WEDGE (WLR 75D) DD FQ4 AMH 22ER0_BLANK.xls
XLS spreadsheet 60 KB Posted
- Attached to
- USCGC WEDGE Dry Dock Repair FY 22
- Solicitation number
- 701085-22-R-P4556500
About this file
This document includes a pricing schedule and sources sought notice for ship repair and maintenance services. The U.S. Coast Guard Surface Forces Logistics Center seeks contractors to perform drydock maintenance for its 75-foot river buoy tender USCGC WEDGE and 90-foot barge from August 16, 2022 through October 25, 2022 at the contractor's shipyard. The scope of work involves 59 items including steel repair, tank cleaning and inspection, machinery servicing, insulation replacement, steel preservation, and deck repair. Interested parties must submit documentation by April 4, 2022 to be considered as a prime contractor, including their business size, certifications, past performance on similar projects, and confirmation they will submit a proposal if a solicitation is issued. The NAICS code for this opportunity is 336611 for ship building and repair.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Spec - WEDGE (WLR 75D) DD FQ4 AMH 22R0.pdf | ||
| WEDGE Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC WEDGE (WLR-75D) DRYDOCK AVAILABILITY FY2022 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, U/W Body, Inspect - Tender | JOB | 1 | $0.00 | |
| D-002 | Hull Plating, U/W Body, Ultrasonic Testing - Tender | JOB | 1 | $0.00 | |
| D-003 | U/W Body, Preserve, 100 percent - Tender | JOB | 1 | $0.00 | |
| D-004 | Hull Plating Freeboard, Preserve, 100 Percent - Tender | JOB | 1 | $0.00 | |
| D-005 | Propulsion Shaft Rope Guards, Inspect | JOB | 1 | $0.00 | |
| D-006 | Voids, Non-Accessible, Leak Test - Tender | JOB | 1 | $0.00 | |
| O-007 | Voids, Non-Accessible, Internal Surfaces, Preserve | JOB | 1 | $0.00 | |
| D-008 | Tanks, MP Fuel Service, Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-009 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-010 | Propulsion Shaft Seals, Mechanical Overhaul and Inflatable renew | JOB | 1 | ||
| O-011 | Propulsion Shafting, Straighten | JOB | 1 | $0.00 | |
| O-012 | Propulsion Shafting, Optical or Laser Alignment Check | JOB | 1 | $0.00 | |
| O-013 | Propulsion Shaft Bearings, External, Renew | JOB | 1 | $0.00 | |
| D-014 | Propulsion Shaft Bearings, External, Check Clearances | JOB | 1 | $0.00 | |
| D-015 | Stern Tube Interior Surfaces, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| O-016 | Propeller, Perform Minor Repairs and Reconditioning | JOB | 1 | $0.00 | |
| D-017 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-018 | Keel Coolers, Clean, Inspect and Hydro | JOB | 1 | $0.00 | |
| D-019 | Fathometer Transducer, General Maintenance | JOB | 1 | $0.00 | |
| D-020 | Sea Strainers, All Sizes, Renew | JOB | 1 | $0.00 | |
| D-O21 | Rudder Assembly, Remove, Inspect And Reinstall | JOB | 1 | $0.00 | |
| D-022 | Rudders, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| D-023 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | $0.00 | |
| D-024 | Spuds, Overhaul - Tender | JOB | 1 | $0.00 | |
| D-025 | Spud Wells, Preserve - Tender | JOB | 1 | $0.00 | |
| D-026 | Cathodic Protection, Zinc Anodes, Renew, - Tender | JOB | 1 | $0.00 | |
| D-027 | Drydock - Tender | JOB | 1 | $0.00 | |
| D-028 | Temporary Services, Provide - Tender | JOB | 1 | $0.00 | |
| D-029 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-030 | Hull Plating, U/W Body, Inspect - Barge | JOB | 1 | $0.00 | |
| D-031 | Hull Plating, U/W Body, Ultrasonic Testing - Barge | JOB | 1 | $0.00 | |
| D-032 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect - Barge | JOB | 1 | $0.00 | |
| D-033 | Voids, Non-Accessible, Leak Test - Barge | JOB | 1 | $0.00 | |
| O-034 | Voids, Non-Accessible, Internal Surfaces, Preserve - Barge | JOB | 1 | $0.00 | |
| D-034 | Keel Coolers, Clean, Inspect and Hydro - Barge | JOB | 1 | $0.00 | |
| D-036 | Fathometer Transducer, General Maintenance - Barge | JOB | 1 | $0.00 | |
| D-037 | U/W Body, Preserve, 100 percent - Barge | JOB | 1 | $0.00 | |
| D-038 | Hull Plating Freeboard, Preserve, 100 Percent - Barge | JOB | 1 | $0.00 | |
| D-039 | Cathodic Protection, Zinc Anodes, Renew - Barge | JOB | 1 | $0.00 | |
| D-040 | Drydock - Barge | JOB | 1 | $0.00 | |
| D-041 | Temporary Services, Provide - Barge Barge | JOB | 1 | $0.00 | |
| D-042 | Hull Fittings, Weight Handling Rigging Hardware, Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-043 | Hull Fittings (Mooring and Towing), Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-044 | Spuds, Overhaul - Barge | JOB | 1 | $0.00 | |
| D-045 | Spud Wells, Preserve - Barge | JOB | 1 | $0.00 | |
| D-046 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $0.00 | |
| D-047 | Boat Davit Winch, Shrink Wrap | JOB | 1 | $0.00 | |
| D-048 | Buoy and Cargo Handling Crane, Shrink Wrap | JOB | 1 | $0.00 | |
| D-049 | Anti-Ventilation Underwater Hull Strakes, Installation | JOB | 1 | $0.00 | |
| D-050 | Joiner Door, Renew | JOB | 1 | ||
| D-051 | Navigation Lighting Panel, Renew | JOB | 1 | ||
| D-052 | Aton Hold Repair | JOB | 1 | ||
| D-053 | Engine Room Bulkhead Repair | JOB | 1 | ||
| D-054 | Lead-Based Paint, Perform Spot Abatement | JOB | 1 | ||
| D-055 | Gunwale Bulwark Repair | JOB | 1 | ||
| D-056 | Lead-Based Paint, 100% Abatement, Perfom - Tender | JOB | 1 | ||
| D-057 | Aft Deck Plating (Barge), Repair | JOB | 1 | ||
| D-058 | Barge Air Compressor Water Cooled Heat Exchanger, Install | JOB | 1 | ||
| D-059 | Compartment Insulation (General), Renew | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 1120 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(1/20/2022)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .