woodlandstudymowing_generalspecifications.doc
DOC document 80 KB Posted
- Attached to
- 23NC Woodland Study Mowing
- Solicitation number
- 6100062774
- Issued by
- Lycoming County, Pennsylvania
About this file
This is a general specifications document from the Pennsylvania Game Commission for machine mowing services of laurel and woody interference on State Game Lands (SGL) 033, 075, and 100 in Centre and Lycoming Counties. The project requires mowing 54 acres of land using forestry-type mowing machines with suitable cutting devices of at least 75hp. A guided tour for prospective bidders is scheduled for January 14th, 2025, at 10:00 AM starting at Harpers Creekside Tavern in Waterville, PA. Bids will be opened on January 24th, 2025, at 2:00 PM at the Pennsylvania Game Commission in Harrisburg. The contract term begins upon receipt of the approved Purchase Order and terminates on April 11th, 2025, with no extensions permitted.
The project will be awarded on a line item basis with bids submitted on a dollars per acre basis. Contractors must provide a $1,000 performance bond and maintain comprehensive general liability insurance of $300,000 per occurrence for both bodily injury and property damage, as well as workers' compensation insurance. Payment will be made on a reimbursement basis for successfully completed work based on the Commission's surveyed acreage treated. The contractor must meet specific equipment requirements and follow strict operational guidelines, including providing 48 hours notice prior to initial site meetings and demonstrating capability to use digital mapping in AVENZA.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Terms and Conditions.pdf | ||
| Woodland_Mowing__100M.pdf | ||
| Woodland_Mowing__33M.pdf | ||
| Woodland_Mowing__33U.pdf | ||
| woodlandstudymowing_letter.docx | DOCX document | |
| Woodland_Mowing__75M.pdf | ||
| Woodland_Mowing__75U.pdf | ||
| Woodland_Mowing__100U.pdf | ||
| Woodlands_Location_Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SGL 033, 075, 100
1/2/2025 Woodland Study Mowing
GENERAL SPECIFICATIONS
I. SCOPE OF WORK:
A. The Pennsylvania Game Commission, Northcentral Region, machine mowing of laurel and other woody interference, no hand felling. Services shall include, but not be limited to, the furnishing of all labor, superintendence, tools and equipment for the mowing of laurel and woody interference on 54 acres of SGL 033, 075 and 100, Centre and Lycoming Counties. Detailed specifications are attached in the bid packet. All Purchase Orders require the contractor to provide the equipment, labor, insurance, and all miscellaneous expenses to complete the operation.
Any questions concerning the technical aspects of this bid should be directed to:
Dan Heggenstaller
Assistant Regional Forester, Northcentral Region Phone: 570-660-9411 Email: dheggensta@pa.gov Travis McNichol
Assistant Regional Forester, Northcentral Region
Phone: 814-342-0629
Email: tmcnichol@pa.gov
II. CONTRACT TASKS:
A. Project Location:
a. State Game Lands 033, 075, 100 in Centre and Lycoming Counties. The contractor will mow all laurel and woody stems up to 4 inches DBH on 54 acres, as described below and outlined on the attached map.
b. Maps of the locations are included in the bid packet.
B.
SITE INSPECTION AND ASSISTANCE:
The PGC will conduct a one-time-only guided tour of one of the work sites for prospective bidders on January 14th, 2025 beginning at 10:00 AM. The tour will start with a review of the site. We will meet at: Harpers Creekside Tavern
11661 Little Pine Creek Road
Waterville, PA 17776 (English Center, PA) Contractors are permitted to visit the project site on any date on their own time to further inspect the site. If prospective contractors would like to meet PGC staff on site at the different time, contact one of the forestry staff listed above.
C.
OPERATOR QUALIFICATIONS:
To bid on this project, an Operator must have the office, maintenance facilities, equipment, employees, and qualified equipment operators and mechanics, and have tools, equipment, and spare parts for the make and type of equipment indicated in these specifications.
