Windy_Hill_Methane_Monitoring_Plan_10-9-2009.pdf

PDF 946 KB Posted

Attached to
(RFP) 27-09, Groundwater/Methane Gas Monitoring Services - Annual Contracts
Solicitation number
27-09
Issued by
Henry County, Georgia

About this file

This is a Methane Monitoring Plan document prepared for Windy Hill in Henry County, Georgia, in support of groundwater and methane gas monitoring services. The plan outlines the monitoring requirements and protocols necessary for compliance with environmental regulations at the specified site. The document establishes the framework for ongoing monitoring activities that align with the related RFP 27-09 solicitation for Groundwater/Methane Gas Monitoring Services - Annual Contracts, which requires submissions by 3:00 PM on September 10, 2026, through Henry County's eProcurement Portal.

The Methane Monitoring Plan details the technical specifications, monitoring locations, frequency of sampling, and analytical procedures required to assess methane gas concentrations and groundwater conditions at the Windy Hill site. The plan serves as the baseline reference document for contractors responding to the annual contract opportunity and ensures standardized monitoring practices throughout the contract term. Contractors bidding on RFP 27-09 must demonstrate their capability to execute the monitoring protocols outlined in this plan, including adherence to established sampling methodologies and reporting requirements for both methane gas and groundwater parameters.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .