WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

TUNNEL VENTILATION IMPROVEMENT

IMPLEMENTATION - PHASE II

MARCH 15, 2019

CONTRACT NO.: FTA-18-FQ15192-MECH-0002

RFP SUBMISSIONDRAFT

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

DRAWING INDEX

FQ15192 NONE G-00-001 01

K. KHATTAB

M. SAUNDERS

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

GENERAL

DRAWING NUMBER SHEET NUMBER TITLE

ICA

DRAWING NUMBER SHEET NUMBER TITLE

ELECTRICAL

DRAWING NUMBER SHEET NUMBER TITLE

STRUCTURAL

DRAWING NUMBER SHEET NUMBER TITLE

MECHANICAL

DRAWING NUMBER SHEET NUMBER TITLE

ARCHITECTURAL

DRAWING NUMBER SHEET NUMBER TITLE

DRAFT

N

BUS GARAGE SITE

DRAINAGE PUMPING STATION

FAN SHAFT

EMERGENCY EXIT

PARKING CAPACITY

JET FAN NICHE

CHILLER PLANT

TRACTION POWER SUBSTATION

SIDE PLATFORM STATION

CENTER PLATFORM STATION

DOUBLE CROSSOVER

SINGLE CROSSOVER

EQUILATERAL TURNOUT

TURNOUT

LEGEND:

PRINCE GEORGE'S COUNTY

DISTRICT OF COLUMBIA

"A"

MONTGOMERY COUNTY

DISTRICT OF COLUMBIA

GREENBELT

YARD

E99

ARLINGTON COUNTY

FAIRFAX COUNTY

ARLINGTON COUNTY

FAIRFAX COUNTY

PRINCE GEORGE'S COUNTY

DISTRICT OF COLUMBIA

SEE INSET

MARYLAND

VIRGINIA

K008b

J002 J001

C011a

C010a

C008

C008

C007 C008

K007

K006

D011

D014

D010

D013

D006 D007

D012

G003

G001 G002

F004

F005

F009

F008

F007

F011

F010

B004

E004

E006

E011

B006

B006

DETAIL "A"

NOV-93

VA.

D.C.

MONTGOMERY COUNTY

POTOMAC RIVER

P.G. COUNTY

SOUTHERN AVE.

CONGRESS

HEIGHTS

SHADY GROVE

YARD A99

SHADY GROVE

"B"

A016

FRIENDSHIP

HEIGHTS

TENLEYTOWN-AU

VAN NESS-UDC

CLEVELAND PARK

GEORGIA AVE - PETWORTH

ROCKVILLE

TWINBROOK

WHITE FLINT

GROSVENOR-STRATHMORE

MEDICAL CENTER

BETHESDA

TAKOMA

SILVER SPRING

FOREST GLEN

WHEATON

GLENMONT

ANACOSTIA

BRADDOCK ROAD

KING ST

C010c

FRANCONIA-

SPRINGFIELD

"C" "J" / "H"

"F"

"N"

"K"

"G"

"D"

"E"

SYSTEM MAP

SUITLAND

BRANCH AVE.

LANDOVER

NEW CARROLLTON

D008

BRENTWOOD YARD B99

WEST FALLS CHURCH YARD K99

SPRING HILL

GREENSBORO

WOLF TRAP STATION

FUTURE

BRANCH AVE.

