 05 33.13 - Conduit for Electrical Systems G. 26 05 33.16 - Boxes for Electrical Systems H. 26 05 33.23 - Surface Raceways for Electrical Systems I. 26 05 53 - Identification for Electrical Systems J. 26 05 83 - Wiring Connections K. 26 09 23 - Lighting Control Devices L. 26 09 36 - Modular Dimming Controls - Lutron QS M. 26 09 43 - Network Lighting Controls - Lutron QS/Quantum N. 26 27 26 - Wiring Devices O. 26 28 11.11 - Molded Case / Insulated Case Circuit Breakers - Schneider Electric Square D
PowerPacT / MasterPacT P. 26 28 13 - Fuses Q. 26 28 16.13 - Enclosed Circuit Breakers R. 26 28 16.16 - Enclosed Switches S. 26 29 13 - Enclosed Controllers T. 26 51 00 - Interior Lighting U. 26 56 00 - Exterior Lighting
3.17 DIVISION 27 -- COMMUNICATIONS
A. 27 05 05 - Selective Demolition for Communication B. 27 05 29 - Hangers and Supports for Communications Systems C. 27 10 00 - Structured Cabling
3.18 DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY
A. 28 05 05 - Selective Electronic Safety and Security Demolition B. 28 46 00 - Fire Detection and Alarm
3.19 DIVISION 31 -- EARTHWORK
A. 31 10 00 - Site Clearing B. 31 23 16.13 - Trenching
3.20 DIVISION 32 -- EXTERIOR IMPROVEMENTS
A. 32 11 20 - Subbase and Aggregate Base Courses B. 32 12 16 - Asphalt Paving C. 32 13 13 - Concrete Paving
END OF SECTION
A/E PROJECT 5-6248
Copyright GMB 2025 SECTION 01 23 00
ALTERNATES
SECTION 01 23 00 - ALTERNATES
(ADDENDUM 001)
PART 1 GENERAL
2.1 SECTION INCLUDES
A. Description of Alternates.
1. Alternate P-1: Provide all costs associated with the provision and installation of electric water coolers including all related services.
2. Alternate Pine Creek Elementary: Provide all costs associated with the Pine Creek
Elementary drawings attached to this Bid Package. (Note: there is no sub-alternate, Pine Creek Elementary as a whole is the alternate).
2.2 RELATED REQUIREMENTS
2.3 ACCEPTANCE OF ALTERNATES
A. Alternates quoted on Bid Forms will be reviewed and accepted or rejected at Owner's option.
Accepted Alternates will be identified in the Owner-Contractor Agreement.
B. Coordinate related work and modify surrounding work to integrate the Work of each Alternate.
C. The Base Bid for the project shall, in general, include all of the work necessary to complete, as per Drawings and Specifications, the site and building work. Alternate Bid prices shall also be based on complete areas and systems following all requirements of the Drawings and Specifications for all site and building work.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
GMB Copyright 2025 SECTION 08 71 00
DOOR HARDWARE
WEST OTTAWA PUBLIC SCHOOLS
LAKESHORE ELEMENTARY SCHOOL IMPROVEMENTS
A/E PROJECT 5-6248
SECTION 08 71 00 – DOOR HARDWARE
PART 1 - GENERAL
1.01 SUMMARY
A. Section includes:
1. Mechanical and electrified door hardware.
2. Electronic access control system components.
3. Field verification, preparation and modification of existing doors and frames to receive new door hardware.
B. Section excludes:
1. Windows
2. Cabinets (casework), including locks in cabinets
3. Signage
4. Toilet accessories
5. Overhead doors
C. Related Sections:
1. Division 01 Section “Alternates” for alternates affecting this section.
2. Division 06 Section “Rough Carpentry”
3. Division 06 Section "Finish Carpentry”
4. Division 07 Section “Joint Sealants” for sealant requirements applicable to threshold installation specified in this section.
5. Division 08 Sections:
a. “Metal Doors and Frames”
b. “Flush Wood Doors”
c. “Stile and Rail Wood Doors”
d. "Aluminum-Framed Entrances and Storefronts"
6. Division 09 sections for touchup, finishing or refinishing of existing openings modified by this section.
7. Division 26 “Electrical” sections for connections to electrical power system and for low-voltage wiring.
8. Division 28 “Electronic Safety and Security” sections for coordination with other components of electronic access control system and fire alarm system.
