Water_Treatment_Plant_Unit_B_Specifications.pdf

PDF 7 MB Posted

Attached to
Water Treatment Plant Unit B Rehabilitation
Solicitation number
PSUT-25-08
Issued by
Broward County, Florida

About this file

Water Treatment Plant Unit B Rehabilitation – Project Manual and Specifications

This project manual contains comprehensive technical specifications and bid documents for the City of Pembroke Pines Water Treatment Plant Unit B Rehabilitation project in Broward County, Florida. The solicitation seeks qualified contractors to perform complete renovation of the existing 59-foot-diameter solids contact clarifier/softener treatment unit, including cleaning and removal of tank internals, installation of new mechanical components (radial launders, inner and outer draft tubes, hood structures, rotor-impellers, effluent collection systems), replacement of electrical systems, installation of new access hatches and stairs, surface preparation, and comprehensive interior and exterior painting. The project encompasses removal and reinstallation of internal tank infrastructure, with the existing tank shell, gearbox, and motor to be reused and maintained. A mandatory pre-bid meeting is scheduled for July 15, 2025, at 10:00 am, with questions due by July 29, 2025, and final bid submissions required by August 12, 2025, at 2:00 pm. The project timeline allows 180 calendar days from the Notice to Proceed for substantial completion, with the estimated budget of $1,700,000 including contingency provisions. Veolia Water Technologies & Solutions will provide a one-year manufacturer warranty for the rehabilitation work contingent on proper installation and operation according to specifications.

Contractor qualifications require successful completion of a minimum of three similar lime softening unit projects within the past ten years and must include an AMPP Level 1 Basic Coatings Inspector on staff for at least six months prior to bidding. Bidders must submit a 5 percent proposal security based on the total cumulative base amount and provide Payment and Performance Bonds covering 100 percent of the contract price. All contractors must be registered in the E-Verify system and comply with background screening requirements. Comprehensive insurance requirements include General Liability, Workers' Compensation, Auto Liability, and Environmental/Pollution Liability coverage, with the City of Pembroke Pines named as additional insured. The project is subject to Davis-Bacon prevailing wage requirements, and all construction and demolition debris must be collected through the City's solid waste franchise agreement with Waste Pro of Florida, Inc. The specifications reference extensive industry standards including ASTM, AWWA, ASME, AWS, NEC, and OSHA requirements, with detailed coating system specifications from manufacturers including Tnemec Company, Inc. and PPG.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF PEMBROKE PINES

Utility Department 8300 South Palm Drive

Pembroke Pines, FL 33025

PROJECT MANUAL

WATER TREATMENT PLANT

UNIT B REHABILITATION

April 21,2025

04/2025 00000-1 COPP WTP REHAB UNIT B

TABLE OF CONTENTS

CITY OF PEMBROKE PINES

WATER TREATMENT PLANT UNIT B REHABILITATION

PROJECT SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

01010 Summary of Work 01015 General Requirements 01021 Owner Contingency Allowances 01025 Measurement for Payment 01045 Cutting and Patching 01046 Modifications to Existing Structures, Piping and Equipment 01050 Field Engineering And Surveying 01090 References 01152 Applications for Payment 01200 Project Meetings 01310 Construction Schedules 01340 Shop Drawings, Working Drawings, and Samples 01370 Schedule of Values 01400 Quality Control 01410 Materials and Installation Testing 01505 Control of Work 01510 Temporary Utilities 01530 Existing Utilities 01531 Protection of Existing Property 01540 Security 01550 Site Access and Storage 01600 Material and Equipment 01630 Substitutions 01700 Contract Closeout 01710 Cleaning 01720 Project Record Documents 01730 Operating and Maintenance Data 01740 Warranties and Bonds

DIVISION 2 – SITE WORK (NOT USED) ________

DIVISION 3 – CONCRETE (NOT USED)

04/2025 00000-2 COPP WTP REHAB UNIT B

DIVISION 4 – MASONRY (NOT USED)

DIVISION 5 – METALS (NOT USED)

DIVISION 6 - WOOD AND PLASTICS (NOT USED)

DIVISION 7 - THERMAL AND MOISTURE PROTECTION (NOT USED)

DIVISION 8 - DOORS AND WINDOWS (NOT USED)

DIVISION 9 – FINISHES

09900 Protective Coatings

DIVISION 10 – SPECIALTIES (NOT USED)

DIVISION 11 – EQUIPMENT

11225 Solids Contact Clarifier Rehabilitation

DIVISION 12 - FURNISHING (NOT USED) ________

DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14 - CONVEYING SYSTEM (NOT USED)

DIVISION 15 – MECHANICAL (NOT USED)

DIVISION 16 – ELECTRICAL (NOT USED)

16000 Electrical General Requirements 16011 Codes and Standards

APPENDIX ONE VEOLIA UNIT B OBSERVATION REPORT

04/2025 01010-1 COPP WTP REHAB UNIT B

SECTION 01010

SUMMARY OF WORK

PART 1 - PART 1 - GENERAL

1.01 DESCRIPTION

A. Section includes: Identification and summary description of the Project, the WORK, location, Owner-furnished products, activities by others, coordination, and early occupancy by Owner.

B. The WORK consists of the renovation and painting of Water Treatment Plant Unit B including, but not limited to, cleaning, removal and replacement of tank internals, electrical systems, new hatches, new stairs, surface preparation and painting as shown in the Drawing and specified herein.

1.02 RELATED SECTIONS

A. Section 01015 - General Requirements

B. Section 01025 - Measurement and Payment

C. Section 01505 - Control of Work

1.03 REFERENCES (NOT USED)

1.04 CONTRACTOR USE OF SITE

A. The Contractor shall limit his area of work to remain within those properties and easements as depicted in the Drawings or as approved in writing by the Owner.

