Wildhawk Water Treatment Plant Recoating Project Phase 2
Solicitation number
4620
Issued by
Sacramento County, San Francisco City, California

About this file

This is a Notice to Contractors document from the Sacramento County Water Agency for the Wildhawk Water Treatment Plant Recoating Project Phase 2, located at 10325 Wildhawk Drive, Sacramento, CA 95829. The project involves comprehensive modifications and recoating of multiple water storage tanks, including a 1.5 MG treated water storage tank, a 0.165 MG backwash tank, and a 0.080 MG sludge tank. Specific work includes inspection blasting of interior roof rafter beams, replacing the center column dollar plate with a steel conical truss, cutback of roof rafter beams, reinstallation of tank opening door sheets, installation of roof vents and perimeter guard rails, and surface preparation and coating of interior and exterior surfaces. The bid response deadline is February 15, 2024, at 2:00 pm, with a mandatory pre-bid meeting scheduled for February 1, 2024, at 9:00 am. Electronic bids must be submitted through the Sacramento County Electronic Bidding Portal.

The estimated construction cost is $1,691,139, and the project requires a General Engineering Contractor license (Class A and Class 33). Bidders must provide a bid guarantee of at least 10% of the bid amount in the form of a bid bond, certified check, or cashier's check. The contract includes labor compliance requirements, with bidders needing to comply with prevailing wage regulations and be registered with the California Department of Industrial Relations. Contractors must submit various documentation, including a non-collusion declaration, Iran Contracting Act disclosure, and proof of licensing and registration. The basis for award will be the base bid only, with no consideration of additive or deductive items.

View the file

Other files

File Type Posted
4620_Plans_&_Specs_-_Feb_2024.pdf PDF
ATTACHMENT_2_Title_VI_Assurances.pdf PDF
ATTACHMENT_1_FHWA_1273,_7.5.22_Rev.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO CONTRACTORS

WILDHAWK WATER TREATMENT PLANT RECOATING PROJECT

PHASE 2

County of Sacramento

9660 Ecology Lane

Sacramento, CA 95827

RELEASE DATE: January 18, 2024

DEADLINE FOR QUESTIONS: February 8, 2024

RESPONSE DEADLINE: February 15, 2024, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/%7bproject.government.code%7d

County of Sacramento

NOTICE TO CONTRACTORS

Wildhawk Water Treatment Plant Recoating Project Phase 2

1. Introduction

2. Notice to Contractors

3. Pricing Proposal

4. Vendor Submissions

Attachments:

A - 4620 Plans & Specs - Feb 2024

Notice to Contractors #4620 Title: Wildhawk Water Treatment Plant Recoating Project Phase 2

1. Introduction

1.1. Summary

In general, the work to be performed under this contract includes the furnishing of all labor, materials, and equipment for modifying the 1.5 MG ground level steel water storage tank no.

2’s internal roof support structure; and for the interior and exterior recoating of the 1.5 MG treated water storage tank no. 2 (built 2005), 0.165 MG backwash tank (built 2005), 0.080 MG sludge tank (built 2005); and other related facilities at a water treatment plant. All facilities are owned by the Sacramento County Water Agency and are located at 10325 Wildhawk Drive, Sacramento, CA 95829. The work includes, but is not limited to, inspection blast of interior inner ring roof rafter beams at center vent of the 1.5 MG treated water storage tank no. 2;

replacement of the 1.5 MG treated water storage tank no. 2’s center column dollar plate with a new steel conical truss; cutback of inner ring roof rafter beams (approximately 12 to 18 inches) in the 1.5 MG treated water storage tank no. 2; removal and reinstallation of temporary tank opening door sheet on the 1.5 MG treated water storage tank no. 2; installation of two new roof vents atop the 1.5 MG treated water storage tank no. 2; installation of a perimeter guard rail atop the 1.5 MG treated water storage tank no. 2, 0.165 MG backwash tank and 0.080 MG sludge tank; surface preparation and coating application of the interior and exterior surfaces of the 1.5 MG treated water storage tank no. 2, the 0.165 MG backwash tank and the 0.080 MG sludge tank; exterior surface preparation and coating application of one (7-pump) reclaimed water booster station, all site hydrants, bollards and conduits; and, compliance with all health, safety, and other applicable federal, state or local regulations whose jurisdiction the facilities are located within

