Waste Diversion Plan

: +christopher.clever@gsa.gov +walter.tersch@gsa.gov

(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.

-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.

-Christopher Clever - PCBL That's correct.

-Jake Begnaud - WPIDBBProject Waste Management PlanSubmittal Type:Waste Diversion Plan (Anticipated):Waste Diversion Report (Final) :
The general info in these gray cells replicates onto the Report tabs.
Project Name:ECC (estimated construction cost):Project Manager:ePM/ePMX Project # :
Project Short Description:PM email or phone:gBUILD Project # :
Building Number:Service Center / Field Office:Budget Activity:(list all applicable)RWA # :

Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)

Material*
(see weight conversion factors below)Diversion MethodTarget Diversion Rate for each material, by weight
(Change to actual target(s) as needed)Diverted (lbs)Landfilled (lbs)Total C&D material weight (Diverted + Landfilled) (lbs)Diversion

Rate

Reuse*Recycle or CompostDonation
Asphalt50%000n/a
Brick, Masonry, and Tile50%000n/a
Cardboard50%000n/a
Carpet, including Padding50%000n/a
Ceiling tile50%000n/a
Concrete50%000n/a
Drywall/ sheetrock (unpainted)50%000n/a
Metals50%000n/a
Painted wood, drywall, or plywood50%000n/a
Reusable items50%000n/a
Roofing50%000n/a
Soil, Rock, Land Clearing Debris50%000n/a
Wood (unpainted)50%000n/a
Other: ____________________50%000n/a
Other: ____________________50%000n/a
Other: ____________________50%000n/a
Total**:000n/a
Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse.
ItemReuse OnsiteReuse OffsiteOff-Site Recipient or Salvage/ Deconstruction Company
Volume-to-Weight Conversion Factor Reference Table
If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal.
Asphalt paving: 1 cubic yard = 773 lbsDirt or sand: 1 cubic yard = 929 lbs
Asphalt or composite roof shingles: 1 cubic yard = 731 lbsFiberglass insulation, loose: 1 cubic yard = 17 lbs
Brick, laid flat: 1 flat square foot = 20 lbsMixed (composite) C&D material: 1 cubic yard = 417 lbs
Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs)Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs
Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbsRock, crushed: 1 cubic yard = 2,570 lbs
Concrete: 1 cubic yard = 860 lbsWood: 1 cubic yard = 169 lbs
*Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.