Tunnel_Ventilation_Improvement_DRAFT_DWGS.pdf
PDF 9 MB Posted
- Solicitation number
- Not on record
About this file
Draft General Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EXHIBIT_A_PEST_CONTROL_FINAL_5219.pdf | ||
| IFB_CQ19219_Pest_Control_Services_050619.pdf | ||
| Advance_Notice_Signed_32819.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
TUNNEL VENTILATION IMPROVEMENT
IMPLEMENTATION - PHASE II
MARCH 15, 2019
CONTRACT NO.: FTA-18-FQ15192-MECH-0002
RFP SUBMISSIONDRAFT
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
DRAWING INDEX
FQ15192 NONE G-00-001 01
K. KHATTAB
M. SAUNDERS
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
GENERAL
DRAWING NUMBER SHEET NUMBER TITLE
ICA
DRAWING NUMBER SHEET NUMBER TITLE
ELECTRICAL
DRAWING NUMBER SHEET NUMBER TITLE
STRUCTURAL
DRAWING NUMBER SHEET NUMBER TITLE
MECHANICAL
DRAWING NUMBER SHEET NUMBER TITLE
ARCHITECTURAL
DRAWING NUMBER SHEET NUMBER TITLE
DRAFT
N
BUS GARAGE SITE
DRAINAGE PUMPING STATION
FAN SHAFT
EMERGENCY EXIT
PARKING CAPACITY
JET FAN NICHE
CHILLER PLANT
TRACTION POWER SUBSTATION
SIDE PLATFORM STATION
CENTER PLATFORM STATION
DOUBLE CROSSOVER
SINGLE CROSSOVER
EQUILATERAL TURNOUT
TURNOUT
LEGEND:
PRINCE GEORGE'S COUNTY
DISTRICT OF COLUMBIA
"A"
MONTGOMERY COUNTY
DISTRICT OF COLUMBIA
GREENBELT
YARD
E99
ARLINGTON COUNTY
FAIRFAX COUNTY
ARLINGTON COUNTY
FAIRFAX COUNTY
PRINCE GEORGE'S COUNTY
DISTRICT OF COLUMBIA
SEE INSET
MARYLAND
VIRGINIA
K008b
J002 J001
C011a
C010a
C008
C008
C007 C008
K007
K006
D011
D014
D010
D013
D006 D007
D012
G003
G001 G002
F004
F005
F009
F008
F007
F011
F010
B004
E004
E006
E011
B006
B006
DETAIL "A"
NOV-93
VA.
D.C.
MONTGOMERY COUNTY
POTOMAC RIVER
P.G. COUNTY
SOUTHERN AVE.
CONGRESS
HEIGHTS
SHADY GROVE
YARD A99
SHADY GROVE
"B"
A016
FRIENDSHIP
HEIGHTS
TENLEYTOWN-AU
VAN NESS-UDC
CLEVELAND PARK
GEORGIA AVE - PETWORTH
ROCKVILLE
TWINBROOK
WHITE FLINT
GROSVENOR-STRATHMORE
MEDICAL CENTER
BETHESDA
TAKOMA
SILVER SPRING
FOREST GLEN
WHEATON
GLENMONT
ANACOSTIA
BRADDOCK ROAD
KING ST
C010c
FRANCONIA-
SPRINGFIELD
"C" "J" / "H"
"F"
"N"
"K"
"G"
"D"
"E"
SYSTEM MAP
SUITLAND
BRANCH AVE.
LANDOVER
NEW CARROLLTON
D008
BRENTWOOD YARD B99
WEST FALLS CHURCH YARD K99
SPRING HILL
GREENSBORO
WOLF TRAP STATION
FUTURE
BRANCH AVE.