1.2. Contact Information

Juan Perez

Assistant Civil Engineer

Email: perezju@saccounty.gov

Phone: (916) 875-6916

Department:

DGS: CAPSD - Construction

Department Head:

Jeff Gasaway

Department Director

1.3. Timeline

Release Project Date January 18, 2024 mailto:perezju@saccounty.gov tel:(916)875-6916

Pre-Bid Meeting (Mandatory) February 1, 2024, 9:00am

10325 Wildhawk Drive, Sacramento, CA 95829

Question Submission Deadline February 8, 2024, 4:00pm

Question Response Deadline February 12, 2024, 4:00pm

Bid Submission Deadline February 15, 2024, 2:00pm

Bid Opening February 15, 2024, 2:00pm

2. Notice to Contractors

2.1. ADVERTISEMENT SUMMARY

Notice is hereby given that the Board of Directors of the Sacramento County Water Agency will receive sealed bids for the following project:

BID DATE: Thursday, February 15, 2024

SUBMIT BIDS TO: COUNTY OF SACRAMENTO. SUBMIT ELECTRONIC RESPONSES VIA THE SACRAMENTO

COUNTY ELECTRONIC BIDDING PORTAL (SACCOUNTYEBIDS). BIDDERS MUST ELECTRONICALLY SUBMIT

THEIR BID ONLINE NO LATER THAN 2:00 PM ON THE DAY OF THE BID. BID OPENING(S) WILL BE ONLINE

AT 2:00 PM AT THE FOLLOWING LINK: SACCOUNTYEBIDS.

Responses delivered by hand, fax, telephone, e-mail, or any postal carrier will not be accepted. If bidder uploads a file to SacCountyEbids, it is the bidder's responsibility to ensure the file is not corrupt or damaged. If County is unable to open an attachment because it is damaged, corrupt, infected, etc., it may disqualify bidder’s submission. See this training guide for assistance in entering your online response.

FOR: Wildhawk Water Treatment Plant Recoating Project Phase 2

CONTRACT NUMBER: 4620

ESTIMATED CONSTRUCTION COST: $1,691,139

CONTRACTOR LICENSE REQUIRED: General Engineering Contractor, Class A, and Class 33

PRE-BID QUESTIONS DUE VIA Q&A: Date: Thursday, February 8, 2024 No later than: 4:00 pm

PROJECT DESCRIPTION: The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and other incidental work for: modifying the 1.5 MG ground level steel water storage tank no. 2’s internal roof support structure; and for the interior and exterior recoating of the 1.5 MG treated water storage tank no. 2 (built 2005), 0.165 MG backwash tank (built 2005), 0.080

MG sludge tank (built 2005); and other related facilities at a water treatment plant. All facilities are owned by the Sacramento County Water Agency and are located at 10325 Wildhawk Drive, Sacramento, CA 95829. The work includes, but is not limited to, inspection blast of interior inner ring roof rafter beams at center vent of the 1.5 MG treated water storage tank no. 2; replacement of the 1.5 MG treated water storage tank no. 2’s center column dollar plate with a new steel conical truss; cutback of inner ring roof rafter beams (approximately 12 to 18 inches) in the 1.5 MG treated water storage tank

no. 2; removal and reinstallation of temporary tank opening door sheet on the 1.5 MG treated water storage tank no. 2; installation of two new roof vents atop the 1.5 MG treated water storage tank no. 2;

installation of a perimeter guard rail atop the 1.5 MG treated water storage tank no. 2, 0.165 MG backwash tank and 0.080 MG sludge tank; surface preparation and coating application of the interior and exterior surfaces of the 1.5 MG treated water storage tank no. 2, the 0.165 MG backwash tank and the 0.080 MG sludge tank; exterior surface preparation and coating application of one (7-pump) reclaimed water booster station, all site hydrants, bollards and conduits; and, compliance with all https://secure.procurenow.com/portal/saccounty https://secure.procurenow.com/portal/saccounty http://help.procurenow.com/en/articles/5815468-opengov-procurement-vendor-training health, safety, and other applicable federal, state or local regulations whose jurisdiction the facilities are located within.