B. Contractors' use of lands other than those depicted in the Drawings shall require written approval from the land owner and be at the Contractors risk and cost.

1.05 LOCATION OF WORK

A. The work is located at Pembroke Pines Water Treatment Plant, located at 7960 Johnson St in the City of Pembroke Pines, Florida.

1.06 DESCRIPTION OF WORK

A. Removal and replacement of components in Treatment Unit B as per plan sheet.

B. Renovation and painting of Treatment Unit B as per Section 09900 and plan sheet.

C. Unit C stair access as per location illustration on the plan sheet.

1.07 WORK SEQUENCE

A. Incorporate sequence of the Work into the Critical Path Method Schedule.

B. Modifications Treatment Unit B.

C. Coordinate all required modifications with Owner's Operations.

D. Restore all work areas and test, start-up and train personnel on new system modifications.

04/2025 01010-2 COPP WTP REHAB UNIT B

1.08 OWNER OCCUPANCY

A. Cooperate with Owner to minimize conflict, and to facilitate Residences and Owner's operations.

B. Schedule the Work to accommodate this requirement.

1.09 WORK BY OTHERS

A. The Contractor is advised that work by others may take place during the duration of the contract time. It shall be the Contractor's responsibility to coordinate and schedule all Work as not to delay or hinder his work or the work by others.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION (NOT USED)

END OF SECTION

04/2025 01015-1 COPP WTP REHAB UNIT B

SECTION 01015

GENERAL REQUIREMENTS

PART 1 - GENERAL

1.01 DESCRIPTION

A. This Section provides for miscellaneous provisions applicable to the Work.

1.02 RELATED SECTIONS

A. Section 01090 - References

B. Section 01310 – Construction Schedules

C. Section 01340 – Shop Drawings, Working Drawings and Samples

D. Section 01530 – Existing Utilities

E. Section 01720 – Project Record Documents

F. Other Sections as applicable.

1.03 TERMINOLOGY

A. Throughout the Contract Documents, the following definitions apply:

1. Owner- The individual or entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed.

2. Work- The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services and documentation necessary to produce such construction, and furnishing, installing and incorporating all materials and equipment into such construction, all as required by the Contract Documents.

1.04 SAFETY

A. All work shall be done in a safe manner and in strict compliance with all requirements of the Federal Occupational Safety and Health Act (OSHA), The Florida Trench Safety Act and all other State and local safety and health regulations.

B. The Contractor shall comply promptly with such safety regulations as may be prescribed by the Owner or the local authorities having jurisdiction and shall, when so directed, properly correct any unsafe conditions created by, or unsafe practices on the part of, his employees. In the event of the Contractor’s failure to comply, the Owner may take the necessary measures to correct the conditions or practices complained of, and all costs thereof will be deducted from any monies due. Failure of the Owner to direct the correction of unsafe conditions or practices shall not relieve the Contractor of his responsibilities.

C. The Contractor shall provide, erect and maintain as necessary, strong and suitable barricades, danger signs and warning lights for the protection of the public.

04/2025 01015-2 COPP WTP REHAB UNIT B

1.05 APPLICABLE CODES

A. The Contractor shall comply with the applicable standards codes and specifications governing the Contract Documents whether City, County, State or Federal. The Contractor is obligated to notify the Owner and Engineer of any deficiency contained in the Contract Documents immediately upon discovery. Where conflicts exist in such, the more stringent shall govern.

1.06 APPLICABLE PERMITS AND LICENSES

A. The Contractor shall abide by all permit conditions, whether, general, specific, limited or otherwise. A copy of all applicable permits and licenses, with the exception of City permits obtained by the Contractor, are attached hereto and made a part of the Contract Documents.

1.07 PUBLIC BID DISCLOSURE ACT 218.80 FS

A. All the local governmental entity permits or fees are to be disclosed, including, but not limited to, all license fees, permit fees, impact fees, or inspection fees, payable by the contractor to the unit of government that issued the bidding documents or other governmental agency, PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.01 PRE-CONSTRUCTION RESPONSIBILITIES

A. Upon receipt of the Notice To Proceed, the Contractor shall arrange for a Pre- Construction meeting. The meeting shall be held with a minimum of one weeks’ notice and shall include the Engineer, the Owner, and Representatives for all affected utility companies.

3.02 TEMPORARY UTILITIES

A. The Contractor shall be responsible to arrange for and supply all temporary utilities including, but not limited to, water, sewer, and electricity.

B. The cost of temporary utilities shall be considered incidental to the cost of the Work and is therefore included in the Bid.

3.03 UNDERGROUND LOCATING SERVICE

A. Prior to underground construction, the Contractor is required by the Underground Facility Damage Prevention and Safety Act, Chapter 556 FS to contact Sunshine 811, for the location of underground utilities.

3.04 HURRICANE PREPAREDNESS PLAN

A. Should the Performance of the work occur during Hurricane Season, within thirty days of the date of Notice to Proceed, the Contractor shall submit to the Engineer and Owner a Hurricane Preparedness Plan. The Plan should outline the necessary measures that the contractor proposes to perform at no additional cost to the owner in case of a hurricane warning. The plan shall detail these measures with specific action items defining responsible personnel.

04/2025 01015-3 COPP WTP REHAB UNIT B

3.05 INCLEMENT WEATHER

A. In the event of inclement weather, or whenever Engineer shall direct; Contractor will cause Subcontractors to carefully protect the work and materials against damage or injury from the weather. If in the opinion of the Engineer, any portion of Work or materials shall have been damaged or injured by reason of failure on the part of Contractor or any Subcontractor to so protect the Work, such Work and materials shall be removed and replaced at the expense of the Contractor.

