Washington Park Utility Extension Project PART ONE Specifications.pdf

PDF 6 MB Posted

Attached to
Washington Park Utility Extension Project Bid
Solicitation number
2025-17
Issued by
Shiawassee County, Michigan

About this file

This document is a detailed technical specification for Part One of the Washington Park Utility and Roadway Improvements project for the City of Owosso, Michigan. The specifications cover multiple aspects of infrastructure construction, including water main installation, trace wire implementation, roadway improvements, utility work, and concrete construction. Key technical requirements are outlined for various construction methods, including HMA base crushing and shaping, asphalt cement stabilized aggregate base course, water main installation with specific material and installation standards, trace wire installation, and concrete work. The project involves precise technical specifications for pipe laying, trench work, testing, sterilization, pressure testing, and installation of appurtenances like fire hydrants, valves, and service connections.

The document provides comprehensive technical guidance with specific material requirements, including specifications for PVC and ductile iron pipes, copper service leads, fire hydrants, gate valves, and trace wire systems. Measurement and payment details are provided for each type of work, with unit prices determined by linear feet, each unit, or lump sum. The specifications emphasize compliance with Michigan Department of Transportation (MDOT) 2020 Standard Specifications, AWWA standards, and local city requirements. Special attention is given to quality control, testing procedures, disinfection protocols, and documentation requirements, ensuring a high standard of infrastructure construction that meets both engineering and municipal standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY of OWOSSO, MICHIGAN

PART ONE:

WASHINGTON PARK UTILITY AND ROADWAY IMPROVEMENTS

The specifications that follow are to be used only for the portion of the work related to the Washington Park Utility and Roadway Improvements (Part One) as documented on the following Drawings as included in this Project:

PAGE NUMBER TITLE

1 Cover Sheet 2 Water Main Notes and Details 3 Water Main Standard Details 4 Street Items and General Notes and Details

Sewer Trench Details 5 SESC Standard Notes 6 Typical Cross Sections 7 Traffic Control Plan 8 Removal Plan 9 Construction Plan

10 Construction Profile 11 Reserved 12 Detail Grades

13-14 Water Main Plan and Profile 15 Reserved 16 Soil Borings

17-19 Cross Sections – Wesley Drive

Prepared by

Part One - Washington Park Utility and Roadway Improvements

SPECIAL PROVISION

FOR

TECHNICAL SPECIFICATIONS

CW/City of Owosso 1 OF 1 April 2025

General Requirement The MDOT 2020 STANDARD SPECIFICATIONS FOR CONSTRUCTION shall govern all technical specifications for PART ONE of this project. The following parts of the Contract will prevail over all other parts in the following order:

1. Special Provisions.

2. Supplemental Specifications.

3. Project Plans and Drawings.

4. MDOT Standard Plans.

5. 2020 Standard Specifications

6. City of Owosso Standard Specifications.

The Contractor shall not take advantage of any apparent error or omission in the contract documents. If any uncertainty, inconsistency, omission, or conflict is discovered within the contract documents, the Engineer will solely decide as to the true intent of the language.

Part One - Washington Park

CITY OF OWOSSO

AUDIO VISUAL FILMING

City of Owosso/CW 1 of 2 October 2024

a. Description. Provide a film record of physical, structural and aesthetic conditions of the area described in this special provision as it exists prior to the beginning of any construction activities. The film must be professional quality, providing a clear and accurate visual record of existing condition.

Complete pre-construction filming, under the supervision of the Engineer, before any construction activity is started. Furnish the completed pre-construction tape to the Engineer one week prior to placement of any materials or equipment in the construction area. Any portion of the tape determined by the Engineer to be unacceptable for the documentation of existing conditions must be re-filmed prior to the start of any construction activity. All costs associated with the need to re-film will be borne by the Contractor.

b. Audio-Video Production. Provide the name of the videotaping services company to the Engineer a minimum of 5 work days prior to the start of taping.

Use color DVD video and equipment which allows audio and video information to be recorded.

Do not splice or edit the video. Speed and electronics of the video equipment and DVD must conform to video taping industry standards. Film in the general direction of vehicular travel and do not exceed 45 feet per minute (approximately 0.5 miles per hour). Control pan and zoom rates to ensure playback clarity of the subject matter being filmed.

Use audio and video cues to identify location, relative to project limits and landmarks, at intervals of not more than 100 feet along the filming route. Provide audio commentary as necessary during filming to describe streets, buildings, landmarks and other details which will enhance the documentation of existing conditions.

Conduct filming during a time of good visibility and not during periods of precipitation, or when snow, leaves, or other natural debris obstruct the area being filmed.

Use video equipment with date/time stamp and digital annotation capabilities. The final video recording must display the date (month, day and year) and the time (hours, minutes, and seconds). This transparent information is to appear on the upper left hand corner of the frame.

