Water Softener Questions and Answers.docx

DOCX document 19 KB Posted

Attached to
FCI Jesup FY25 Water Softener System
Solicitation number
RFQP03072500006
Issued by

About this file

This document is a set of Questions and Answers related to a federal contract opportunity for a Water Softener System at the Federal Correctional Institution (FCI) in Jesup, Georgia.

The key details are: The Bureau of Prisons has a requirement for a Whole Institution Water Softener System for the domestic water supply at FCI Jesup. A site visit is scheduled for December 4, 2024 at 10:00am EST. All questions must be submitted by email to the Contracting Officer and will be posted to SAM.gov. The pipe size is 12-inches in diameter, and there is no wage determination as this is a supply and oversight only contract. The period of performance is 180 days after the issuance of a notice to proceed, and no bonds are required. The water hardness is 124 mg per liter, and the institution has the means to unload and store salt deliveries. The Government intends to award a firm fixed price purchase order to the responsible quoter whose quote is most advantageous considering delivery, past performance, and price.

View the file

Other files

File Type Posted
Water Softener Questions and Answers.docx DOCX document
Water Softener Questions and Answers.docx DOCX document
Site Pictures.pdf PDF
RFQP03072500006 Sam.gov.pdf PDF
Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Water Softener Questions and Answers

· Will there be a site visit? Yes, December 4th, 2024, at 10:00am Est., 2600 US-301S, Jesup, GA 31599

· Do you need any information before the site visit, i.e.. Company Name, phone number of the company visiting? Yes, email GF S. Sweat ssweat@bop.gov your company name, the employees name who will be visiting the in-person site visit. No questions will be answered on site. All questions will be submitted by email to the CO C. Parker, cparker@bop.gov and posted to Sam.gov.

· What is the pipe sizing for this application? 12-inch pipe in diameter.

· Is there a wage determination for the project? No wage determination as this is a Supply and oversite only.

· Does is fall under the SCA or DBA? Neither, as this is a Supply.

· What is the period of performance for this project? 180 days after the issuance of notice to proceed.

· Are any bonds required for the project? No bonds required

· Is electrical available? Yes

· Will the system supply irrigation? No

· Will the system be general use? Yes

· Is the system well fed or from the city? City

· What type of pipe is in the ground? Steel (specifics not known)

· How deep is the line down in the ground? Approximately 8 feet

· What size is the line coming into the institution? 12” main

· Is there a separate line for fire suppression? No

· Is the contractor responsible for the tap into 12” main? No

· What is the normal PSI for daily water flow? 50 psi to 70 psi

· Has the water been tested for hardness? 124 mg per liter water hardness

· Do you have the means to unload a shipment of salt? Yes, we have a forklift and a means to store it.

· Does it matter on the weight (40/ 50 lb. bags) of the bags of salt? No

· Do we need to follow guidelines? Yes, NFPA 70, NFPA 101, or any applicable regulating guidelines.

· Is there a building or concreate pad to put the water softener system on?

No, open concept until the dimensions are provide from awarded contract at that time FCI Jesup will supply the cement pad and building/covering.

· When they cut into the pipe are you aware that the water will be off for a day or two? This is just the supply of the water softener system, not an install. Therefore, not a concern in this phase of the project.

· Can the water get shut off with the water valve? Yes, the water can be turned off.