3.06 ADVANCE INVESTIGATIONS

A. The Contractor shall be responsible for uncovering and exposing existing utilities sufficiently in advance of pipe laying operations to confirm elevation, size, material and clearance separation(s). If, upon excavation, an existing utility is found to be in conflict with the proposed construction or be of a size or material different from what is shown on the plans, the Contractor shall immediately notify the Engineer, who will in turn prepare a recommendation. Failure of the Contractor to perform advance investigations shall not relieve it of any claims for delay or damages.

3.07 PRESERVATION AND RESTORATION

A. Contractor shall be responsible for the preservation and protection of property adjacent to the work site against damage or injury as a result of his operations under this project. Any damage or injury occurring on account of any act, omission or neglect on the part of the Contractor shall be restored in a proper and satisfactory manner or replaced by and at the expense of the Contractor to an equal or superior condition than previously existed.

3.08 PROTECTION OF WORK AND MATERIAL

A. During the progress of the work and up to the date of final payment, the Contractor shall be solely responsible for the care and protection of all work and materials covered by the Contract.

B. All work and materials shall be protected against damage, injury or loss from any cause whatsoever, and the Contractor shall make good any such damage or loss at his own expense. Protection measures shall be subject to the approval of the CITY.

3.09 CONTRACTOR USE OF PREMISES

A. Contractor shall have limited use of the premises for construction operations, including limited use of the site. The Contractor's use of the premises is further limited to the Owner's right to perform construction operations with its own forces or to employ separate Contractors on portions of the project.

B. The Contractor shall be responsible for coordinating his daily activities in conjunction with any Contractors presently working within the vicinity of this project.

C. Confine operations to areas within rights-of-way and easements.

D. Keep existing driveways and entrances serving the premises clear and available to the Owner, Residents and the Owner's employees at all times.

1. Do not use these areas for parking or storage of materials.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.

04/2025 01015-4 COPP WTP REHAB UNIT B

3.10 DISPOSAL

A. Do not dispose of any unsuitable fill, hazardous or organic material onsite. All such material shall be disposed of in a legal manner by the Contractor, the cost of which shall be included in the Bid.

3.11 ENVIRONMENTAL PROTECTION

A. Provide protection, operate temporary facilities and conduct construction in ways and by methods that comply with environmental regulations, and minimize the possibility that air, waterways and subsoil might be contaminated or polluted, or that other undesirable effects might result.

3.12 MATERIAL AND EQUIPMENT

A. Substitutions: After Bidding period, up to 30 days after date of Notice to Proceed, the Engineer will consider written requests from Contractor for proposed substitutions of products. Subsequent requests will be considered only in case of product unavailability or other condition beyond control of the Contractor. Submit a separate request for each proposed substitution;

1. Do not order or install substitute products without written acceptance from the Engineer of Record.

2. Do not imply or indicate substitutions on shop drawings or product data submittals without a separate formal request.

3. Engineer will determine acceptability of substitution.

4. Only one request for substitution for each product will be considered. If not accepted, Contractor shall provide specified product.

B. Product selection is governed by the Contract Documents and governing regulations, not by previous project experience.

1. Where a single or multiple products or manufacturers are named, provide one of the products indicated or submit a request for substitution for any product or manufacturer not named unless no substitution is permitted.

2. Where the Specifications only require compliance with performance requirements, an imposed code, standard or regulation, select a product that complies with the requirements, standards, codes or regulations specified.

3. Manufacturers named in a Specification section are those manufacturers considered capable of manufacturing products conforming to the specified requirements. The naming of a particular manufacturer does not imply acceptance or approval of just any standard product of that manufacturer.

3.13 ADJUSTMENT OF EXISTING UTILITIES

A. The Contractor shall raise or lower all manholes, valve boxes, etc. to finished grade.

The cost of these adjustments shall be considered incidental to the cost of the Work and is therefore included in the Bid.

3.14 EXISTING IRRIGATION

A. All existing irrigation systems within the area of the Work shall be restored to original condition or better and adjusted to finished grade. The cost of repairs and/or

04/2025 01015-5 COPP WTP REHAB UNIT B

adjustment to existing irrigation shall be considered incidental to the cost of the Work and is therefore included in the Bid.

3.15 DEWATERING

A. In accordance with SFWMD criteria contained in 40E-2.061 F.A.C., a dewatering permit is not required provided the following provisions are met:

1. Maximum daily pumpage is less than 5 million gallons (MG) and a maximum total project pumpage of less than 100 MG over a one year period;

2. All discharge shall remain on the project site;

3. No dewatering shall occur to a depth below elevation 0.0 feet NGVD within 1,000 feet of saline water, except when dewatering water with a chloride concentration of greater than 1,000 milligrams per liter;

4. No dewatering shall occur within 100 feet of a wastewater treatment plant rapid-rate land application system permitted under Part IV of Chapter 62- 610, F.A.C.;

5. No dewatering shall occur within 1,000 feet of a known landfill or contamination; and,

6. No dewatering shall occur within 1,000 feet of a freshwater wetland unless dewatering activities are completed within 60 days.

7. All dewatering operations are subject to the Permit Conditions in Section 5.0 of the SFWMD APPLICANT’S HANDBOOK FOR WATER USE PERMIT APPLICATIONS (07-16-2014), including responsibility for mitigating any harm that may occur as a result of the dewatering to existing legal uses, off-site land uses, or natural resources.

B. The Contractor shall apply for a dewatering permit through the SFWMD if any of the above conditions cannot be met.

3.16 DEMOLITION

A. Limits of demolition which may be shown in the Contract Documents are general in nature. Actual limits of demolition shall be as determined by the field conditions in conformance with the requirements of the Work.

B. All sidewalks within the limits of construction which are not ADA compliant (cross-slopes which exceed 2% and/or running slopes which exceed 5% and/or changes in level of ¼” or greater) shall be demolished and reconstructed to meet these requirements.