I. EQUIPMENT SPECIFICATIONS:
a. Any machine equipment to be used for this project must be a forestry type mowing machine with suitable cutting devices such as a “hydroax”, “Fecon”, or other suitable cutting head mounted on a machine capable of negotiating forest terrain. All machines used for this project must be of at least 75hp. The Commission reserves the right to reject any piece of equipment that in its opinion will not safely and adequately complete the job.
III. CONTRACT REQUIREMENTS:
A. All work can be started immediately after bid award notification and contract signing. Work must be completed by the termination date: April 11th, 2025. No contract extensions will be approved.
CONTRACT REQUIREMENTS:
· All laurel and all woody stems up to 4 inches are to be mowed.
· This project is part of a research study and certain areas near the treatment block must not be entered by equipment. As such, the contractor must meet on site with the Forester prior to unloading equipment and entering the treatment area. The contractor must provide 48 hours notice prior to the initial REQUIRED site meeting. The contractor will be provided a digital map of the treatment area for use in AVENZA. The contractor must demonstrate the capability to consult the digital map while performing mowing operations.
· Areas to be mowed will be designated on a digital map and will be marked in the field by orange flagging tape.
· There are rebar stakes around the edges of the mowing areas along the flag lines. They are heavily flagged and painted orange.
· The contractor is required to meet the forester at each of the six sites prior to beginning work.
· Woody material felled using a mechanical flail type system may not have stumps with clean, sharp cuts and edges and must be less than twelve (12) inches, except when in the opinion of the Field Contract Coordinator, said height is impractical.
· Woody material felled with clean cuts must have stumps that are parallel to the ground surface and shall not exceed six (6) inches in height measured on the side next to the highest ground or the diameter of the stump, whichever is smaller, except when in the opinion of the Field Contract Coordinator, said height is impractical.
· Cut trees must be removed from trails, roads, tail drains, streams, and utility rights-of- way.
· The Operator shall exercise care and caution in all operations to prevent damage to all trees not specified for treatment.
· Damage to trails, roads, streams, or utility rights-of-way caused by the Operator’s equipment must be repaired by the Operator at their expense.
· Any trash resulting from the Operator’s operations must be removed from the area and properly disposed.
· The Operator shall not block any roads or trails in the area during performance of this contract. The Operator shall not in any way hinder the progress of any Timber Sale Contracts in these areas.
· All labor, equipment, tools, etc., needed to complete contracted projects are to be provided by the Operator.
· Timber Damages – when in the opinion of Field Contract Coordinator, damage to the residual stand becomes excessive, the Operator shall pay the Commission a fair base current value determined by the Field Contract Coordinator per unit of volume. If this value for damage due to Operator’s carelessness or negligence is less than $10.00 per tree, then a minimum charge of $10.00 per tree will be made whether the tree is commercial, non-commercial, merchantable, or non-merchantable.
B.
The contractor agrees to comply with all attachments.
C.
As a further guarantee of faithful performance of the conditions set forth in this Contract, the Successful bidder hereby agrees to furnish the Commission with Cashiers or Treasurers Check, Letter of Credit, or Insurance Bond payable to the Pennsylvania Game Commission, in the amount of $1,000.00.
D.
Failure to comply with any of the terms or conditions of the Contract will result in cancellation of the agreement.
IV. INSURANCE REQUIREMENTS:
A. The contractor will provide Workmen’s Compensation insurance sufficient to cover all of the employees of contractor working to fulfill this contract.
B. Comprehensive General Liability Insurance, including bodily injury and property damage insurance, to protect the Commonwealth, and the contractor from claims arising out of the performance of the contract. The amount of Bodily Injury Insurance shall not be less than $300,000.00 for injury to or death of persons per occurrence. The amount of Property Damage Insurance shall not be less than $300,000.00 per occurrence.
Such policies shall name the Commonwealth as an additional insured. Prior to the commencement of work under this contract, the contractor must provide the Commonwealth with current Certificates of Insurance. These Certificates shall contain a provision that coverage afforded under the policy shall not be canceled or changed until at least thirty (30) days prior written notice has been given to the Commonwealth.
