Wharf_ Pier BP.pdf

PDF 394 KB Posted

Attached to
IPD STL Holding Tank Cleaning
Solicitation number
70Z02925QNEWO0025
Issued by

About this file

This document is a detailed engineering drawing (Riverside Plan and Elevation) for a U.S. Coast Guard Facilities Design & Construction project located at the St. Louis Mobilization Base in Missouri. The technical drawing depicts a waterfront facility with multiple structural elements, including a 2-ton crane at column lines C-4 and C-12, access ramps, bridge structures, and various elevation and section views. The drawing is prepared by Stanley Consultants and is part of the U.S. Army Corps of Engineers Service Base infrastructure design, specifically focusing on the waterfront plan and elevation details with precise architectural and engineering specifications.

The technical drawing provides comprehensive architectural and engineering details including structural measurements, crane placement, elevation profiles, and waterfront layout. Key elements include a 5' x 12' access ramp, multiple structural grid lines, and specific height and positioning annotations for various infrastructure components. The drawing is part of a larger facilities design project for the U.S. Coast Guard, indicating a technical planning phase for infrastructure development at the St. Louis base location.

View the file

Other files

File Type Posted
70Z02925QNEWO0025_0_US.pdf PDF
Attachment B.pdf PDF
Floating Pier BP.pdf PDF
2025 Floating pier_Lift_station_cleaning_SOW.doc DOC document
Attachment A_cleaning_IPD.docx DOCX document
CG Base STL Pier Photo.jpg JPG image
Pier Sewage Lift Station BP2.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .