Wasserburger_Federal_1_OW_P_A_01505__Mobilization.docx
DOCX document 21 KB Posted
- Solicitation number
- 140L6221R0030
About this file
This document outlines mobilization requirements for a federal contract to plug and reclaim an orphaned oil well. The contractor will be responsible for preparatory work and operations to mobilize personnel, equipment, supplies, and incidentals to the project site. No direct payment will be made for moves between project sites, which must be included in pricing for other contract items. Payment of a lump sum price for mobilization will be made upon completion of the work. The related federal contract opportunity is issued by the Bureau of Land Management Wyoming Region for plugging and reclaiming the Wasserburger Federal 1 oil well, with no further details provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L6221R0030_Amd_0002.pdf | ||
| Wasserburger_Federal_1_OW_P_A_17322_O_G_well_P_A_20210817_landowner_requirements_0001.docx | DOCX document | |
| Sol_140L6221R0030_Amd_0001.pdf | ||
| Wasserburger_Federal_1_OW_P_A_01500__Temp_Fac_and_Controls.docx | DOCX document | |
| BidSched_Wasserberger_Fed_1_orphaned_well_plugging.xlsx | XLSX spreadsheet | |
| Wasserburger_Federal_1_OW_P_A_17322__O_G_well_P_A.docx | DOCX document | |
| Sol_140L6221R0030.pdf | ||
| Wasserburger_Federal_1_OW_P_A_01009__Gen_Info_and_Requirements.docx | DOCX document | |
| Ventrum_Wasserburger_no1_Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| DIVISION 1 | SECTION 01505 |
| GENERAL REQUIREMENTS | MOBILIZATION/DEMOBILIZATION |
PART 1: GENERAL
1.1 SUMMARY
A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations which must be performed, or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.
PART 2: PRODUCTS
(There are no applicable requirements.)
PART 3: EXECUTION
(There are no applicable requirements.)
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT:
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT:
B. Payment: No direct payment for moves between project sites will be made. The Contractor shall include consideration for moves between project sites in the bid price for other items of the Contract. Prices and payment will be full compensation for the work described in this section. Payment will be made under:
Pay Item Description Pay Unit
01505 (01) Mobilization Lump Sum
END OF SECTION
Wasserburger Federal 1 orphaned well P&A 01505 -
MOBILIZATION
11/01 Project Name (ftr B)