SOW_22_FEB_2018.pdf

PDF 378 KB Posted

Attached to
Carpet Install Building 465 Federal contract opportunity
Solicitation number
WO23417
Issued by
Department of the Air Force Global Strike Command

About this file

Statement of Work dated 22 February 2018

View the file

Other files for this federal contract opportunity

Other files attached to Carpet Install Building 465, newest first.
File Type Posted
Questions_and_Answers.pdf PDF
RFQ_REV.pdf PDF
SOW_15_FEB_2018.pdf PDF
RFQ.pdf PDF
DRAWING.pdf PDF
SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Work Request #23417, Project GHLN 15-0066

STATEMENT OF WORK

Work Request #23417 GHLN 15-0066 Demo and Replace Carpet in 6 Rooms at Building 465

22 February 2018

1. GENERAL:

a) Carpet is not government furnished. Contractor shall supply carpet and deliver it to Building 465 for installation. See attached drawings for locations/measurements of new carpet. Contractor is responsible to verify all quantities and measurements for carpet demo, floor prep, carpet installation and wall base prior to ordering materials or starting work activities. Contractor shall supply and install carpet at Building 465, Rooms 126, 127, 128, 131, 132 and 133.

b) All other materials (adhesives, edge strips, floor stone, seam joining materials, etc.) are to be furnished by the Contractor and of a type suitable for the purpose intended.

c) There is existing carpet to be removed. Contractor is responsible for off-base disposal.

d) Contractor will move and replace all furniture for carpet demo and installation. Computers, printers, fax machines, copiers will be moved as required by the government.

e) Work hours shall be from 7:30 AM to 4:30 PM. Workdays are Monday through Friday except for federal holidays. Any other work hours must be approved by the Contracting Officer. NOTE:

Contractor can only work in one room at a time.

f) Hazardous Materials (HM) Approval. Contractor shall submit a Materials Safety Data Sheet (MSDS) for each chemical and/or compound proposed carpet or vinyl installation to the 90CONS/LGCA for review and approval prior to delivery to the base. A HM is defined in Federal Standard DED-STD-313D, Tables I and II. The definition of materials presenting a health or physical hazard is found in OSHA 29 Code of Federal Regulations 1910.1200(c).

g) Hazardous Materials Management. All HM shall be managed, stored and monitored in full compliance with all applicable local, state, federal and Air Force regulations. Contractors who bring hazardous materials onto FEW AFB without authorization are responsible for any punitive or regulatory actions. Contractors are responsible for proper disposal of containers/hazardous material. Flammable liquids shall be stored in an approved fireproof storage cabinet. All chemicals shall be secured and properly stored when not in use.

h) Prohibited Hazardous Materials. Prohibited materials include those that contain Class 1 ozone-depleting substances (including CFCs, halons, carbon tetrachloride, methyl chloroform and methyl bromide) per Air Force Policy and as regulated by Title VI of the Clean Air Act, specifically Sections 601-607. Other prohibited construction materials include lead (i.e. lead-based paint), asbestos, PCBs or other hazardous substances.

i) New and Recycled Materials and Equipment Purchasing. All materials and equipment shall be new or newly manufactured using recycled materials unless otherwise indicated. All materials (both new and recycled) shall be the most suitable and highest grade and type for the intended use unless otherwise indicated. They shall be produced by a manufacturer regularly engaged in manufacturing or fabricating similar products with a history of successful production acceptable to the Contracting Office. When names of manufacturers or models are listed, the purpose is to give examples of products meeting the specifications and to provide a basis for subject to the following: (1) The product is equivalent to the specified product meets or exceeds the requirements of the specifications and is otherwise suitable for the intended use. (2) The warranty meets or exceeds that of the specified product and the requirements of the specifications. (3) The Contractor coordinates the installation and makes any necessary changes at no additional cost to the Government. (4) The Contractor waives claims for any time extension associated with the use of the product.

j) Recycled Product Purchases. Contractors must comply with guidelines and requirements of The Air Force Affirmative Procurement Program for the purchase and use of recycled material. This is required by Presidential Executive Order and Section 6002 of the Resource Conservation and Recovery Act (RCRA) (42 U.S.C. 6962). The use of recycled products is mandatory unless they are not available within a reasonable time frame, or if the cost exceeds the cost of a non-recycled item or if they do not meet the technical requirements of the project, or if they are not available from at least two (2) sources so as to maintain a satisfactory level of competition. The construction materials included under this requirement are all types of carpet made of polyester fiber and floor tile containing recovered rubber or plastic. The use of other recycled products is encouraged.

k) Recycled Products Reporting. Contractors must compile a "Recycled Products Report" for the Resource Recovery and Recycling Manager at 90 CES/CEV listing the total quantity recycled products used. Submit the report through the COAR at the end of the contract period or at the end of the calendar year, whichever comes first.

l) Material Storage. Contractors shall protect materials during delivery, storage, handling and installation per manufacturer's printed instructions. Materials should be placed on blocking and covered when necessary to protect from water, dust, direct exposure to sunlight and other elements.

