This project manual details the West Spencer Field Road Roundabout Project for Santa Rosa County, Florida, prepared by Consor North America, Inc. The project involves roadway improvements at the intersection of West Spencer Field Road, South Spencer Field Road, and Giddens Lane, including converting an existing signalized intersection to a roundabout and adding lighting. The original project scope included constructing a new signal, removing speed humps, adding turn lanes, and installing pedestrian crossings. The revised scope focuses on the roundabout design, with work spanning stations 10+38.86 to 16+27.38 on West Spencer Field Road and stations 47+89.05 to 55+27.95 on Giddens Lane and South Spencer Field Road. The project will utilize Florida Department of Transportation (FDOT) Standard Plans and Specifications for Road and Bridge Construction dated FY 2025-26.
The project is funded by Santa Rosa County and will involve roadway reconstruction, widening, and pavement design using Optional Base Group 9 and 14 with Type SP Structural Course and Friction Course. The geotechnical analysis revealed silty sand soil conditions with potential perched groundwater, which may impact pavement design. Utility coordination involves relocations and adjustments for Florida Power & Light, AT&T, City of Milton Gas, and Pace Water System. The project includes drainage analysis, utility test holes, and comprehensive cross-section and profile designs. Specific technical specifications cover areas such as mobilization, maintenance of traffic, erosion control, excavation, base materials, asphalt concrete, signage, lighting, and various infrastructure elements. The contract will require careful management of existing utilities, right-of-way adjustments, and adherence to FDOT standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
West Spencer Field Project
SANTA ROSA COUNTY, FLORIDA
RFP 21-006 PW
Santa Rosa County Board of County Commissioners:
Bobby Burkett District 1
Kerry Smith (Chairman) District 2
Rhett Rowell District 3
Ray Eddington District 4
Colten Wright (Vice Chairman) District 5
Thomas Thibault, Engineering Project Manager
Prepared by:
Consor North America, Inc.
2818 Cypress Ridge Blvd, Suite 200
Wesley Chapel, FL 33544
THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY:
ON THE DATE ADJACENT TO THE SEAL.
PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED AND THE SIGNATURE MUST BE VERIFIED
ON ANY ELECTRONIC COPIES
ENGINEER OF RECORD:
ERIK C. LESCHAK, PE
PE NO. 63874
(813) 435-2600
CONSOR NORTH AMERICA, INC.
2818 CYPRESS RIDGE BLVD, SUITE 200
WESLEY CHAPEL, FLORIDA 33544
TABLE OF CONTENTS
Invitation to Bid………………………………………..00110-1 to 00110-3
Instruction to Bidders………………………………….00120-1 to 00120-3
Bid Form………………………………………………..00130-1 to 00130-3
Schedule of Unit Prices…………………………………………………….1
Statement of Public Entity Crimes……………………………………...A1
Insurance Requirements…...……………………………………………1-2
General Provisions…...…………………………………………………1-32
Supplementary Conditions…………………………………………00800-1
Davis-Bacon Wage Decision…………………………………………….1-4
EEO Sample Documents/ Worksheet………………………………….1-22
TECHNICAL SPECIFICATIONS
Governing Standards and Specification shall be Florida Department of
Transportation, Standard Plans dated FY 2025-26. And Standard
Specifications for Road and Bridge Construction dated FY 2025-26, as amended by contract documents.
For Standard Plans for Road Construction follow the link:
https://www.fdot.gov/design/standardplans/current
For the Standard Specifications for Road and Bridge Construction click on the “Specifications” link at the following website:
http://www.fdot.gov/programmanagement/implemented/SpecBooks
Specifications identified for this project include:
Section 100 Construction Equipment – General Requirements
Section 101 Mobilization
Section 102 Maintenance of Traffic
Section 104 Prevention, Control and Abatement of Erosion and Water Pollution
Section 105 Contractor Quality Control General Requirements
Section 110 Clearing and Grubbing
Section 120 Excavation and Embankment
Section 125 Excavation and Embankment for Structures and Pipe
Section 160 Stabilizing
Section 204 Graded Aggregate Base
Section 234 Superpave Asphalt Base
Section 283 Reclaimed Asphalt Pavement Base
Section 285 Optional Base Course
Section 334 Superpave Asphalt Concrete
Section 337 Asphalt Concrete Friction Course
Section 425 Inlets, Manholes, and Junction Boxes
Section 430 Pipe Culverts
Section 520 Concrete Gutter, Curb Elements, and Traffic Separator
Section 522 Concrete Sidewalks and Driveways
Section 527 Detectable Warnings
Section 530 Revetment Systems
Section 570 Performance Turf
Section 603 General Requirements for Traffic Control Signals and Devices
Section 620 Grounding and Lighting Protection
Section 630 Conduit
Section 632 Signal Cable
Section 633 Communication Cable
Section 634 Span Wire Assembly
Section 635 Pull Boxes, Splice Boxes, Junction Boxes, and Fiber Optic Splice Vaults
TECHNICAL SPECIFICATIONS cont… Section 639 Electrical Power Service Assemblies
Section 641 Prestressed Concrete Poles
Section 646 Aluminum Poles, Pedestals, and Posts
Section 650 Vehicle Traffic Signal Assemblies
Section 653 Pedestrian Signal Assemblies
Section 660 Vehicle Detection System
Section 665 Pedestrian Detection System
Section 670 Traffic Controller Assemblies
Section 671 Traffic Controllers
Section 676 Traffic Cabinets
Section 678 Traffic Controller Accessories
Section 680 System Control Equipment
Section 682 Video Equipment
Section 684 Network Devices
Section 700 Highway Signing
Section 710 Painted Pavement Markings
Section 713 Permanent Tape Pavement Markings
Section 715 Highway Lighting System
Section 911 Base and Stabilized Base Materials
Section 914 Stabilizing Materials
Section 981 Turf Materials
Section 982 Fertilizer
Section 983 Water for Grassing
Section 985 Geosynthetic Materials
Section 987 Soil Layer Materials
Note: All 900 series materials specifications referenced within the above list shall be considered applicable as directed in the specification.
DESIGN DOCUMENTATION
1. General Background
2. Survey/ Alignment Control
3. Subsurface Utilities
4. Pavement Design
5. Intersection Data Collection and Analysis
6. Roundabout Swept Path and Fastest Path Analysis
7. Drainage Analysis
8. Geotechnical Analysis
9. Utility Coordination
1. General Background
General Background
West Spencerfield Road is located in Santa Rosa County near Pace, FL. It is primary north and south corridor between US 90 and Berryhill Road. The roadway is a two lane rural roadway with 12 foot lanes and 4 foot grass shoulders. The project area is located immediately west of the Spencer Outlying Field.
