This PDF contains detailed inspection photos and recommendations for a 501,000 gallon Bolted Ground Storage Tank (GST). The document provides a comprehensive assessment of the tank's current conditions across multiple system components, including tank floor, security, exterior coatings, interior conditions, shell accessories, access points, foundation, and grounding.
Key recommendations include: installing sacrificial cathodic protection rods beneath the tank floor, implementing security fencing and signage, pressure washing the exterior, installing insulation, performing an interior dry cleanout to remove sediment, adding heating elements, installing an anti-vortex plate, adding sacrificial anodes for cathodic protection, addressing foundation drainage and concrete cracking, and making various safety and maintenance improvements such as installing a cable-type safety climb device on the shell ladder and a lock on the primary roof hatch. The images document each area of assessment with detailed close-up and wide-angle views, providing visual evidence of the tank's current condition and areas requiring maintenance or upgrade.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Repair Water Tank Combined Synopsis-Solicitation.pdf | ||
| RFQP02132500015.pdf | ||
| SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Current Conditions:
The underside of the tank floor does not appear to be protected from rusting and corrosion.
Recommendations:
Install sacrificial cathodic protection rods radially every 15' beneath the floor of the tank.
Tank Floor Sacrificial Cathodic Protection
501,000 Gallon Bolted GST
Current Conditions:
The tank is not secured by a fence and does not have signage to deter unauthorized access.
Recommendations:
Install a fence and proper signage. *Fence installation to be done by others.*
Security
Recommendations :
● Pressure wash the tank exterior with an antifungal solution.
● Install a prefabricated, vertical standing seam panel insulation system.
Current Conditions :
● The tank's exterior coating is in good condition; however, it needs to be cleaned.
● The tank is not currently insulated.
Coatings
Exterior
Exterior
● Perform a dry interior cleanout to remove sediment. *WORK SHOULD BE PERFORMED ON AN
EMERGENCY BASIS.*
Current Conditions :
● The tank has excessive sediment buildup.
Coatings
Sediment
Sediment
● Abrasive blast all interior areas to a SSPC-SP10 (near white) then apply a 80-100 mil thick monolithic 100% solids/zero VOC lining system. The elastomeric properties allow for expansion and contraction of the substrate caused by thermal shifts and weight. This coating meets the NSF 61/600 and FDA requirements for food contact. This coating would only be applied to the floor and shell of the tank.
Current Conditions :
● The lifespan of bolted tanks can be extended by installing a protective coating system.
Coatings
Interior Wet
Interior Wet
● Install a cable-type safety climb device on the shell ladder.
● Install a Fall Protection Required sign near the base of the shell ladder.
Current Conditions :
● The shell ladder is not in compliance for the following reason: Does not have a compliant cable-type safety climb device.
● There is currently no signage at the base of the shell ladder.
Ladders/Platforms
Shell Ladder
Shell Ladder
● Adjust, calibrate, and lubricate the existing liquid level gauge.
Current Conditions :
● The liquid level gauge needs to be adjusted and calibrated.
Shell Accessories
Liquid Level Gauge
Liquid Level Gauge
● Install a thermometer on the tank.
Current Conditions :
● The tank is not equipped with a thermometer.
Shell Accessories
Thermometer
● Replace the PVC overflow pipe with a steel overflow system, complete with standoffs, flapper valve, and screen.
Current Conditions :
● The tank is equipped with a PVC overflow pipe which appears to be in poor condition.
Shell Accessories
Overflow
Overflow
● Install a frost-proof drain valve complete with a locking device. *Lock to be provided by owner.*
Current Conditions :
● The tank is not equipped with a drain valve.
Shell Accessories
Drain
● No work recommended.
Current Conditions :
● The vent appears to be in good condition.
Roof
Roof Vent 1
● Install two open coil element (OCE) heaters. *Electrical work by others.*
Current Conditions :
● The tank does not appear to have heaters.
Interior
Heating System
● Install an anti-vortex plate on the suction line.
Current Conditions :
● The tank is not equipped with an anti-vortex plate.
Interior
Anti-Vortex
● Install sacrificial anodes on the interior shell.
Current Conditions :
● The tank does not appear to be equipped with a passive cathodic protection system.
Interior
Cathodic Protection
● Post a Confined Space Entry sign at the primary roof hatch.
● Install a lock on the primary roof hatch. *Owner to provide a lock.*
Current Conditions :
● The primary roof hatch does not have a Confined Space Entry sign.
● The primary roof hatch does not have a locking device.
Access Points
Primary Roof Hatch
Primary Roof Hatch
● Replace the bolts on the primary shell manway with maintenance-free galvanized steel bolts.
Current Conditions :
● The bolts on the primary shell manway are showing signs of rust.
Access Points
Primary Shell Manway
Primary Shell Manway
● No work recommended.
Current Conditions :
● The tank is properly grounded for lightning protection.
Foundation & Grade
Grounding
● Clean the area around the anchor bolts, tighten the anchor nuts and tack weld the nuts to the bolts, then repaint.
Current Conditions :
● The anchor bolts and nuts are showing signs of rusting.
Foundation & Grade
Anchor Bolts
● Remove all fill to expose 6" of foundation and properly grade for drainage. This should be done by a local excavating company.
● Clean the exposed foundation and seal or paint to protect the concrete.
● Repair cracks and spalling with a commercial non-shrinking grout.
Current Conditions :
● The top of the foundation is less than 6" above grade.
● The foundation does not appear to be sealed.
● The foundation is experiencing cracking and spalling.
Foundation & Grade
Foundation
Foundation