YARD F99
NEW CARROLLTON YARD D99
COLLEGE PARK-
U OF MD
GREENBELT
POTOMAC RIVER
GLENMONT YARD B98
TO YARD
WEST FALLS CHURCH- VT/UVA
WOODLEY PARK
ALEXANDRIA
YARD C99
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
OVERALL PLAN
FQ15192 NONE G-00-002 02
K. KHATTAB
M. SAUNDERS
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
GENERAL NOTES
FQ15192 NONE G-00-003 03
K. KHATTAB
M. SAUNDERS
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
LEGEND AND ABBREVIATIONS
FQ15192 NONE G-00-004 04
K. KHATTAB
M. SAUNDERS
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
N
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
DEMOLITION PLAN 1 OF 2
1/4" = 1'-0" S-01-001 05
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 21.67
KEY MAPDRAFT
N
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
DEMOLITION PLAN 2 OF 2
1/4" = 1'-0" S-01-002 06
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 33.67
N
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
FAN SHAFT FA6
DEMOLITION PLAN
1/4" = 1'-0" S-01-003 07
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 67.92
N
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA9
DEMOLITION PLAN 1 OF 2
1/4" = 1'-0" S-01-004 08
J. CECININI
J. CEC
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 113.92
N
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA9
DEMOLITION PLAN 2 OF 2
1/4" = 1'-0" S-01-005 09
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 125.92
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
PLAN 1 OF 4
1/4" = 1'-0" S-01-006 10
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 21.67
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
PLAN 2 OF 4
1/4" = 1'-0" S-01-007 11
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 33.67
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
PLAN 3 OF 4
1/4" = 1'-0" S-01-008 12
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 35.84
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
PLAN 4 OF 4
1/4" = 1'-0" S-01-009 13
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 48.34
N
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
FAN SHAFT FA6
PLAN
1/4" = 1'-0" S-01-010 14
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 67.92
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA9
PLAN 1 OF 4
1/4" = 1'-0" S-01-011 15
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 113.92
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA9
PLAN 2 OF 4
1/4" = 1'-0" S-01-012 16
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 125.92
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA9
PLAN 3 OF 4
1/4" = 1'-0" S-01-013 17
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 128.09
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA9
PLAN 4 OF 4
1/4" = 1'-0" S-01-014 18
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 140.59
SECTION
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
DEMOLITION SECTION
1/4" = 1'-0" S-03-001 19
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
SECTION
1/4" = 1'-0" S-03-002 20
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
1DRAFT
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA9
DEMOLITION SECTION
1/4" = 1'-0" S-03-003 21
J. CECININI
J. CECININI
G. SANTONOCITO
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DESCRIPTION
DATE NUM
REVISIONS
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION IMPROVEMENT IMPLEMENTATION - PHASE II
FTA-18-FQ15192-MECH-0002
VENTILATION SHAFT VA9 (SIMILAR FOR VA8)
PROPOSED ALTERNATIVE SECTION
1/4" = 1'-0" S-03-004 22
JC
JC
GS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
VENT SHAFT VA9 VENT SHAFT VA8
FAN SHAFT FA6
SCHEMATIC EQUIPMENT LAYOUT PLAN
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
SCHEMATIC EQUIPMENT LAYOUT PLAN
FQ15192 NONE M-00-001 23
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
VA9
OUTBOUND
VA8
OUTBOUND
FA6
VA9
INBOUND
VA8
INBOUND
AIRFLOW DIAGRAM
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
AIRFLOW DIAGRAM
FQ15192 NONE M-00-002 24
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
MAINTENANCE VENTILATION ZONES PLAN
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
MAINTENANCE VENTILATION ZONES PLAN
FQ15192 NONE M-00-003 25
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