1.02 REFERENCES
A. UL, LLC
1. UL 10B - Fire Test of Door Assemblies
2. UL 10C - Positive Pressure Test of Fire Door Assemblies
3. UL 1784 - Air Leakage Tests of Door Assemblies
4. UL 305 - Panic Hardware
B. DHI - Door and Hardware Institute
WEST OTTAWA PUBLIC SCHOOLS
1. Sequence and Format for the Hardware Schedule
2. Recommended Locations for Builders Hardware
3. Keying Systems and Nomenclature
4. Installation Guide for Doors and Hardware
C. NFPA – National Fire Protection Association
1. NFPA 70 – National Electric Code
2. NFPA 80 – 2016 Edition – Standard for Fire Doors and Other Opening Protectives
3. NFPA 101 – Life Safety Code
4. NFPA 105 – Smoke and Draft Control Door Assemblies
5. NFPA 252 – Fire Tests of Door Assemblies
D. ANSI - American National Standards Institute
1. ANSI A117.1 – 2017 Edition – Accessible and Usable Buildings and Facilities
2. ANSI/BHMA A156.1 - A156.29, and ANSI/BHMA A156.31 - Standards for Hardware and
Specialties
3. ANSI/BHMA A156.28 - Recommended Practices for Keying Systems
4. ANSI/WDMA I.S. 1A - Interior Architectural Wood Flush Doors
5. ANSI/SDI A250.8 - Standard Steel Doors and Frames
1.03 SUBMITTALS
A. General:
1. Submit in accordance with Conditions of Contract and Division 01 Submittal Procedures.
2. Prior to forwarding submittal:
a. Comply with procedures for verifying existing door and frame compatibility for new hardware, as specified in PART 3, “EXAMINATION” article, herein.
b. Review drawings and Sections from related trades to verify compatibility with specified hardware.
c. Highlight, encircle, or otherwise specifically identify on submittals: deviations from Contract Documents, issues of incompatibility or other issues which may detrimentally affect the Work.
B. Action Submittals:
1. Product Data: Submit technical product data for each item of door hardware, installation instructions, maintenance of operating parts and finish, and other information necessary to show compliance with requirements.
2. Riser and Wiring Diagrams: After final approval of hardware schedule, submit details of electrified door hardware, indicating:
a. Wiring Diagrams: For power, signal, and control wiring and including:
1) Details of interface of electrified door hardware and building safety and security systems.
2) Schematic diagram of systems that interface with electrified door hardware.
3) Point-to-point wiring.
4) Risers.
3. Samples for Verification: If requested by Architect, submit production sample of requested door hardware unit in finish indicated and tagged with full description for coordination with schedule.
WEST OTTAWA PUBLIC SCHOOLS
a. Samples will be returned to supplier. Units that are acceptable to Architect may, after final check of operations, be incorporated into Work, within limitations of key coordination requirements.
4. Door Hardware Schedule:
a. Submit concurrent with submissions of Product Data, Samples, and Shop Drawings.
Coordinate submission of door hardware schedule with scheduling requirements of other work to facilitate fabrication of other work critical in Project construction schedule.
b. Submit under direct supervision of a Door Hardware Institute (DHI) certified Architectural Hardware Consultant (AHC) or Door Hardware Consultant (DHC) with hardware sets in vertical format as illustrated by Sequence of Format for the Hardware Schedule published by DHI.
c. Indicate complete designations of each item required for each opening, include:
1) Door Index: door number, heading number, and Architect’s hardware set number.
2) Quantity, type, style, function, size, and finish of each hardware item.
3) Name and manufacturer of each item.
4) Fastenings and other pertinent information.
5) Location of each hardware set cross-referenced to indications on Drawings.
6) Explanation of all abbreviations, symbols, and codes contained in schedule.
7) Mounting locations for hardware.
8) Door and frame sizes and materials.
9) Degree of door swing and handing.
10) Operational Description of openings with electrified hardware covering egress, ingress (access), and fire/smoke alarm connections.
5. Key Schedule:
a. After Keying Conference, provide keying schedule that includes levels of keying, explanations of key system's function, key symbols used, and door numbers controlled.
b. Use ANSI/BHMA A156.28 “Recommended Practices for Keying Systems” as guideline for nomenclature, definitions, and approach for selecting optimal keying system.
c. Provide 3 copies of keying schedule for review prepared and detailed in accordance with referenced DHI publication. Include schematic keying diagram and index each key to unique door designations.
d. Index keying schedule by door number, keyset, hardware heading number, cross keying instructions, and special key stamping instructions.
e. Provide one complete bitting list of key cuts and one key system schematic illustrating system usage and expansion. Forward bitting list, key cuts and key system schematic directly to Owner, by means as directed by Owner.
f. Prepare key schedule by or under supervision of supplier, detailing Owner’s final keying instructions for locks.