C. When sidewalk tie-ins exist outside the limits of construction which are not ADA compliant, the Contractor shall replace those sections as directed by the Owner.

03/2025 01021-1 COPP WTP REHAB UNIT B

SECTION 01021

OWNER CONTINGECY ALLOWANCES

PART 1 - GENERAL

1.01 DESCRIPTION

A. This Section provides for administrative procedures for the Contractors utilization of monetary amounts for Owner contingency allowances when contained in the Contract Sum or Total Base Bid.

B. The Contractor has included in the Contract Price all Allowances so named in the Contract Documents and Shall cause the Works so covered to be performed for such sums and by such person or entities as may be acceptable to Owner and Engineer.

C. The contractor agrees that an Allowance, if any, is for the sole use of Owner to cover unanticipated or undetermined costs.

D. All owner Allowances which remain unused, in whole or in part, remain the property of the Owner.

1.02 RELATED SECTIONS

A. Section 01025 – Measurement and Payment.

B. Section 01152 – Application for Payment

C. Section 01310 - Construction Schedules.

D. Section 01340 – Shop Drawings, Working Drawings and Samples

E. Section 03740 - Repair of Damaged Concrete

F. Other Sections as Applicable.

1.03 SCHEDULE OF ALLOWANCES

A. Refer to Bid Form.

1.04 PROCEDURES FOR ADMINISTRATION OF ALLOWANCES.

A. Funds will only be drawn from Owner contingency allowances by Change Order.

B. Costs shall be as represented in the Unit Price Schedule or Unit Price Bid Form.

C. Payment shall be as represented in Section 01025 – Measurement for Payment.

1.05 COST INCLUDED IN PERMITTING ALLOWANCES

A. Cost of the permit application fee determined by the agency at the time of the Contractor’s submittal. All other costs associated with obtaining the required permits shall be the responsibility of the Contractor.

1.06 COSTS INCLUDED IN ALLOWANCES

A. Cost of product to Contractor, less applicable trade discounts.

B. Delivery to site, products handling at site, including unloading, uncrating, and storage.

C. Applicable taxes unless covered by Owner Furnished Equipment clause.

03/2025 01021-2 COPP WTP REHAB UNIT B

D. Protection of products from elements and from damage.

E. Labor, insurance, payroll, bonding, equipment rental and installation and finishing, except when installation is specified as part of allowance.

F. Other expenses required to complete installation.

G. Contractor field and home office overhead and profit.

1.07 CONTRACTOR RESPONSIBILITIES

A. Promptly notify Engineer of any reasonable objections from supplier.

B. On notification of selection, execute purchase agreement with designated supplier.

C. Arrange for process shop drawings, product data, and samples.

D. Arrange for delivery. Promptly inspect products upon delivery for completeness, damage, and defects. Submit claims for transportation damage.

E. Install, adjust, and finish products.

F. Provide warranties for products and installation.

1.08 CORRELATION WITH CONTRACTOR SUBMITTALS

A. Schedule shop drawings, product data, samples, and delivery dates, in Progress Schedule for products selected under allowances.

PART 2 - PRODUCTS (NOT USED)

04/2025 01025-1 COPP WTP REHAB UNIT B

SECTION 01025

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.01 DESCRIPTION

A. This Section includes administrative and procedural requirements for determining Work completed under the unit price contract.

1.02 RELATED SECTIONS

A. Section 01152 – Applications for Payment

B. Section 01370 – Schedule of Values

C. Other Sections as applicable.

1.03 REFERENCE STANDARDS

A. American Society for Testing and Materials (ASTM)

B. Occupational Safety and Health Act (OSHA)

C. American Society of Mechanical Engineers (ASME)

D. American Institute of Steel Construction (AISC)

E. American Waterworks Association (AWWA)

F. American Welding Society (AWS)

G. Underwriters Laboratories (UL)

H. National Electric Code (NEC)

I. Steel Structures Painting Council (SSPC)

1.04 GENERAL REQUIREMENTS

A. Prices shall include all costs required for the completed, in-place construction of the specified unit of work. This may include but not be limited to, materials and delivery;

cost of installation; incidentals; labor including social security, insurance, and other required fringe benefits; workman's compensation insurance; bond premiums; rental of equipment and machinery; taxes; testing; surveys; incidental expenses; and supervision.

B. Installation, acceptance and payment shall be in accordance with the REFERENCE

STANDARDS.

C. The Owner reserves the right to reject the Contractor's measurement of completed work that involves use of established unit prices, and to have this Work measured by an independent surveyor acceptable to the Contractor at the Owner's expense.

D. Contract Sum adjustments will be by Change Order on basis of net accumulative change for each unit price category.

04/2025 01025-2 COPP WTP REHAB UNIT B

E. Except as otherwise specified, unit prices shall apply to both deductive and additive variations of quantities.

F. Lump sum and unit prices in the Agreement shall remain in effect until date of final completion of the entire Work.

G. Partial payment for material and equipment properly stored and protected will be made in accordance with requirements of the General Conditions.

H. No separate payment will be made for Record Drawings.

I. Abbreviations:

1. Acre - AC

2. Allowance - AL

3. Cubic Yard - CY

4. Each - EA

5. Furnish and Install - F & I

6. Gallons - GA

7. Gross Mile - GM

8. Linear Feet – LF

9. Lump Sum - LS

10. Million Gallons – MG

11. Net Mile - NM

12. Square Foot – SF

13. Square Yard – SY

14. Ton - TN

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION

3.01 MEASUREMENT AND PAYMENT

A. Payment shall constitute full compensation and will be made as indicated in the

RELATED SECTIONS.

B. The Contractor shall submit a Schedule of Values for Engineer approval in accordance with Section 01370 prior to the first Application for Payment.

1. The Schedule of Values shall include Lump Sum prices or Measured quantities for each pay item broken down from the Bid Items, subject to approval by the Owner.