EMERGENCY VENTILATION ZONES PLAN
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
EMERGENCY VENTILATION ZONES PLAN
FQ15192 NONE M-00-004 26
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
EMERGENCY MODE TABLE
MODE
NUMBER
INCIDENT
TRACK
EMERGENCY
ZONE
INCIDENT TRAIN
CAR
VENTILATION
DIRECTION
EVACUATION
DIRECTION
VA8
FANS
VA8 DAMPER POSITION
VA9
FANS
VA9 DAMPER POSITION
FA6
FANS
FA6 DAMPER POSITION
FID 1, 2, 3 & 4
TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2
FID 1, 2, 3 & 4
TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2
FID 1, 2, 3, 4 & 5
BRD 1
NORMAL MODE TABLE
MODE
NUMBER
VENTILATION
DIRECTION
DESCRIPTION
INPUT
FROM
VA8
FANS
VA8 DAMPER POSITION
VA9
FANS
VA9 DAMPER POSITION
FA6
FANS
FA6 DAMPER POSITION
COMMENTS
FID 1, 2, 3 & 4
TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2
FID 1, 2, 3 & 4
TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2
FID 1, 2, 3, 4 & 5
BRD 1
MAINTENANCE MODE TABLE
MODE
NUMBER
TRACK
MAINTENANCE
ZONE
VA8
FANS
VA8 DAMPER POSITION
VA9
FANS
VA9 DAMPER POSITION
FA6
FANS
FA6 DAMPER POSITION
FID 1, 2, 3 & 4
TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2
FID 1, 2, 3 & 4
TSD 1 TSD 2 TED 1 TED 2 BRD 1 & 2
FID 1, 2, 3, 4 & 5
BRD 1
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
MODES OF OPERATION TABLES
FQ15192 NONE M-00-005 27
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
SCALE: 1/4" = 1'-0"
0 2
TRACK LEVEL PLAN (EL. 21.67)
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
VENTILATION SHAFT VA8
PLAN 1 OF 2
FQ15192 1/4"=1'-0" M-01-001 28
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
FAN ROOM LEVEL PLAN (EL. 35.84)
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
PLAN 2 OF 2
FQ15192 1/4"=1'-0" M-01-002 29
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
TRACK LEVEL PLAN (EL. 113.92)
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
VENTILATION SHAFT VA9
PLAN 1 OF 2
FQ15192 1/4"=1'-0" M-01-003 30
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
FAN ROOM PLAN (EL. 127.92)
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
VENTILATION SHAFT VA9
PLAN 2 OF 2
FQ15192 1/4"=1'-0" M-01-004 31
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
0 2
TRACK LEVEL PLAN (EL. 67.92)
N
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
FAN SHAFT FA6
TRACK LEVEL PLAN
FQ15192 1/4"=1'-0" M-01-005 32
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
0 2
VA8 SECTION (SIMILAR TO VA9)
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
SECTION 1 OF 3
FQ15192 1/4"=1-0" M-03-001 33
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
SECTION 2 OF 3
FQ15192 1/4"=1-0" M-03-002 34
C. HAWKINS
AA
AA
VA8 SECTION
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
SECTION 3 OF 3
FQ15192 1/4"=1-0" M-03-003 35
C. HAWKINS
VA8 SECTION AT TRANSITION LEVEL
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA9
FQ15192 1/4"=1'-0" M-03-004 36
C. HAWKINS
VA9 SECTION
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
FAN SHAFT FA6
SECTION 1 OF 2
FQ15192 1/4"=1'-0" M-03-005 37
C. HAWKINS
FA6 SECTION
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DATE
DATE
DRAWN
DESIGNED
CHECKED
SECTION 2 OF 2
FQ15192 1/4"=1'-0" M-03-006 38
C. HAWKINS
FA6 DIVIDING WALL ELEVATION
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
0 2 DRAFT
DATE
DATE
DRAWN
DESIGNED
CHECKED
TYPICAL DETAILS
SHEET 1 OF 3
FQ15192 3/4"=1'-0" M-05-001 39
C. HAWKINS
FAN ARRANGEMENT
FAN CROSS SECTION
0 1 2 3
SCALE: 3/4" = 1'-0"
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TYPICAL DETAILS
SHEET 2 OF 3
FQ15192 3/4"=1'-0" M-05-002 40
C. HAWKINS
TRACK EXHAUST DAMPER ASSEMBLY
FAN ISOLATION DAMPER ASSEMBLY
SINGLE DAMPER MODULE
FAN ISOLATION DAMPER DETAIL
0 1 2 3
SCALE: 3/4" = 1'-0"
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
TRACK EXHAUST DAMPER DETAIL
DATE
DATE
DRAWN
DESIGNED
CHECKED
TYPICAL DETAILS
SHEET 3 OF 3
FQ15192 AS NOTED M-05-003 41
C. HAWKINS
VERTICAL DAMPER MOUNTING FRAME
FAN ACCESS HATCH
TYPICAL MULLION DETAIL
20 1
SCALE: 1" = 1'-0"
0 1 2 3
SCALE: 3/4" = 1'-0"
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
FAN BASIS OF DESIGN
TAG LOCATION INSIDE DIAMETER
FAN PERFORMANCE DATA FAN MOTOR DATA
WEIGHT
(LBS)
BASIS OF DESIGN MODEL
AIRFLOW (CFM) S.P. (IN. W.G.)
