ATTACHMENT C.1
Request for Proposal Letter
Task Order Project:
Contractor shall provide all personnel, materials, labor, equipment and supervision to complete removal of the existing roof and the installation of a new roof at the – Hastings, NE Weather Forecast Office (WFO).
The contractor shall prepare a price proposal in accordance with the attached scope of work, price breakout, task order special clauses, and Davis Bacon General Wage Decision Number NE160064, NE64 dated 04/01/2016 or the most recent Davis Bacon General Wage Decision.
It is highly encouraged that you schedule a Pre-Site Visit to measure, visually observe conditions and verify conditions. Please contact Mark Fairchild at Hastings Nebraska 402-462-2127x3x1 to schedule a site visit.
Notice to proceed for this task order will be issued after receipt of proof of insurance and any required properly executed payment and performance bonds.
ITEM NO SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT
0001 Contractor shall provide all materials, labor, equipment and supervision to complete removal of the existing roof on the Weather Forecast Office (WFO) and the installation of a new architectural shingled roof with a minimum of an added 4” inch added ridged insulation at the Hastings, Nebraska Weather Forecast Office according to Statement of Work dated 4/4/2016 and the Davis Bacon General Wage Decision Number NE160064, dated 4/01/2016 or the most recent Davis Bacon General Wage Decision is applicable to this solicitation.
1 JB $__________ $__________
0002 Contractor shall provide extended 25 manufacturer warranty.
1 JB $__________ $__________
Please provide the price per sheet including labor if damaged underlayment needs to replaced assuming it will be replaced in 8x12 full sheets
Note: The proposal should include a breakout of the price for the materials and labor. Offers providing less than 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
Task Order Special Clauses
Name of Project: ASPHALT SHINGLE ROOF REPLACEMENT
1. FAR 36.204 - DISCLOSURE OF THE MAGNITUDE OF THE CONSTRUCTION
PROJECT: The magnitude of this project is between $25,000 and $100,000.
2. FAR 36.204 - REPRESENTATION BY CORPORATIONS REGARDING
DELINQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY
FEDERAL LAW (FEB 2016) (a) As required by sections 744 and 745 of Division E of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L 113-235), and similar provisions, if contained in subsequent appropriations acts, the Government will not enter into a contract with any corporation that--
(1) Has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, where the awarding agency is aware of the unpaid tax liability, unless an agency has considered suspension or debarment of the corporation and made a determination that suspension or debarment is not necessary to protect the interests of the Government; or
(2) Was convicted of a felony criminal violation under any Federal law within the preceding 24 months, where the awarding agency is aware of the conviction, unless an agency has considered suspension or debarment of the corporation and made a determination that this action is not necessary to protect the interests of the Government.
(b) The Offeror represents that—
(1) It is [ ] is not [ ] a corporation that has any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability; and
(2) It is [ ] is not [ ] a corporation that was convicted of a felony criminal violation under a Federal law within the preceding 24 months.
3. FAR 52.211-6 – BRAND NAME OR EQUAL (AUG 199)
4. FAR 52.211-10 - COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984) The Contractor shall be required to (a) commence work under this task order within 10 days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days from date of notice to proceed. The time stated for completion shall include final cleanup of the premises.
5. FAR 52.222-23 - NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION
TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
(FEB 1999)
Goals for minority participation for each trade:
1.1%
Goals for female participation for each trade:
5.3%
The covered area is: ADAMS COUNTY NE
6. WAGE DETERMINATION: Wage Determination number listed below, or the most recent, will be incorporated into the task order.
NE160064, dated 04/01/2016 NE64- ADAMS COUNTY
All Equal Employment Opportunity (EEO) posters can be obtained fromhttp://www.dol.gov/compliance/topics/posters.htm and must be posted at the site along with the Wage Determinations.
7. 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995): The offeror is not required to visit the site where services are to be performed. However, if they wish to visit the site to satisfy themselves as to all general and local conditions that may affect the cost of the performance of the task order, they may Contact Mark Fairchild at Hastings Nebraska 402-462- 2127x3x1 to schedule a site visit.
