WI 1 Spec.pdf

PDF 183 KB Posted

Attached to
USCGC Joseph Gerczak Dockside Tank Clean & Inspect
Solicitation number
70Z03426QHONO1000
Issued by

About this file

This is a Performance Work Statement (PWS) for Work Item 1: Tanks, Clean and Inspect for the USCGC JOSEPH GERCZAK (WPC-154) Dockside Availability in FY2026. The contractor is required to clean and inspect twelve fuel and waste water tanks with a combined capacity of approximately 21,823 gallons at 95% capacity. Specific tanks include Fuel Oil Service tanks (1S, 1P, 2S, 2P), Emergency Generator Fuel Tank, Fuel Oil Storage tanks (1 and 2), Fuel Oil Overflow tanks (1 and 2), Oily Water tank, Dirty Oil tank, and an Aft Void. The contractor must remove and dispose of specified quantities of fuel and waste water ranging from 10 to 535 gallons per tank in compliance with all applicable Federal, state, and local regulations, with complete chain of custody documentation required.

The contractor must provide all protective coverings to prevent contamination of non-affected vessel components, handle all interferences per SFLC Standard Specification 0000, and maintain a plug log for all tank vents. Cleaning requirements include removal of residual fuel, water, sediment, sludge, rust, and biological growth without damaging existing coating systems. Comprehensive inspections must document tank structural condition, coating condition with measurements and pit depth analysis (up to 10 pits per tank), fastener material and condition, tank level indicator and float switch condition, sounding/vent tube condition, suction and discharge piping condition, and zinc anode condition in oily water and dirty oil tanks. Tank closure requires new gaskets conforming to AMS-C6183, thread chasing on studs, renewal of damaged fasteners per MIL-DTL-1222 guidance (assuming 10% replacement), and renewal of all Nylock hex nuts. Initial and post-repair operational tests must be witnessed by Coast Guard personnel, with all findings documented in Contractor Field Reports (CFR) submitted to the Contracting Officer's Representative.

View the file

Other files

File Type Posted
154-WPC_601_302_1_-_D.pdf PDF
SFLC-ESD-25_Tank_and_Void_Assessment_Form.pdf PDF
SF1449.pdf PDF
154B-WPC_601_302_1_-_A.pdf PDF
dockside SOW.docx DOCX document
Fixed_Price_Service_FAR_HSAR_Clauses.docx DOCX document
Wage Determination Honolulu.txt TXT text file
154-WPC_506_201_1_-_A.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC JOSEPH GERCZAK (WPC-154) DOCKSIDE AVAILABILITY FY2026

15 (Rev-0)

12305_JLW_0523_154WPC

WORK ITEM 1: Tanks, Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):

TABLE 1 FUEL TANKS AND VOIDS

TANK LOCATION CAPACITY -

95%

(GALLONS)

FUEL OR

WASTE WATER

TO BE

REMOVED AND

DISPOSED OF

(GALLONS)

Fuel Oil Service 1S 3-17-1-F 1750 175

Fuel Oil Service 1P 3-17-2-F 1750 175

Fuel Oil Service 2S 3-41-1-F 840 84

Fuel Oil Service 2P 3-41-2-F 840 84

Emer Gen Fuel Tank 1-10-1-F 93 10

Fuel Oil Storage 1 3-11-0-F 5040 504

Fuel Oil Storage 2 3-23-0-F 5350 535

Fuel Oil Overflow 1 3-10-0-F 606 60

Fuel Oil Overflow 2 3-40-0-F 1159 115

Oily Water 3-34-1-W 336 34

Dirty Oil 3-34-2-F 336 34

Aft Void 3-43-0-V 924 N/A

1.2 Government-furnished property.

None.

16 (Rev-0)

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 154 WPC 601-302, Rev D, General Arrangement

Coast Guard Drawing 154B WPC 601-302, Rev -, General Arrangement

Coast Guard Drawing 154 WPC 506-301, Rev -, Fills, Vents, Sounds and Overflows Diagram

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

OTHER REFERENCES

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets

MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor must furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor must remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

Fuel

Piping

Tank access cover

3.1.4.1 Fuel. The Contractor must remove and dispose of diesel fuel in the quantities listed in Table 1.

Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations (see 4.2 (Tank content restoration)). Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery. Submit CFR to the COR upon completion of work.

17 (Rev-0)

3.1.4.2 SSDG service tank draining/cleaning. In the event that generators must be operated aboard the vessel during execution of this item, an adequate amount of fuel must remain in at least one generator service tank for the duration while others are being cleaned. The Contractor must coordinate with ships force to determine a plan for filling this requirement (e.g. drain/clean one SSDG service tank then ship force refill prior to working subsequent service tanks, etc.). Submit a CFR documenting the mutually agreed upon plan for SSDG service tank cleaning.

NOTE

Vessel may come in with less tank fluid contents than specified above.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard demonstrate existing operational condition. Submit a CFR.

3.3 Plug log. The Contractor must keep a written record of all plugs put in any tanks vents. A separate list must be kept for each tank being entered.

3.3.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.

3.3.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.

NOTE

Initial and post repair operational tests apply only to tanks that possess TLIs.

3.4 Cleaning requirements. The Contractor must remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as residual fuel or water, sediment, sludge, rust, or biological growth, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.

3.5 Tank content and waste disposal. The Contractor must dispose of residual tank contents and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.

3.6 Inspection. The Contractor must accomplish the following tasks:

3.6.1 Visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces.

Submit a CFR including the following, as applicable:

Tank structural condition.

Inaccessible areas.

18 (Rev-0)

Condition of tank coating, including measurements taken, percentage, location, and type of coating failure (if tank interior surfaces are coated).

Tank level indicator (TLI) and/or float switch condition, as applicable.

Sounding/vent tube and striker plate condition.

Suction and discharge piping condition.

Fastener material and condition (correct fastener material is stainless steel).

Determine condition of zinc anodes in oily water & dirty oil tanks (zincs with 50% wastage or more should be renewed).

3.6.2 Include pit measurement results in CFR specified above, showing where pit measurements were taken and the depth of the pit.

3.7 Tank closing. The Contractor must ensure that the tank(s) remain open for at least 24 hours after completion of any KO-authorized repair and preservation procedures. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C- 6183. Chase threads on studs to ensure even installation of the access covers. Renew any damaged or missing fasteners. Use MIL-DTL-1222 as guidance. Existing undamaged fasteners may be reused. For purpose of bid, assume 10% of existing fasteners will require renewal. Renew all Nylock hex nuts.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.8 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all operating condition. Submit a CFR.

4. NOTES

4.1 Tank content removal.

with the installed pumping system.

4.2 Tank content restoration.

appropriate time.

File details come from the government source that posted it. Updated .