Windsor PV Generator Systems As Built Dwgs.pdf

PDF 3 MB Posted

Attached to
OAAA, 2010, 082506, Windsor Readiness Center Backup Battery
Solicitation number
IFB1 OAAA 2027000019 4
Issued by
Weld County, Colorado Springs City, Colorado

About this file

This document is a set of as-built electrical drawings for a photovoltaic (PV) generator system installation at the Windsor Readiness Center, a Colorado Army National Guard facility under the Department of Military and Veteran's Affairs. The drawings, prepared by Curtis Hansen and dated July 2018, detail the complete electrical infrastructure for the PV-generator system project number PN080580. The documentation includes comprehensive schematics for multiple electrical panels (SPH, SPL, HE, LE), transformer configurations (TLSB, TSPL), automatic transfer switches (ATS 1 and ATS 2), and associated distribution systems serving various facility loads including exterior lighting, emergency lighting, receptacles, door locks, fire alarm control panels, and corridor and restroom lighting. The system incorporates smart panel monitoring capabilities with status indicators for kilowatt output, kilowatt-hour usage, amperage, load distribution, generator performance, and inverter status, with current transformers positioned on generator output conductors and metering equipment mounted to the ATS housing element.

The electrical system is designed with specific amperage and voltage configurations across multiple panels: a 120-amp, 208-volt panel rated at 2000 AIC capacity; a 277-amp, 480-volt main lug panel rated at 10,000 AIC capacity; and a 120-amp, 208-volt panel rated at 2000 AIC capacity for fire safety systems. The installation includes surge protective devices (SPD) rated at 225 amps with 10,000 and 14,000 AIC capacities, spare breaker provisions, and designated PV connection breakers throughout the facility. The drawings reference multiple circuit connections with specific notes regarding breaker programming to "Tier 2" status for circuits nine and eleven, new breaker installations in designated spaces, and alternative smart panel configurations. Supporting drawing references are provided, including power plan sheets E0.1 through E3.2 (drawing number 150450-E2.01).

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Military and Veteran's Affairs

Colorado Army National Guard Windsor

Readiness Center PV-Generator System

PN080580

Curtis Hansen

AS BUILT 7/2018

UP

Curtis Hansen

*PANELS SPH AND SPL INSTALLED IN

RM C108 DUE TO SPACE LIMITATIONS

UP

Panel SPH

Curtis Hansen Panel SPL

Curtis Hansen

XFMR

TLSB &

TSPL

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

SPL

Curtis Hansen

Curtis Hansen

Curtis Hansen

SPH

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

SPARE JUNCTION BOX AND

CONDUIT FROM MSB TO SPH

FEEDER CONDUIT FROM HE TO SPH

Generator status and output ATS 1 kW, kWh, Amps ATS 2 kW, kWh, Amps smart panel status (2) smart panel load (2) GPM controller failure status GPM inverter limiting status

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen

Curtis Hansen x

Curtis Hansen x

Curtis Hansen x

Curtis Hansen x

Curtis Hansen x

Curtis Hansen x

Curtis Hansen *CT’s ARE LOCATED ON GENERATOR OUTPUT CONDUCTORS

**METER MOUNTED TO ATS ‘HE’

SPD

10,000

DESCRIPTION

C112/C113 Rcpt (New)

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Space

Space

Space

Space

Space

Space

TOTAL

TOTAL

LOAD

DESIGN

AMP

AIC

/ 208

L

VOLT

A MAIN CB

R

M

A

E

T|S|O

M|A|E|H

KVA

AMPS

PHASE

PANEL

GROUND BUS

100% NEUTRAL BUS

PHASE

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

LOADS IN

VOLT-AMPERES

50.0

SPL

KVA

AMPS

AMPS

L

WIRE SERVICE

R

CONNECTED

DESIGN

DEMAND

SPARE

M

A

E

SURFACE MOUNTED

T|S|O

M|A|E|H DESCRIPTION

Spare

Spare

Spare

Spare

Spare

Space

Space

Space

Space

Space

TOTAL

KVA

KVA

KVA

KVA

SPD

14,000

DESCRIPTION

Area A Exterior Ltg

Area B Exterior Ltg

Area C Exterior Ltg

Area A Em Ltg

Area C Em Ltg

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Space

Space

Space

Space

Space

Space

TOTAL

TOTAL

LOAD

DESIGN

SPARE

AMP

AIC

/ 480

L

VOLT

MAIN LUGS ONLY

R

16.0

19.3

M

A

E

T|S|O

M|A|E|H

KVA

AMPS

PHASE

D.F.