C. Informational Submittals:
1. Provide Qualification Data for Supplier, Installer and Architectural Hardware Consultant.
2. Provide Product Data:
a. Certify that door hardware approved for use on types and sizes of labeled fire-rated doors complies with listed fire-rated door assemblies.
b. Include warranties for specified door hardware.
WEST OTTAWA PUBLIC SCHOOLS
D. Closeout Submittals:
1. Operations and Maintenance Data: Provide in accordance with Division 01 and include:
a. Complete information on care, maintenance, and adjustment; data on repair and replacement parts, and information on preservation of finishes.
b. Catalog pages for each product.
c. Final approved hardware schedule edited to reflect conditions as installed.
d. Final keying schedule
e. Copy of warranties including appropriate reference numbers for manufacturers to identify project.
f. As-installed wiring diagrams for each opening connected to power, both low voltage and 110 volts.
E. Inspection and Testing:
1. Submit written reports to the Owner and Authority Having Jurisdiction (AHJ) of the results of functional testing and inspection for:
a. fire door assemblies, in compliance with NFPA 80.
b. required egress door assemblies, in compliance with NFPA 101.
1.04 QUALITY ASSURANCE
A. Qualifications and Responsibilities:
1. Supplier: Recognized architectural hardware supplier with a minimum of 5 years documented experience supplying both mechanical and electromechanical door hardware similar in quantity, type, and quality to that indicated for this Project. Supplier to be recognized as a factory direct distributor by the manufacturer of the primary materials with a warehousing facility in the Project’s vicinity. Supplier to have on staff, a certified Architectural Hardware Consultant (AHC) or Door Hardware Consultant (DHC) available to Owner, Architect, and Contractor, at reasonable times during the Work for consultation.
2. Installer: Qualified tradesperson skilled in the application of commercial grade hardware with experience installing door hardware similar in quantity, type, and quality as indicated for this Project.
3. Architectural Hardware Consultant: Person who is experienced in providing consulting services for door hardware installations that are comparable in material, design, and extent to that indicated for this Project and meets these requirements:
a. For door hardware: DHI certified AHC or DHC.
b. Can provide installation and technical data to Architect and other related subcontractors.
c. Can inspect and verify components are in working order upon completion of installation.
d. Capable of producing wiring diagram and coordinating installation of electrified hardware with Architect and electrical engineers.
4. Single Source Responsibility: Obtain each type of door hardware from single manufacturer.
B. Certifications:
1. Fire-Rated Door Openings:
WEST OTTAWA PUBLIC SCHOOLS
a. Provide door hardware for fire-rated openings that complies with NFPA 80 and requirements of authorities having jurisdiction.
b. Provide only items of door hardware that are listed products tested by UL LLC, Intertek Testing Services, or other testing and inspecting organizations acceptable to authorities having jurisdiction for use on types and sizes of doors indicated, based on testing at positive pressure and according to NFPA 252 or UL 10C and in compliance with requirements of fire-rated door and door frame labels.
2. Smoke and Draft Control Door Assemblies:
a. Provide door hardware that meets requirements of assemblies tested according to UL 1784 and installed in compliance with NFPA 105
b. Comply with the maximum air leakage of 0.3 cfm/sq. ft. (3 cu. m per minute/sq. m) at tested pressure differential of 0.3-inch wg (75 Pa) of water.
3. Electrified Door Hardware
a. Listed and labeled as defined in NFPA 70, Article 100, by testing agency acceptable to authorities having jurisdiction.
4. Accessibility Requirements:
a. Comply with governing accessibility regulations cited in “REFERENCES” article 087100, 1.02.D3 herein for door hardware on doors in an accessible route. This project must comply with all Federal Americans with Disability Act regulations and all Local Accessibility Regulations.
C. Pre-Installation Meetings
1. Keying Conference
a. Incorporate keying conference decisions into final keying schedule after reviewing door hardware keying system including:
1) Function of building, flow of traffic, purpose of each area, degree of security required, and plans for future expansion.