MOTOR HP
FAN SOUND LEVEL
TAG LOCATION
SOUND POWER LEVEL (Lw dB)
BASIS OF DESIGN MODEL
1kHz 2kHz 4kHz 8kHz
SOUND ATTENUATION BASIS OF DESIGN
TAG LOCATION
MINIMUM
CROSS-SECTIONAL
AREA (FT2)
PERFORMANCE DATA
WEIGHT
(LBS)
BASIS OF DESIGN MODEL
AIRFLOW (CFM)
MAX PRESSURE
DROP
LENGTH
IN. W.G.
IN. W.G.
IN. W.G.
IN. W.G.
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
EQUIPMENT SCHEDULE
SHEET 1 OF 2
FQ15192 NONE M-06-001 42
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DAMPER BASIS OF DESIGN
TAG LOCATION OPENING SIZE
ASSEMBLY INFORMATION
FAIL POSITION BASIS OF DESIGN MODEL
INSTALLATION NO. OF MODULES
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
EQUIPMENT SCHEDULE
SHEET 2 OF 2
FQ15192 NONE M-06-002 43
C. HAWKINS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
TRIP
TYPE
FRAME
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL
SYMBOLS
NONE E-00-001 44
A. GONZALEZ
V. CAPOBIANCO
L. LUTLEY
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
NW VENT SHAFT
O.B. TRACK
I.B. TRACK
NE VENT SHAFT
C L
E V
E L
A N
D
P
A R
K
S
T A
T I O
N
C
O N
T I N
U E
S
T O
V
A
E S
S
S
T A
T I O
N
I.B. TRACK
C L
E V
E L
A N
D
P
A R
K
S
T A
T I O
N
C
O N
T I N
U E
S
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL
CLEVELAND PARK STATION - NORTH
1/8" = 1'-0" E-01-001 45
A. GONZALEZ
R. PARTYKEVYCH
L. LUTLEY
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
SCALE: 1/8" = 1'-0"
1680 4
UPPER ANCILLARY ROOMS PLAN
C L
E V
E L
A N
D
P
A R
K
S
T A
T I O
N
C
O N
T I N
U E
S
F
S
H A
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL - VENT SHAFT VA9
CLEVELAND PARK STATION - SOUTH
1/8" = 1'-0" E-01-002 46
A. GONZALEZ
R. PARTYKEVYCH
L. LUTLEY
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
SCALE: 1/8" = 1'-0"
1 DRAFT
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL
FAN SHAFT FA6
1/8" = 1'-0" E-01-003 47
A. GONZALEZ
R. PARTYKEVYCH
L. LUTLEY
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
SCALE: 1/4" = 1'-0"
FA6 DAMPER CONNECTIONS
2DRAFT
A
W O
O D
L E
Y
P
A R
K
S
T A
T I O
N
C
O N
T I N
U E
S
A
SCALE: 1/8" = 1'-0"
1680 4
N
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL - VENT SHAFT VA8
WOODLEY PARK STATION - NORTH
1/8"=1'-0" E-01-004 48
A. GONZALEZ
R. PARTYKEVYCH
L. LUTLEY
1 DRAFT
W O
O D
L E
Y
P
A R
K
S
T A
T I O
N
C
O N
T I N
U E
S
A
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL
WOODLEY PARK STATION - SOUTH
1/8" = 1'-0" E-01-005 49
A. GONZALEZ
R. PARTYKEVYCH
L. LUTLEY
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
SCALE: 1/8" = 1'-0"
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL - CLEVELAND PARK STATION
SINGLE LINE DIAGRAM
NONE E-06-001 50
A. GONZALEZ
R. PARTYKEVYCH
L. LUTLEY
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL - WOODLEY PARK STATION
SINGLE LINE DIAGRAM
NONE E-06-002 51
A. GONZALEZ
R. PARTYKEVYCH
L. LUTLEY