PANEL

GROUND BUS

100% NEUTRAL BUS

PHASE

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

LOADS IN

VOLT-AMPERES

18.7

22.5

60.0

37.5

HE

KVA

AMPS

AMPS

AMPS

L

WIRE SERVICE

R

CONNECTED

DESIGN

DEMAND

SPARE

S

S

S

M

A

E

SURFACE MOUNTED

T|S|O

M|A|E|H

2960.0

3653.0

1000.0

DESCRIPTION

TRANSFORMER

TE

Area B Em Ltg

PV CONNECTION BRKR

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Space

Space

Space

TOTAL

18.7

49.9

18.7

31.2

KVA

KVA

KVA

KVA

10,000

DESCRIPTION

FACP

C116 Door Locks

LCPA

Spare

Spare

Spare

Spare

Spare

TOTAL

TOTAL

LOAD

DESIGN

SPARE

AMP

AIC

/ 208

L

VOLT

A MAIN CB

R

5.0

8.4

E

E

E

M

A

E

T|S|O

M|A|E|H

KVA

AMPS

PHASE

PANEL

GROUND BUS

100% NEUTRAL BUS

PHASE

A

B

C

A

B

C

A

B

C

A

B

C

LOADS IN

VOLT-AMPERES

5.0

13.9

50.0

36.1

LE

KVA

AMPS

AMPS

AMPS

L

WIRE SERVICE

R

CONNECTED

DESIGN

DEMAND

SPARE

E

E

M

A

E

SURFACE MOUNTED

T|S|O

M|A|E|H

DESCRIPTION

MNS Power Supply

B104 - Door Locks

LCPB

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

TOTAL

5.0

18.0

5.0

13.0

KVA

KVA

KVA

KVA

C112/C113 Rcpt (New)

C112/C113 Rcpt (New)

C112/C113 Rcpt (New)

Spare

Spare

Spare

Space

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

SPD

14,000

DESCRIPTION

C111/C114 Lighting

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Spare

Space

Space

Space

Space

Space

Space

TOTAL

TOTAL

LOAD

DESIGN

AMP

AIC

/ 480

L

VOLT

A MAIN CB

R

10.2

M

A

E

T|S|O

M|A|E|H

KVA

AMPS

PHASE

PANEL

GROUND BUS

100% NEUTRAL BUS

PHASE

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

A

B

C

LOADS IN

VOLT-AMPERES

60.0

SPH

KVA

AMPS

AMPS

L

WIRE SERVICE

R

CONNECTED

DESIGN

DEMAND

SPARE

M

A

E

SURFACE MOUNTED

T|S|O

M|A|E|H DESCRIPTION

Spare

Spare

Spare

Spare

Spare

Space

Space

TOTAL

KVA

KVA

KVA

KVA

Corridor Lighting

Restroom Lighting

Spare

Spare

Spare

Space

XFMR

Spare

Spare

Spare

Spare

Spare

0 2000

C111/C114 Lighting(Note 1)

NOTES:

1. CONNECT TO SPARE BREAKER IN PANEL.

NOTES:

1. CONNECT TO SPARE BREAKER IN PANEL.

C112/C113 Rcpt (New)

C112/C113 Rcpt (New)

C112/C113 Rcpt (New)

C112/C113 Rcpt (New)

(Note 2)

2. NEW BREAKER IN SPACE NOTED. THIS BREAKER SHALL FEED PANEL SPH FOR SMART PANEL ALTERNATE.

Spare

Spare

Spare

PV CONNECTION BRKR

Spare

Spare

Spare

Curtis Hansen

Curtis Hansen

SPARE BREAKERS FOR CIRCUITS 9 & 11 PROGRAMMED TO ‘TIER 2’

Curtis Hansen

Curtis Hansen

Curtis Hansen

FEED TO PANEL SPH

SPARE

150450-E2.01-Power Plan-E0.1
150450-E2.01-Power Plan-E0.2
150450-E2.01-Power Plan-E1.1
150450-E2.01-Power Plan-E2.1
150450-E2.01-Power Plan-E2.2
150450-E2.01-Power Plan-E3.1
150450-E2.01-Power Plan-E3.2

File details come from the government source that posted it. Updated .