Original Project Scope included:
North/ West Spencer Field Road
1) Construct a new signal
2) Remove speed humps
3) Add turn lanes on West Spencer Field Road
4) Add pedestrian crossings on all 4 legs of intersection
West Spencer Field Road and Giddens Road
1) Construct a new signal
2) Add pedestrian crossing on all 4 legs and connect to existing sidewalk
3) Re-align Giddens Road to intersect South Spencer Field Road
4) Optional Service - Provide property acquisition for realignment
Midblock Crossing at Winner’s Gait Circle
1) Construct mid-block crossing with flashing beacon
Revised Project Scope:
West Spencer Field Road and Giddens Road
1) Converted Signalized Intersection to a roundabout to minimize right of way impacts
2) Add lighting to the roundabout
2. Survey/ Alignment Controls
3. Subsurface Utilities
Subsurface Utility Engineering Test Hole Report
Test Hole # Client:
Project:
PROJECT DATA
WO #: W117088.000 JN: J067171 Date 03/20/2025
Task #: N/A FPN #: N/A PM: Dana Sowers
Station: N/A Offset: N/A Chief: Daniel
Crew: Brayden Time: 6:58 AM
Weather: broken clouds, 57F
TEST HOLE DATA
Utility Type: Water Location
Condition: Fair
Material: Polyvinyl Chloride
Marker: Hub, Lath, Nail and Disk
Height (IN):
Width (IN):
Top (f):
Bottom (f):
Ground Cover: Dirt
Owner: Pace Water System
Soil Type: Dirt
Soil Condition: Dry
Notes:
Also Found:
SURVEY DATA
V Datum:
H Datum:
Zone:
Northing:
Easting:
Grade Elev:
Utility Elev:
TH-1 Consour
S Spencer Field Rd at W Spencer Field Rd
10.50
10.50
3.50
4.38
N/A
Type Material Height (IN) Width (IN) Top (f) Bottom (f) Owner
NAVD88 Site Image
NAD83
0903 Florida North
598146.97
1135467.60
131.05
127.55
Profile View
Photo Report
TH-1
S Spencer Field Rd at W Spencer Field Rd
6500 All American Blvd., Orlando, Florida 32810 Phone 407-292-8580 http://www.southeasternsurveying.com Page 1 of 1
Photo No. 1
Photo No. 2
Photo No. 3
Site Image
Project:
PROJECT DATA
WO #: W117088.000 JN: J067171 Date 03/20/2025
Task #: N/A FPN #: N/A PM: Dana Sowers
Station: N/A Offset: N/A Chief: Daniel
Crew: Brayden Time: 7:20 AM
Weather: clear sky, 57F
TEST HOLE DATA
Utility Type: Water Location
Condition: Fair
Material: Polyvinyl Chloride
Marker: Hub, Lath, Nail and Disk
Height (IN):
Width (IN):
Top (f):
Bottom (f):
Ground Cover: Dirt
Owner: Pace Water System
Soil Type: Dirt
Soil Condition: Dry
Notes:
Also Found:
SURVEY DATA
V Datum:
H Datum:
Zone:
Northing:
Easting:
Grade Elev:
Utility Elev:
TH-2 Consour
S Spencer Field Rd at W Spencer Field Rd
10.00
10.00
4.40
5.23
N/A
Type Material Height (IN) Width (IN) Top (f) Bottom (f) Owner
NAVD88 Site Image
NAD83
0903 Florida North
598291.02
1135479.15
132.58
128.18
TH-2
S Spencer Field Rd at W Spencer Field Rd
6500 All American Blvd., Orlando, Florida 32810 Phone 407-292-8580 http://www.southeasternsurveying.com Page 1 of 1
Photo No. 1
Photo No. 2
Photo No. 3 Photo No. 4
Project:
PROJECT DATA
WO #: W117088.000 JN: J067171 Date 03/20/2025
Task #: N/A FPN #: N/A PM: Dana Sowers
Station: N/A Offset: N/A Chief: Daniel
Crew: Brayden Time: 7:26 AM
Weather: clear sky, 58F
TEST HOLE DATA
Utility Type: Water Location
Condition: Fair
Material: Polyvinyl Chloride
Marker: Hub, Lath, Nail and Disk
Height (IN):
Width (IN):
Top (f):
Bottom (f):
Ground Cover: Dirt
Owner: Pace Water Systems
Soil Type: Dirt
Soil Condition: Dry
Notes:
Also Found:
SURVEY DATA
V Datum:
H Datum:
Zone:
Northing:
Easting:
Grade Elev:
Utility Elev:
TH-3 Consour
S Spencer Field Rd at W Spencer Field Rd
8.50
8.50
3.45
4.16
N/A
Type Material Height (IN) Width (IN) Top (f) Bottom (f) Owner
NAVD88 Site Image
NAD83
0903 Florida North
598286.08
1135493.73
132.11
128.66
TH-3
S Spencer Field Rd at W Spencer Field Rd
6500 All American Blvd., Orlando, Florida 32810 Phone 407-292-8580 http://www.southeasternsurveying.com Page 1 of 1
Photo No. 1 Photo No. 2
Photo No. 3 Photo No. 4
Project:
PROJECT DATA
WO #: W117088.000 JN: J067171 Date 03/20/2025
Task #: N/A FPN #: N/A PM: Dana Sowers
Station: N/A Offset: N/A Chief: Daniel
Crew: Brayden Time: 7:32 AM
Weather: clear sky, 58F
TEST HOLE DATA
Utility Type: Gas Location
Condition: Fair
Material: Coated Steel
Marker: Hub, Lath, Nail and Disk
Height (IN):
Width (IN):
Top (f):
Bottom (f):
Ground Cover: Dirt
Owner: Natural Gas of Milton
Soil Type: Dirt
Soil Condition: Dry
Notes:
Also Found:
SURVEY DATA
V Datum:
H Datum:
Zone:
Northing:
Easting:
Grade Elev:
Utility Elev:
TH-4 Consour
S Spencer Field Rd at W Spencer Field Rd
2.50
2.50
1.85
2.06
N/A
Type Material Height (IN) Width (IN) Top (f) Bottom (f) Owner
NAVD88 Site Image
NAD83
0903 Florida North
598259.05
1135515.02
132.52
130.67
TH-4
S Spencer Field Rd at W Spencer Field Rd
6500 All American Blvd., Orlando, Florida 32810 Phone 407-292-8580 http://www.southeasternsurveying.com Page 1 of 1
Photo No. 1 Photo No. 2
Photo No. 3
Photo No. 4
4. Pavement Design
PAVEMENT DESIGN CALCULATIONS:
DRAFT - Preliminary design based on available information.
1. For the design of the pavement for TWO 5; the designer was not given traffic counts, Equivalent Single Axle Load (ESAL) calculations or a Resilient Modulus based on Geotech testing.
2. However, the geotechnical engineer provided a assumed Resilent Modulus of 9500psi based on soil types encountered and grain size distribution.
3. Used the pavement composition from the as-builts of the W. Spencer Field Road at Norris Rd/Attaway Dr intersection project just to the south to get the SNr and ESAL as a starting point.
Intersection improvements for W Spencer Field Rd at Norris Rd/Attaway Dr (south of TWO 05's limits) used a pavement design of:
For TWO 05 - Geotechnical information noted a potential perched water table along Giddens Ln. and W Spencer Field Rd at three boring locations.
Existing Project to the South Pavement Design (Intersection improvements for W Spencer Field Rd at Norris Rd/Attaway Dr - assume no base clearance restrictions and had full 3' clearance) :
Layer Coefficient Thickness (in) SN FC-12.5 0.44 x 1.50 = 0.66 Type SP (Traffic C) 0.44 x 2.00 = 0.88 OBG 9 0.18 x 10.00 = 1.80 Stabilization 0.08 x 12.00 = 0.96
Total Depth = 25.50 SN = 4.30 Assumed Mr = 9500 PSI (from Tierra) Assumed %R = 80% (conservative based on acceptable %R for collector roadways for which 75% is min. for reconstruction) Assumed SNr = 4.27 (conservative interpolation based on the above) Assumed ESAL = 10,000,000 (using Table A.2A,Mr of 9500 and the Sne of 4.30 for the Existing Project to the South Pavement Design - projected an ESAL close to 4.30 )
SNr (25% Mr Reduction) = 7125 PSI SNr (25% Mr Reduction) = 4.72 SNr (50% Mr Reduction) = 4750 PSI SNr (50% Mr Reduction) = 5.41
Layer Coefficient Thickness (in) SN FC-12.5 0.44 x 1.50 = 0.66 Type SP (Traffic C) 0.44 x 2.00 = 0.88 OBG 9 0.18 x 10.00 = 1.80 Stabilization 0.08 x 12.00 = 0.96
Total Depth = 25.50 SN = 4.30
Layer FC-12.5 0.44 x 1.50 = 0.66 Type SP (Traffic C) 0.44 x 2.00 = 0.88 OBG 12 Type B 12.5 0.30 x 7.50 = 2.25 Stabilization 0.08 x 12.00 = 0.96
Total Depth = 23.00 SN = 4.75
Giddens Lane - Sta. 47+89.05 to Sta. 52+01.01 (50% Mr Reduction - if needed confirm w/ Geotech) Layer FC-12.5 0.44 x 1.50 = 0.66 Type SP (Traffic C) 0.44 x 3.00 = 1.32 OBG 14 Type B 12.5 0.30 x 8.50 = 2.55 Stabilization 0.08 x 12.00 = 0.96
Total Depth = 25.00 SN = 5.49
Disclamer:
W Spencer Field Road - Sta. 10+38.86 to Sta. 16+27.38, Sta. 20+22.05 to Sta. 28+23.58 S Spencer Field Road - Sta. 53+18.85 to Sta. 55+27.95
Giddens Lane - Sta. 47+89.05 to Sta. 52+01.01 (25% Mr Reduction)
Widening = 12" Type B Stabilization, OBG 9, 2" Type SP Structural Course (Traffic C) (PG76-22), 1.5" Friction Course FC-12.5 (Traffic C) (PG76-22) Milling = 1.5" (Avg. Depth) Mill Existing Asphalt Pavement Resurfacing = 1.5" Friction Course FC-12.5 (Traffic C) (PG76-22)
Assumed that this design was intended to exceed the minimum required thickness for new construction or reconstruction FDOT Flexible Pavement Design Manual (FPDM) Table 5.5 of 3" for greater than 3,500,000 ESAL's 20-yr period as well as minimum Optional Base Group 9 (10"-LM or 6"-Type B-12.5).
Assumptions / Research:
Assumes 1' base clearance is achieved. May need profile, underdrain or ditch adjustments.
AADT through this intersection from FDOT Traffic Online shows 2021 AADT of 10,900 to Giddens Rd/S Spence Field Rd.
Proposed Pavement Designs for TWO 05:
PAVEMENT DESIGN #1 - Reconstruction & Widening Design: (Uses Spencer Field Rd at Norris Rd/Attaway Dr Intersection Improvements pavement design, boring on W Spencer Field Rd was preliminarily reviewed and base clearance appears to be met, recommend confirmation from
Assumes 2' base clearance is achieved. May need profile, underdrain or ditch adjustments.