V. HOLD HARMLESS:
The contractor shall be responsible for and agrees to indemnify and hold harmless the Commonwealth from and against damages to property or injuries (including death) to any persons and other losses, damages, expenses, claims, demands, suits, and actions by any party against the Commonwealth in connection with the work performed by the contractor.
VI.
DAMAGE TO PROPERTY:
The Contractor shall be responsible for any damage to Commonwealth property resulting from the improper use of equipment for this project. The Contractor will be given one (1) written warning that damage is becoming excessive and if the action continues damages will be assessed.
PROPERTY INFRASTRUCTURE - Contractor shall immediately repair, in a manner that meets with the approval of the Officer in Charge, any damage to administrative roads and other facilities, including access roads, resulting from their use for this operation, general wear and tear is accepted. Officer in Charge may notify the Contractor in writing to temporarily discontinue use of any of the above whenever, in their opinion, such action is necessary to prevent serious damage.
VII.
BID AWARD:
The bid shall be submitted on a dollars per acre basis by line item. Bids will be awarded on a line item basis. The Operator shall complete the electronic invitation for bid to be found at www.pasupplierportal.state.pa.us, for award of the bid.
Bids will be publicly opened on January 24th, 2025 at 2:00 PM, at the Pennsylvania Game Commission, 2001 Elmerton Ave., Harrisburg, PA 17110-9797. Failure to sign the IFB will be reason for rejection of the bid and bids received after the due date or due time will not be accepted.
The per acre price shall include the cost of equipment, labor, insurance, and all miscellaneous expenses necessary for the completion of the tasks. Prices bid shall be in dollar and cents only.
The quantities herein are only estimates and may increase or decrease dependent upon the needs of the Commission. Operator shall be paid at the unit price bid for actual services performed.
The Commission reserves the right to reject any and all bids and to choose the bid that, in its sole opinion; best meet the needs of this project.
ALL VENDORS WHO CONDUCT BUSINESS WITH THE PENNSYLVANIA GAME COMMISSION MUST HAVE A VENDOR NUMBER ASSIGNED TO THEM IN ORDER
TO RECEIVE PAYMENT FROM THE COMMONWEALTH.
Vendors may access the website www.pasupplierportal.state.pa.us or phone (877) 435-7363 or (717) 346-2676 or email ra-srmhelp@state.pa.us for assistance to register as a new vendor or, if you are an existing vendor, to change a main or remit to address. This is a Dept of General services (DGS) website so you need to contact them directly if you have any problems with the website.
VIII
CONTRACT TERM:
The contract term shall commence upon contractor’s receipt of the approved Purchase Order(s), receipt of performance bond, and proof of insurance. This also includes a notice to proceed and terminate April 11, 2025.
1) OPERATIONS AND NON-WORK DAYS
a) No woods operation will be permitted on the following days:
1. The opening day and all Saturdays during spring turkey season, including the youth spring gobbler hunt.
b) The contractor, employees, and sub-contractors may not hunt to, from, or at the job site when the work location is beyond a gated road that is closed to public traffic. The contractor may travel to and from the work location on no-work days to check on the condition of equipment.
Except on Sundays, it is unlawful to be present on State Game Lands from November 15 through December 15 inclusive when not engaged in lawful hunting or trapping and fail to wear a minimum of 250 square inches of daylight fluorescent-orange material on the head, chest, and back combined, or in lieu thereof, a hat of the same colored material. The material shall be worn so it is visible in a 360-degree arc.
IX.
PAYMENT TERMS:
Payment shall be on a reimbursement basis for actual services performed. Payment will be made on the basis determined by the Commission’s surveyed acreage treated.
Only work successfully completed to the specifications will be paid for by the agency.
Attachment #1 “JOB SPECIFICATIONS”
Hand Felling
| Machine Mowing |
| Acceptable Treatment Period |
| notes / comments |
| Region |
| Property |
| Project Name |
| Acres |
| NC |
| SGL 033, 075, 100 |
| Woodland Study Mowing |
| 54 |
| Contract Signing -April 11th, 2025 |
File details come from the government source that posted it. Updated .