C. The quantity approved for payment shall be either:

04/2025 01025-3 COPP WTP REHAB UNIT B

1. Percentage of the Lump Sum Price - A percentage of the Lump Sum Price equivalent to the percentage of the project completion as determined by the Engineer as of the date of the pay request submitted. The percent completion of the project shall be based on the percent of the total project actually constructed and not on the percent of the Contract price completed.

2. Measured Quantities - The actual quantities in-place and accepted as measured by the Engineer on the date of the pay request submitted in the units specified in the bid form or schedule of values.

3.02 PROTECTION

A. Where pavement, pipes, valves, appurtenances, trees, shrubbery, fences, other property, or structures are in proximity to the WORK, adequate protection shall be provided. Such protection is considered incidental to construction and shall not be assigned to any pay item.

3.03 RESTORATION

A. Where pavement, pipes, valves, structures, appurtenances, trees, shrubbery, fences, other property or structures not designated as pay items, have been damaged, removed or disturbed by the Contractor, whether deliberately or through failure to carry out the requirements of the Contract Documents, state laws, municipal ordinances or the specific direction of the Engineer, or through failure to employ usual and reasonable safeguards, such property and surface structures shall be replaced or repaired at the expense of the Contractor to a condition equal to that before work began within a time frame approved by the Engineer. Such restoration is considered incidental to construction and shall not be assigned to any pay item.

PART 4 - BID ITEMS

4.01 BID ITEM NO. 1 - MOBILIZATION AND DEMOBILIZATION

A. Payment shall be made as percentage of the Lump Sum Price.

B. The Lump Sum Price shall include compensation for all labor, materials, equipment, and all other incidents required for all temporary facilities, transportation, communications, office, maintenance and other pre- or post- construction expenses necessary for the start or cessation of the work at Water Treatment Unit B.

C. The Lump Sum Price shall exclude the cost for construction material and installation.

D. No further payment shall be made for remobilization unless all the work is suspended by the owner for a period in excess of three months and through no fault to the Contractor.

E. The Lump Sum Price shall not exceed five percent (5%) of the contract price.

4.02 BID ITEM NO. 2 - RENOVATION OF TREATMENT UNIT B.

A. The Lump Sum Price shall include, but not be limited to, all work for removal and replacement of all components in accordance with the Contract Documents including, but not limited to, Radial Launders, Radial Discharge launders, Collector launder/ Annular ring, effluent pocket, bottom flushing system piping and nozzles, hood and

04/2025 01025-4 COPP WTP REHAB UNIT B

hood support structure, sludge concentrator gates, rotor impeller, inlet pipe, chemical feed piping, inner draft tubes, floor drain cover, columns, install new inlet channel manway’s, cross bracing, temporary supports, additional hatches etc. This item shall include all submittals, permitting, site preparation, demolition, installation, tie-ins, supports, engineering, coordination with Owner’s Operations, successful testing, startup and commissioning and manufacturer’s field services for Treatment Unit B.

4.03 BID ITEM NO. 3 - SURFACE PREPARTION AND PAINTING .

A. The Lump Sum Price shall include, but not be limited to, all work in accordance with the Contract Documents for the complete surface preparation, painting and clean-up of the interior of Treatment Unit B and sludge valves below. This item shall include all permitting, site preparation, demolition, installation, tie-ins, pipe supports, coordination with Owner’s Operations, submittals, testing and painting manufacturer’s field services for the Treatment Unit B.

4.04 BID ITEM NO. 4 – ELECTRICAL RENOVATION

A. The Lump Sum Price shall include but not be limited to, all work in accordance with the Contract Documents related to the removal and replacement of all electrical conduit, wiring, and electrical accessories, such as switches, outlets, junction boxes, etc., on top of Unit B and sludge valves below. This item shall include submittals, demolition and disposal, installation, parts and labor.

4.05 BID ITEM NO. 5 - UNIT C STAIR ACCESS.

A. The Lump Sum Price shall include, but not be limited to, all work in accordance with the Contract Documents associated with Unit C stair access with complete design and installation. This item shall include all design, permitting, site preparation, tie-ins, coordination with Owner’s Operations, commissioning, submittals and professional engineering services.

03/2025 01045-1 COPP WTP REHAB UNIT B

SECTION 01045

CUTTING AND PATCHING

1.01 DESCRIPTION

A. Contractor shall be responsible for all cutting, fitting and patching required to complete the work or to:

1. Make its several parts fit together properly.

2. Uncover portions of the Work to provide for installation of ill-timed work.

3. Remove and replace defective work.

4. Remove and replace work not conforming to requirements of Contract Documents.

5. Remove samples of installed work as specified for testing.

6. Investigate subsurface conditions or utilities.

1.02 RELATED SECTIONS

A. Section 01010 - Summary of Work

B. Section 01015 – General Requirements

C. Other Sections as applicable.

1.03 SUBMITTALS

A. Submit a written request to the Engineer in advance of executing any cutting or alteration which affects:

1. Work of the Owner or any separate contractor.

2. Structural value or integrity of any element of the Project.

3. Integrity or effectiveness of weather-exposed or moisture-resistant elements or systems.

4. Efficiency, operational life, maintenance or safety of operational elements.

5. Visual qualities of sight-exposed elements.

B. Request shall include:

1. Identification of the Project.

2. Description of affected work.

3. The necessity for cutting, alteration or excavation.

4. Effect on work of Owner or any separate contractor, or on structural or weatherproof integrity of Project.

5. Description of proposed work:

03/2025 01045-2 COPP WTP REHAB UNIT B

a. Scope of cutting, patching, alteration, or excavation.

b. Trades who will execute the work.

c. Products proposed to be used.

d. Extent of refinishing to be redone.