2) Preliminary key system schematic diagram.
3) Requirements for key control system.
4) Requirements for access control.
5) Address for delivery of keys.
2. Pre-installation Conference
a. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
b. Inspect and discuss preparatory work performed by other trades.
c. Inspect and discuss electrical roughing-in for electrified door hardware.
d. Review sequence of operation for each type of electrified door hardware.
e. Review required testing, inspecting, and certifying procedures.
f. Review questions or concerns related to proper installation and adjustment of door hardware.
3. Electrified Hardware Coordination Conference:
a. Prior to ordering electrified hardware, schedule and hold meeting to coordinate door hardware with security, electrical, doors and frames, and other related suppliers.
WEST OTTAWA PUBLIC SCHOOLS
1.05 DELIVERY, STORAGE, AND HANDLING
A. Inventory door hardware on receipt and provide secure lock-up for hardware delivered to Project site. Promptly replace products damaged during shipping.
B. Tag each item or package separately with identification coordinated with final door hardware schedule, and include installation instructions, templates, and necessary fasteners with each item or package. Deliver each article of hardware in manufacturer’s original packaging.
C. Maintain manufacturer-recommended environmental conditions throughout storage and installation periods.
D. Provide secure lock-up for door hardware delivered to Project. Control handling and installation of hardware items so that completion of Work will not be delayed by hardware losses both before and after installation.
E. Handle hardware in manner to avoid damage, marring, or scratching. Correct, replace or repair products damaged during Work. Protect products against malfunction due to paint, solvent, cleanser, or any chemical agent.
F. Deliver keys to manufacturer of key control system for subsequent delivery to Owner.
1.06 COORDINATION
A. Coordinate layout and installation of floor-recessed door hardware with floor construction.
Cast anchoring inserts into concrete.
B. Installation Templates: Distribute for doors, frames, and other work specified to be factory or shop prepared. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing door hardware to comply with indicated requirements.
C. Security: Coordinate installation of door hardware, keying, and access control with Owner's security consultant.
D. Electrical System Roughing-In: Coordinate layout and installation of electrified door hardware with connections to power supplies and building safety and security systems.
E. Existing Openings: Where existing doors, frames and/or hardware are to remain, field verify existing functions, conditions and preparations and coordinate to suit opening conditions and to provide proper door operation.
1.07 WARRANTY
A. Manufacturer's standard form in which manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within published warranty period.
1. Warranty does not cover damage or faulty operation due to improper installation, improper use or abuse.
2. Warranty Period: Beginning from date of Substantial Completion, for durations indicated in manufacturer’s published listings.
a. Mechanical Warranty
1) Locks
WEST OTTAWA PUBLIC SCHOOLS
a) Schlage L Series: 10 years
2) Exit Devices
a) Von Duprin: 10 years
3) Closers
a) LCN 4000 Series: 30 years
b. Electrical Warranty
1) Locks
a) Schlage: 3 years
2) Exit Devices
a) Von Duprin: 3 years
1.08 MAINTENANCE
A. Furnish complete set of special tools required for maintenance and adjustment of hardware, including changing of cylinders.
B. Turn over unused materials to Owner for maintenance purposes.
PART 2 - PRODUCTS
2.01 MANUFACTURERS
A. The Owner requires use of certain products for their unique characteristics and project suitability to ensure continuity of existing and future performance and maintenance standards. After investigating available product offerings, the Awarding Authority has elected to prepare proprietary specifications. These products are specified with the notation: “No Substitute.”
1. Where “No Substitute” is noted, submittals and substitution requests for other products will not be considered.
B. Approval of manufacturers and/or products other than those listed as “Scheduled Manufacturer” or “Acceptable Manufacturers” in the individual article for the product category shall be in accordance with QUALITY ASSURANCE article, herein.
C. Approval of products from manufacturers indicated in “Acceptable Manufacturers” is contingent upon those products providing all functions and features and meeting all requirements of scheduled manufacturer’s product.
D. Where specified hardware is not adaptable to finished shape or size of members requiring hardware, furnish suitable types having same operation and quality as type specified, subject to Architect's approval.
2.02 MATERIALS
A. Fabrication
1. Provide door hardware manufactured to comply with published templates generally prepared for machine, wood, and sheet metal screws. provide screws according to manufacturer’s recognized installation standards for application intended.
