This is a Performance Work Statement for Work Item 7 of the USCGC Joseph Gerczak (WPC-154) Dockside Availability FY2026, detailing requirements for cleaning and inspecting the vessel's sewage and grey water systems. The contractor must clean all sewage and grey water system interior surfaces including tanks, piping, pumps, valves, vent lines, manifolds, and related components by removing obstructions, clogs, uric scale, and waste buildup to ensure unobstructed flow. The work encompasses chemical cleaning of piping using commercially available biodegradable descalers safe for stainless steel, mechanical tank cleaning of the Grey Water Tank 3-17-0-W, Sewage Holding Tank 2-4-0-W, and sewage vacuum accumulation tank, and renewal of zinc anodes that have lost more than 50% material using government-furnished anodes (NIIN: 014474686, quantity 2, estimated cost $142.19 per unit). The contractor must submit a cleaning plan CFR within seven days of arrival conference containing qualified personnel lists, Safety Data Sheets for all chemicals, detailed cleaning procedures and methods, and pre-approved locations for opening piping at minimum 3 separate sewage and 3 separate grey water system clean-out points for verification inspections.

Key requirements include initial operational pre-testing of all systems with Coast Guard personnel, inspection of grey water tank coating condition pre-cleaning with submitted CIR, borescope inspection post-cleaning to verify solid deposit removal, visual inspection of all components for wear and damage, renewal of all disturbed soft components, maintenance of a plug log for all unattended system openings, and comprehensive post-repair operational testing including vacuum pressure switch adjustments, level switch and pump cycle verification, leak testing with water runs and smoke tests, and vacuum system pressure verification maintaining -0.40 to -0.55 bar for 20 minutes. All sewage and grey water disposal must utilize Coast Guard pier facility tanks or contractor-furnished disposal facilities complying with Federal, state, and local regulations. Coast Guard personnel will operate all shipboard machinery and equipment throughout the work. The contractor must notify the Contracting Officer Representative at least 24 hours prior to closing tanks and submit CFRs documenting all operational tests, inspections, and final system conditions.

View the file

Other files

File Type Posted
dockside SOW.docx DOCX document
SF1449.pdf PDF
SFLC-Std-Spec-6310-(2022).pdf PDF
Fixed_Price_Service_FAR_HSAR_Clauses.docx DOCX document
Wage Determination Honolulu.txt TXT text file
SFLC-Std-Spec-0000-(2022).pdf PDF
SFLC-ESD-25_Tank_and_Void_Assessment_Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC JOSEPH GERCZAK (WPC-154) DOCKSIDE AVAILABILITY FY2026

59301_JLW_0523_154WPC

WORK ITEM 7: Sewage and Grey Water System, Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean the sewage and grey water system (e.g. tanks, piping, etc.).

TABLE 1

USE OF COAST GUARD SEWAGE AND GREY WATER DISPOSAL FACILITIES

(PARA 3.3.5.2)

NO

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

N **Sewage Tank Zinc Anode NIIN: 014474686 2 142.19

*Government-loaned property, which must be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 154 WPC 127-302, Rev C, Potable Water & Sewage Tank Fabrication Details

Coast Guard Drawing 154 WPC 506-201, Rev A, Fills Vents, Sounds, and Overflows

Coast Guard Drawing 154B WPC 506-201, Rev A, Fills Vents, Sounds, and Overflows

Coast Guard Drawing 154 WPC 506-301, Rev -, Fills, Vents, Sounds, Overflows Diagram

Coast Guard Drawing 154 WPC 528-301, Rev B, Grey Water System Diagram

Coast Guard Drawing 154 WPC 593-201, Rev F, Sewage System Arrangement

Coast Guard Drawing 154 WPC 593-301, Rev C, Sewage System Diagram

Coast Guard Drawing 154B WPC 593-201, Rev A, Sewage System Arrangement

Coast Guard Drawing 154B WPC 593-301, Rev -, Sewage System Diagram

Coast Guard Drawing 154 WPC 593-303, Rev A, Sewage Control System

Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement

Coast Guard Drawing 154B WPC 601-302, Rev -, General Arrangement

Coast Guard Drawing 154 WPC 633-301, Rev C, Cathodic Protection System

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):

3.2.1 Inspection of Grey Water Tank.

3.1.2 Tech Rep.

None.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.1.5 Temporary Sanitary and Sewage Facilities. Whenever sewage or grey water collection service is disrupted due to Contractor repairs, the Contractor must provide temporary facilities in accordance with SFLC Standard Spec 0000 par 3.2.11.