6. Alternatives to cutting and patching.

7. Cost proposal, when applicable.

8. Written permission of any separate contractor whose work will be affected.

9. Submit written notice to the Engineer designating the date and the time work will be uncovered.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Comply with specifications and standards for each specific project involved.

PART 3 - EXECUTION

3.01 INSPECTION

A. Inspect existing conditions of Project, including elements subject to damage or to movement during cutting or patching.

B. After uncovering work, inspect conditions affecting installation of Products, or performance of work.

C. Report unsatisfactory or questionable conditions to the Engineer in writing; do not proceed with work until the Engineer has provided further instructions.

3.02 PREPARATION

A. Provide adequate temporary support as necessary to assure structural value or integrity of affected portion of Work.

B. Provide devices and methods to protect other portions of Project from damage.

C. Provide protection from elements for that portion of the Project which may be exposed by cutting and patching work, and maintain excavations free from water.

3.03 PERFORMANCE

A. Execute cutting and demolition by methods which will prevent damage to other work and will provide proper surfaces to receive installation of repairs.

B. Execute cutting methods which will prevent settlement or damage to other work.

C. Employ original Installer or Fabricator to perform cutting and patching for:

1. Weather-exposed or moisture-resistant surfaces.

2. Sight-exposed finished surfaces.

03/2025 01045-3 COPP WTP REHAB UNIT B

D. Execute fitting and adjustment of products to provide a finished installation to comply with specified products, functions, tolerances and finishes.

E. Restore work which has been cut or removed; install new products to provide completed Work in accord with requirements of Contract Documents.

F. Fit work airtight to pipes, sleeves, ducts, conduit and other penetrations through surfaces.

G. Refinish entire surfaces as necessary to provide an even finish to match adjacent finishes:

1. For continuous surfaces, refinish to nearest intersection.

2. For an assembly, refinish entire unit.

03/2025 01046-1 COPP WTP REHAB UNIT B

SECTION 01046

MODIFICATIONS TO EXISTING STRUCTURES, PIPING AND EQUIPMENT

1.01 DESCRIPTION

A. Furnish all labor, materials, equipment and incidentals required to modify, alter and convert existing structures as shown or specified and as required for the installation of new mechanical equipment, piping and appurtenances. Existing piping and equipment shall be removed, abandoned or dismantled as necessary for the performance of the work.

1.02 RELATED SECTIONS

A. Section 01045 - Cutting and Patching

B. Section 01310 - Construction Scheduling

C. Section 03300 - Cast-In-Place Concrete

D. Other Sections as applicable.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.01 GENERAL

A. The Contractor shall cut, repair, reuse, excavate, demolish or otherwise remove parts of the existing structures or appurtenances, as indicated on the Contract Drawings, herein specified, or necessary to permit completion of the work under this Contract.

B. The above work shall include the cutting of grooves and chases in existing masonry to permit the proper bonding of new masonry to old, repainting of existing masonry, the drilling of holes into bolts, or other appurtenances, and the cutting of holes in masonry for the installation of pipe, conduits, and other appurtenances. The work shall include all necessary cutting and bending of reinforcing steel, structural steel, or miscellaneous metal work found embedded in the existing structures.

C. Blasting with explosives will not be permitted to complete any work under this Contract. Care shall be taken not to damage any part of existing buildings, foundations and exterior structures both below and above ground.

D. No existing structure, equipment, or appurtenance shall be shifted, cut, removed, or otherwise altered except with the express approval of and to the extent approved by the Engineer.

E. When removing materials or portions of existing structures and when making openings in walls and partitions, the Contractor shall take all precautions and use all necessary barriers and other protective devices so as not to damage the structures or

03/2025 01046-2 COPP WTP REHAB UNIT B

contents by falling or flying debris and not to damage the structures from excavation or undermining of existing structural supports, beams, footings, columns or any structural member.

F. Materials and equipment removed in the course of making alterations and additions shall remain the property of the Owner, except that items not salvageable, as determined by the Engineer and the Owner shall become the property of the Contractor to be disposed of by him off the site of the work at his own place of disposal. The Contractor shall assist the Owner in loading and hauling of salvageable materials within the City limits of the project.

G. All work of altering existing structures shall be done at such time and in such manner as will comply with the approved time schedule. So far as possible before any part of the work is started, all tools, equipment, and materials shall be assembled and made ready so that the work can be completed without delay.

H. All workmanship and new materials involved in constructing the alterations shall conform to the General Specifications for the classes of work insofar as such specifications are applicable.

I. All cutting of existing masonry or other material to provide suitable bonding to new work shall be done in a manner to meet the requirements of the respective section of these specifications covering the new work. When not covered, the work shall be carried on in the manner and to extent directed by the Engineer.

J. Where holes in existing masonry are required to be sealed, unless otherwise herein specified, they shall be sealed with cement mortar or concrete. The sides of the openings shall be provided with keyed joints and shall be suitably roughened to furnish a good bond and make a watertight joint. All loose or unsound material adjacent to the opening shall be removed and, if necessary, replaced with new material. The method of placing the mortar seal shall provide a suitable means of releasing entrapped air.

K. Surfaces of seals visible in the completed work shall be made to match as nearly as possible the adjacent surfaces.

L. Non-shrink grout shall be used for setting wall castings, sleeves, leveling pump bases, doweling anchors into existing concrete, and elsewhere as shown.

M. Operating equipment shall be thoroughly cleaned and then lubricated and greased for protection during prolonged storage.

N. The Contractor shall provide flumes, hoses, piping, etc. to divert or provide suitable plugs, bulkheads or other means to hold back the flow of wastewater, water or other liquids, all as required in the performance of the work under this Contract.

3.02 SALVAGE

A. Any existing equipment or material, including but not limited to, motors, electrical components or controls, pipe, fittings, couplings, etc., which is removed or replaced as a result of construction under this project may be designated as salvage by the Engineer or Owner, and if so, shall be removed or excavated, if necessary, and

03/2025 01046-3 COPP WTP REHAB UNIT B

delivered to the Owner at a location directed by the Owner. Any equipment or material not worthy of salvaging, as directed by the Owner, shall be disposed of by the Contractor at a suitable location.

3.03 CONNECTING TO EXISTING PIPING AND EQUIPMENT

A. The Contractor shall verify exact location, material, alignment, joint, etc. of existing piping and equipment prior to making the connections called out in the Drawings.

The verifications shall be performed with adequate time to correct any potential alignment or other problems prior to the actual time of connection.

B. The Contractor shall dismantle and remove all existing equipment, piping and other appurtenances required, he shall cut existing pipelines for the purpose of making connections thereto. Anchor bolts for equipment and structural steel removed shall be cut off one inch below the concrete surface. Surface shall be finished as specified in Division 3.

C. At the time that a new connection is made to an existing pipeline, additional new piping, extending to and including the most convenient new valve, shall be installed.

D. Where necessary or required for the purpose of making connections, the Contractor shall cut existing pipe lines in a manner to provide an approved joint. Where required, he shall weld beads, flanges or provide Dresser Couplings, all as specified and required.

03/2025 01050-1 COPP WTP REHAB UNIT B

SECTION 01050

FIELD ENGINEERING AND SURVEYING

1.01 DESCRIPTION

A. Provide and pay for field engineering and surveying services required for Project as follows:

1. Surveying work required for the lay-out and execution of Work.

2. Surveying work required to identify and maintain existing control points, bench marks and property line corners.

3. Surveying work required to verify existing utility locations.

4. Surveying work as required to create Project Record Documents.

5. Civil, structural, or other professional engineering services specified, or required to execute the Contractor's construction methods.

6. Testing, sampling, calibrating and training services specified, or required to execute the Contractor’s construction methods including soils, concrete, material, etc.

1.02 RELATED SECTIONS

A. Section 01410 – Materials and Installation Testing

B. Other Sections as applicable.

1.03 QUALIFICATIONS OF PROFESSIONAL

A. Florida Registered Professional Surveyor and Mapper, acceptable to the Owner and the Engineer.

B. Florida Registered Professional Engineer(s) of the specialty required for on the Project, acceptable to the Owner and the Engineer.

1.04 SURVEY REFERENCE POINTS

A. Horizontal and vertical control points for the Project are to be established by the Engineer and provided to the Contractor.

B. Locate and protect control points prior to starting work, and preserve all permanent reference points during construction.

1. Make no changes or relocations without prior written notice to the Engineer.

2. Report to the Engineer when any reference point is lost or destroyed, or requires relocation because of necessary changes in grades or locations.

3. Require surveyor to replace project control points which may be lost or destroyed.

03/2025 01050-2 COPP WTP REHAB UNIT B

a. Establish replacements based on original survey control.

1.05 PROJECT SURVEY REQUIREMENTS

A. Establish a minimum of two temporary bench marks on site, referenced to data by survey control points.

1. Record locations, with horizontal and vertical data, on Project Record Documents.

B. Establish lines and levels, locate and lay out, by instrumentation and similar appropriate means:

1. Site Improvements

a. Line and grade of pipe and structure installation; top of pipe, invert, slope, etc.

b. Grading for fill and topsoil placement, roadway sub-base and base installation.

2. Controlling lines and levels required for all trades.

C. From time to time, verify layouts by same methods.

1.06 RECORDS

A. Maintain a complete, accurate log of all control and survey work as it progresses in accordance with Section 01720.

1.07 SUBMITTALS

A. Submit name and address of Professional Surveyor and Mapper or Professional Engineer to the Engineer.

B. On request of the Engineer, submit documentation to verify accuracy of field engineering work.

C. Submit certificate signed by registered surveyor certifying that elevations and locations of improvements are in conformance, or non-conformance, with Contract Documents.

D. Submit Project Record Documents in accordance with Section 01720.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.01 ADVANCE INVESTIGATIONS

A. The Contractor shall be responsible for uncovering and exposing existing utilities sufficiently in advance of pipe laying operations to confirm elevation, size, material and clearance separation(s). If, upon excavation, an existing utility is found to be in conflict with the proposed construction or be of a size or material different from what is shown on the plans, the Contractor shall immediately notify the Engineer, who will in turn prepare a recommendation. Failure of the Contractor to perform the advance investigation shall not relieve it of any claims for delay or damages.

03/2025 01050-3 COPP WTP REHAB UNIT B

04/2025 01090-1 COPP WTP REHAB UNIT B

SECTION 01090

REFERENCES

1.01 DESCRIPTION

A. Applicable Publications: Whenever in these specifications references are made to published specifications, codes, standards, or other requirements, it shall be understood that wherever no date is specified, only the latest specifications, standards, or requirements of the respective issuing agencies which have been published as of the date that the WORK is advertised for bids, shall apply; except to the extent that said standards or requirements may be in conflict with applicable laws, ordinances, or governing codes. No requirements set forth herein or shown on the drawings shall be waived because of any provision of, or omission from, said standards or requirements.

B. Specialists, Assignments: In certain instances, specification text requires (or implies) that specific work is to be assigned to specialists or expert entities, who must be engaged for the performance of that work. Such assignments shall be recognized as special requirements over which the CONTRACTOR has no choice or option. These assignments shall not be interpreted so as to conflict with the enforcement of building codes and similar regulations governing the WORK; also they are not intended to interfere with local union jurisdiction settlements and similar conventions. Such assignments are intended to establish which party or entity involved in a specific unit of work is recognized as "expert" for the indicated construction processes or operations. The final responsibility for fulfillment of the entire set of contract requirements remains with the CONTRACTOR.

1.02 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS

A. Without limiting the generality of other requirements of the specifications, all work specified herein shall conform to or exceed the requirements of the following documents to the extent that the provisions of such documents are not in conflict with the requirements of these Specifications nor the applicable codes.

B. References herein to "Building Code" or “Code” shall mean the Florida Building Code.

The latest edition of the code as approved and used at the local agency having jurisdiction, shall apply to the WORK herein, including, all addenda, modifications, amendments, or other lawful changes thereto.

C. In case of conflicts between codes, reference standards, drawings and other Contract Documents, the most stringent requirements shall govern. All conflicts shall be brought to the attention of the ENGINEER for clarifications and directions prior to ordering or providing any materials or labor. The CONTRACTOR shall bid the most stringent requirements.

D. Applicable Standard Specifications: The CONTRACTOR shall construct the WORK specified herein in accordance with the requirements of the Contract Documents and the referenced portion of those referenced codes, standards, and specifications listed

04/2025 01090-2 COPP WTP REHAB UNIT B

herein; except, that wherever references to "Standard Specifications" are made, the provisions therein for measurement and payment shall not apply.

E. References herein to "OSHA Regulations for Construction" shall mean Title 29, Part 1926, Construction Safety and Health Regulations, Code of Federal Regulations, including all changes and amendments thereto.

F. References herein to "OSHA Standards" shall mean Title 29, Part 1910, Occupational Safety and Health Standards, Code of Federal Regulations (OSHA), including all changes and amendments thereto.

1.03 TRADE NAMES AND ALTERNATIVES

A. For convenience in designation in the Contract Documents, materials to be incorporated in the WORK may be designated under a trade name or the name of a manufacturer and its catalog information. The use of alternative material which is equal in quality and of the required characteristics for the purpose intended will be permitted, subject to the following requirements:

1. The burden of proof as to the quality and suitability of such alternative equipment, products, or other materials shall be upon the CONTRACTOR.

2. The ENGINEER will be the sole judge as to the comparative quality and suitability of such alternative equipment, products, or other materials and its decisions shall be final.

3. Base Bid requirements outlined in the Supplement to Bid Form, shall supersede any language contained hereinafter.

B. Whenever in the Contract Documents the name or the name and address of the manufacturer or distributor is given for a product or other material, or if any other source of a product or material is indicated therefore, such information is given for the convenience of the CONTRACTOR only, and no limit, restriction, or direction is indicated or intended thereby, nor is the accuracy or reliability of such information guaranteed. It shall be the responsibility of the CONTRACTOR to determine the accurate identity and location of any such manufacturer, distributor, or other source of any product or material called for in the Contract Documents.

C. The CONTRACTOR may offer any material, process, or equipment which it considers equivalent to that indicated. Unless otherwise authorized in writing by the ENGINEER, the substantiation of offers of equivalency must be submitted within 30 days after execution of the Agreement. The CONTRACTOR, at its sole expense, shall furnish data concerning items it has offered as equivalent to those specified. The CONTRACTOR shall have the material as required by the ENGINEER to determine that the quality, strength, physical, chemical, or other characteristics, including durability, finish, efficiency, dimensions, service, and suitability are such that the items will fulfill its intended function. Installation and use of a substitute item shall not be made until accepted by the ENGINEER. If a substitute offered by the CONTRACTOR is found to be not equal to the specified material, the CONTRACTOR shall furnish and install the specified material.

D. The CONTRACTOR'S attention is further directed to the requirement that failure to submit data substantiating a request for the substitution of an "or equal" item within

04/2025 01090-3 COPP WTP REHAB UNIT B

said 30-day period after the execution of the Agreement, shall be deemed to mean that the CONTRACTOR intends to furnish one of the specific brand-named products named in the specification, and the CONTRACTOR does hereby waive all rights to offer or use substitute products in each such case. Wherever a proposed substitute product has not been submitted within said 30-day period, or wherever the submission of a proposed substitute product fails to meet the requirements of the specifications and an acceptable resubmittal is not received by the ENGINEER within said 30-day period, the CONTRACTOR shall furnish only one of the products originally-named in the Contract Documents.

1.04 ABBREVIATION

A. Wherever in these specifications references are made to the standards, specifications, or other published data of the various national, regional, or local organizations, such organizations may be referred to by their acronyms or abbreviation only. As a guide to the user of these specifications, the following acronyms and abbreviations which may appear in these specifications shall have the meanings indicated herein.

1.05 ABBREVIATIONS AND ACRONYMS

A. Abbreviations and acronyms contained in the Contract Documents may include, but not be limited to, the following:

AAMA Architectural Aluminum Manufacturer's Association

AAR Association of American Railroads

AASHTO American Association of the State Highway and Transportation Officials

AATCC American Association of Textile Chemists and Colorists

ACI American Concrete Institute

ACPA American Concrete Pipe Association

ACPPA American Concrete Pressure Pipe Association

AFBMA Anti-Friction Bearing Manufacturer's Association, Inc.

AGA American Gas Association

AGC Associated General Contractors

AGMA American Gear Manufacturer's Association

AHAM Association of Home Appliance Manufacturers

AI The Asphalt Institute

AIA American Institute of Architects

04/2025 01090-4 COPP WTP REHAB UNIT B

AISC American Institute of Steel Construction

AISI American Iron and Steel Institute

AITC American Institute of Timber Construction

AMCA Air Movement and Control Association

ANS American Nuclear Society

ANSI American National Standards Institute, Inc.

APA American Plywood Association

API American Petroleum Institute

APWA American Public Works Association

AREA American Railway Engineering Association

ASA Acoustical Society of America

ASAE American Society of Agricultural Engineers

ASCE American Society of Civil Engineers

ASHRAE American Society of…

This is the start of the file's text. The full file is on GovTribe.