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL - TYPICAL RISER DIAGRAM
POWER CABLE / CONDUIT
NONE E-06-003 52
A. GONZALEZ
R. PARTYKEVYCH
L. LUTLEY
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ELECTRICAL - TYPICAL RISER DIAGRAM
SCADA CABLE / CONDUIT
NONE E-06-004 53
A. GONZALEZ
R. PARTYKEVYCH
L. LUTLEY
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
FOPP
NETWORK SYMBOLS:
FACP
FO
ETH
SCADA SYMBOLS:
HMI
OIT
SRV
ANC
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
ICA SYMBOLS AND ABBREVIATIONS
FQ15192 NONE IC-00-001 54
S. VARGHESE
V. CAPOBIANCO
T.KUHN
CLEVELAND PARK STATION
FO
F O
REMOTE
HMI
WOODLEY PARK STATION
FO
F O
FOFO
FO FO FO
TUNNEL
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION CONTROL SYSTEM (TVCS)
BLOCK DIAGRAM
FQ15192 NONE IC-06-001 55
T. KUHN
HMI
HMI
B
ETH
E T
H
ETH
E T
H
FO FO FO FO
S
E T
H
RMX
A1
COM
A1
PLC
A
HMI RIO
PS
A
HMI
ROCC
EXISTING
SCADA
SYSTEM
S
PS
B
RMX
A2
IO
PS
A
IO
F O
F O
F O
F O
FOFO
F O
F O
ETH
ETH
ETH
E T
H
E T
H
RMX
B1
COM
B1
PLC
B
HMI
PS
A
HMI
PS
B
RMX
B2
IO
PS
A
IO
F O
FO FO FO FO FO FO FO FO FO FO FO
F O
F O
F O
F O
FO FO
F O
F O
ETH
ETH
ETH
E T
H
S S
RIO
F O
F O
F O
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION CONTROL SYSTEM (TVCS)
COMMUNICATIONS AND NETWORK ARCHITECTURE
FQ15192 NONE IC-06-002 56
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION CONTROL SYSTEM (TVCS), P&ID
TUNNEL VENTILATION FAN (TVF) AND DAMPERS - (VA8, VA9, VA6)
FQ15192 NONE IC-06-003 57
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION CONTROL SYSTEM (TVCS)
P&ID - DETAILS
AS NOTED IC-06-004 58
S. VARGHESE
V.CAPOBIANCO
T. KUHN
P&ID EQUIPMENT TAG LIST - VA8*
BANK/GROUP TAG
# DEVICES IN
BANK/GROUP
EQUIPMENT TAGS MOTOR/ACTUATOR TAGS
P&ID - TUNNEL VENTILATION FAN (TVF)
P&ID - SUGGESTED TAGGING (VA8)
(MULTIPLE MODULES)
P&ID DETAIL - TYPICAL DAMPER
ALARM ANNUNCIATION
P&ID DETAIL - LOCAL FCP
4DRAFT
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
FRONT VIEW - SUGGESTED
LEFT SIDE VIEW - SUGGESTED
TOP VIEW - SUGGESTED
NAMEPLATE ENGRAVING LIST
N# LINE 1 LINE 2 LINE 3
NAMEPLATE ENGRAVING LIST
N# LINE 1 LINE 2 LINE 3
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION CONTROL SYSTEM (TVCS)
FAN CONTOL PANEL - LAYOUT AND DETAILS
FQ15192 AS NOTED IC-06-005 59
S. VARGHESE
V. CAPOBIANCO
5 5 6 7 7 8 9
5 12 13 14 15
2 2 3 22
19 20
18 21
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION CONTROL SYSTEM (TVCS)
FAN CONTROL PANEL - INTERNAL LAYOUT AND DETAILS
FQ15192 AS NOTED IC-06-006 60
S. VARGHESE
V.CAPOBIANCO
T. KUHN
PCR AND SCR - TUNNEL MONITORING CONTROL PANEL AND TERMINAL JUNCTION BOX - EQUIPMENT LIST
ITEM QTY DESCRIPTION MANUFACTURER MODEL NUMBER
POWER DISTRIBUTION
24VDC CONTROL PANEL
POWER DISTRIBUTION
120VAC CONTROL PANEL
UPS MONITORING
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION CONTROL SYSTEM (TVCS)