WEST OTTAWA PUBLIC SCHOOLS
2. Finish exposed screws to match hardware finish, or, if exposed in surfaces of other work, to match finish of this other work including prepared for paint surfaces to receive painted finish.
3. Provide concealed fasteners wherever possible for hardware units exposed when door is closed. Coordinate with “Metal Doors and Frames”, “Flush Wood Doors”, “Stile and Rail Wood Doors” to ensure proper reinforcements. Advise the Architect where visible fasteners, such as thru bolts, are required.
B. Modification and Preparation of Existing Doors: Where existing door hardware is indicated to be removed and reinstalled.
1. Provide necessary fillers, Dutchmen, reinforcements, and fasteners, compatible with existing materials, as required for mounting new opening hardware and to cover existing door and frame preparations.
2. Use materials which match materials of adjacent modified areas.
3. When modifying existing fire-rated openings, provide materials permitted by NFPA 80 as required to maintain fire-rating.
C. Provide screws, bolts, expansion shields, drop plates and other devices necessary for hardware installation.
1. Where fasteners are exposed to view: Finish to match adjacent door hardware material.
D. Cable and Connectors:
1. Where scheduled in the hardware sets, provide each item of electrified hardware and wire harnesses with number and gage of wires enough to accommodate electric function of specified hardware.
2. Provide Molex connectors that plug directly into connectors from harnesses, electric locking and power transfer devices.
3. Provide through-door wire harness for each electrified locking device installed in a door and wire harness for each electrified hinge, electrified continuous hinge, electrified pivot, and electric power transfer for connection to power supplies.
2.03 HINGES
A. Manufacturers and Products:
1. Scheduled Manufacturer and Product:
a. Ives 5BB series
2. Acceptable Manufacturers and Products:
a. Hager BB1191/1279 series
b. Stanley FBB series
B. Requirements:
1. Provide hinges conforming to ANSI/BHMA A156.1.
2. Provide five knuckle, ball bearing hinges.
3. 1-3/4 inch (44 mm) thick doors, up to and including 36 inches (914 mm) wide:
a. Exterior: Standard weight, bronze or stainless steel, 4-1/2 inches (114 mm) high
b. Interior: Standard weight, steel, 4-1/2 inches (114 mm) high
WEST OTTAWA PUBLIC SCHOOLS
4. 1-3/4 inch (44 mm) thick doors over 36 inches (914 mm) wide:
a. Exterior: Heavy weight, bronze/stainless steel, 5 inches (127 mm) high
b. Interior: Heavy weight, steel, 5 inches (127 mm) high
5. 2 inches or thicker doors:
a. Exterior: Heavy weight, bronze or stainless steel, 5 inches (127 mm) high
b. Interior: Heavy weight, steel, 5 inches (127 mm) high
6. Adjust hinge width for door, frame, and wall conditions to allow proper degree of opening.
7. Provide three hinges per door leaf for doors 90 inches (2286 mm) or less in height, and one additional hinge for each 30 inches (762 mm) of additional door height.
8. Where new hinges are specified for existing doors or existing frames, provide new hinges of identical size to hinge preparation present in existing door or existing frame.
9. Hinge Pins: Except as otherwise indicated, provide hinge pins as follows:
a. Steel Hinges: Steel pins
b. Non-Ferrous Hinges: Stainless steel pins
c. Out-Swinging Exterior Doors: Non-removable pins
d. Out-Swinging Interior Lockable Doors: Non-removable pins
e. Interior Non-lockable Doors: Non-rising pins
10. Provide hinges with electrified options as scheduled in the hardware sets. Provide with number and gage of wires enough to accommodate electric function of specified hardware. Locate electric hinge at second hinge from bottom or nearest to electrified locking component. Provide mortar guard for each electrified hinge specified.
2.04 CONTINUOUS HINGES
A. Manufacturers:
1. Scheduled Manufacturer:
a. Ives
2. Acceptable Manufacturers:
a. Select
B. Requirements:
1. Provide aluminum geared continuous hinges conforming to ANSI/BHMA A156.26, Grade 1.
2. Provide aluminum geared continuous hinges, where specified in the hardware sets, fabricated from 6063-T6 aluminum.
3. Provide split nylon bearings at each hinge knuckle for quiet, smooth, self-lubricating operation.
4. Provide hinges capable of supporting door weights up to 450 pounds, and successfully tested for 1,500,000 cycles.
5. On fire-rated doors, provide aluminum geared continuous hinges classified for use on rated doors by testing agency acceptable to authority having jurisdiction.