PAVEMENT DESIGN #2 & #3 (if needed) - Reconstruction Design: (Below demonstrates a SN based on an Mr reduction due to potential base clearance issues based on borings provided. These designs would address the increased SNr stemming from the Mr reduction. However, additional effort may be needed to achieve the corresponding base clearance that would need to be achieved in addition to the below pavement designs such as profile adjustments, underdrain or a deeper ditch system. Additional analysis/coordination with geotech is recommended. 25% Mr Reduction design would be recommended assuming base clearance is achievable.)
5. Intersection Data Collection and Analysis
Intersection Data Collection and Analysis
West Spencer Field Rd / South Spencer Field Rd – Giddens Ln
West Spencer Field Rd / North Spencer Field Rd – Rolyat Rd
Santa Rosa County, FL
Prepared for:
American Consulting Professionals, LLC Pace, FL
Prepared by:
HSA Consulting Group
1315 Country Club Road
Gulf Breeze, FL 32563
November 1, 2021
West Spencer Field Road / South Spencer Field Road – Giddens Lane and
West Spencer Field Road / North Spencer Field Road – Rolyat Road
Intersection Data Collection and Analysis
Introduction
The intersections of West Spencer Field Road / South Spencer Field Road – Giddens Lane and
West Spencer Field Road / North Spencer Field Road – Rolyat Road were analyzed to confirm the need for signalization and to document any changes in conditions since the Spencer Field Traffic
Analysis conducted by Genesis (May 2018). Twelve-hour turning movement counts were conducted at each intersection. A spot speed study was conducted on West Spencer Field Road north of North Spencer Field Road in order to document existing speeds, which potentially affect the criteria used in signal warrants. The Manual on Uniform Traffic Control Devices traffic signal warrant criteria were then reviewed for each intersection. In addition, Synchro analysis was conducted for the signalized condition for the PM peak hour in order to determine the need for turn lanes at the intersections.
Data Collection
Twelve-hour turning movement counts were conducted at the two intersections from 7am to
7pm on Tuesday, October 12, 2021. The TMCs were conducted from video collected at the intersections. Printouts of the TMCs, including hourly totals, peak hour summaries, and separate truck counts, are included in Appendix A. The AM, midday and PM peak hour volumes are presented in Figure 1.
AM
Midday
PM
6 491 99
7 226 84 51 123 240
7 304 106 0 5 5
87 32 26
4 3 5
1 4 2 2 195 7
3 10 11 9 260 27
7 456 50
20 403 31
26 235 32 21 34 68
17 311 51 38 60 105
85 15 36
21 30 86
60 40 75 50 245 29
34 21 18 38 248 33
28 407 38
FIGURE 1 - Peak Hour Turning Movement Volumes
W. Spencer Field Rd
Rolyat Rd N. Spencer Field Rd
S. Spencer Field RdGiddens Ln
The spot speed study was conducted on Friday, October 8, 2021 between 11am and 12pm on
West Spencer Field Road south of Twelve Oaks Drive. There are speed humps on West Spencer
Field Road north of North Spencer Field Road. The location of the spot speed study was north of the area influenced by the speed humps. The posted speed in this area is 30 mph. A printout of the spot speed study is included in Appendix B. The observed 85th percentile speed was 41 mph in the southbound direction and 39 mph in the northbound direction. The speeds indicate that if the speed humps are removed, the prevailing speed approaching the North Spencer Field Road intersection would be approximately 40 mph, which is justification for using the criteria for the
70% volume level in the signal warrants.
Traffic Signal Warrant Analysis
The two intersections were analyzed using existing traffic volumes and lane configurations to determine if current volumes would meet the traffic signal warrant criteria published in Section
4C.01 of the 2009 Manual on Uniform Traffic Control Devices. As noted above, the spot speed study documented 85th vehicle percentile speeds on West Spencer Field Road north of North
Spencer Field Road at 41 MPH on the southbound approach. This allowed 70% traffic volumes to be used in the warrant analysis. The 70% criteria are also applicable at the South Spencer Field
Road – Giddens Lane intersection based on the posted speed of 45 mph north of the intersection.
Existing traffic volumes were obtained from the 12-hour turning movement counts at each intersection during a typical weekday (October 12, 2021). Both intersection configurations utilize single lane approaches sharing all directional movements. Right turn volumes were reduced by
25% to account for right turns on red from the shared lanes.
The signal warrant worksheets for Warrants 1 and 2 are presented in Appendix C. At West
Spencer Field / South Spencer Field Road - Giddens Road, two of the nine traffic signal warrants were met using current traffic volumes. Warrant 1B was met at the 70% and 80% level. Warrant
2 was met at the 70% level. At West Spencer Field / North Spencer Field Road - Rolyat Road, two of the nine traffic signal warrants were met using current traffic volumes. Warrant 1A was met at the 70% level and 1B was met at the 70% and 80% level. Warrant 2 was met at the 70% and
100% levels.
Synchro Analysis
Signalized intersection analysis was conducted for the two intersections using the PM peak hour volumes (the highest peak hour volumes) in order to determine the need for turn lanes. Printouts of the Synchro analysis are included in Appendix D. The analysis utilized existing configurations
(single lane on all approaches, no turn lanes). The results show that the level of service (LOS) at
South Spencer Field Road is B for the overall intersection (and B for the EB, WB and NB approaches, A for the SB approach). At North Spencer Field Road, the LOS is A for the overall intersection (and B for the EB and WB approaches, A for the NB and SB approaches). Based on these results, it is clear that the intersections do not require turn lanes. This is consistent with the findings and recommendations of the 2018 Spencer Field Traffic Analysis.
APPENDIX A
12-Hour Turning Movement Counts
W. Spencer Field Rd / S. Spencer Field Rd – Giddens Lane
W. Spencer Field Rd / N. Spencer Field Rd – Rolyat Rd
HSA Consulting Group Inc.
1284 Jackson Avenue
Chipley FL, 32428 File Name : W Spencer Field Rd @ Gidden Site Code : 00000000 Start Date : 10/12/2021 Page No : 1
Groups Printed- Cars - Trucks W Spencer Field Rd
Southbound S Spencer Field Rd
Westbound W Spencer Field Rd
Northbound Giddens Ln Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int.
Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 6 115 3 0 7 10 8 0 12 35 2 0 7 11 10 0 226 07:15 11 137 7 0 13 10 8 0 7 39 1 0 3 12 5 0 253 07:30 8 131 14 0 3 9 9 0 7 36 5 0 8 5 4 0 239 07:45 3 130 6 0 14 5 5 0 6 47 1 0 7 8 13 0 245 Total 28 513 30 0 37 34 30 0 32 157 9 0 25 36 32 0 963
08:00 6 124 4 0 10 7 5 0 9 52 6 0 6 10 9 0 248 08:15 8 93 3 0 12 10 8 0 4 64 7 0 7 14 13 0 243 08:30 5 112 3 0 25 12 1 0 9 56 2 0 4 15 8 0 252 08:45 7 112 7 0 32 7 6 0 21 55 11 0 6 15 7 0 286 Total 26 441 17 0 79 36 20 0 43 227 26 0 23 54 37 0 1029
09:00 11 86 7 0 16 9 6 0 16 70 9 0 4 16 6 0 256 09:15 6 66 9 0 5 13 4 0 10 44 7 0 7 11 9 0 191 09:30 7 58 9 0 11 7 7 0 6 51 4 0 9 9 5 0 183 09:45 12 72 7 0 13 12 4 0 10 54 9 0 12 10 6 0 221 Total 36 282 32 0 45 41 21 0 42 219 29 0 32 46 26 0 851
10:00 7 58 2 0 7 13 8 0 10 48 5 0 9 14 4 0 185 10:15 12 60 2 0 6 14 10 0 6 40 4 0 4 11 7 0 176 10:30 7 56 4 0 5 9 1 0 6 43 4 0 8 14 9 0 166 10:45 3 60 4 0 16 16 4 0 7 48 4 0 3 5 5 0 175 Total 29 234 12 0 34 52 23 0 29 179 17 0 24 44 25 0 702
11:00 7 56 3 0 3 15 8 0 12 50 7 0 8 18 5 0 192 11:15 11 63 3 0 2 13 6 0 5 47 4 0 9 16 4 0 183 11:30 13 53 3 0 2 20 13 0 7 39 3 0 6 12 7 0 178 11:45 6 78 5 0 5 12 5 0 6 40 6 0 5 9 6 0 183 Total 37 250 14 0 12 60 32 0 30 176 20 0 28 55 22 0 736
12:00 4 52 4 0 6 9 6 0 1 55 6 0 6 14 5 0 168 12:15 9 50 2 0 12 21 9 0 5 57 8 0 8 13 6 0 200 12:30 7 66 6 0 7 16 6 0 8 57 4 0 13 14 7 0 211 12:45 8 55 7 0 3 14 16 0 10 50 5 0 9 16 5 0 198 Total 28 223 19 0 28 60 37 0 24 219 23 0 36 57 23 0 777
13:00 5 53 6 0 2 12 6 0 8 57 11 0 10 12 2 0 184 13:15 7 62 7 0 6 17 9 0 13 65 10 0 8 7 7 0 218 13:30 10 64 8 0 7 8 9 0 6 68 8 0 3 8 3 0 202 13:45 10 56 5 0 0 23 10 0 11 58 4 0 9 13 9 0 208 Total 32 235 26 0 15 60 34 0 38 248 33 0 30 40 21 0 812
14:00 9 70 6 0 5 14 7 0 9 55 8 0 11 17 2 0 213 14:15 6 57 3 0 9 12 10 0 7 66 8 0 8 13 1 0 200 14:30 2 75 4 0 8 16 7 0 10 69 10 0 6 9 8 0 224 14:45 13 66 7 0 2 18 12 0 5 74 9 0 14 12 5 0 237 Total 30 268 20 0 24 60 36 0 31 264 35 0 39 51 16 0 874
15:00 5 72 6 0 6 10 10 0 16 53 8 0 9 19 9 0 223 15:15 10 58 4 0 6 20 14 0 12 90 7 0 16 26 8 0 271 15:30 10 80 6 0 5 13 16 0 20 86 13 0 23 31 8 0 311 15:45 20 77 3 0 6 15 14 0 17 80 11 0 29 22 2 0 296 Total 45 287 19 0 23 58 54 0 65 309 39 0 77 98 27 0 1101
16:00 10 58 3 0 3 25 8 0 7 78 10 0 16 12 4 0 234 16:15 10 78 2 0 12 20 16 0 4 66 10 0 25 20 3 0 266 16:30 9 66 3 0 6 20 10 0 8 111 10 0 26 12 8 0 289 16:45 8 58 6 0 7 14 18 0 8 109 8 0 24 20 7 1 288 Total 37 260 14 0 28 79 52 0 27 364 38 0 91 64 22 1 1077
Chipley FL, 32428 File Name : W Spencer Field Rd @ Gidden Site Code : 00000000 Start Date : 10/12/2021 Page No : 2
Groups Printed- Cars - Trucks W Spencer Field Rd
Southbound S Spencer Field Rd
Westbound W Spencer Field Rd
Northbound Giddens Ln Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int.
Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 17:00 13 86 6 0 8 24 19 0 9 102 14 0 23 13 1 0 318 17:15 13 75 4 0 9 32 19 0 9 95 9 0 22 20 7 0 314 17:30 12 81 6 0 10 29 11 0 6 109 4 0 18 20 5 0 311 17:45 13 69 1 0 9 20 19 0 4 101 11 0 23 22 5 0 297 Total 51 311 17 0 36 105 68 0 28 407 38 0 86 75 18 0 1240
18:00 10 70 4 0 2 21 13 0 12 94 10 0 15 9 8 0 268 18:15 9 55 1 0 6 13 10 0 7 87 8 0 11 13 5 0 225 18:30 3 60 6 0 2 8 8 0 5 75 12 0 9 8 4 0 200 18:45 9 54 4 0 1 12 7 0 13 80 6 0 4 15 3 0 208 Total 31 239 15 0 11 54 38 0 37 336 36 0 39 45 20 0 901
Grand Total 410 3543 235 0 372 699 445 0 426 3105 343 0 530 665 289 1 11063 Apprch % 9.8 84.6 5.6 0.0 24.5 46.1 29.4 0.0 11.0 80.1 8.9 0.0 35.7 44.8 19.5 0.1
Total % 3.7 32.0 2.1 0.0 3.4 6.3 4.0 0.0 3.9 28.1 3.1 0.0 4.8 6.0 2.6 0.0
Chipley FL, 32428 File Name : W Spencer Field Rd @ Gidden Site Code : 00000000 Start Date : 10/12/2021 Page No : 3
W Spencer Field Rd Southbound
S Spencer Field Rd Westbound
W Spencer Field Rd Northbound
Giddens Ln Eastbound
Start Time
Left Thr u Rig ht Ped s App.
Total
Left Thr u Rig ht Ped s App.
Total
Left Thr u Rig ht Ped s App.
Total
Left Thr u Rig ht Ped s App.
Total
Int.
Total
Peak Hour From 07:00 to 09:45 - Peak 1 of 1 Intersecti on 08:15
Volume 31 403 20 0 454 85 38 21 0 144 50 245 29 0 324 21 60 34 0 115 1037
Percent 6.8 88.
4.4 0.0
59.
26.
14.
0.0 15.
75.
9.0 0.0
18.
52.
29.
0.0
08:45 Volume
7 112 7 0 126 32 7 6 0 45 21 55 11 0 87 6 15 7 0 28 286
Peak Factor
0.906
High Int. 08:45 08:45 09:00 08:15 Volume 7 112 7 0 126 32 7 6 0 45 16 70 9 0 95 7 14 13 0 34
Peak Factor
0.90
0.80
0.85
0.84
Peak Hour From 10:00 to 13:45 - Peak 1 of 1 Intersecti on 13:00
Volume 32 235 26 0 293 15 60 34 0 109 38 248 33 0 319 30 40 21 0 91 812
Percent 10.
80.
8.9 0.0
13.
55.
31.
0.0 11.
77.
10.
0.0
33.
44.
23.
0.0
13:15 Volume
7 62 7 0 76 6 17 9 0 32 13 65 10 0 88 8 7 7 0 22 218
Peak Factor
0.931
High Int. 13:30 13:45 13:15 13:45 Volume 10 64 8 0 82 0 23 10 0 33 13 65 10 0 88 9 13 9 0 31
Peak Factor
0.89
0.82
0.90
0.73
Peak Hour From 14:00 to 18:45 - Peak 1 of 1 Intersecti on 17:00
Volume 51 311 17 0 379 36 105 68 0 209 28 407 38 0 473 86 75 18 0 179 1240
Percent 13.
82.
4.5 0.0
17.
50.
32.
0.0 5.9 86.
8.0 0.0
48.
41.
10.
0.0
17:00 Volume
13 86 6 0 105 8 24 19 0 51 9 102 14 0 125 23 13 1 0 37 318
Peak Factor
0.975
High Int. 17:00 17:15 17:00 17:45 Volume 13 86 6 0 105 9 32 19 0 60 9 102 14 0 125 23 22 5 0 50
Peak Factor
0.90
0.87
0.94
0.89
Chipley FL, 32428 File Name : W Spencer Field Rd @ Gidden Site Code : 00000000 Start Date : 10/12/2021 Page No : 1
Groups Printed- Trucks W Spencer Field Rd
Southbound S Spencer Field Rd
Westbound W Spencer Field Rd
Northbound Giddens Ln Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int.
Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 0 2 0 0 0 1 0 0 3 0 0 0 1 0 0 0 7 07:15 0 3 0 0 0 0 2 0 1 1 0 0 0 0 0 0 7 07:30 0 0 0 0 0 0 0 0 0 2 0 0 0 1 0 0 3 07:45 0 4 0 0 0 0 0 0 2 1 0 0 0 1 0 0 8 Total 0 9 0 0 0 1 2 0 6 4 0 0 1 2 0 0 25
08:00 2 7 0 0 0 1 0 0 1 3 0 0 0 0 0 0 14 08:15 1 3 0 0 0 2 2 0 1 2 2 0 0 2 1 0 16 08:30 0 3 0 0 2 0 0 0 0 3 0 0 0 1 0 0 9 08:45 1 6 0 0 0 0 0 0 0 1 0 0 1 0 0 0 9 Total 4 19 0 0 2 3 2 0 2 9 2 0 1 3 1 0 48
09:00 1 7 0 0 1 0 1 0 2 7 0 0 0 1 0 0 20 09:15 1 6 0 0 0 0 0 0 2 6 0 0 0 0 0 0 15 09:30 0 6 0 0 1 1 2 0 0 6 0 0 0 0 1 0 17 09:45 1 2 2 0 2 1 0 0 0 3 1 0 3 0 0 0 15 Total 3 21 2 0 4 2 3 0 4 22 1 0 3 1 1 0 67
10:00 2 2 0 0 0 0 0 0 0 1 0 0 0 0 0 0 5 10:15 0 3 0 0 0 1 2 0 0 3 0 0 0 1 0 0 10 10:30 0 3 0 0 1 1 0 0 1 0 0 0 0 0 0 0 6 10:45 0 2 0 0 0 3 0 0 1 1 0 0 0 0 1 0 8 Total 2 10 0 0 1 5 2 0 2 5 0 0 0 1 1 0 29
11:00 1 1 0 0 0 0 0 0 0 3 1 0 0 0 0 0 6 11:15 1 3 0 0 0 1 0 0 1 2 0 0 0 0 0 0 8 11:30 1 5 0 0 0 1 0 0 0 1 0 0 0 0 0 0 8 11:45 0 8 0 0 0 1 0 0 0 0 0 0 0 1 0 0 10 Total 3 17 0 0 0 3 0 0 1 6 1 0 0 1 0 0 32
12:00 0 2 0 0 0 3 1 0 0 1 0 0 0 1 0 0 8 12:15 0 0 0 0 0 0 1 0 0 5 0 0 0 3 0 0 9 12:30 1 5 0 0 1 1 0 0 0 2 0 0 0 2 0 0 12 12:45 0 4 0 0 0 1 1 0 0 1 0 0 0 0 0 0 7 Total 1 11 0 0 1 5 3 0 0 9 0 0 0 6 0 0 36
13:00 0 4 0 0 0 0 0 0 0 3 1 0 0 0 0 0 8 13:15 0 2 1 0 0 1 0 0 9 2 2 0 0 0 0 0 17 13:30 1 2 0 0 1 0 0 0 0 7 0 0 0 0 0 0 11 13:45 0 2 1 0 0 1 1 0 0 3 0 0 0 0 1 0 9 Total 1 10 2 0 1 2 1 0 9 15 3 0 0 0 1 0 45
14:00 1 5 0 0 0 1 1 0 0 1 1 0 0 0 0 0 10 14:15 1 7 0 0 1 0 2 0 1 4 0 0 0 0 0 0 16 14:30 0 1 0 0 0 1 0 0 0 2 0 0 0 0 1 0 5 14:45 0 3 0 0 2 1 1 0 1 5 0 0 0 0 0 0 13 Total 2 16 0 0 3 3 4 0 2 12 1 0 0 0 1 0 44
15:00 1 0 0 0 1 0 0 0 0 2 0 0 1 0 0 0 5 15:15 1 2 1 0 0 2 1 0 0 3 0 0 0 0 0 0 10 15:30 1 5 0 0 0 1 1 0 0 2 0 0 0 2 0 0 12 15:45 1 7 0 0 1 1 2 0 1 1 0 0 0 2 1 0 17 Total 4 14 1 0 2 4 4 0 1 8 0 0 1 4 1 0 44
16:00 0 3 0 0 0 0 0 0 0 3 1 0 0 0 1 0 8 16:15 0 3 0 0 0 1 1 0 0 0 0 0 0 1 0 0 6 16:30 0 2 0 0 2 0 0 0 0 3 1 0 1 0 0 0 9 16:45 0 2 0 0 0 1 0 0 0 1 2 0 1 0 0 1 8 Total 0 10 0 0 2 2 1 0 0 7 4 0 2 1 1 1 31
Chipley FL, 32428 File Name : W Spencer Field Rd @ Gidden Site Code : 00000000 Start Date : 10/12/2021 Page No : 2
Groups Printed- Trucks W Spencer Field Rd
Southbound S Spencer Field Rd
Westbound W Spencer Field Rd
Northbound Giddens Ln Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int.
Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 17:00 1 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 3 17:15 0 1 0 0 1 0 0 0 0 5 0 0 0 0 0 0 7 17:30 0 2 1 0 0 1 1 0 0 2 0 0 0 1 0 0 8 17:45 0 3 0 0 0 1 1 0 0 2 0 0 1 1 0 0 9 Total 1 6 1 0 1 2 2 0 1 10 0 0 1 2 0 0 27
18:00 0 0 0 0 0 1 0 0 0 2 1 0 0 0 0 0 4 18:15 0 2 0 0 1 1 0 0 0 2 0 0 0 1 0 0 7 18:30 0 0 0 0 0 0 2 0 0 2 0 0 0 0 1 0 5 18:45 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 4 Total 0 2 0 0 1 2 2 0 0 10 1 0 0 1 1 0 20
Grand Total 21 145 6 0 18 34 26 0 28 117 13 0 9 22 8 1 448 Apprch % 12.2 84.3 3.5 0.0 23.1 43.6 33.3 0.0 17.7 74.1 8.2 0.0 22.5 55.0 20.0 2.5
Total % 4.7 32.4 1.3 0.0 4.0 7.6 5.8 0.0 6.3 26.1 2.9 0.0 2.0 4.9 1.8 0.2
Chipley FL, 32428 File Name : W Spencer Fd Rd @ N Spencer Fd Rd Site Code : 00000000 Start Date : 10/12/2021 Page No : 1
Groups Printed- Cars - Trucks W Spencer Field Rd
Southbound N Spencer Field Rd
Westbound W Spencer Field Rd
Northbound Rolyat Rd Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int.
Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 19 118 4 0 20 0 25 0 0 50 1 0 0 0 0 0 237 07:15 23 122 0 0 14 0 16 0 1 48 1 0 3 0 1 0 229 07:30 18 125 0 0 12 0 28 0 0 45 2 0 1 1 1 0 233 07:45 39 126 2 0 5 0 18 0 1 52 3 0 0 0 1 0 247 Total 99 491 6 0 51 0 87 0 2 195 7 0 4 1 3 0 946
08:00 23 97 2 0 12 0 24 0 2 55 6 0 0 1 2 0 224 08:15 20 89 3 0 11 0 13 0 1 63 5 0 1 0 2 0 208 08:30 26 110 2 0 14 0 20 0 3 49 7 0 2 0 1 0 234 08:45 27 138 1 0 10 1 24 0 4 52 3 0 1 0 3 0 264 Total 96 434 8 0 47 1 81 0 10 219 21 0 4 1 8 0 930
09:00 26 64 5 0 3 0 21 0 5 65 9 0 0 0 0 0 198 09:15 25 70 1 0 3 1 28 0 1 46 6 0 0 3 1 0 185 09:30 17 54 0 0 8 2 21 0 1 42 5 0 1 0 3 0 154 09:45 15 69 3 0 6 1 21 0 2 60 10 0 3 1 1 0 192 Total 83 257 9 0 20 4 91 0 9 213 30 0 4 4 5 0 729
10:00 17 60 2 0 7 0 26 0 5 52 8 0 1 1 0 0 179 10:15 23 56 4 0 10 0 22 0 1 38 4 0 2 1 1 0 162 10:30 27 51 2 0 7 1 16 0 2 45 8 0 0 0 2 0 161 10:45 18 51 2 0 8 7 15 0 0 48 2 0 1 0 5 0 157 Total 85 218 10 0 32 8 79 0 8 183 22 0 4 2 8 0 659
11:00 17 53 2 0 5 0 23 0 2 56 7 0 3 2 5 0 175 11:15 11 50 3 0 5 2 25 0 3 51 5 0 2 2 4 0 163 11:30 28 46 1 0 6 0 25 0 2 41 5 0 1 0 4 0 159 11:45 15 69 3 0 9 0 20 0 1 39 5 0 3 2 5 0 171 Total 71 218 9 0 25 2 93 0 8 187 22 0 9 6 18 0 668
12:00 17 58 1 0 4 0 32 0 3 50 8 0 3 1 0 0 177 12:15 19 58 1 0 7 3 33 0 3 58 3 0 2 1 1 0 189 12:30 22 58 2 0 7 1 31 0 1 62 9 0 3 1 2 0 199 12:45 21 47 2 0 9 3 37 0 4 60 6 0 2 3 4 0 198 Total 79 221 6 0 27 7 133 0 11 230 26 0 10 6 7 0 763
13:00 22 60 3 0 4 1 24 0 0 68 7 0 1 0 2 0 192 13:15 22 52 0 0 9 1 28 0 3 72 7 0 0 0 1 0 195 13:30 19 67 2 0 10 0 34 0 2 60 7 0 0 1 3 0 205 13:45 19 62 1 0 5 0 31 0 0 63 5 0 1 0 3 0 190 Total 82 241 6 0 28 2 117 0 5 263 26 0 2 1 9 0 782
14:00 18 74 1 0 6 1 36 0 2 58 12 0 5 2 1 0 216 14:15 23 61 2 0 9 3 40 0 1 57 14 0 2 2 1 0 215 14:30 27 71 2 0 9 1 35 0 0 64 7 0 1 1 3 0 221 14:45 24 70 0 0 12 0 34 0 1 93 6 0 1 1 2 0 244 Total 92 276 5 0 36 5 145 0 4 272 39 0 9 6 7 0 896
15:00 28 68 2 0 5 4 41 0 1 66 7 0 5 1 6 0 234 15:15 35 77 0 0 8 1 38 0 2 85 15 0 1 0 0 0 262 15:30 27 84 3 0 5 0 39 0 6 104 9 1 0 0 1 0 279 15:45 35 68 2 0 16 1 48 0 1 105 14 0 1 1 3 0 295 Total 125 297 7 0 34 6 166 0 10 360 45 1 7 2 10 0 1070
16:00 28 59 1 0 4 1 34 0 2 92 16 0 2 1 4 0 244 16:15 30 85 3 0 6 0 43 0 0 80 18 0 0 1 1 0 267 16:30 29 68 2 0 7 0 55 0 2 112 13 0 0 0 1 0 289 16:45 25 73 1 0 3 4 58 0 1 112 19 0 1 0 1 0 298 Total 112 285 7 0 20 5 190 0 5 396 66 0 3 2 7 0 1098
Chipley FL, 32428 File Name : W Spencer Fd Rd @ N Spencer Fd Rd Site Code : 00000000 Start Date : 10/12/2021 Page No : 2
Groups Printed- Cars - Trucks W Spencer Field Rd
Southbound N Spencer Field Rd
Westbound W Spencer Field Rd
Northbound Rolyat Rd Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int.
Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 17:00 25 88 3 0 9 1 50 0 3 131 9 0 1 2 4 0 326 17:15 27 75 1 0 7 0 77 0 1 101 9 0 3 0 5 0 306 17:30 24 78 1 0 5 0 47 0 2 114 14 0 2 0 2 0 289 17:45 27 70 3 0 6 1 35 0 1 115 20 0 4 1 1 0 284 Total 103 311 8 0 27 2 209 0 7 461 52 0 10 3 12 0 1205
18:00 26 72 0 0 5 0 54 0 4 96 5 0 2 0 1 0 265 18:15 21 52 1 0 2 0 62 0 1 84 14 0 1 0 1 0 239 18:30 23 50 1 0 7 1 25 0 0 73 11 0 1 0 4 0 196 18:45 21 50 1 0 4 0 37 0 0 69 7 0 2 0 4 0 195 Total 91 224 3 0 18 1 178 0 5 322 37 0 6 0 10 0 895
Grand Total 1118 3473 84 0 365 43 1569 0 84 3301 393 1 72 34 104 0 10641 Apprch % 23.9 74.3 1.8 0.0 18.5 2.2 79.4 0.0 2.2 87.4 10.4 0.0 34.3 16.2 49.5 0.0
Total % 10.5 32.6 0.8 0.0 3.4 0.4 14.7 0.0 0.8 31.0 3.7 0.0 0.7 0.3 1.0 0.0
Chipley FL, 32428 File Name : W Spencer Fd Rd @ N Spencer Fd Rd Site Code : 00000000 Start Date : 10/12/2021 Page No : 3
W Spencer Field Rd Southbound
N Spencer Field Rd Westbound
W Spencer Field Rd Northbound
Rolyat Rd Eastbound
Start Time
Left Thr u Rig ht Ped s App.
Total
Left Thr u Rig ht Ped s App.
Total
Left Thr u Rig ht Ped s App.
Total
Left Thr u Rig ht Ped s App.
Total
Int.
Total
Peak Hour From 07:00 to 09:45 - Peak 1 of 1 Intersecti on 07:00
Volume 99 491 6 0 596 51 0 87 0 138 2 195 7 0 204 4 1 3 0 8 946
Percent 16.
82.
1.0 0.0
37.
0.0 63.
0.0 1.0
95.
3.4 0.0 50.
12.
37.
0.0
07:45 Volume
39 126 2 0 167 5 0 18 0 23 1 52 3 0 56 0 0 1 0 1 247
Peak Factor
0.957
High Int. 07:45 07:00 07:45 07:15 Volume 39 126 2 0 167 20 0 25 0 45 1 52 3 0 56 3 0 1 0 4
Peak Factor
0.89
0.76
0.91
0.50
Peak Hour From 10:00 to 13:45 - Peak 1 of 1 Intersecti on 12:45
Volume 84 226 7 0 317 32 5 123 0 160 9 260 27 0 296 3 4 10 0 17 790
Percent 26.
71.
2.2 0.0
20.
3.1 76.
0.0 3.0
87.
9.1 0.0 17.
23.
58.
0.0
13:30 Volume
19 67 2 0 88 10 0 34 0 44 2 60 7 0 69 0 1 3 0 4 205
Peak Factor
0.963
High Int. 13:30 12:45 13:15 12:45 Volume 19 67 2 0 88 9 3 37 0 49 3 72 7 0 82 2 3 4 0 9
Peak Factor
0.90
0.81
0.90
0.47
Peak Hour From 14:00 to 18:45 - Peak 1 of 1 Intersecti on 16:30
Volume 106 304 7 0 417 26 5 240 0 271 7 456 50 0 513 5 2 11 0 18 1219
Percent 25.
72.
1.7 0.0 9.6 1.8
88.
0.0 1.4 88.
9.7 0.0
27.
11.
61.
0.0
17:00 Volume
25 88 3 0 116 9 1 50 0 60 3 131 9 0 143 1 2 4 0 7 326
Peak Factor
0.935
High Int. 17:00 17:15 17:00 17:15 Volume 25 88 3 0 116 7 0 77 0 84 3 131 9 0 143 3 0 5 0 8
Peak Factor
0.89
0.80
0.89
0.56
Chipley FL, 32428 File Name : W Spencer Fd Rd @ N Spencer Fd Rd Site Code : 00000000 Start Date : 10/12/2021 Page No : 1
Groups Printed- Trucks W Spencer Field Rd
Southbound N Spencer Field Rd
Westbound W Spencer Field Rd
Northbound Rolyat Rd Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int.
Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 07:00 1 0 0 0 2 0 1 0 0 5 0 0 0 0 0 0 9 07:15 1 1 0 0 2 0 0 0 0 4 0 0 0 0 0 0 8 07:30 2 3 0 0 0 0 0 0 0 1 0 0 0 0 0 0 6 07:45 3 5 1 0 0 0 0 0 0 2 0 0 0 0 0 0 11 Total 7 9 1 0 4 0 1 0 0 12 0 0 0 0 0 0 34
08:00 0 2 0 0 0 0 2 0 0 4 0 0 0 0 0 0 8 08:15 1 2 0 0 0 0 2 0 0 3 1 0 0 0 1 0 10 08:30 3 6 0 0 1 0 1 0 0 1 0 0 0 0 0 0 12 08:45 0 8 0 0 0 0 0 0 0 4 0 0 0 0 0 0 12 Total 4 18 0 0 1 0 5 0 0 12 1 0 0 0 1 0 42
09:00 1 5 0 0 0 0 1 0 0 7 1 0 0 0 0 0 15 09:15 2 7 0 0 1 0 4 0 0 7 1 0 0 0 0 0 22 09:30 3 4 0 0 0 0 0 0 0 1 0 0 0 0 0 0 8 09:45 0 4 0 0 1 0 0 0 0 5 1 0 0 0 0 0 11 Total 6 20 0 0 2 0 5 0 0 20 3 0 0 0 0 0 56
10:00 1 2 0 0 0 0 1 0 0 1 0 0 0 0 0 0 5 10:15 0 2 0 0 1 0 2 0 0 3 0 0 0 0 0 0 8 10:30 0 2 0 0 0 0 0 0 0 1 0 0 0 0 0 0 3 10:45 0 0 1 0 1 0 1 0 0 0 0 0 0 0 0 0 3 Total 1 6 1 0 2 0 4 0 0 5 0 0 0 0 0 0 19
11:00 0 3 0 0 0 0 1 0 0 4 1 0 0 0 1 0 10 11:15 0 3 0 0 0 0 1 0 0 2 0 0 0 0 0 0 6 11:30 3 3 0 0 0 0 0 0 0 1 0 0 0 0 0 0 7 11:45 0 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Total 3 18 0 0 0 0 2 0 0 7 1 0 0 0 1 0 32
12:00 2 0 0 0 0 0 1 0 0 1 0 0 0 0 0 0 4 12:15 2 1 0 0 1 0 0 0 0 3 0 0 0 0 0 0 7 12:30 0 3 0 0 0 0 1 0 0 4 0 0 0 0 0 0 8 12:45 0 2 0 0 0 0 2 0 0 1 0 0 0 0 0 0 5 Total 4 6 0 0 1 0 4 0 0 9 0 0 0 0 0 0 24
13:00 1 2 0 0 1 0 1 0 0 2 0 0 0 0 0 0 7 13:15 1 1 0 0 1 0 0 0 0 3 0 0 0 0 0 0 6 13:30 4 2 0 0 1 0 2 0 0 5 0 0 0 0 0 0 14 13:45 1 2 0 0 0 0 2 0 0 2 0 0 0 0 0 0 7 Total 7 7 0 0 3 0 5 0 0 12 0 0 0 0 0 0 34
14:00 1 5 0 0 0 0 2 0 0 2 0 0 0 0 0 0 10 14:15 0 5 0 0 0 0 2 0 0 7 0 0 0 0 0 0 14 14:30 1 1 0 0 0 0 1 0 0 3 0 0 0 0 0 0 6 14:45 0 3 0 0 0 0 4 0 0 7 0 0 0 0 0 0 14 Total 2 14 0 0 0 0 9 0 0 19 0 0 0 0 0 0 44
15:00 2 0 0 0 0 0 1 0 0 2 0 0 0 0 0 0 5 15:15 3 7 0 0 1 0 1 0 0 3 1 0 0 0 0 0 16 15:30 1 3 0 0 0 0 1 0 0 3 0 0 0 0 0 0 8 15:45 0 4 0 0 0 0 1 0 0 2 0 0 0 0 0 0 7 Total 6 14 0 0 1 0 4 0 0 10 1 0 0 0 0 0 36
16:00 0 2 0 0 0 0 1 0 0 4 1 0 0 0 0 0 8 16:15 2 3 0 0 0 0 2 0 0 1 0 0 0 0 0 0 8 16:30 0 2 0 0 0 0 3 0 0 0 0 0 0 0 0 0 5 16:45 1 1 0 0 0 0 2 0 0 1 0 0 0 0 0 0 5 Total 3 8 0 0 0 0 8 0 0 6 1 0 0 0 0 0 26
Chipley FL, 32428 File Name : W Spencer Fd Rd @ N Spencer Fd Rd Site Code : 00000000 Start Date : 10/12/2021 Page No : 2
Groups Printed- Trucks W Spencer Field Rd
Southbound N Spencer Field Rd
Westbound W Spencer Field Rd
Northbound Rolyat Rd Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int.