YARD F99

NEW CARROLLTON YARD D99

COLLEGE PARK-

U OF MD

GREENBELT

POTOMAC RIVER

GLENMONT YARD B98

TO YARD

WEST FALLS CHURCH- VT/UVA

WOODLEY PARK

ALEXANDRIA

YARD C99

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

OVERALL PLAN

FQ15192 NONE G-00-002 02

K. KHATTAB

M. SAUNDERS

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

GENERAL NOTES

FQ15192 NONE G-00-003 03

K. KHATTAB

M. SAUNDERS

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

LEGEND AND ABBREVIATIONS

FQ15192 NONE G-00-004 04

K. KHATTAB

M. SAUNDERS

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

N

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

DEMOLITION PLAN 1 OF 2

1/4" = 1'-0" S-01-001 05

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 21.67

KEY MAPDRAFT

N

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

DEMOLITION PLAN 2 OF 2

1/4" = 1'-0" S-01-002 06

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 33.67

N

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

FAN SHAFT FA6

DEMOLITION PLAN

1/4" = 1'-0" S-01-003 07

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 67.92

N

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA9

DEMOLITION PLAN 1 OF 2

1/4" = 1'-0" S-01-004 08

J. CECININI

J. CEC

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 113.92

N

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA9

DEMOLITION PLAN 2 OF 2

1/4" = 1'-0" S-01-005 09

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 125.92

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

PLAN 1 OF 4

1/4" = 1'-0" S-01-006 10

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 21.67

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

PLAN 2 OF 4

1/4" = 1'-0" S-01-007 11

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 33.67

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

PLAN 3 OF 4

1/4" = 1'-0" S-01-008 12

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 35.84

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

PLAN 4 OF 4

1/4" = 1'-0" S-01-009 13

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 48.34

N

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

FAN SHAFT FA6

PLAN

1/4" = 1'-0" S-01-010 14

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 67.92

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA9

PLAN 1 OF 4

1/4" = 1'-0" S-01-011 15

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 113.92

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA9

PLAN 2 OF 4

1/4" = 1'-0" S-01-012 16

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 125.92

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA9

PLAN 3 OF 4

1/4" = 1'-0" S-01-013 17

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 128.09

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA9

PLAN 4 OF 4

1/4" = 1'-0" S-01-014 18

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 140.59

SECTION

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

DEMOLITION SECTION

1/4" = 1'-0" S-03-001 19

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

SECTION

1/4" = 1'-0" S-03-002 20

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

1DRAFT

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA9

DEMOLITION SECTION

1/4" = 1'-0" S-03-003 21

J. CECININI

J. CECININI

G. SANTONOCITO

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DESCRIPTION

DATE NUM

REVISIONS

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION IMPROVEMENT IMPLEMENTATION - PHASE II

FTA-18-FQ15192-MECH-0002

VENTILATION SHAFT VA9 (SIMILAR FOR VA8)

PROPOSED ALTERNATIVE SECTION

1/4" = 1'-0" S-03-004 22

JC

JC

GS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

VENT SHAFT VA9 VENT SHAFT VA8

FAN SHAFT FA6

SCHEMATIC EQUIPMENT LAYOUT PLAN

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

SCHEMATIC EQUIPMENT LAYOUT PLAN

FQ15192 NONE M-00-001 23

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

VA9

OUTBOUND

VA8

OUTBOUND

FA6

VA9

INBOUND

VA8

INBOUND

AIRFLOW DIAGRAM

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

AIRFLOW DIAGRAM

FQ15192 NONE M-00-002 24

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

MAINTENANCE VENTILATION ZONES PLAN

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

MAINTENANCE VENTILATION ZONES PLAN

FQ15192 NONE M-00-003 25

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

EMERGENCY VENTILATION ZONES PLAN

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

EMERGENCY VENTILATION ZONES PLAN

FQ15192 NONE M-00-004 26

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

EMERGENCY MODE TABLE

MODE

NUMBER

INCIDENT

TRACK

EMERGENCY

ZONE

INCIDENT TRAIN

CAR

VENTILATION

DIRECTION

EVACUATION

DIRECTION

VA8

FANS

VA8 DAMPER POSITION

VA9

FANS

VA9 DAMPER POSITION

FA6

FANS

FA6 DAMPER POSITION

FID 1, 2, 3 & 4

TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2

FID 1, 2, 3 & 4

TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2

FID 1, 2, 3, 4 & 5

BRD 1

NORMAL MODE TABLE

MODE

NUMBER

VENTILATION

DIRECTION

DESCRIPTION

INPUT

FROM

VA8

FANS

VA8 DAMPER POSITION

VA9

FANS

VA9 DAMPER POSITION

FA6

FANS

FA6 DAMPER POSITION

COMMENTS

FID 1, 2, 3 & 4

TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2

FID 1, 2, 3 & 4

TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2

FID 1, 2, 3, 4 & 5

BRD 1

MAINTENANCE MODE TABLE

MODE

NUMBER

TRACK

MAINTENANCE

ZONE

VA8

FANS

VA8 DAMPER POSITION

VA9

FANS

VA9 DAMPER POSITION

FA6

FANS

FA6 DAMPER POSITION

FID 1, 2, 3 & 4

TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2

FID 1, 2, 3 & 4

TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2

FID 1, 2, 3, 4 & 5

BRD 1

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

MODES OF OPERATION TABLES

FQ15192 NONE M-00-005 27

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

SCALE: 1/4" = 1'-0"

0 2

TRACK LEVEL PLAN (EL. 21.67)

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

VENTILATION SHAFT VA8

PLAN 1 OF 2

FQ15192 1/4"=1'-0" M-01-001 28

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

FAN ROOM LEVEL PLAN (EL. 35.84)

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

PLAN 2 OF 2

FQ15192 1/4"=1'-0" M-01-002 29

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

TRACK LEVEL PLAN (EL. 113.92)

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

VENTILATION SHAFT VA9

PLAN 1 OF 2

FQ15192 1/4"=1'-0" M-01-003 30

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

FAN ROOM PLAN (EL. 127.92)

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

VENTILATION SHAFT VA9

PLAN 2 OF 2

FQ15192 1/4"=1'-0" M-01-004 31

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

0 2

TRACK LEVEL PLAN (EL. 67.92)

N

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

FAN SHAFT FA6

TRACK LEVEL PLAN

FQ15192 1/4"=1'-0" M-01-005 32

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

0 2

VA8 SECTION (SIMILAR TO VA9)

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

SECTION 1 OF 3

FQ15192 1/4"=1-0" M-03-001 33

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

SECTION 2 OF 3

FQ15192 1/4"=1-0" M-03-002 34

C. HAWKINS

AA

AA

VA8 SECTION

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

SECTION 3 OF 3

FQ15192 1/4"=1-0" M-03-003 35

C. HAWKINS

VA8 SECTION AT TRANSITION LEVEL

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA9

FQ15192 1/4"=1'-0" M-03-004 36

C. HAWKINS

VA9 SECTION

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

FAN SHAFT FA6

SECTION 1 OF 2

FQ15192 1/4"=1'-0" M-03-005 37

C. HAWKINS

FA6 SECTION

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DATE

DATE

DRAWN

DESIGNED

CHECKED

SECTION 2 OF 2

FQ15192 1/4"=1'-0" M-03-006 38

C. HAWKINS

FA6 DIVIDING WALL ELEVATION

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

0 2 DRAFT

DATE

DATE

DRAWN

DESIGNED

CHECKED

TYPICAL DETAILS

SHEET 1 OF 3

FQ15192 3/4"=1'-0" M-05-001 39

C. HAWKINS

FAN ARRANGEMENT

FAN CROSS SECTION

0 1 2 3

SCALE: 3/4" = 1'-0"

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TYPICAL DETAILS

SHEET 2 OF 3

FQ15192 3/4"=1'-0" M-05-002 40

C. HAWKINS

TRACK EXHAUST DAMPER ASSEMBLY

FAN ISOLATION DAMPER ASSEMBLY

SINGLE DAMPER MODULE

FAN ISOLATION DAMPER DETAIL

0 1 2 3

SCALE: 3/4" = 1'-0"

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

TRACK EXHAUST DAMPER DETAIL

DATE

DATE

DRAWN

DESIGNED

CHECKED

TYPICAL DETAILS

SHEET 3 OF 3

FQ15192 AS NOTED M-05-003 41

C. HAWKINS

VERTICAL DAMPER MOUNTING FRAME

FAN ACCESS HATCH

TYPICAL MULLION DETAIL

20 1

SCALE: 1" = 1'-0"

0 1 2 3

SCALE: 3/4" = 1'-0"

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

FAN BASIS OF DESIGN

TAG LOCATION INSIDE DIAMETER

FAN PERFORMANCE DATA FAN MOTOR DATA

WEIGHT

(LBS)

BASIS OF DESIGN MODEL

AIRFLOW (CFM) S.P. (IN. W.G.)