6. Provide aluminum geared continuous hinges with electrified option scheduled in the hardware sets. Provide with number and gage of wires enough to accommodate electric function of specified hardware.
WEST OTTAWA PUBLIC SCHOOLS
7. Provide hinges 1 inch (25 mm) shorter in length than nominal height of door, unless otherwise noted or door details require shorter length and with symmetrical hole pattern.
2.05 ELECTRIC POWER TRANSFER
A. Manufacturers:
1. Scheduled Manufacturer and Product:
a. Von Duprin EPT-10 (Owner Standard)
2. Acceptable Manufacturers and Products:
a. No Substitute
B. Requirements:
1. Provide power transfer with electrified options as scheduled in the hardware sets. Provide with number and gage of wires enough to accommodate electric function of specified hardware.
2. Locate electric power transfer per manufacturer’s template and UL requirements, unless interference with operation of door or other hardware items.
2.06 MORTISE LOCKS
A. Manufacturers and Products:
1. Scheduled Manufacturer and Product:
a. Schlage L9000 series (Owner Standard)
2. Acceptable Manufacturers and Products:
a. No Substitute
B. Requirements:
1. Provide mortise locks conforming to ANSI/BHMA A156.13 Series 1000, Grade 1, and UL Listed for 3-hour fire doors.
2. Indicators: Where specified, provide indicator window measuring a minimum 2-inch x 1/2 inch with 180-degree visibility. Provide messages color-coded with full text and/or symbols, as scheduled, for easy visibility.
3. Provide locks manufactured from heavy gauge steel, containing components of steel with a zinc dichromate plating for corrosion resistance.
4. Provide lock case that is multi-function and field reversible for handing without opening case. Cylinders: Refer to “KEYING” article, herein.
5. Provide locks with standard 2-3/4 inches (70 mm) backset with full 3/4 inch (19 mm) throw stainless steel mechanical anti-friction latchbolt. Provide deadbolt with full 1-inch (25 mm) throw, constructed of stainless steel.
6. Provide standard ASA strikes unless extended lip strikes are necessary to protect trim.
7. Provide electrified options as scheduled in the hardware sets. Where scheduled, provide switches and sensors integrated into the locks and latches. Provide motor based electrified locksets that comply with the following requirements:
WEST OTTAWA PUBLIC SCHOOLS
a. Universal input voltage – single chassis accepts 12 or 24VDC to allow for changes in the field without changing lock chassis.
b. Fail Safe/Fail Secure – changing mode between electrically locked (fail safe) and electrically unlocked (fail secure) is field selectable without opening the lock case
c. Low maximum current draw – maximum 0.4 amps to allow for multiple locks on a single power supply.
d. Low holding current – maximum 0.01 amps to produce minimal heat, eliminate “hot levers” in electrically locked applications, and to provide reliable operation in wood doors that provide minimal ventilation and air flow.
e. Connections – provide quick-connect Molex system standard.
8. Lever Trim: Solid brass, bronze, or stainless steel, cast or forged in design specified, with wrought roses and external lever spring cages. Provide thru-bolted levers with 2-piece spindles.
a. Lever Design: 03A.
2.07 EXIT DEVICES
A. Manufacturers and Products:
1. Scheduled Manufacturer and Product:
a. Von Duprin 98/35A series (Owner Standard)
2. Acceptable Manufacturers and Products:
a. No Substitute
B. Requirements:
1. Provide exit devices tested to ANSI/BHMA A156.3 Grade 1 and UL listed for Panic Exit or Fire Exit Hardware.
2. Cylinders: Refer to “KEYING” article, herein.
3. Provide smooth touchpad type exit devices, fabricated of brass, bronze, stainless steel, or aluminum, plated to standard architectural finishes to match balance of door hardware.
4. Touchpad must extend a minimum of one half of door width. No plastic inserts are allowed in touchpads.
5. Provide exit devices with deadlatching feature for security and for future addition of alarm kits and/or other electrified requirements.
6. Provide exit devices with weather resistant components that can withstand harsh conditions of various climates and corrosive cleaners used in outdoor pool environments.
7. Provide flush end caps for exit devices.
8. Provide exit devices with manufacturer’s approved strikes.
9. Provide exit devices cut to door width and height. Install exit devices at height recommended by exit device manufacturer, allowable by governing building codes, and approved by Architect.
