This document is a set of as-built electrical drawings for a photovoltaic (PV) generator system installation at the Windsor Readiness Center, a Colorado Army National Guard facility under the Department of Military and Veteran's Affairs. The drawings, prepared by Curtis Hansen and dated July 2018, detail the complete electrical infrastructure for the PV-generator system project number PN080580. The documentation includes comprehensive schematics for multiple electrical panels (SPH, SPL, HE, LE), transformer configurations (TLSB, TSPL), automatic transfer switches (ATS 1 and ATS 2), and associated distribution systems serving various facility loads including exterior lighting, emergency lighting, receptacles, door locks, fire alarm control panels, and corridor and restroom lighting. The system incorporates smart panel monitoring capabilities with status indicators for kilowatt output, kilowatt-hour usage, amperage, load distribution, generator performance, and inverter status, with current transformers positioned on generator output conductors and metering equipment mounted to the ATS housing element.
The electrical system is designed with specific amperage and voltage configurations across multiple panels: a 120-amp, 208-volt panel rated at 2000 AIC capacity; a 277-amp, 480-volt main lug panel rated at 10,000 AIC capacity; and a 120-amp, 208-volt panel rated at 2000 AIC capacity for fire safety systems. The installation includes surge protective devices (SPD) rated at 225 amps with 10,000 and 14,000 AIC capacities, spare breaker provisions, and designated PV connection breakers throughout the facility. The drawings reference multiple circuit connections with specific notes regarding breaker programming to "Tier 2" status for circuits nine and eleven, new breaker installations in designated spaces, and alternative smart panel configurations. Supporting drawing references are provided, including power plan sheets E0.1 through E3.2 (drawing number 150450-E2.01).
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Military and Veteran's Affairs
Colorado Army National Guard Windsor
Readiness Center PV-Generator System
PN080580
Curtis Hansen
AS BUILT 7/2018
UP
Curtis Hansen
*PANELS SPH AND SPL INSTALLED IN
RM C108 DUE TO SPACE LIMITATIONS
UP
Panel SPH
Curtis Hansen Panel SPL
Curtis Hansen
XFMR
TLSB &
TSPL
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
SPL
Curtis Hansen
Curtis Hansen
Curtis Hansen
SPH
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
SPARE JUNCTION BOX AND
CONDUIT FROM MSB TO SPH
FEEDER CONDUIT FROM HE TO SPH
Generator status and output ATS 1 kW, kWh, Amps ATS 2 kW, kWh, Amps smart panel status (2) smart panel load (2) GPM controller failure status GPM inverter limiting status
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen x
Curtis Hansen x
Curtis Hansen x
Curtis Hansen x
Curtis Hansen x
Curtis Hansen x
Curtis Hansen *CT’s ARE LOCATED ON GENERATOR OUTPUT CONDUCTORS
**METER MOUNTED TO ATS ‘HE’
SPD
10,000
DESCRIPTION
C112/C113 Rcpt (New)
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
Space
Space
Space
TOTAL
TOTAL
LOAD
DESIGN
AMP
AIC
/ 208
L
VOLT
A MAIN CB
R
M
A
E
T|S|O
M|A|E|H
KVA
AMPS
PHASE
PANEL
GROUND BUS
100% NEUTRAL BUS
PHASE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
LOADS IN
VOLT-AMPERES
50.0
SPL
KVA
AMPS
AMPS
L
WIRE SERVICE
R
CONNECTED
DESIGN
DEMAND
SPARE
M
A
E
SURFACE MOUNTED
T|S|O
M|A|E|H DESCRIPTION
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
Space
Space
TOTAL
KVA
KVA
KVA
KVA
SPD
14,000
DESCRIPTION
Area A Exterior Ltg
Area B Exterior Ltg
Area C Exterior Ltg
Area A Em Ltg
Area C Em Ltg
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
Space
Space
Space
TOTAL
TOTAL
LOAD
DESIGN
SPARE
AMP
AIC
/ 480
L
VOLT
MAIN LUGS ONLY
R
16.0
19.3
M
A
E
T|S|O
M|A|E|H
KVA
AMPS
PHASE
D.F.