BASIS FOR AWARD: The basis for award shall be base bid only, with no additive or deductive items, or no consideration of additive or deductive items.

CONTRACT INFORMATION: Contract Documents are contained herein and include: Notice to

Contractors, the Sacramento County Standard Construction Specifications, the Special Provisions, the

Bid Proposal form and any attachments, exhibits, drawings, addenda, and/or documents provided by the Project Manager that pertain to this project.

• Contract Documents are available at: SacCountyEbids

• The Standard Construction Specifications, which are incorporated by reference in the Contract

Documents, may be downloaded at: https://saccountyspecs.saccounty.gov/Pages/default.aspx.

2.2. MANDATORY PRE-BID MEETING

A mandatory pre-bid meeting will be held on Thursday, February 1, 2024, at 9:00 am, 10325 Wildhawk

Drive, Sacramento, CA 95829. The project engineers will be present to provide a project summary and to answer questions.

Attendance of the Pre-Bid Conference is MANDATORY for this project. The mandatory pre-bid conference and walk-through will be held for the purpose of reviewing questions regarding the project.

A representative of the prime Contractor must be in attendance and sign the log. A representative of the

County will be present to review the project with the bidders, allow bidders to walk the site and to answer questions. Bids received from bidders who do not attend this meeting will be deemed non-responsive.

2.3. BID GUARANTEES

Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the

Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid.

2.4. BONDS

The successful bidder shall be required to execute a material and labor Payment Bond and Performance

Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price.

Pursuant to Public Contract Code, section 22300, the Contractor may, at its own expense, substitute securities for any money being withheld by the County to ensure performance under this contract. The

Contractor must notify the County of its intent to pursue this option prior to the issuance/execution of a contract.

https://saccountyspecs.saccounty.gov/Pages/default.aspx

2.5. LICENSE REQUIREMENTS

Award of this contract requires a valid California contractor's license with the classification identified above.

Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractor’s license number on the bid form.

No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5.

2.6. LABOR COMPLIANCE PROGRAM

The County of Sacramento received final approval from the Director of California Department of

Industrial Relations as a Labor Compliance Program effective March 15, 1994. All questions regarding this Labor Compliance Program and prevailing wage requirements should be directed to the Labor

Compliance Section at: 916-875-2711. In accordance with Section 1771.5 of the California Labor Code, the payment of the general prevailing rate of per diem wages or the general prevailing rate of per diem wages for holiday and overtime is not required for any public works project of $25,000 or less when the project is for construction work, or for any public works project of $15,000 or less when the project is for alteration, demolition, repair, or maintenance work.

This is a Construction project in accordance with Labor Code section 1771.5.

Pursuant to California Labor Code, section 1720 and following, and section 1770 and following, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the

Director of the California Department of Industrial Relations. Copies of the prevailing wage determinations are on file at the office of the County of Sacramento Labor Compliance Program, 9700

Goethe Road, Suite D, Sacramento, CA 95827, and are also available at http://www.dir.ca.gov/DLSR/PWD.

2.7. QUESTIONS

Direct pre-bid questions to the Project Manager, Juan Perez, via the Q&A tab in the portal. ALL PRE-BID

QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN Thursday, February 8, 2024 BY 4:00 pm.

Questions received after that time will not be answered. Responses will be by addenda to the bid documents.

The Board reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder.

By order of the Board of Directors of the Sacramento County Water Agency, Sacramento County, California, dated: 12/05/2023.