10. Mount mechanism case flush on face of doors or provide spacers to fill gaps behind devices. Where glass trim or molding projects off face of door, provide glass bead kits.
11. Provide cylinder or hex-key dogging as specified at non fire-rated openings.
12. Removable Mullions: 2 inches (51 mm) x 3 inches (76 mm) steel tube. Where scheduled as keyed removable mullion, provide type that can be removed by use of a keyed cylinder, which is self-locking when re-installed.
13. Provide factory drilled weep holes for exit devices used in full exterior application, highly corrosive areas, and where noted in hardware sets.
WEST OTTAWA PUBLIC SCHOOLS
14. Provide electrified options as scheduled.
15. Top latch mounting: double- or single-tab mount for steel doors, face mount for aluminum doors eliminating requirement of tabs, and double tab mount for wood doors.
16. Provide exit devices with optional trim designs to match other lever and pull designs used on the project.
17. Special Options:
a. Concealed Vertical Cable Exit Devices: provide cable-actuated concealed vertical latch system in two-point for non-rated or fire rated wood doors up to a 90 minute rating and less bottom latch (LBL) configuration for non-rated or fire rated wood doors up to 20 minute rating. Vertical rods not permitted.
1) Cable: Stainless steel with abrasive resistant coating. Conduit and core wire ends snap into latch and center slides without use of tools.
2) Wood Door Prep: Maximum 1 inch x 1.1875 inch x 3.875 inches top latch pocket and 1 inch x 1.1875 inch x 5 inches bottom latch pocket which does not require the use of a metal wrap or edge for non-rated or fire rated wood doors up to a 45 minute rating.
3) Latchbolts and Blocking Cams: Manufactured from sintered metal low carbon copper- infiltrated steel, with molybdenum disulfide low friction coating.
4) Top Latchbolt: Minimum 0.38 inch (10 mm) and greater than 90-degree engagement with strike to prevent door and frame separation under high static load.
5) Bottom Latchbolt: Minimum of 0.44-inch (11 mm) engagement with strike.
6) Product Cycle Life: 1,000,000 cycles.
7) Latch Operation: Top and bottom latch operate independently of each other. Top latch fully engages top strike even when bottom latch is compromised. Separate trigger mechanisms not permitted.
8) Latch release does not require separate trigger mechanism.
9) Cable and latching system characteristics:
a) Installed independently of exit device installation, and capable of functioning on door prior to device and trim installation.
b) Connected to exit device at single point in steel and aluminum doors, and two points for top and bottom latches in wood doors.
c) Bottom latch height adjusted, from single point for steel and aluminum doors and two points for wood doors, after system is installed and connected to exit device, while door is hanging
d) Bottom latch position altered up and down minimum of 2 inches (51 mm) in steel and aluminum doors without additional adjustment. Bottom latch deadlocks in every adjustment position in wood doors.
e) Top and bottom latches in steel and aluminum doors and top latch in wood doors may be removed while door is hanging.
2.08 ELECTRONIC ACCESS CONTROL LOCKSETS AND EXIT DEVICE TRIM
A. Manufacturers:
1. Scheduled Manufacturer and Product:
a. Schlage AD series (Owner Standard)
2. Acceptable Manufacturers and Products:
a. No Substitute
B. Requirements:
WEST OTTAWA PUBLIC SCHOOLS
1. Provide adaptable electronic access control products that comply with the following requirements:
a. Listed, UL 294 - The Standard of Safety for Access Control System Units.
b. Compliant with ANSI/BHMA A156.25 Grade 1 Operation and Security.
c. Certified to UL10C, FCC Part15, Florida Building Code Standards TAS 201 large missile impact, TAS 202 and TAS 203.
d. Compliant with ASTM E330 for door assemblies.
e. Compliant with ICC / ANSI A117.1, NFPA 101, NFPA 80, and Industry Canada IC.
2. Functions: Provide functions as scheduled that are field configurable without taking the adaptable electronic product off the door.
3. Emergency Override: Provide mechanical key override; cylinders: Refer to “KEYING” article, herein.
4. Levers:
a. Vandal Resistance: Exterior (secure side) lever rotates freely while door remains locked, preventing damage to internal lock components from vandalism by excessive force.
b. Provide non-handed lever trim that operates independently of non-locking levers.
c. Style: Rhodes (RHO).
d. Tactile Warning (Knurling): Where required by authority having jurisdiction. Provide on levers on exterior (secure side) of doors serving rooms considered to be hazardous.