FAN CONTROL PANEL - TYPICAL SCHEMATICS - SHEET 1 OF 2
FQ15192 AS NOTED IC-06-007 61
S. VARGHESE
V.CAPOBIANCO
COM(+)
COM(-)
IN
COM(+)
COM(-)
IN
IN
IN
IN
SIG +
SIG -
IN
FIELD INSTRUMENT
4-WIRE
SIG +
SIG -
N
G
L
GROUND
NEUT
LINE
COM(+)
COM(-)
OUT
24 VDC(+)
24 VDC(-)
COM(+)
COM(-)
OUT
24 VDC(+)
24 VDC(-)
CR
CR
LOAD
LOAD
COM(+)
COM(-)
OUT
24 VDC(+)
24 VDC(-)
24 VDC(+)
24 VDC(-)
CR
CRCR
24 VDC(-)
24 VDC(-)
24 VDC(-)
SHIELD
MS +
EX +
MS -
EX -
RTD
VIA INTERPOSING RELAY
24VDC POWER CONTACT OUTPUT
VIA INTERPOSING RELAY
DRY CONTACT OUTPUT
24VDC DISCRETE OUTPUT
RTD INPUT FROM 4-WIRE RTD
24VDC DISCRETE INPUT
FROM A SINGLE DEVICE
MULTIPLE 24VDC DISCRETE INPUT
FROM 2-WIRE TRANSMITTER
ANALOG CURRENT INPUT
FROM 4-WIRE TRANSMITTER
ANALOG CURRENT INPUT
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION CONTROL SYSTEM (TVCS)
FAN CONTROL PANEL - TYPICAL SCHEMATICS - SHEET 2 OF 2
FQ15192 AS NOTED IC-06-008 62
S. VARGHESE
V.CAPOBIANCO
4 5
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
REMOTE HMI PANEL - EQUIPMENT LIST
ITEM QTY DESCRIPTION MANUFACTURER MODEL NUMBER
NAMEPLATE ENGRAVING LIST
N# LINE 1 LINE 2 LINE 3
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
TUNNEL VENTILATION CONTROL SYSTEM (TVCS)
REMOTE HMI PANEL - LAYOUT AND DETAILS
FQ15192 AS NOTED IC-06-009 63
S. VARGHESE
V.CAPOBIANCO
T. KUHN
NAMEPLATE ENGRAVING LIST
N# LINE 1 LINE 2 LINE 3
EQUIPMENT LAYOUT
FRONT VIEW
SIDE VIEW
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
PLAN 1 OF 3
1/4" = 1'-0" A-01-001 64
P. BASTARDO
R. WOJ.
R. FRITZ
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
KEY MAP
PLAN AT EL. 21.671DRAFT
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
PLAN 2 OF 3
1/4" = 1'-0" A-01-002 65
P. BASTARDO
R. WOJ.
R. FRITZ
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
PLAN AT EL. 35.841DRAFT
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
VENTILATION SHAFT VA8
PLAN 3 OF 3
FQ15192 1/4"=1-0" A-01-003 66
P. BASTARDO
R. WOJ
R. FRITZ
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL SUBMITTAL
03/15/19 3 RFP CONTRACT DRAWINGS
VA8 PLAN AT TRANSITION LEVEL1DRAFT
N
SCALE: 1/4" = 1'-0"
0 2
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
CONTRACT NO. SHEET NO.
of
FAN SHAFT FA6
PLAN
1/4" = 1'-0" A-01-004 67
P. BASTARDO
R. WOJ.
R. FRITZ
DRAWING NO.SCALE
DATE
DATE
DATE
DRAWN
DESIGNED
CHECKED
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
CONTRACT NO. SHEET NO.
of
APPROVED
DESCRIPTIONDATE NUMTITLE
REVISIONS
NUMBER
REFERENCE DRAWINGS
DEPARTMENT OF DESIGN AND CONSTRUCTION
ENGA - MECHANICAL ENGINEERING
ENGINEER
DATE
ENGINEERING MANAGER
APPROVED
DATEDATE
TUNNEL VENTILATION IMPROVEMENT
CONTRACT DRAWINGS NOT FOR CONSTRUCTION
FQ15192 70
03/15/19
03/15/19
03/15/19
12/07/18 1 INTERMEDIATE SUBMITTAL
02/01/19 2 FINAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.