MOTOR HP

FAN SOUND LEVEL

TAG LOCATION

SOUND POWER LEVEL (Lw dB)

BASIS OF DESIGN MODEL

1kHz 2kHz 4kHz 8kHz

SOUND ATTENUATION BASIS OF DESIGN

TAG LOCATION

MINIMUM

CROSS-SECTIONAL

AREA (FT2)

PERFORMANCE DATA

WEIGHT

(LBS)

BASIS OF DESIGN MODEL

AIRFLOW (CFM)

MAX PRESSURE

DROP

LENGTH

IN. W.G.

IN. W.G.

IN. W.G.

IN. W.G.

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

EQUIPMENT SCHEDULE

SHEET 1 OF 2

FQ15192 NONE M-06-001 42

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DAMPER BASIS OF DESIGN

TAG LOCATION OPENING SIZE

ASSEMBLY INFORMATION

FAIL POSITION BASIS OF DESIGN MODEL

INSTALLATION NO. OF MODULES

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

EQUIPMENT SCHEDULE

SHEET 2 OF 2

FQ15192 NONE M-06-002 43

C. HAWKINS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

TRIP

TYPE

FRAME

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL

SYMBOLS

NONE E-00-001 44

A. GONZALEZ

V. CAPOBIANCO

L. LUTLEY

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

NW VENT SHAFT

O.B. TRACK

I.B. TRACK

NE VENT SHAFT

C L

E V

E L

A N

D

P

A R

K

S

T A

T I O

N

C

O N

T I N

U E

S

T O

V

A

E S

S

S

T A

T I O

N

I.B. TRACK

C L

E V

E L

A N

D

P

A R

K

S

T A

T I O

N

C

O N

T I N

U E

S

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL

CLEVELAND PARK STATION - NORTH

1/8" = 1'-0" E-01-001 45

A. GONZALEZ

R. PARTYKEVYCH

L. LUTLEY

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

SCALE: 1/8" = 1'-0"

1680 4

UPPER ANCILLARY ROOMS PLAN

C L

E V

E L

A N

D

P

A R

K

S

T A

T I O

N

C

O N

T I N

U E

S

F

S

H A

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL - VENT SHAFT VA9

CLEVELAND PARK STATION - SOUTH

1/8" = 1'-0" E-01-002 46

A. GONZALEZ

R. PARTYKEVYCH

L. LUTLEY

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

SCALE: 1/8" = 1'-0"

1 DRAFT

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL

FAN SHAFT FA6

1/8" = 1'-0" E-01-003 47

A. GONZALEZ

R. PARTYKEVYCH

L. LUTLEY

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

SCALE: 1/4" = 1'-0"

FA6 DAMPER CONNECTIONS

2DRAFT

A

W O

O D

L E

Y

P

A R

K

S

T A

T I O

N

C

O N

T I N

U E

S

A

SCALE: 1/8" = 1'-0"

1680 4

N

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL - VENT SHAFT VA8

WOODLEY PARK STATION - NORTH

1/8"=1'-0" E-01-004 48

A. GONZALEZ

R. PARTYKEVYCH

L. LUTLEY

1 DRAFT

W O

O D

L E

Y

P

A R

K

S

T A

T I O

N

C

O N

T I N

U E

S

A

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL

WOODLEY PARK STATION - SOUTH

1/8" = 1'-0" E-01-005 49

A. GONZALEZ

R. PARTYKEVYCH

L. LUTLEY

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

SCALE: 1/8" = 1'-0"

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL - CLEVELAND PARK STATION

SINGLE LINE DIAGRAM

NONE E-06-001 50

A. GONZALEZ

R. PARTYKEVYCH

L. LUTLEY

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL - WOODLEY PARK STATION

SINGLE LINE DIAGRAM

NONE E-06-002 51

A. GONZALEZ

R. PARTYKEVYCH

L. LUTLEY

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL - TYPICAL RISER DIAGRAM

POWER CABLE / CONDUIT

NONE E-06-003 52

A. GONZALEZ

R. PARTYKEVYCH

L. LUTLEY

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ELECTRICAL - TYPICAL RISER DIAGRAM