3.1.6 Temporary HVAC. If the C cleaning plan will degrade continuous operation of must provide temporary ventilation to all impacted areas equivalent to the normal zonal ventilation rating for those spaces (i.e. maintain existing climate control) for the duration of work as described in SFLC Std Spec 0000.

3.1.7 Refer to all references beneath section 2 above, as applicable.

NOTE

Be aware that the grey water system has few isolation valves and many openings that must be plugged or blanked to contain cleaning media.

Be aware that AC condensate drains into the Grey Water Tank at 8 separate locations. Any temporary disruption or degradation of climate control must be fully addressed by the cleaning plan.

For these reasons, based on lessons learned, it is suggested that chemical cleaning be used on sewage piping and grey water system piping be cleaned mechanically (e.g. waterjetting, etc.)

3.1.8 Cleaning Plan. No later than 7 days after the arrival conference, and prior to the start of cleaning work, the Contractor must submit a cleaning plan CFR that contains the following:

A list of qualified personnel who will disassemble machinery or handle chemicals.

An SDS for every chemical proposed for use.

A step by step description of the procedures and methods that will be used to clean the systems

A list of locations in the sewage and grey water piping system where piping lines will be opened and components will be removed. At a minimum the piping must be opened at 3 separate sewage system clean-out locations and 3 separate grey water system clean-out to verify cleaning was adequately performed. These locations must be pre-approved by the COR and included in the cleaning plan CFR.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test and inspection - initial. Prior to commencement of cleaning work, the Contractor must witness Coast Guard personnel perform an operational pre-test of all items and shipboard devices to be disturbed, used, repaired, or altered, (e.g. TLIs, pumps, etc.) to demonstrate existing operational condition and to determine a more precise scope of cleaning required. Submit a CFR detailing any required growth work or repairs identified during the operational test based on the observed condition of the systems. Use the most economical methods for accomplishing the work.

3.2.1 Inspection of Grey Water Tank. Open and inspect the grey water tank to determine the condition of the grey water tank coating system to the greatest extent practicable, pre-cleaning. Submit a CIR detailing the condition of the grey water tank coating system and any noted discrepancies, include an estimated square footage of failed coating in the CIR.

3.3 Cleaning and Inspection Requirements. he Contractor

must below. Clean, in their entirety, all sewage and grey water system interior surfaces (e.g. sewage and grey water ppg interiors, pump interiors, valve interiors, all sewage and grey water tank vent lines interiors, sewage vacuum switch manifold interiors, fire main sprinkler pipe interiors and spray hole interiors in main sewage tank used to flush sewage tank, overboard/to shore connection discharge pump and all related valve and pipe interiors, etc.) that may come in contact with sewage or grey-water, by removing all obstructions, clogs, uric scale, and waste build-up on piping and component interiors, ensuring subsequent free unobstructed flow of waste solids and fluids.

NOTE

Depending on the condition of the system at the contract start date, chemical cleaning may not adequately remove all obstructions, scale, and build-up present. More intrusive cleaning methods, such as pressure washing, flexible auger cleaning, or other mechanical means of cleaning, may be required to remove all obstructions, scale, etc. These more intrusive methods are in scope of this work item and the Contractor may be required to use one or more them, in the appropriate quantities, to achieve minimum cleaning requirements.

NOTE

Before filling a system with descaler ensure all openings below the fill point are blanked off or plugged.

3.3.1 Chemical Cleaning of Piping. When chemically cleaning piping and component interiors use a commercially available biodegradable sewage/grey-water system descaler (e.g. SEW CLEAN, etc.) safe for use on stainless steel. Fill the systems with descaler and hold for a long enough period to clean the systems as described above. After cleaning is complete drain and dispose of all sewage and grey water system contents.