Clerk of the Board

Sacramento County Water Agency

3. Pricing Proposal

WILDHAWK WATER TREATMENT PLANT RECOATING PROJECT PHASE 2

Line Item Description Quantity Unit of

Measure Unit Cost Total

G001 Mobilization/Demobilization 1 LS

W001 Inspection Blast of Interior Inner Ring

Roof Rafter Beams at Center Vent of the 1.5 MG Treated Water Storage

Tank No. 2

1 LS

W002 Removal and Reinstallation of

Temporary Tank Opening Door Sheet on 1.5 MG Treated Water Storage

Tank No. 2

1 LS

W003 Installation of Center Column Steel

Conical Truss Rafter Support Structure in 1.5 MG Treated Water Storage

Tank No. 2

1 LS

W004 Cutback of Inner Ring Roof Rafter

Beams at Center Column (approx 18 inches) in 1.5 MG Treated Water

Storage Tank No. 2

30 EA

W005 Installation of Two New Additional

Roof Vents Atop the 1.5 MG Treated

Water Storage Tank No. 2

1 LS

W006 Installation of guard rail atop 1.5 MG

Treated Water Storage Tank No. 2

452 FT

W007 Installation of guard rail atop 0.165

MG Backwash Tank No. 2

87 FT

W008 Installation of guard rail atop 0.080

MG Sludge Tank

40 FT

W009 Installation of 6-in x 6-in x ¼-in steel plate

10 EA

W010 Installation of 12-in x 12-in x ¼-in steel plate

10 EA

Line Item Description Quantity Unit of

Measure Unit Cost Total

W011 Prepare 1.5 MG Treated Water

Storage Tank No. 2 Interior for

Recoating

1 LS

W012 Recoat 1.5 MG Treated Water Storage

Tank No. 2 Interior

1 LS

W013 Install caulking in interior of 1.5 MG

Treated Water Storage Tank No. 2

1 LS

W014 Prepare 1.5 MG Treated Water

Storage Tank No. 2 Exterior for

Recoating

1 LS

W015 Recoat 1.5 MG Treated Water Storage

Tank No. 2 Exterior

1 LS

W016 Prepare 0.165 MG Backwash Tank No.

2 Interior for Recoating

1 LS

W017 Recoat 0.165 MG Backwash Tank No.

2 Interior

1 LS

W018 Install caulking in interior of 0.165 MG

Backwash Tank No. 2

1 LS

W019 Prepare 0.165 MG Treated Water

Storage Tank No. 2 Exterior for

Recoating

1 LS

W020 Recoat 0.165 MG Treated Water

Storage Tank No. 2 Exterior

1 LS

W021 Prepare 0.080 Sludge Tank Interior for

Recoating

1 LS

W022 Recoat 0.080 MG Sludge Tank Interior 1 LS

W023 Install caulking in interior of 0.080 MG

Sludge Tank

1 LS

W024 Prepare 0.080 MG Sludge Tank

Exterior for Recoating

1 LS

Line Item Description Quantity Unit of

Measure Unit Cost Total

W025 Recoat 0.080 MG Sludge Tank Exterior 1 LS

W026 Prepare Reclaimed Water Pump

Station Exterior for Recoating

1 LS

W027 Recoat Reclaimed Water Pump

Station Exterior

1 LS

W028 Prepare Site Hydrants for Recoating 6 EA

W029 Recoat Site Hydrants 6 EA

W030 Prepare Site Conduits 1 LS

W031 Recoat Site Conduits 1 LS

W032 Prepare Site Bollards 88 EA

W033 Recoat Site Bollards 88 EA

TOTAL

4. Vendor Submissions

4.1. What form of Bid Guarantee will Contractor be submitting?* Bid security must be a bidder bond, a certified check or cashier’s check payable to the Treasurer of the

County of Sacramento, or cash. Bids secured by personal checks or personal guarantees will be rejected.

☐ Scanned copy of Fully Executed Bid Bond

☐ E-bid Bond (Use Surety 2000)

☐ Cashier's or Certified Check

☐ Cash

*Response required

4.2. Bid Guarantee

Upload a scanned copy of your fully executed bid bond here if Contractor is submitting a scanned bid bond.

