Floating Pier BP.pdf

PDF 383 KB Posted

Attached to
IPD STL Holding Tank Cleaning
Solicitation number
70Z02925QNEWO0025
Issued by

About this file

This document is a detailed engineering drawing (General Layout) for a Floating Dock at the U.S. Coast Guard Facilities Design & Construction Center in Norfolk, VA. The architectural plan shows a comprehensive layout with precise dimensional measurements, featuring multiple dock sections with varying configurations, including crane positions, dock sections, and structural elements. The technical drawing is prepared by Stanley Consultants and is associated with the U.S. Army Corps of Engineers Service, specifically for the Waterfront Facilities floating dock project, with the drawing number 02-A5002 and marked as sheet S7 of 12.

The drawing provides a top-down view with grid coordinates, detailing the dock's structural design, including dock sections labeled with specific measurements, positioning of equipment, and structural components. Multiple annotated sections show dock configurations, with precise measurements ranging from 27'-0" to 57'-0" across different grid points. The document is part of a larger set of engineering plans for a maritime infrastructure project, offering a detailed technical blueprint for constructing a floating dock facility.

View the file

Other files

File Type Posted
Wharf_ Pier BP.pdf PDF
70Z02925QNEWO0025_0_US.pdf PDF
Attachment B.pdf PDF
2025 Floating pier_Lift_station_cleaning_SOW.doc DOC document
Attachment A_cleaning_IPD.docx DOCX document
CG Base STL Pier Photo.jpg JPG image
Pier Sewage Lift Station BP2.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JTMedfisch Rectangle

File details come from the government source that posted it. Updated .