Total Factor 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 17:00 0 1 0 0 0 0 0 0 0 1 0 0 0 0 0 0 2 17:15 0 0 0 0 0 0 2 0 0 2 1 0 0 0 0 0 5 17:30 1 2 0 0 0 0 1 0 0 3 0 0 0 0 0 0 7 17:45 1 2 0 0 0 0 0 0 0 2 0 0 0 0 0 0 5 Total 2 5 0 0 0 0 3 0 0 8 1 0 0 0 0 0 19
18:00 1 0 0 0 0 0 1 0 0 2 0 0 0 0 0 0 4 18:15 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 3 18:30 0 0 0 0 0 0 1 0 0 1 1 0 0 0 0 0 3 18:45 0 0 0 0 0 0 0 0 0 4 2 0 0 0 0 0 6 Total 1 0 0 0 0 0 2 0 0 10 3 0 0 0 0 0 16
Grand Total 46 125 2 0 14 0 52 0 0 130 11 0 0 0 2 0 382 Apprch % 26.6 72.3 1.2 0.0 21.2 0.0 78.8 0.0 0.0 92.2 7.8 0.0 0.0 0.0 100.0 0.0
Total % 12.0 32.7 0.5 0.0 3.7 0.0 13.6 0.0 0.0 34.0 2.9 0.0 0.0 0.0 0.5 0.0
APPENDIX B
Spot Speed Study
W. Spencer Field Rd south of Twelve Oaks Drive
Form 750-010-03
TRAFFIC ENGINEERING
February 2015
78 - 79.9
76 - 77.9
74 - 75.9
72 - 73.9
70 - 71.9
68 - 69.9
66 - 67.9
64 - 65.9
62 - 63.9
60 - 61.9
58 - 59.9
56 - 57.9
54 - 55.9
52 - 53.9
50 - 51.9
48 - 49.9
1 46 - 47.9 1
1 1 44 - 45.9 1 1 1
42 - 43.9 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 40 - 41.9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 38 - 39.9 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 36 - 37.9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 34 - 35.9 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 32 - 33.9 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 30 - 31.9 1 1 1
1 1 1 1 1 1 1 1 1 1 28 - 29.9 1 1 1 1 1
1 1 1 1 1 1 26 - 27.9 1 1
24 - 25.9
22 - 23.9
1 20 - 21.9
18 - 19.9
16 - 17.9
14 - 15.9
12 - 13.9
10 - 11.9
Santa Rosa
Time Period From:
State of Florida Department of Transportation
VEHICLE SPOT SPEED STUDY
General Information Site Information
Analyst/Observer: Robert Madden Location: W Spencer Field Rd s. of Twelve Oaks Dr
11:00 AM To: 12:00 PM Roadway ID: 58000020
Weather/Road Condition: Clear Dry Milepost : 3.211
South bound Both
Directions
Posted Speed (mph): 30mph Remarks:
Vehicles traveling North bound Speed
(mph)
Vehicles traveling
Agency or Company: HSA City:
Date Performed: Friday, October 08, 2021 County:
15 20 Total
Cum
Total
Cum
Total Total
20 15 10 5
100 0 ≥ 80 0 102
Total Cum
Total5 10
0 202
100 0 0 102 0
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 0 0 102 0 202
100 1 1 102 2 202
100 0 0 102 0 202
97 0 9 98 9 195
99 2 3 101 5 200
91 14 9 73 23 164
97 6 16 89 22 186
67 20 22 44 42 111
77 10 20 64 30 141
32 15 3 10 18 42
47 15 12 22 27 69
7 6 2 2 8 9
17 10 5 7 15 24
1 0 0 0 0 1
1 0 0 0 0 1
0 0 0 0 0 0
1 1 0 0 1 1
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
100 TOTALS 102 202
0 0 ≤ 10 0 0 0
Travel Direction 1 → North Speed Data Summary South ← Travel Direction 2 Both
Directions
30-40 10 mph Pace 32-42 32-42
OK OK OK
85 85th Percentile Vehicle 87 172
39 85th Percentile Speed 41 41
APPENDIX C
Signal Warrant Worksheets
APPENDIX D
Synchro Analysis – PM Peak Hour
West Spencer Field Rd at S Spencer Field Rd PM Peak 10/28/2021
West Spencer Field Rd at S Spencer Field Rd 10/28/2021 PM Peak Synchro 10 Light Report
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 86 75 18 36 105 68 28 407 38 51 311 7 Future Volume (vph) 86 75 18 36 105 68 28 407 38 51 311 7 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.986 0.956 0.989 0.997 Flt Protected 0.977 0.991 0.997 0.993 Satd. Flow (prot) 0 1794 0 0 1765 0 0 1837 0 0 1844 0 Flt Permitted 0.769 0.917 0.964 0.889 Satd. Flow (perm) 0 1412 0 0 1633 0 0 1776 0 0 1651 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 13 54 11 3 Link Speed (mph) 30 30 30 30 Link Distance (ft) 775 805 646 584 Travel Time (s) 17.6 18.3 14.7 13.3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 93 82 20 39 114 74 30 442 41 55 338 8 Shared Lane Traffic (%) Lane Group Flow (vph) 0 195 0 0 227 0 0 513 0 0 401 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 Total Split (s) 23.5 23.5 23.5 23.5 26.5 26.5 26.5 26.5 Total Split (%) 47.0% 47.0% 47.0% 47.0% 53.0% 53.0% 53.0% 53.0% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.5 5.5 5.5 5.5 Lead/Lag Lead-Lag Optimize?
Recall Mode None None None None Max Max Max Max Act Effct Green (s) 10.6 10.5 25.3 25.3 Actuated g/C Ratio 0.24 0.24 0.58 0.58 v/c Ratio 0.55 0.52 0.49 0.42 Control Delay 18.9 14.7 10.3 9.6 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 18.9 14.7 10.3 9.6
LOS B B B A
Approach Delay 18.9 14.7 10.3 9.6 Approach LOS B B B A Queue Length 50th (ft) 38 35 76 57 Queue Length 95th (ft) 82 79 187 143 Internal Link Dist (ft) 695 725 566 504 Turn Bay Length (ft) Base Capacity (vph) 597 713 1041 965
West Spencer Field Rd at S Spencer Field Rd PM Peak 10/28/2021
West Spencer Field Rd at S Spencer Field Rd 10/28/2021 PM Peak Synchro 10 Light Report
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.33 0.32 0.49 0.42
Intersection Summary Area Type: Other Cycle Length: 50 Actuated Cycle Length: 43.3 Natural Cycle: 50 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.55 Intersection Signal Delay: 12.1 Intersection LOS: B Intersection Capacity Utilization 65.4% ICU Level of Service C Analysis Period (min) 15
Splits and Phases: 3: W Spencer Field Rd & Giddens Ln/S Spencer Field Rd
West Spencer Field at N. Spencer Field PM Peak 10/29/2021
PM Peak Synchro 10 Light Report
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 5 2 11 26 5 240 7 456 50 106 304 7 Future Volume (vph) 5 2 11 26 5 240 7 456 50 106 304 7 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.915 0.880 0.987 0.998 Flt Protected 0.987 0.995 0.999 0.987 Satd. Flow (prot) 0 1682 0 0 1631 0 0 1837 0 0 1835 0 Flt Permitted 0.770 0.963 0.994 0.770 Satd. Flow (perm) 0 1312 0 0 1579 0 0 1827 0 0 1431 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 12 261 13 2 Link Speed (mph) 30 30 30 30 Link Distance (ft) 686 752 600 627 Travel Time (s) 15.6 17.1 13.6 14.3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow (vph) 5 2 12 28 5 261 8 496 54 115 330 8 Shared Lane Traffic (%) Lane Group Flow (vph) 0 19 0 0 294 0 0 558 0 0 453 0 Turn Type Perm NA Perm NA Perm NA Perm NA Protected Phases 4 8 2 6 Permitted Phases 4 8 2 6 Detector Phase 4 4 8 8 2 2 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 23.5 23.5 23.5 23.5 23.5 23.5 23.5 23.5 Total Split (s) 23.5 23.5 23.5 23.5 36.5 36.5 36.5 36.5 Total Split (%) 39.2% 39.2% 39.2% 39.2% 60.8% 60.8% 60.8% 60.8% Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.5 5.5 5.5 5.5 Lead/Lag Lead-Lag Optimize?