3. E-Bid Bond

Please enter your Bid Bond information from Surety2000 below If Contractor is submitting an E-Bid

Bond

4.3. Non-collusion Declaration*

The undersigned declares:

I am an authorized representative with binding authority for my company, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on the date this bid is submitted.

☐ Please confirm

*Response required

4.4. Iran Contracting Act Disclosure Form *

(California Public Contract Code, sections 2202-2208)

When responding to a bid or proposal or executing a contract or renewal for a County of Sacramento contract for goods or services of $1,000,000 or more, a vendor must either:

A. certify it is not on the current list of persons engaged in investment activities in Iran created by the California Department of General Services (“DGS”) pursuant to Public Contract Code section

2203(b) and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person, for 45 days or more, if that other person will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS; or

B. demonstrate it has been exempted from the certification requirement for that solicitation or contract pursuant to Public Contract Code section 2203(c) or (d).

To comply with this requirement, please select one of the options below. Please note: California law establishes penalties for providing false certifications, including civil penalties equal to the greater of

$250,000 or twice the amount of the contract for which the false certification was made; contract termination; and three-year ineligibility to bid on contracts. (Public Contract Code section 2205.)

OPTION #1 - CERTIFICATION

I certify I am duly authorized to execute this certification on behalf of the vendor/financial institution, and the vendor/financial institution is not on the current list of persons engaged in investment activities in Iran created by DGS and is not a financial institution extending twenty million dollars ($20,000,000) or more in credit to another person/vendor, for 45 days or more, if that other person/vendor will use the credit to provide goods or services in the energy sector in Iran and is identified on the current list of persons engaged in investment activities in Iran created by DGS.

OPTION #2 – EXEMPTION

Pursuant to Public Contract Code sections 2203(c) and (d), a public entity may permit a vendor/financial institution engaged in investment activities in Iran, on a case-by-case basis, to be eligible for, or to bid on, submit a proposal for, or enters into or renews, a contract for goods and services. If you have obtained an exemption from the certification requirement under the Iran Contracting Act, please select

"EXEMPTION" below, and attach documentation demonstrating the exemption approval with your electronic submission.

☐ Certification

☐ Exemption

*Response required

4.5. Type of Business*

☐ C Corporation

☐ S Corporation

☐ Limited Liability C Corporation

☐ Partnership

☐ Limited Liability Partnership

☐ Sole Proprietor/Individual

☐ Other

*Response required

4.6. Type your Legal Company Name Here*

State your Company's Name Here. This will be verified against the California Secretary of State's

Website.

*Response required

4.7. Contractors State License Board (CSLB) Number*

Please enter your License Number here. This will be verified against the state database

*Response required

4.8. Contractors State License Board (CSLB) License Expiration Date * Enter your CSLB license expiration date:

4.9. Contractors State License Board (CSLB) License Classifications* Enter your current CSLB license classifications:

*Response required

4.10. California Department of Industrial Relations Registration* Please enter your Public Works Contractor Registration Number. This will be verified against the state database.

*Response required

4.11. Provide the full contact name, title, and e-mail of the signatory for your firm. Please provide contact information for the Contract Manager for your firm in order to distribute Contract Documents, including other recipients requiring a copy, if awarded.**

Signatory: name, title, email

Contract manager/admin: name, phone, email

*Response required

4.12. Additional Required Vendor Bid Information*

Please download the below documents, complete, and upload.

• 4620_ADDITIONAL_REQ_BID_INF...

4.13. I hereby certify under penalty of perjury that the above statements are true.*

☐ Please confirm https://government-project.s3.us-west-2.amazonaws.com/56825/0ed4b81a-17e2-4341-b148-ba374d36e396_4620_ADDITIONAL_REQ_BID_INFO.pdf?AWSAccessKeyId=AKIARC2J5PZDCCU66EXN&Expires=1705696593&Signature=%2BIk9bUj9awa3SEB7H5alzzMsOFM%3D&response-content-disposition=attachment%3B%20filename%3D%224620_ADDITIONAL_REQ_BID_INFO.pdf%22

File details come from the government source that posted it. Updated .