About this file

This file contains four attachments related to the Webb Mitigation Site maintenance mowing contract, including location maps, site details, and a Contract Discrepancy Report template. Attachments 1-2 show location maps of the Webb Mitigation Site along the Columbia River near Cathlamet, Washington, with detailed driving directions from I-5.

Attachment 3 provides an aerial view and layout of the mowing areas, which include Field 1 (50 acres), Field 2 (30 acres), wetland areas (70 acres total), berm and ditch areas (30 acres), and main ditch slope (2.15 miles = 5 acres). The map shows access points, cross ditches, and avoid channels between the berm and ditch. Attachment 4 is a blank Contract Discrepancy Report form used to document contract performance issues, containing sections for describing problems, contractor responses, government evaluation, and closeout signatures.

View the file

Other files for this federal contract opportunity

Other files attached to Webb Mitigation Site Maintenance Mowing, newest first.
File Type Posted
B.08 Quote Table Breakdown.docx DOCX document
B.04 Wage Determination Columbia County v24_1.15.25.pdf PDF
A.03 QASP Webb Mowing.pdf PDF
B.08 N25Q0014 Solicitation Updated .pdf PDF
A.02 PWS_Webb mowing 2025-2029_04Dec2024_cro.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CathlametCathlamet

C o l u m b i a

R i v e r

P u g e tP u g e t

I s l a n dI s l a n d

L i t t l e

I s l a n d

L i t t l e

I s l a n d

WallaceWallace Is.Is.

WhitesWhites Is.Is.

C a t h l a m e t C h a n n e l

W ah k i ak u m

C o .

C o w lit z

C o.

C la t s o p

C o .

C o l u m bi a C o.

Brown Island

Brown Island

55555454

474746464545

7,460,000

7,460,000

7,480,000

7,480,000

7,500,000

7,500,000

7,520,000

7,520,000

0, 0, 0, 0, 0, 0, 123°22'38"W

123°22'38"W

123°15'8"W

123°15'8"W

°7

'1

"N

°7

'1

"N

Columbia River Channel Improvement Project Location Map

Webb Mitigation Site River Miles 37 - 55

1 0 1 20.5

Miles

1:100,000

Projection: State Plane, Oregon North Zone, NAD 83.

Map Production Date: 13 May 2004

Webb Mitigation Site

C o l u m b i a C o .

O r e g o n

C o l u m b i a C o .

O r e g o n

C o w l i t z C o .

W a s h i n g t o n C o w l i t z C o .

W a s h i n g t o n

C l a t s o p C o .

O r e g o n

C l a t s o p C o .

O r e g o n

W a h k i a k u m C o .

W a s h i n g t o n

W a h k i a k u m C o .

W a s h i n g t o n

Attachment 2 g2odnjbs Text Box Driving Directions:

Depart I-5 Take Exit 36 onto SR-432 Tennant Way for 3.1 mi Turn LEFT (South) onto SR-433 Oregon Way for 2.5 mi Entering Oregon across Longview Bridge Bear RIGHT (West) onto US-30 for 17.9 mi Turn RIGHT (North) onto Woodson Rd for 0.1 mi Turn RIGHT to stay on Woodson Rd for 0.9 mi Bear RIGHT (East) onto Webb District Rd for 0.9 mi Arrive at Webb Wildlife Mitigation Site

70 ACRES

BERM AND AREA

FIELD 1

50 ACRES

FIELD 2

30 ACRES

WETLAND AREAS

COMBINED

TOTAL

AVOID

CHANNELS

BETWEEN BERM AND DITCH

30 ACRES

WEBB D

ISTRIC

T R D

W O

O D S

O N R

D

RIVER FRONT RD

MAIN DITCH SLOPE

2.15 MILES = 5 ACRES

Attachment 3 g2odnjbs Callout Cross Ditches (3 North ditches connect to East;

1 South ditch connects to West) g2odnjbs Line g2odnjbs Line g2odnjbs Line g2odnjbs Callout Enter Field 1 from River Front Rd g2odnjbs Callout Enter Field 2 from Webb District Rd g2odnjbs Callout Enter Wetland from Webb District Rd

CONTRACT DISCREPANCY REPORT

Instructions: QAP fills in blocks 1, 3, 4, 5 (prepared), and 6. Contractor fills in blocks 9 and 10.

1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY

3. TO: (Contractor and Managers Name) 4. FROM: (Name of QAE)

5. DATES

PREPARED RETURNED BY CONTRACTOR ACTION COMPLETE

6. DISCREPANCY OR PROBLEM: (Describe in detail: include applicable SOW/Contract references: attach continuation sheet if necessary.)

7. SIGNATURE OF CONTRACTING OFFICER

8. TO: (Contracting Officer) FROM: (Contractor)

9. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE: ATTACH CONTINUATION SHEET IF NECESSARY.

(Cite applicable Q.C. program procedures or new Q.C. procedures.)

10. SIGNATURE OF CONTRACTOR REPRESENTATIVE DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, rejection; attach continuation sheet if necessary.)

12. GOVERNMENT ACTIONS (Reduced payment, cure notice, show cause, other.)

CLOSE OUT

NAME-TITLE SIGNATURE DATE

CONTRACTOR

NOTIFIED

QAE

ACO