SCADA CABLE / CONDUIT

NONE E-06-004 53

A. GONZALEZ

R. PARTYKEVYCH

L. LUTLEY

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

FOPP

NETWORK SYMBOLS:

FACP

FO

ETH

SCADA SYMBOLS:

HMI

OIT

SRV

ANC

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

ICA SYMBOLS AND ABBREVIATIONS

FQ15192 NONE IC-00-001 54

S. VARGHESE

V. CAPOBIANCO

T.KUHN

CLEVELAND PARK STATION

FO

F O

REMOTE

HMI

WOODLEY PARK STATION

FO

F O

FOFO

FO FO FO

TUNNEL

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION CONTROL SYSTEM (TVCS)

BLOCK DIAGRAM

FQ15192 NONE IC-06-001 55

T. KUHN

HMI

HMI

B

ETH

E T

H

ETH

E T

H

FO FO FO FO

S

E T

H

RMX

A1

COM

A1

PLC

A

HMI RIO

PS

A

HMI

ROCC

EXISTING

SCADA

SYSTEM

S

PS

B

RMX

A2

IO

PS

A

IO

F O

F O

F O

F O

FOFO

F O

F O

ETH

ETH

ETH

E T

H

E T

H

RMX

B1

COM

B1

PLC

B

HMI

PS

A

HMI

PS

B

RMX

B2

IO

PS

A

IO

F O

FO FO FO FO FO FO FO FO FO FO FO

F O

F O

F O

F O

FO FO

F O

F O

ETH

ETH

ETH

E T

H

S S

RIO

F O

F O

F O

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION CONTROL SYSTEM (TVCS)

COMMUNICATIONS AND NETWORK ARCHITECTURE

FQ15192 NONE IC-06-002 56

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION CONTROL SYSTEM (TVCS), P&ID

TUNNEL VENTILATION FAN (TVF) AND DAMPERS - (VA8, VA9, VA6)

FQ15192 NONE IC-06-003 57

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION CONTROL SYSTEM (TVCS)

P&ID - DETAILS

AS NOTED IC-06-004 58

S. VARGHESE

V.CAPOBIANCO

T. KUHN

P&ID EQUIPMENT TAG LIST - VA8*

BANK/GROUP TAG

# DEVICES IN

BANK/GROUP

EQUIPMENT TAGS MOTOR/ACTUATOR TAGS

P&ID - TUNNEL VENTILATION FAN (TVF)

P&ID - SUGGESTED TAGGING (VA8)

(MULTIPLE MODULES)

P&ID DETAIL - TYPICAL DAMPER

ALARM ANNUNCIATION

P&ID DETAIL - LOCAL FCP

4DRAFT

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

FRONT VIEW - SUGGESTED

LEFT SIDE VIEW - SUGGESTED

TOP VIEW - SUGGESTED

NAMEPLATE ENGRAVING LIST

N# LINE 1 LINE 2 LINE 3

NAMEPLATE ENGRAVING LIST

N# LINE 1 LINE 2 LINE 3

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION CONTROL SYSTEM (TVCS)

FAN CONTOL PANEL - LAYOUT AND DETAILS

FQ15192 AS NOTED IC-06-005 59

S. VARGHESE

V. CAPOBIANCO

5 5 6 7 7 8 9

5 12 13 14 15

2 2 3 22

19 20

18 21

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION CONTROL SYSTEM (TVCS)

FAN CONTROL PANEL - INTERNAL LAYOUT AND DETAILS

FQ15192 AS NOTED IC-06-006 60

S. VARGHESE

V.CAPOBIANCO

T. KUHN

PCR AND SCR - TUNNEL MONITORING CONTROL PANEL AND TERMINAL JUNCTION BOX - EQUIPMENT LIST

ITEM QTY DESCRIPTION MANUFACTURER MODEL NUMBER

POWER DISTRIBUTION

24VDC CONTROL PANEL

POWER DISTRIBUTION

120VAC CONTROL PANEL

UPS MONITORING

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION CONTROL SYSTEM (TVCS)

FAN CONTROL PANEL - TYPICAL SCHEMATICS - SHEET 1 OF 2

FQ15192 AS NOTED IC-06-007 61

S. VARGHESE

V.CAPOBIANCO

COM(+)

COM(-)

IN

COM(+)

COM(-)

IN

IN

IN

IN

SIG +

SIG -

IN

FIELD INSTRUMENT

4-WIRE

SIG +

SIG -

N

G

L

GROUND

NEUT

LINE

COM(+)

COM(-)

OUT

24 VDC(+)

24 VDC(-)

COM(+)

COM(-)

OUT

24 VDC(+)

24 VDC(-)

CR

CR

LOAD

LOAD

COM(+)

COM(-)

OUT

24 VDC(+)

24 VDC(-)

24 VDC(+)

24 VDC(-)

CR

CRCR

24 VDC(-)

24 VDC(-)

24 VDC(-)

SHIELD

MS +

EX +

MS -

EX -

RTD

VIA INTERPOSING RELAY

24VDC POWER CONTACT OUTPUT

VIA INTERPOSING RELAY

DRY CONTACT OUTPUT

24VDC DISCRETE OUTPUT

RTD INPUT FROM 4-WIRE RTD

24VDC DISCRETE INPUT

FROM A SINGLE DEVICE

MULTIPLE 24VDC DISCRETE INPUT

FROM 2-WIRE TRANSMITTER

ANALOG CURRENT INPUT

FROM 4-WIRE TRANSMITTER

ANALOG CURRENT INPUT

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION CONTROL SYSTEM (TVCS)

FAN CONTROL PANEL - TYPICAL SCHEMATICS - SHEET 2 OF 2

FQ15192 AS NOTED IC-06-008 62

S. VARGHESE

V.CAPOBIANCO

4 5

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

REMOTE HMI PANEL - EQUIPMENT LIST

ITEM QTY DESCRIPTION MANUFACTURER MODEL NUMBER

NAMEPLATE ENGRAVING LIST

N# LINE 1 LINE 2 LINE 3

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

TUNNEL VENTILATION CONTROL SYSTEM (TVCS)

REMOTE HMI PANEL - LAYOUT AND DETAILS

FQ15192 AS NOTED IC-06-009 63

S. VARGHESE

V.CAPOBIANCO

T. KUHN

NAMEPLATE ENGRAVING LIST

N# LINE 1 LINE 2 LINE 3

EQUIPMENT LAYOUT

FRONT VIEW

SIDE VIEW

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

PLAN 1 OF 3

1/4" = 1'-0" A-01-001 64

P. BASTARDO

R. WOJ.

R. FRITZ

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

KEY MAP

PLAN AT EL. 21.671DRAFT

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

PLAN 2 OF 3

1/4" = 1'-0" A-01-002 65

P. BASTARDO

R. WOJ.

R. FRITZ

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

PLAN AT EL. 35.841DRAFT

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

VENTILATION SHAFT VA8

PLAN 3 OF 3

FQ15192 1/4"=1-0" A-01-003 66

P. BASTARDO

R. WOJ

R. FRITZ

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL SUBMITTAL

03/15/19 3 RFP CONTRACT DRAWINGS

VA8 PLAN AT TRANSITION LEVEL1DRAFT

N

SCALE: 1/4" = 1'-0"

0 2

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

CONTRACT NO. SHEET NO.

of

FAN SHAFT FA6

PLAN

1/4" = 1'-0" A-01-004 67

P. BASTARDO

R. WOJ.

R. FRITZ

DRAWING NO.SCALE

DATE

DATE

DATE

DRAWN

DESIGNED

CHECKED

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

CONTRACT NO. SHEET NO.

of

APPROVED

DESCRIPTIONDATE NUMTITLE

REVISIONS

NUMBER

REFERENCE DRAWINGS

DEPARTMENT OF DESIGN AND CONSTRUCTION

ENGA - MECHANICAL ENGINEERING

ENGINEER

DATE

ENGINEERING MANAGER

APPROVED

DATEDATE

TUNNEL VENTILATION IMPROVEMENT

CONTRACT DRAWINGS NOT FOR CONSTRUCTION

FQ15192 70

03/15/19

03/15/19

03/15/19

12/07/18 1 INTERMEDIATE SUBMITTAL

02/01/19 2 FINAL…