Windy Hill Site Map.pdf

PDF 3 MB Posted

Attached to
RFP #27-06, Groundwater/Methane Gas Monitoring Services - Annual Contract
Solicitation number
PE-67500-NONST-2027-000000170
Issued by
Henry County, Georgia

About this file

This is a site map document for the Windy Hill location in Henry County, Georgia, supporting a Request for Proposal for groundwater and methane gas monitoring services. The map identifies critical infrastructure elements including well vaults, water supply piping, vent trenches, and their connections across the site. The RFP #27-06 solicits qualified vendors to provide comprehensive groundwater and surface water sample collection, testing, and reporting services, along with methane gas well monitoring for Henry County's closed landfills on a renewable annual contract basis. Proposals must be submitted by 3:00 PM local time on September 10, 2026, through the County's eProcurement Portal at https://procurement.opengov.com/portal/henryga. Mail, common carrier, and in-person submissions are accepted at Henry County Purchasing Department, 140 Henry Parkway, McDonough, GA 30253, while emailed or faxed proposals will not be considered. Proposals may not be withdrawn for sixty days following the closing date, except as permitted by Georgia law.

The contractor must furnish all labor, materials, equipment, tools, and services necessary to manage water samples and perform required laboratory testing and methane gas monitoring at multiple closed landfill sites within Henry County. The contract is structured as a renewable annual agreement, allowing for multi-year engagement contingent on satisfactory performance and continued county requirements. Henry County reserves the right to reject any and all proposals and to waive any technicalities in the evaluation process. No specific pricing terms, set-aside categories, or funding amounts are detailed in the available documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mark Callout 2016 Vent Trench

Mark Callout MM-35 well vault water supply piping

Mark Callout Vent Trench Connection

Mark Polygonal Line

Mark Oval

DLW

Polygonal Line

Mark Callout Vent Trench Connection

Mark Callout 2020 Vent Trench

File details come from the government source that posted it. Updated .