WI 8 Spec.pdf

PDF 123 KB Posted

Attached to
USCGC Joseph Gerczak Dockside Wet Deck Resealing
Solicitation number
70Z03426QHONO1004
Issued by

About this file

This is a Performance Work Statement for Work Item 8 of the USCGC Joseph Gerczak (WPC-154) Dockside Availability project scheduled for FY2026. The work involves the removal and reapplication of interior wet deck coverings across 21 specified compartments totaling approximately 987 square feet.

The contractor must remove existing deck coating and reapply an epoxy flake system to obtain uniform, defect-free surfaces in designated heads, passages, mess deck, galley, showers, and storage areas. Key requirements include sanding down existing deck coverings to remove discolorations and damage, reapplying color coat and flakes to achieve uniform appearance, reapplying sealers, and renewing slip-resistant tread stickers where disturbed. The contractor must maintain the original thickness of the epoxy flake system to minimize impact on vessel weight and moment. Cove base renewal is not required for any of the listed compartments, as indicated by the "NO" designation in Table 1. The contractor must furnish and install all protective coverings to prevent contamination of non-affected vessel components and conduct a pre-work inspection to identify any additional repairs beyond those specified, submitting findings in a Change/Repair Form for contracting officer authorization before performing growth repairs. References include Coast Guard Drawing 154 WPC 634-301 (Deck Covering Schedule) and SFLC Standard Specification 0000 (2022). A cautionary note indicates that the epoxy flake system is applied over delicate joiner deck on second deck areas, requiring care to avoid damage during removal of existing deck material.

View the file

Other files

File Type Posted
dockside SOW.docx DOCX document
Wage Determination Honolulu.txt TXT text file
Fixed_Price_Service_FAR_HSAR_Clauses.docx DOCX document
154-WPC_634_301_1_-_B.pdf PDF
SF1449 filled.pdf PDF
SFLC-Std-Spec-0000-(2022).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC JOSEPH GERCZAK (WPC-154) DOCKSIDE AVAILABILITY FY2026

63410_JLW_0523_154WPC

WORK ITEM 8: Interior Wet Deck Coverings, Reseal

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to remove and then reapply the upper components of the deck covering in the compartments described in Table 1, to obtain a uniform and defect-free surface.

TABLE 1 - DECK COVERING LOCATIONS TO BE SEALED

LOCATION

NAME, SPACE

APPROX.

SURFACE

AREA

(SQFT)

COVE

BASE

REPAIRS, IN ADDITION TO RESEALING,

REQUIRED TO COMPLETE THE

RESEAL

Head (1-12-0-L) 12 NO N/A

Passage (1-15-0-L) 30 NO N/A Head (1-15-1-L) 15 NO N/A

-16-1-A) 35 NO N/A

Mess Deck (1-17-0-Q) 105 NO N/A

Galley (1-18-2-Q) 80 NO N/A Head (1-23-1-L) 20 NO N/A

Passage (1-23-0-L) including stairwell landing

142 NO N/A

Passage (1-23-2-L) 12 NO N/A Passage (2-10-0-L) 70 NO N/A Shower (2-12-1-L) 15 NO N/A Head (2-12-2-L) 15 NO N/A

Shower (2-13-1-L) 15 NO N/A Head (2-13-2-L) 15 NO N/A

Shower (2-14-1-L) 15 NO N/A Head (2-14-2-L) 15 NO N/A

Passage (2-17-0-L) 51 NO N/A Head (2-23-1-L) 30 NO N/A

Passage (2-23-0-L) 50 NO N/A Climate Controlled Store Room (2-

23-4-A)

60 NO N/A

Passage (2-25-0-L) 20 NO N/A

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 154 WPC 634-301, Rev B, Deck Covering Schedule

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Inspection and Report. The Contractor shall inspect all deck areas being resealed as specified in Table 1 - Deck Covering Locations to be sealed, and all other affected components (e.g. cove base PC 7 of Coast Guard Drawing 154 WPC 634-301, non-skid slip resistant tread stickers PC 6 of Coast Guard Drawing 154 WPC 634-301, etc.). Determine if repairs in addition to those already specified in Table 1 will be required to complete the scope of work specified herein. Submit a CFR detailing findings and recommended additional repairs. Perform those repairs after the KO releases a modification or change request authorizing those growth repairs.

NOTE

hick the existing clear coat is in all areas, and it may be difficult to remove damaged or discolored clear coating without damaging the appearance of the flakes beneath. For these reasons the job should be planned as if application of flakes may be required over a significant portion of the specified surface to ensure scheduling problems do not occur during execution.

3.3 Epoxy flake system resealing. The Contractor shall remove coating from, and then recoat, the deck areas specified in Table 1 above. Sand down the existing deck covering areas to remove all discolorations and damage, which may require covering removal into the colored area. Reapply color coat and flakes to obtain uniform color, as required. Reapply sealers. Renew PC 6 of Coast Guard Drawing 154 WPC 634- 301 (slip-resistant treads) where disturbed. Maintain the existing net weight of the deck covering system by maintaining the original thickness of the epoxy flake system; generally apply no more material than was removed. Allow sealer to cure for the manufacturer recommended times.

CAUTION

Epoxy flake system is applied over delicate joiner deck on most of the 2nd deck areas. Do not damage joiner deck during removal of top layer of existing deck material.

To minimize impact on cutter weight & moment, do not add excessive deck covering material, beyond what was removed. Make new deck covering thickness as close as practicable to the original, pre-resealed thickness.

3.4 Cove Base. The Contractor shall renew all associated cove base (PC 7 on Coast Guard Drawing 154WPC 634-301) for each compartment listed in Table 1 if the associated Cove Base column is marked

4 inch wide cove base may be installed in lieu of 2.5 inch wide cove base as specified on the drawing. The Contractor may renew the existing cove base if 4 inch wide is installed.

4. NOTES

This section is not applicable to this work item.

File details come from the government source that posted it. Updated .