Materials should be delivered in original containers or packaging with labels intact. Storage locations shall not interfere with work of other trades. Acceptable temperature and humidity conditions must be maintained. Work areas shall be enclosed, watertight, and heated as necessary to protect finish materials during and after installation.

m) Affirmative Procurement Guidance. The use of recycled material shall follow requirements based upon Department of the Air Force Space Command Affirmative Procurement Program Policy and Guidance Letter dated 8 April 2002. The main legal requirements for an Affirmative Procurement Program (APP) are derived from Executive Order 13101 dated 14 September 1998 (http;//www.ofee.gov) and the Resource Conservation and Recovery Act (RCRA) Section 6002 (http://www.ornl.gov/ornlp2/sec6002.htm). This policy requires action by the Federal Government or its authorized agents to make more efficient use of natural resources by maximizing recycling and preventing waste whenever possible. Specifically, it mandates procurement of the five EPA guideline items; calls for review of government plans and specifications to eliminate virgin material requirements; requires recycling programs and requires consideration of: recovered materials use, reuse of products, life cycle cost analysis, ease of recycling, and use of environmentally preferable products.

2. CARPET INSTALLATION DIRECT GLUE DOWN:

a) Repair holes, cracks, depressions and rough areas using materials suitable for the purpose intended; grind raised areas and ridges to a smooth, level surface. Sweep floor clean of all foreign materials before installation.

b) Remove existing vinyl base board and replace with new rubber baseboard.

c) Install carpet wall to wall in areas indicated: spread adhesive with a notched trowel. Installed sheet vinyl shall be smooth, uniform and secure with a minimum of seams; seams at doorways centered directly under doors; treat all seams with a seam adhesive. Install aluminum, vinyl or rubber edge strips at all sheet vinyl edges that meet hard surface flooring.

Trim edges at walls straight and true.

3. CLEAN-UP:

When complete, remove all debris, scraps and foreign matter. Remove any soiled spots or adhesive with appropriate spot remover. Clean area as required to remove all small debris, dust footprints, etc. Scraps smaller than 2' x 3' shall be disposed of. Pieces larger than 2' x 3' but less than 12' x 10' shall be rolled and tied and left in the building unless directed otherwise.

4. PERFORMANCE PERIOD:

Contractor shall complete this project within ninety (90) calendar days after contract award.

Installation is to be scheduled with the government POC.

5. OTHER REQUIREMENTS:

In Building 465, existing wall base will be replaced with 6” Mannington Commercial rubber base or equal, match existing color as closely as possible. The carpet will be replaced with one of the following:

J0069 No Limits #69401 Everlasting with EcoWorx Performance Broadloom (EPBL) 26 oz Shaw Contract Number FA8057-17-C-0002 Web: www.shawcontractgroup.com POC: Nick Peters Phone: (202) 315-8162 Email: Nick.peters@shawinc.com

Minimalist # 1486 Proportion 22oz with TitanBac Plus backing J+J Flooring Group Contract Number FA8057-17-C-0003 Web: jjflooringgroup.com POC: Kay Henderson Phone: 800.241.4586 x8389 Email: usaf@jjflooringgroup.com

Broken Checks #553 Trim 28oz with RFI Unibond Plus backing Mohawk Contract NumberFA8057-17-C-0004 Web: www.mohawkgroup.com POC: AnnaLeigh Warmack Phone: (706) 879-6554 Email: Annaleigh_warmack@mohawkind.com

All selections should have non-permeable moisture barrier/backing (EPBL or equivalent).

Carpet should have the following:

Shock absorbing cushion Meet ABA requirements Impact-absorbing mat/padding Contain Anti-microbial properties Solution dyed Integrated moisture barrier CRI Green Label Contains Zero VOC's (Volatile organic compounds ) organic chemicals that have a high vapor pressure at ordinary room temperature Conventional Cleaning process Integral wall base system

Effective October 1, 2017, there is a Mandatory Use Policy for Air Force Carpet Acquisitions which mandates carpet purchases. The Installer/Contractor must choose one of the four carpet selections listed above and negotiate with the carpet vendors listed. Once the negotiation is complete, the installer/contractor shall provide a quote to 90th Contracting (90 CONS) that includes the price for the carpet and adhesives. A statement from the installer/contractor confirming and validating that prices are at or below the NTE prices set in the Tier I Contracts must be submitted with their quote.

File details come from the government source that posted it.