Recall Mode None None None None Max Max Max Max Act Effct Green (s) 7.9 7.9 32.1 32.1 Actuated g/C Ratio 0.15 0.15 0.63 0.63 v/c Ratio 0.09 0.63 0.48 0.50 Control Delay 12.8 10.9 7.4 8.4 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 12.8 10.9 7.4 8.4
LOS B B A A
Approach Delay 12.8 10.9 7.4 8.4 Approach LOS B B A A Queue Length 50th (ft) 2 8 63 53 Queue Length 95th (ft) 15 60 172 157 Internal Link Dist (ft) 606 672 520 547 Turn Bay Length (ft) Base Capacity (vph) 471 727 1153 900
West Spencer Field at N. Spencer Field PM Peak 10/29/2021
PM Peak Synchro 10 Light Report
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.04 0.40 0.48 0.50
Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 51.1 Natural Cycle: 60 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.63 Intersection Signal Delay: 8.6 Intersection LOS: A Intersection Capacity Utilization 81.3% ICU Level of Service D Analysis Period (min) 15
Splits and Phases: 3: W Spencer Rd & Rolyat Rd/N Spencer Rd
6. Roundabout Swept Path and Fastest Path
Analysis
7. Drainage Analysis
SANTA ROSA COUNTY PUBLIC WORKS
SPREAD CALCULATIONS
Road: West Spencer Field Road Sheet 1 of 1
County: Santa Rosa Prepared by: JCB Date: 5/30/25
Project Number: 21-006 ACEF-005 Checked by: JAM Date: 6/2/25
System Description: Roundabout Inlets
0.016
Inlet No.
or
Location
C · A
(ac)
Overland
Runoff
(cfs)
Previous
Bypass
(cfs)
Total
Flow
(cfs)
Cross
Slope
(ft/ft)
Long
Slope
Spread
(ft)
Allowable
Spread (ft)
Intercepted
Flow (cfs)
Bypass
Flow
(cfs)
Bypass to Inlet
No. or
Location
S-03 0.040 0.2 0.0 0.2 0.02 1.11% 3.6 8.3 0.2 0.0 51+00 L
S-04 0.074 0.3 0.0 0.3 0.02 0.61% 5.0 6.5 0.3 0.0 54+20 R
S-09 0.024 0.1 0.0 0.1 0.02 2.30% 2.6 8.8 0.1 0.0 10+70 R
S-10 0.028 0.1 0.0 0.1 0.02 2.66% 2.6 9.8 0.1 0.0 10+70 L
S-12 0.075 0.3 0.0 0.3 0.02 0.30% 5.8 10.8 0.3 0.0 In Sag
S-13 0.032 0.1 0.0 0.1 0.02 1.30% 3.2 6.8 0.1 0.0 14+20 L
S-14 0.019 0.1 0.0 0.1 0.02 0.30% 3.4 6.5 0.1 0.0 In Sag
10+70 L 0.095 0.4 0.0 0.4 0.02 0.71% 5.3 6.0 0.0 0.4 Curb End
10+70 R 0.110 0.4 0.0 0.4 0.02 0.82% 5.5 6.0 0.0 0.4 Curb End
14+20 L 0.040 0.2 0.0 0.2 0.02 0.30% 4.5 6.5 0.0 0.2 Curb End
51+00 L 0.063 0.3 0.0 0.3 0.02 0.37% 5.2 6.5 0.0 0.3 Curb End
51+00 R 0.090 0.4 0.0 0.4 0.02 0.39% 5.9 6.5 0.0 0.4 Curb End
54+20 L 0.081 0.3 0.0 0.3 0.02 0.30% 5.9 6.0 0.0 0.3 Curb End
54+20 R 0.023 0.1 0.0 0.1 0.02 0.31% 3.7 6.5 0.0 0.1 Curb End
Manning's n=
16/ 2/2025
STRMSWR
21-006 ACEF-005 128.55Consor North America Inc.
W Spencer Field Rd Roundabout JCB 0.00
0.000.200.95Santa Rosa JAM 129.73 Milton 10
HGL method: Standard FDOT (Jump HGL to pipe crown).
D5369.71D5308.90 0.42Partial0.1556n/an/a0.000.080.070.950.07 0.100132.44 132.44 132.340.00
53+69.71 24.23 0.0600n/asubn/a0.000.0010.00 0.54 8.06 0.080.000.000.200.03 n/a0.650.00
1 64.26DITCH n/a0.1556n/a132.110.00n/a0.000.000.080.000.000.00 0.100132.010.65
D5308.90 S-08 1.29Partial2.9284n/an/a0.000.000.000.950.00 1.682132.13 132.13 130.440.00
53+08.90 45.00 0.0600n/asubn/a0.000.0010.54 0.48 7.90 0.080.080.000.200.00 n/a0.640.00
1 57.45DITCH n/a5.2219n/a132.010.00n/a0.000.000.080.000.000.00 3.000129.010.64
S-11 S-08 2.29Full0.089818.96132.000.000.880.710.950.75 0.145130.73 130.73 130.590.00
13+76.15 51.32 0.01208.38 130.780.000.0010.00 1.17 8.06 0.880.000.160.200.84 130.597.120.00
1 161.20DBI-D 2.700.124430.00129.200.001.270.000.000.880.000.000.00 0.190129.017.12
S-08 S-07 0.75Partial1.5890n/an/a0.000.000.000.950.00 0.310130.44 130.44 130.130.00
12+08.96 29.52 0.2400n/asubn/a0.000.0011.17 0.16 7.71 0.960.960.000.200.00 n/a7.430.00
1 19.51DITCH n/a1.5890n/a129.010.00n/a0.000.000.960.000.000.00 0.310128.707.43
S-07 S-06 2.81Partial0.120618.96128.700.000.010.000.950.00 0.060129.95 129.95 129.890.00
11+89.45 28.61 0.01209.54zero130.280.000.0011.34 0.29 7.66 0.970.960.010.200.05 130.227.490.00
1 49.77MESC4-24 3.070.161030.00128.700.00-1.250.000.000.970.000.000.00 0.060128.647.49
S-06 S-05 2.97Partial0.186518.96131.500.000.000.000.950.00 0.090129.82 129.82 129.730.00
11+40.15 29.05 0.012010.43zero130.220.000.0011.63 0.00 7.57 0.980.970.000.200.01 130.137.450.00
1 48.26DBI-D 3.350.192530.00128.640.001.680.000.000.980.000.000.00 0.090128.557.45
Page:STORM SEWER HYDRAULICS System:
PROJECT CONDITIONS
Number: Organization: Outfall Tailwater El: Runoff Coefficients (default)Storm Event - User Defined
Area 3Description: Area 1 Area 2Designed by: Exit Loss at Outfall: Location Frequency County: Checked by: Storm Sewer Control El:
FROM TO Mann'gCapacityFlowFall Tc TravelInten. Total VelocityHGLPipe Pipe ElevationsInlet ElevationsFlow (cfs) Drainage Areas
OffsetStation 'N' Type(%)Height HGLHGLInletQb S-Qb Time CA ActualArea Runoff Lcl CAC*A LenType Brls FLWidth Crown Line Qfd S-Qfd Physical Min HGL CIA UpStrmCoeff
(cfs)(fps) (%)(in)(ft) Flow LineJnc LossClear.TOTALS-Qdw Qdw(min) (min) (in/hr) (ac)Tot CA(A) (C) (CA)
Units: ENGLISH Automated Storm sewer Analysis & Design (ASAD), copyright 1992-2003, Hiteshew Engineering Systems, Inc. Ph: (352) 383-4191
T60v11U.RPT 10/14/2003Portions of ASAD were developed by Kenneth J. Leeming, P.E. at International Engineering Consultants, Inc.
STRMSWR
21-006 ACEF-005 128.55Consor North America Inc.
W Spencer Field Rd Roundabout JCB 0.00
0.000.200.95Santa Rosa JAM 129.73 Milton 10
D5369.71D5308.90 0.000.080.070.950.07 0.00 1.001.00132.34132.44TRAPEZOID: 4.000.16
53+69.71 24.23 0.0010.00 0.54 8.06 0.080.000.000.200.03 0.00 0.65 0.0600132.442:1 4 Wide 2:1 0.090.33 0.33 0.420.16132.34
0.000.000.080.000.000.0064.26DITCH 0.65 0.67 0.67 3.58sub132.11 0.16132.01
D5308.90 S-08 0.000.000.000.950.00 0.00 2.002.50130.47132.15TRAPEZOID: 4.002.93
53+08.90 45.00 0.0010.54 0.48 7.90 0.080.080.000.200.00 0.00 0.64 0.0600132.132:1 4 Wide 2:1 0.090.14 0.12 1.292.93130.44
0.000.000.080.000.000.0057.45DITCH 0.64 2.36 1.88 2.71sub132.01 5.22129.01
S-08 S-07 0.000.000.000.950.00 0.00 2.002.50130.14130.45TRAPEZOID: 4.001.59
12+08.96 29.52 0.0011.17 0.16 7.71 0.960.960.