This statement of work outlines requirements for the removal and disposal of oily waste from the USNS GUADALUPE. The contractor will provide a Washington State certified contractor to offload approximately 35,000 gallons of oily waste water and oily waste from the ship at Naval Base Kitsap-Bremerton Pier Delta between March 11-14, 2024. The contractor must arrange transportation and disposal and coordinate with the Port Engineer. The contractor must provide hoses, fittings, and personnel to safely conduct the offload at a pump rate of 40GPM into trucks. The contractor must report labor hours via the designated DoD data collection site. The Military Sealift Command is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to USNS GUADALUPE Oily Waste Offload, newest first.
File Type Posted
N4044324Q0047_Provisions and Clauses.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT REPRESENTATIVE

2000 WEST MARINE VIEW DRIVE

BLDG 2000 ROOM 147

EVERETT, WASHINGTON 98207

DATE: 6 March 2024

SUBJECT: STATEMENT OF WORK, OILY WASTE WATER / OILY WASTE OFFLOAD AT

NAVAL BASE KITSAP-BREMERTON, PIER DELTA

1.0 ABSTRACT:

This item describes the requirement to dispose of oily waste from USNS GUADALUPE (T-AO-200)

2.0 REFERENCES/ENCLOURES:

2.1 None

2.2 ITEM LOCATION AND DESCRIPTION:

NAVAL BASE KITSAP-BREMERTON

519 Charleston Blvd, Bremerton, WA 98312

2.3 Quantity: Approximately 35,000 GALLONS

3.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/SERVICES:

3.1 None

4.0 NOTES:

4.1 Provided an access list of personnel boarding the ship.

4.1.1 The following information is required:

4.1.1.1 U.S. Citizen Contractors: Full Name, Full SSN, Ship Attending; Reason for Visit; Dates Requiring Access.

4.1.1.2 Non-U.S. Citizen Contractors: Full Name, Date of Birth: Nationality;

SSN, Passport No, or ARC No; Ship Attending; Reason for Visit; Dates requiring Access.

4.1.2 Access requirements shall be processed through the Contracting Officer.

5.0 QUALITY ASSURANCE REQUIRMENTS:

5.1 All work and waste removal shall be verified and to the satisfaction of the MSC

Representative (MSCREP), Ship’s Force, and Puget Sound Naval Shipyard Bremerton

Environmental folks.

TBD

6.0 STATEMENT OF WORK REQUIRED:

6.1 Arrangements/Outfitting: None additional.

6.2 Structural: None additional.

6.3 Mechanical/Fluids:

6.3.1 The Contractor shall provide a Washington State Certified contractor to off load and dispose of approximately 35,000 GALLONS from USNS GUADALUPE

(T-AO-200)

6.3.2 The Contractor shall be responsible to provide all hoses, fittings, and personnel to safely remove all oily waste water / oily waste as required.

6.3.3 The prime contractor shall coordinate and keep in contact with the Port

Engineer for the handling, transporting and disposal of oily waste.

6.3.4 The following additional information is provided for estimating purposes:

6.3.4.1 Pump Rate - 40GPM.

6.3.4.2 Fitting Sizes – 2 1/2" CAMLOC Connection on Ship.

6.3.4.3 Estimated length from hook up to the pier (discharge is to a Truck or

Barge) > @ 200ft of hose laid out on the pier.

6.3.4.4 Approx. 35,000 GLLONS of oily waste water / oily waste– Mixed with residuals and water. Sample available upon request.

6.3.4.5 POC: Chief Engineer USNS GUADALUPE (T-AO 200)

7.0 PERFORMANCE LOCATION:

USNS GUADALUPE (T-AO-200)

NAVAL BASE KITSAP-BREMERTON, PIER DELTA

519 Charleston Blvd, Bremerton, WA 98312

8.0 PERIOD OF PERFORMANCE: 11 THROUGH 14 MARCH 2024

All times are local times:

11 MAR 2024

0700 Two trucks arrive Truck Inspection station NAVAL BASE KITSAP-BREMERTON for inspection and access processing.

0800 Arrive Pier Delta side for DOI / Hoses hook up / commences pumping.

1500 Estimate completion / Hoses disconnected / Trucks secured / Trucks departure from Ship

1600 Trucks away from NAVAL BASE KITSAP-BREMERTON

12 MAR 2024

0700 Two trucks arrive Truck Inspection station NAVAL BASE KITSAP-BREMERTON for inspection and access processing.

0800 Arrive Pier Delta side for DOI / Hoses hook up / commences pumping.

1500 Estimate completion / Hoses disconnected / Trucks secured / Trucks departure from Ship

1600 Trucks away from NAVAL BASE KITSAP-BREMERTON

9.0 WAGE DETERMINATION:

9.1 The following wage determination, in accordance with the Service Contract Act of 1965, as amended, is hereby incorporated by reference into the contract and compliance with the same is mandatory:

10.0 MSC TERMS AND CONDITIONS:

10.1 Offers/quotes submitted in response to this solicitation shall not contain nor be subject to the offeror/vendor's standard commercial terms and conditions. Any offer/quote submitted in response to this solicitation which includes the offeror/vendor's standard commercial terms and conditions may be considered a material defect and may be rejected as being non-responsive to the solicitation.

11.0 MSC NRFK MANPOWER

11.1 The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Military Sealift

Command via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) S, Utilities ONLY; and

(5) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than

October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil.

https://doncmra.nmci.navy.mil/ https://doncmra.nmci.navy.mil/

File details come from the government source that posted it. Updated .