8. 52.246-12 – INSPECTION OF CONSTRUCTION (AUG 1996)
9. 52.246-21 – WARRANTY OF CONSTRUCTION (MAR 1994)
10. 52.249-2 Alt I – TERMINATION FOR CONVENIENCE (FIXED-PRICE)
(MAY 2004—ALTERNATE I (SEP 1996)
11. 1352.201-72 CONTRACTING OFFICER´s REPRESENTATIVE (C0R) (APR
2010)
To be Determined at Award
12. 1352.237-75 Key Personnel (APR 2010)
Site Superintendent:(Contractor provides with proposal) http://www.dol.gov/compliance/topics/posters.htm
13. 1352.246-70 PLACE OF ACCEPTANCE (APR 2010):
The place of acceptance will be: Weather Forecast Office (WFO), 6365 Osborne Drive West, Hastings, Nebraska 68901-9163
14. SCHEDULE OF DELIVERABLES
The following is a schedule of deliverables, including administrative deliverables, required during the performance of this task order. This list is not all-inclusive.
52.222-8 Payrolls and Basic Records (Jun 2010)
The contractor shall submit payrolls in accordance with the clause.
52.228-15 PERFORMANCE
AND PAYMENT BONDS--
CONSTRUCTION (NOV 2006)
Required within 10 calendar days after task order award for obligated amounts of $150,000 or greater.
52.228-13 ALTERNATIVE
PAYMENT PROTECTIONS (JUL
2000)
Required, within 10 calendar days after task order award for obligated amounts between $35,000 - $150,000.
The contractor shall submit one of the payment protections:
(a)Certified cashier’s check in the award contract amount, or an irrevocable letter of credit from a financial institution, or a fully executed payment bond.
(b)The amount of the payment protection shall be 100 percent of the contract price.
(c)The submission of the payment protection is required within 10 calendar days of contract award.
(d)The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e)Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f)When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
1352.228-70, INSURANCE
COVERAGE, AND 52.228-5
INSURANCE – WORK ON A
GOVERNMENT INSTALLATION
Insurance coverage shall be provided in accordance with the clause. Proof of insurance shall be submitted before commencing work under this task order.
General Decision Number: NE160064 04/01/2016 NE64
Superseded General Decision Number: NE20150064
State: Nebraska
Construction Type: Building
County: Adams County in Nebraska.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/22/2016 2 04/01/2016
BOIL0083-002 01/01/2015
Rates Fringes
BOILERMAKER......................$ 34.76 27.06
* ELEC0265-003 03/01/2016
Rates Fringes
ELECTRICIAN
Zone 1......................$ 27.52 10.77 Zone 2......................$ 27.82 10.77 Zone 3......................$ 28.12 10.77 Zone 4......................$ 28.52 10.77
ZONE DEFINITIONS:
Zone 1: 0 to 35 miles from the main Post Office in Lincoln Zone 2: 36 to 50 miles from the main Post Office in Lincoln Zone 3: 51 to 75 miles from the main Post Office in Lincoln Zone 4: 76 miles and over from the main Post Office in Lincoln
ELEV0028-001 01/01/2016
Rates Fringes
ELEVATOR MECHANIC................$ 40.94 29.985+a+b
FOOTNOTE:
a. Vacation Pay: 8% for persons with 5 or more years of service, 6% for persons with less than 5 years of service.
b. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
IRON0021-001 06/01/2015
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 27.20 14.37
LABO1140-010 01/01/2015
Rates Fringes
LABORER (Mason Tender, Brick & Hod)...........................$ 17.98 9.40
PLUM0016-009 08/09/2015
Rates Fringes
PLUMBER (Excludes HVAC Pipe and System Installation).........$ 33.33 13.31
PLUM0464-017 05/31/2015
Rates Fringes
PIPEFITTER (Includes HVAC Pipe and System Installation)....$ 34.84 15.34
SHEE0003-006 07/01/2015
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 32.89 14.93
SUNE2012-001 04/19/2012
Rates Fringes
BRICKLAYER.......................$ 26.74 1.83
CARPENTER........................$ 17.53 2.21
CEMENT MASON/CONCRETE FINISHER...$ 17.80 1.34
LABORER: Common or General......$ 12.39 2.40
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 21.82 2.22
OPERATOR: Loader.................$ 16.58 0.94
ROOFER...........................$ 14.52 0.65
SPRINKLER FITTER (Fire Sprinklers)......................$ 19.07 4.15
TRUCK DRIVER: Dump, Lowboy and Tandem.......................$ 14.56 1.68
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Statement of Work
ASPHALT SHINGLE ROOF REPLACEMENT
NATIONAL WEATHER SERVICE – Weather Forecast Office
6365 Osborne Drive West Hastings, Nebraska 68901-9163
April 4, 2016
SCOPE:
Contractor shall provide all materials, labor, equipment and supervision to complete removal of the existing roof on the Weather Forecast Office (WFO) and the installation of a new architectural shingled roof at the Hastings, Nebraska Weather Forecast Office according to this statement of work.
DESCRIPTION OF WORK:
1. Conduct pre-bid site visit to verify dimensions, site conditions, etc.
2. Remove existing asphalt shingles, felt underlayment and all existing roof nails.
3. Replace all damaged / deformed / rotten decking material. (See notes below)
4. Verify and install correct deck fasteners on existing deck according to manufacturer’s requirements if there are insufficient fasteners to begin with.
5. Install one new layer of 15# felt underlayment (with offsetting overlap).
6. Supply and Install self-adhering leak barrier / ice shield membrane underlayment at eaves, at valley sections and other locations necessary to meet roof manufacturer requirements for roof system manufacture warranty coverage.
7. Remove and replace all drip edge, and valley flashing. Seal seams and joints with 50 year caulking to ensure water tight seal
8. Remove and replace both vents.
9. Remove and replace soffit and running vent on back side of building and paint to match existing.
10. Supply and install new flashings on all roof penetrations.
11. Supply and install new GAF Timberline 30 year architectural shingles (or approved equal or greater).
12. Supply and install new GAF Hip & Ridge Cap shingles (or approved equal or greater).
13. Remove and reinstall lightning protection terminals and associated cables/straps, seal all penetrations.
14. Provide a written 25 Year Manufacturers Watertight System Warranty, labor & materials.
15. Install guttering over front entry way (approx. 45ft long) with downspouts and concrete splash block to divert water away from building. Guttering and downspouts shall match existing.
LINE ITEMS:
1. Roof replacement, complete; all materials supplied submit.
2. Underlayment replacement if damaged, proposal should include a per square foot unit price for underlayment replacement, assuming work would be completed in full sheet increments. Contractor shall submit change order request to Contracting Officer prior to replacing damage underlayment. See below for further instructions.
3. Extended Warranty, submit Price and warranty documentation for evaluation.
INSPECTION AND ACCEPTANCE: The project will be inspected by a government representative after the work has been completed. If the manufacturer performs an inspection as part of the warranty requirement, a government representative shall be given the opportunity to witness this inspection.
LOCATION: NWS Weather Forecast Office 6365 Osborne Drive West
Hastings, Nebraska 68901-9163 Adams County
TERMS OF THE SOW:
1. The contractor shall submit a separate notice for repairs not included in this SOW (underlayment repair, fascia blocking repair, nailer repair, etc.). This notice will contain square feet or linear feet of affected area and projected time which will be added to the contract. The contractor shall submit a cost per unit for additional work. No refurbishment work shall commence without approval of the Contracting Officer
(CO).
2. The contractor, if remotely located, shall designate a representative/site supervisor local to the contract site, with name and contact numbers, for the CO, COR, or MIC to communicate with about the quality of work, progress, and technical details of the project.
3. The contractor will be responsible for the scheduling and coordination of work on the site. In the event severe weather occurs within the warning area of the work site, all work may be halted by the CO. Work stoppage due to severe weather in the warning area is not negotiable and all work will stop immediately.
4. The contractor will not commence work until they have been issued a “Notice to Proceed”. The award and issuance of a purchase order is not the Notice to Proceed with this contract work. Prior to issuance of a Notice to Proceed the contractor shall submit for approval a project schedule showing the date when on-site work will begin, hours work will be performed, and date the work will be completed and all submittals. No work will be performed on Sundays or Federal Holidays. The project representative shall be notified when changes in project schedule are requested along with justification for the schedule change.
5. The Government reserves the right to inspect for quality control at any point during the construction.
6. The Government assumes no responsibility for the division of work to be accomplished by subcontractors.
The prime contractor shall be the sole responsible party for meeting the terms of the contract.
7. The COR or MIC is not authorized to make any commitments or otherwise obligate the government or authorize any changes which affect the contract price, terms, or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express prior authorization of the CO.
ASPHALT SHINGLE, Metal, and other Materials:
SUBMITTALS:
Prior to work beginning: (To be provided within 10 calendar days of contract award.)
1. Submit product data on shingles.
2. Submit product data on underlayment (felt, ice shield membrane, pipe flashing, etc.).
3. Submit product data on mastics and sealants.
4. Submit product data on flashing and fascia material.
5. Submit color samples for color selection of shingles
6. Submit color chart for color selection of metal components.
WARRANTIES:
1. Warranties shall begin on the date of Government acceptance of the work.
2. The objective is to obtain a warranty that covers 100% of Material and Labor regardless if the cause of failure is due to material defects or workmanship errors. The GAF Golden Pledge Warranty or equivalent would meet this requirement and receive maximum evaluation points. Other warranty proposals will be measured against this standard. Other warranty terms will be considered if they provide full Watertight system coverage.
3. Desired warranty terms:
a. 100% Material and Labor coverage for Material Defects for first 25 years.
b. 100% Material and Labor coverage for Workmanship Errors for first 25 years.
c. 100% Watertight System warranty to cover all leaks due to material or workmanship for 25 years.
4. When repairs due to defective workmanship are required during the Contractor’s warranty period, the
Contractor shall make such repairs within 72 hours of notification. When repairs are not performed within the specified time, emergency repairs performed by others will not void the warranty.
MATERIALS:
1. Shingles are to be 30 year architectural shingles equivalent to GAF Timberline, or better.
2. Shingles shall meet the fire resistance requirements of UL 790 Class A.
3. Shingles shall meet the wind resistance requirements of UL 997.
4. Asphalt-saturated felt shall be Type II, number 30 or other material specified by the shingle manufacturer for use as underlayment to comply with warranty requirements.
5. Self-adhering leak barrier underlayment Ice barrier shall be used at any vertical wall interface, eaves, valleys, roof penetrations, and other locations required by specific manufacturer system warranties.
EXECUTION
1. Ensure that roof deck is smooth, clean, dry, and without loose knots or existing roof nails. Roof surfaces shall be firm and free from loose boards, large cracks, and projecting ends protruding nails or edges that might damage the roofing. Vents and other projections through the roof shall be properly flashed and secured in position.
2. Apply roofing materials as specified or recommended by shingle manufacturers written instructions or by
NRCA.
3. Application of underlayment.
4. Install prefinished metal drip edges, flashing, etc.
PREFINISHED METAL:
SUBMITTALS:
1. Submit product data on prefinished metal components; flashing, fascia, drip edge, etc.
2. Submit color samples for color selection of prefinished metal components.
3. Submit 20 year factory finish warranty for sheet metal components
WARRANTIES:
1. Warranties shall begin on the date of Government acceptance of the work.
2. Furnish prefinished metal 20 year factory finish warranty
MATERIALS:
1. Prefinished metal valley, fascia, drip edge, etc. shall be minimum 0.032 in. aluminum, prefinished with minimum 20 year factory finish. (Kynar 500/Hylar 5000 or equivalent)
2. 2. Prefinished metal shall be compatible with shingle color.
EXECUTION:
1. Metal components are to be installed per original construction details and as modified in detail information included in the statement of work
2. Ensure proper lap distances on all metal pieces. Properly seal all laps to create watertight protection from wind driven moisture.
-END-