About this file

Amendment 2 OPA March 19 2015

View the file

Other files

File Type Posted
Amendment_0003.pdf PDF
Amendment_3__Lee_Courthouse_3-20-15.pdf PDF
Questions_and_Answers.pdf PDF
Amendment_0002.pdf PDF
SF_24_Bid_Bond.pdf PDF
Amendment_0001.pdf PDF
Preproposal_Conference_Attendees.pdf PDF
PreProposalConference_Minutes.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

231 Main Street, Biddeford, Maine 04005 TEL 207.283.0193 FAX 207.283.4283 www.oakpoint.com

Amendment NO. 2

Date: March 18, 2014

Project: Window Rehabilitation and Associated Repairs

Richard C. Lee Courthouse New Haven Connecticut

This amendment is issued prior to receipt of the bids and does hereby become a part of the contract documents, and in case of conflict, it shall supersede original project manual and drawings.

Each bidder shall be responsible for issuing information contained herein to sub-contractors and suppliers to ensure that his/her proposal covers all work required by the contract documents including this amendment.

Each bidder shall acknowledge receipt of this amendment on the Contractor Bid Form where indicated.

SPECIFICATIONS

Specification Section 011400 “Work Restrictions”

1. Paragraph 1.3.C Contractor’s Required Work Hours: Delete and Replace with the following: The work shall generally be performed during the Contractor’ General Working Hours. Excessive noise generating and disruptive work shall occur at the Government’s Minimally Occupied hours of early morning (6:00-9:00am) and late afternoons (3:00-6:00pm); based upon an anticipated Court schedule of 9:00am-3:00pm and Government off hours of 6:00pm-6:00am.

1. In general noise generating activities will be permitted throughout the work day based upon Contractor’s close, day to day coordination with the designated US Court’s and Marshall’s personnel, the Contracting Officer and field testing. Whenever work activities disrupt specific U.S. Court trials, activities or Judge’s requirements, regardless of the decibel level, work shall be designated under the following requirements.

2. Noise, Odor Producing, Dust and Vibration Producing Activities: Construction activities that will be disruptive to building occupants and U.S. Court and Marshall activities, as determined by the Contracting Officer, such as noise, dust and vibration shall be performed only prior to and after normal working hours, or on weekends and shall be coordinated with the Contracting Officer.

Specification Section 012350 “Options” Paragraph 1.1.C Performance Period: Delete last sentence and Replace with the following: “Each awarded option will extend the contract completion date by 47 calendar days.”

Specification Section 015000 “Temporary Facilities and Controls” Paragraph 3.5.A.1 Delete and replace with the following: Staging/Fencing Enclosure: Provide building staging/fencing with tamperproof plywood enclosure secured to the first two full levels of staging to prevent physical scaling of the staging. Provide lockable personnel and material access doors to the

Amendment No.2 Southern Maine Community College Campus Center Café, Bookstore, and Interior Renovations, Phase 2 - Cafe

South Portland, Maine • November 21, 2013, 2013, Page 2 of 3 staging. Provide the Contracting Officer three sets of keys to doors to facilitate emergency access.

Staging/fencing shall be removed before completion but after such time as the building can be secured.

Patch and/or repair any site or building conditions disturbed by the staging/fencing.

DRAWINGS

Drawing AE103

1. Rehabilitation Notes – Keynote 1, add the following:

“Catwalk/scaffolding:

Capacity: 40psf;

Width: 36”;

Material: Steel platform framing and steel grating platform;

Overhead Structure Beams: Approximately 23’-0” OC.”

Drawing AE120

1. Detail 2 Add the following note: “Conduit runs along the north, east and south elevation granite watertable anchored by clip and masonry fastener. Reinstall conduit in same manner through the membrane into stone joint with water cut-off mastic below screw head. Anchor spacing not exceed

10’-0” OC.

2. Detail 3 Add the following note: “Provide ‘Wire Strainer-Copper’; World Gutter Systems or comparable product.”

Drawing AE103

1. Detail 1, Café Equipment Floor Plan - Change Keynote B to read “CERAMIC TILE WALL FINISH TO BE

PROVIDED BY THE GENERAL CONTRACTOR FROM A HEIGHT OF 3’-1” ABOVE FINISH FLOOR TO THE

UNDERSIDE OF THE ACOUSTIC TILE CEILING (8’-10”). PAINT GYPSUM BOARD WALL BELOW

CERAMIC TILE. STAINLESS STEEL WALL PANELS TO BE PROVIDED AND INSTALLED BY THE KITCHEN EQUIPMENT CONTRACTOR AT THE 13’-0” +/- LENGTH OF WALL BEHIND THE FRYER, GRIDDLE , AND

CHARBROILER AT THE SOUTH WALL.”

Drawing AE601

1. Change “WOOD FRAME TYPES” at door frame elevations 3 and 4 to “HOLLOW METAL FRAME

TYPES”.

2. Room Finish Schedule – At Kitchen 101C and Kitchen 101D Change wall finish “SSP” to “CWT”

(Ceramic Wall Tile) from a height of 3’-1” above finish floor to underside of SAT ceiling (8’-10”).

Paint gypsum board wall below the ceramic tile. See interior elevations SK-A1,A2,A3,A4 included with this addendum for additional information.

3. Finish Schedule Key – Add “CWT=Ceramic Wall Tile”

4. Color Key/Manufacturer Guide- At Floors materials, Add the following ceramic wall tile colors:

Royal Mosa, Mosa Colors:

6”X6” TILE

CWT-1 20920

CWT-2 19990

CWT-3 17990

CWT-4 18950

CWT-5 18900

CWT-6 18910

CWT-7 18990

CWT-8 18960

CWT-9 20910

CWT-10 19910

CWT-11 17910

Amendment No.2 Southern Maine Community College Campus Center Café, Bookstore, and Interior Renovations, Phase 2 - Cafe

South Portland, Maine • November 21, 2013, 2013, Page 3 of 3

6”X12” TILE

CWT-12 18920

CWT-13 19920

Drawing AE720

1. Detail 4, Typ Soffit Detail – Add note “Provide wood blocking for flat screen TV mounts at three locations at face of gypsum board soffit below existing steel beam. TV mount shall be provided by the Kitchen Equipment Contractor. Coordinate locations with the Kitchen Equipment contractor.”

Drawing AE740

1. Details 2,3,4,10 Café 101 Elevations – Delete and Replace with elevations shown on SK-

A1,A2,A3,A4.

2. Keynotes – Delete keynote F.

ATTACHMENTS

1. Pre-Bid Meeting sign-in sheet

2. SK-A1, SK-A2, SK-A3, SK-A4

3. Specification Section 093013 “Ceramic Tiling”

END OF AMENDMENT No. 2

File details come from the government source that posted it. Updated .