5. Features:
a. Audible feedback that can be enabled or disabled.
b. Tamper-Resistant Screws: Tamper torx screws on inside escutcheon for increased security.
c. Visual tri-colored LED indicators that indicate activation, additional PIN code credential required, operational systems status, system error conditions and low power conditions.
d. Door Position Switch
e. Interior Cover Tamper Guard
f. Mechanical Key Override
g. Request to Exit
h. Request to Enter
i. Lock/Unlock Status
6. Credential Reader:
1) Credential Reader Configuration: Provide credential reader modules in the configurations as indicated in door hardware sets.
2) Credential Reader Capabilities: Provide credential readers capable of operating with the following integrated software partners.
a) 13.56 MHz Smart card credentials:
i. Secure section (Multi-Technology and Smartcard): Schlage MIFARE Classic, Schlage MIFARE DESFire EV1/EV3, PIV and PIV-I Compatible
ii. 13.56 MHz Serial number only (Multi-Technology and Smartcard):
MIFARE, DESFire, HID iClass, MIFARE DESFire EV1/EV3
iii. 125 kHz Proximity card credentials: Schlage, XceedID, HID, GE/CASI ProxLite and AWID.
b) Multi-Technology readers that read both 13.56 MHz Smart Cards and 125 kHz Prox cards.
c) Dual credential reading capabilities credential card or fob and PIN.
d) 12 button keypad with backlit buttons.
WEST OTTAWA PUBLIC SCHOOLS
e) Magnetic Card Reader:
i. Full insertion or swipe reader capable of reading information along full length of magnetic stripe.
ii. Magnetic card triple track reader capable of reading tracks 1, 2 or 3 per configuration in field.
7. Operation:
a. Networked – Hardwired
1) Adaptable electronic access control product system interface:
2) Adaptable electronic access control products to have real-time bidirectional communication between access control system and lock.
3) Credential Verification Time: less than 1 second.
4) When Utilized with Partner Integrated Access Control Network Software with
Remote Commanding Capability: Provide adaptable electronic access control product with the ability to be remotely locked down or unlocked within 10 seconds or less, without user interface at the device.
5) Upon Loss of Power to Device: Provide adaptable electronic access control product with the ability to manage access control offline in one of three methods below that can be configured in the field at lockset by handheld programming device and remotely by Partner integrated software:
a) Fail locked (secured)
b) Fail unlocked (unsecured)
c) Fail As-Is
6) Upon Loss of Communication Between Device and Network: Provide adaptable electronic access control product with the ability to manage access control offline in one of four methods below that can be configured in the field at device by handheld programming device and remotely by Partner integrated software:
a) Fail locked (secured)
b) Fail unlocked (unsecured)
c) Fail As-Is
d) Fail to Degraded/cache mode utilizing cache memory with following selectable options:
i. Grant access up to the last 1,000 unique previously accepted User IDs.
ii. Grant access up to the last 1,000 unique previously accepted facility/site codes.
iii. Remove from cache previously stored User IDs or facility/site codes that have not been presented to lock within the last 5 days.
7) Provide adaptable electronic access control product with the ability to be configured at door by handheld programming device and remotely by Partner integrated software the length of time device is unlocked upon access grant.
8) Provide adaptable electronic access control product with the ability to communicate identifying information such as firmware versions, hardware versions, serial numbers, and manufacturing dates by handheld programming device and remotely by Partner integrated software.
b. Networked – Wireless
1) Adaptable electronic access control product system interface.
2) Adaptable electronic access control products to have real-time bidirectional communication between access control system and lock.
3) Remote Commanding By Partner Integrated Access Control Network Software:
Battery-powered lockset shall have “Wake on Radio” feature causing activation of remote, wireless access control devices, enabling activated devices to be configured, locked or unlocked from a centralized location within 10 seconds or less without user interface at the device.
WEST OTTAWA PUBLIC SCHOOLS
4) Local Commanding: Provide adaptable electronic access control product with the ability to be configured, locked or unlocked locally by handheld programming device, in real-time.
5) When Utilized with Access Control Network Software with Remote Commanding Capability: Provide adaptable electronic access control product with the ability to be remotely locked down or unlocked within 10 seconds or less while battery powered without user interface at the device.
6) Real-time response of battery powered device capable of being configured at door by handheld…
This is the start of the file's text. The full file is on GovTribe.