3.3.2 Tank Cleaning. Interior surfaces of the Grey Water Tank 3-17-0-W, Sewage Holding Tank 2-4-0- W, and sewage vacuum accumulation tank must be cleaned until free of all foreign materials, sediment, and sludge. Remove all persistent residues, residual wash media, and moisture with clean lint-free cloths.

Remove, clean, and re-install all tank interior components (e.g. TLIs, limit switches, eductors, etc.).

Renew all sewage tank and grey water tank zinc anodes that have lost more than 50% of their material using Government-furnished property, otherwise reuse the existing zinc anodes. Remove and dispose of all sewage system contents and collect, contain, and dispose of all wash media and cleaning materials in accordance with all applicable Federal, state, and local regulations. Remove all unused chemicals from USCG property immediately upon completion of work item.

3.3.3 Inspections. After cleaning, inspect the piping interior using a borescope in the presence of the COR, verify that all solid deposits, visible to the unmagnified eye, have been removed. Visually inspect all system components (e.g. TLIs, limit switches, pressure switches, tank interior surfaces, fasteners, gasket seating surfaces, manhole cover surfaces, etc.)

for excessive wear, damage, and all other notable discrepancies. Open and vacuum-clean the control panel assembly and inspect for any indications of overheating or loose wiring or connections. Submit a

CFR.

3.3.4 Miscellaneous. Do not drain any fluids (e.g. sewage, grey water, fresh water, etc.) into any space, bilge, or exterior location. Take all precautions required to prevent contamination of personnel and spaces in accordance with all applicable Federal, state, and local regulations. Renew all disturbed soft components (e.g. seals, gaskets, o-rings, etc.). Do not use the sewage pump installed in the system to offload sewage system contents.

3.3.4.1 Plug log. Plug all unattended openings in the system. Plugs must be fitted with a lanyard, ring or other device to prevent loss of the plug inside the system. Create and maintain a written log of each plug that specifies the location of each. Remove and dispose of all plugs upon completion of work. Furnish the plug log to the Coast Guard Inspector during the performance of close-out inspections.

3.3.4.2 Use of Coast Guard Sewage and Grey Water Disposal Facilities denoted in Table 1 (Use of Coast Guard Sewage and Grey Water Disposal Facilities), beneath paragraph 1.1 (Intent), the Contractor may offload and dispose sewage and grey water system contents into the Coast Guard pier facility tanks in lieu of a Contractor furnished tank truck, otherwise the Contractor must dispose of all waste using the C

3.4 Closing tanks. The Contractor must notify the COR at least 24 hours prior to closing the tank. After completion of all authorized repairs and after the COR inspects all work performed, close the tanks.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.5 Operational test post repairs. After completion of work, the Contractor must thoroughly test all disturbed components and systems and accomplish the following tasks in conjunction with each other as appropriate, in the presence of the Coast Guard Inspector, and submit a CFR:

3.5.1 Adjust the set point on each of the vacuum pressure switches (as applicable) to the set points noted previously.

3.5.2 Verify operation of the low and high level switches/alarms and that the pumps cycle from lead to lag status during operation. Demonstrate proper operation of tank TLIs to prove satisfactory operating condition.

3.5.3 Leak test. After all system components are reinstalled, the Contractor must test all disturbed piping for leaks, as follows:

Run water down all disturbed grey water system piping runs for 5 minutes.

Ensure the system holds vacuum without cycling for at least 20 mins.

Place both vacuumarator selection switches in the "RUN" position. Allow vacuumarator pump to run until system operating pressure of -0.40 to -0.55 bar is reached. Observe vacuum tank pressure gauge. Place both vacuumarator selection switches in the "OFF" position. (NOTE: A vacuum loss of more than 0.14 bar indicates an air leak exists in the system.) Verify vacuum system pressure remains between -0.40 to -0.55 bar for 20 minutes.

Record pressure value and include in the CFR.

Perform smoke leak test on vacuum portions of the sewage system where the Contractor has disturbed a mechanical joint.

Closely monitor the systems for leaks. Repair all leaks detected. Repeat test and inspection tasks until no leaks are detected.

3.5.4 Upon completion of testing and, in the presence of the Coast Guard Inspector, pump tanks to the

4. NOTES

This section is not applicable to this work item.