PANEL
GROUND BUS
100% NEUTRAL BUS
PHASE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
LOADS IN
VOLT-AMPERES
18.7
22.5
60.0
37.5
HE
KVA
AMPS
AMPS
AMPS
L
WIRE SERVICE
R
CONNECTED
DESIGN
DEMAND
SPARE
S
S
S
M
A
E
SURFACE MOUNTED
T|S|O
M|A|E|H
2960.0
3653.0
1000.0
DESCRIPTION
TRANSFORMER
TE
Area B Em Ltg
PV CONNECTION BRKR
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
TOTAL
18.7
49.9
18.7
31.2
KVA
KVA
KVA
KVA
10,000
DESCRIPTION
FACP
C116 Door Locks
LCPA
Spare
Spare
Spare
Spare
Spare
TOTAL
TOTAL
LOAD
DESIGN
SPARE
AMP
AIC
/ 208
L
VOLT
A MAIN CB
R
5.0
8.4
E
E
E
M
A
E
T|S|O
M|A|E|H
KVA
AMPS
PHASE
PANEL
GROUND BUS
100% NEUTRAL BUS
PHASE
A
B
C
A
B
C
A
B
C
A
B
C
LOADS IN
VOLT-AMPERES
5.0
13.9
50.0
36.1
LE
KVA
AMPS
AMPS
AMPS
L
WIRE SERVICE
R
CONNECTED
DESIGN
DEMAND
SPARE
E
E
M
A
E
SURFACE MOUNTED
T|S|O
M|A|E|H
DESCRIPTION
MNS Power Supply
B104 - Door Locks
LCPB
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
TOTAL
5.0
18.0
5.0
13.0
KVA
KVA
KVA
KVA
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
Spare
Spare
Spare
Space
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
SPD
14,000
DESCRIPTION
C111/C114 Lighting
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
Space
Space
Space
TOTAL
TOTAL
LOAD
DESIGN
AMP
AIC
/ 480
L
VOLT
A MAIN CB
R
10.2
M
A
E
T|S|O
M|A|E|H
KVA
AMPS
PHASE
PANEL
GROUND BUS
100% NEUTRAL BUS
PHASE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
LOADS IN
VOLT-AMPERES
60.0
SPH
KVA
AMPS
AMPS
L
WIRE SERVICE
R
CONNECTED
DESIGN
DEMAND
SPARE
M
A
E
SURFACE MOUNTED
T|S|O
M|A|E|H DESCRIPTION
Spare
Spare
Spare
Spare
Spare
Space
Space
TOTAL
KVA
KVA
KVA
KVA
Corridor Lighting
Restroom Lighting
Spare
Spare
Spare
Space
XFMR
Spare
Spare
Spare
Spare
Spare
0 2000
C111/C114 Lighting(Note 1)
NOTES:
1. CONNECT TO SPARE BREAKER IN PANEL.
NOTES:
1. CONNECT TO SPARE BREAKER IN PANEL.
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
(Note 2)
2. NEW BREAKER IN SPACE NOTED. THIS BREAKER SHALL FEED PANEL SPH FOR SMART PANEL ALTERNATE.
Spare
Spare
Spare
PV CONNECTION BRKR
Spare
Spare
Spare
Curtis Hansen
Curtis Hansen
SPARE BREAKERS FOR CIRCUITS 9 & 11 PROGRAMMED TO ‘TIER 2’
Curtis Hansen
Curtis Hansen
Curtis Hansen
FEED TO PANEL SPH
SPARE
| 150450-E2.01-Power Plan-E0.1 |
| 150450-E2.01-Power Plan-E0.2 |
| 150450-E2.01-Power Plan-E1.1 |
| 150450-E2.01-Power Plan-E2.1 |
| 150450-E2.01-Power Plan-E2.2 |
| 150450-E2.01-Power Plan-E3.1 |
| 150450-E2.01-Power Plan-E3.2 |
File details come from the government source that posted it. Updated .