The project station numbers must appear in the lower half of the frame. This stationing must use MDOT standard engineering symbols (i.e., 3+50). If there is no project stationing in an area being filmed, assign assumed stationing to each street or other discrete area being filmed. Start the assumed stationing at 0+00 and increase from west to east or from south to north.

Part One - Washington Park

City of Owosso/CW 2 of 2 October 2024

Include periodic, transparent alpha/numeric information below the station numbers consisting of the name of the project, name of area shown, direction of travel, viewing direction, etc.

c. Area to be Filmed. Film all existing driveways, sidewalks, fences, trees, shrubbery and other structures and landscaping located up to 50 feet outside of the proposed right-of-way line shown on the plans and within the limits of construction. The limits of construction consist of Washington Street from south of North Street to Wesley Drive and Wesley Drive from Water Street to Washington Street. Also film all existing driveways, sidewalks, fences, trees, shrubbery and other structures and landscaping located up to 50 feet outside of the proposed right-of-way line on Water Street from North Street to Wesley Drive. The tape coverage must include the exterior of all buildings within the above described limits.

d. Measurement and Payment. The completed work as documented by the DVD(s) will be paid for at the contract unit price for the following pay item.

Pay Item Pay Unit

Audio Visual Filming………………………………..…………………………………Lump Sum

Payment for the item Audio Visual Filming includes all labor, equipment and materials required to perform the filming and to provide the finished video(s) to the Engineer.

Part One - Washington Park

City of Owosso/RC

SPECIAL PROVISION

FOR

AGGREGATE BASE, _ INCH, MODIFIED

AGGREGATE BASE, LM, MODIFIED

1 of 1 May, 2022

a. Description. This work shall consist of placing and compacting an aggregate base course on a prepared subbase.

b. Materials. The material shall meet the gradation requirements of the Michigan Department of Transportation (MDOT) Standard Specifications for Construction, Section 902, for Dense- Graded Aggregate, 21AA, except all material shall be 100% crushed limestone.

c. Construction Methods. The material shall be placed and compacted in accordance with the MDOT Standard Specifications for Construction, Section 302.03.

d. Measurement and Payment. The completed work, Aggregate Base, _ inch, Modified including all materials, labor, and equipment, as measured will be paid for at the Contract Unit Price for the following Pay Item.

Pay Item Pay Unit

Aggregate Base, _ inch, Modified ................................................................... Square Yard Aggregate Base, LM, Modified ..........................................................................Cubic Yard

Aggregate Base, _ inch, Modified will be measured in place by the square yard.

Aggregate Base, LM, Modified will be measured in place by the cubic yard.

The maximum pay width will be as shown on the plans.

Part One - Washington Park

ASPHALT CEMENT STABILIZED AGGREGATE BASE COURSE

CITY OF OWOSSO/CW 1 OF 4 February, 2020

DESCRIPTION

This work will be done in accordance with the requirements of Section 305, 501, 902, and 904 of the Michigan Department of Transportation (MDOT) 2020 Standard Specifications for Construction, except as herein specified.

This work shall be accomplished in place and shall consist of blending crushed material with hot asphalt cement at the specified rate and depth, shaping to specified elevation and slope, and compacting to specified density.

MATERIALS

Materials shall meet the following requirements:

Asphalt Cement PG 52-28 Fog Coat SS - 1H

The asphaltic material for stabilizing shall be applied at the rate and temperature (minimum 350° F) as determined by the Engineer, so that the residual bitumen added will be between two (2) and five (5) per cent by weight of the asphaltic material.

EQUIPMENT REQUIREMENTS

1. Compaction Equipment - Rollers. Rollers must meet the requirements as specified under Section 501.03 for rollers, except that combination pneumatic-steel wheel and vibratory rollers will be permitted. A minimum of three (3) rollers in operating condition will be required on the project and shall be of the following types:

Minimum of (2) shall be steel drum vibratory type;

Minimum of (1) shall be pneumatic - tire type.

All rollers are to be approved by the Engineer prior to beginning construction.

2. Stabilizing Equipment - All equipment to be approved by the Engineer prior to beginning construction. The stabilizing plant shall be a single-pass, multi-drum, self-propelled rotary mixer combining a cutter rotor, a blending rotor, and two mixing rotors in the mixing chamber. The mixing chamber shall have a positive depth control to insure a uniform depth of stabilized material and must be capable of loosening the base materials to the depth called for without disturbing the subbase. The stabilizing plant shall add the asphalt in predetermined and accurately metered quantities, while maintaining a constant and fixed rate of forward motion, thoroughly blend the asphalt with the road materials, and spread

Part One - Washington Park the mixture uniformly on the roadway.

A spray bar for distribution of the liquid asphalt shall be mounted inside the mixing chamber and shall have nozzles spaced at increments not to exceed six

(6) inches and shall operate in such a manner that all asphalt will be uniformly applied throughout the mixing chamber at the time of injection. The asphalt additive system shall consist of a positive displacement pump and shall display the temperature, pressure and flow rate to accurately check the rate of application of the asphalt at any time. Note - Full width processing is required to eliminate longitudinal joints in the stabilizing material necessitating the use of two

(2) or more stabilizing machines; depending on the width of road to be processed. The system for distributing the asphalt material shall be adjustable for the rate of asphalt application and shall measure accurately the amount of asphalt material being applied. A foot per minute meter and a gallon per minute meter shall be in clear view of the operator and both shall be controlled by the operator from the operator’s station.

CONSTRUCTION METHODS

1. Mixing with Asphalt Materials - Prior to adding the asphaltic material, the moisture content of the crushed material shall be adjusted by aerating or by adding water. The asphaltic material shall be added only to that material which can be completely mixed and compacted in one day. The asphaltic material shall be added through the mixer at the rate and within the temperature range directed by the Engineer. The temperature shall be kept below the flash point of the asphalt cement but shall not fall below 350° F. The mixed material shall be laid directly from the multi-drum mixer to the surface. Conveying the mixed material by belt system from drum to surface will not be allowed.

2. Shaping, Rolling and Compacting - Shaping and compacting shall be done while the asphalt material is in a workable state. The final shaping and compaction shall be accomplished as soon as possible after addition of the asphaltic material. The mixed material shall be so shaped that when compacted it shall be in a reasonably close conformity with lines, grades, and cross-sections shown on the plans or as directed by the Engineer. Stabilized material trimmed from the grade shall be used adjacent to the shoulder to complete the cross section as shown on the plans. Material in excess of the quantity required to complete the cross section shall become the property of the Contractor.

Initial rolling shall be done with one or more pneumatic-tired rollers. The aggregate-asphalt mixture shall be compacted to not less than 98 percent of the unit weight obtained by the Michigan Modified T 180 Test as described in the Density Control Handbook. Such test shall be made on the aggregate-asphalt mixture at the filled moisture content existing during the compacting operation.

Required density shall be maintained until the material has been surfaced.

Density testing requirements are hereby waived for this project, but may be used, as directed by the Engineer, to assure density is being maintained. After final rolling, the Engineer will test the surface using a 10-foot straightedge at selected locations. The variation of the surface from the testing edge of the straightedge between any two contacts with the surface shall at no point exceed ±⅜ inch.

3. Curing - The base may be opened to traffic for a period of time to be determined by the Engineer prior to placing of the surface. Any areas which show evidence of cracking or instability will be investigated and corrected within 48 hours, before any work proceeds. If the stabilized asphalt aggregate pavement is to be left unsurfaced for more than seven (7) days, a fog coat of SS-1H shall be applied at the rate of 0.20 to 0.30 gallons per square yard, at the Contractor’s expense.

4. Weather Limitations - Asphaltic material shall not be applied to the grade or to the aggregate when rain is threatening or when the air temperature is lower than 50° F.

The Stabilization work shall be performed in the accordance with weather limitations in Section 501.03.I, unless otherwise authorized by the Engineer.

MEASUREMENT AND PAYMENT

The completed work as measured for asphaltic stabilized aggregate base course will be paid for at the contract unit prices for the following contract items (Pay Items).

Pay Item Pay Unit Asphalt Cement Stabilized Base Course, 4 Inch Square Yard Asphalt Cement Binder Gallon

Payment for Asphalt Cement Stabilized Base Course, 4 Inch includes the furnishing, hauling, placing, mixing of the asphalt cement into the crushed base material, shaping, and compacting of the mixture. This item will be measured by completed width and length required in the plans to a maximum depth of four (4) inches.

Payment for Asphalt Cement Binder shall be paid for by the gallon applied to the base course.

Payment for Asphalt Emulsion Fog coat SS-1H will not be paid for separately but will be included as part of the work of Asphalt Cement Stabilized Base Course.

Any aerating or adding water necessary to achieve proper moisture will not be paid for separately but will be included as part of the work of Asphalt Cement Stabilized Base Course.

Part One - Washington Park

HMA BASE CRUSHING AND SHAPING, MODIFIED

CITY OF OWOSSO/CW 1 OF 1 February, 2021

DESCRIPTION:

All work shall consist of crushing and shaping the existing pavement section and gravel base to the depth and width as shown on the plans, or as directed by the Engineer, in accordance with Sections 305 and 501 of the Michigan Department of Transportation (MDOT) 2020 Standard Specifications for Construction and as modified herein.

CONSTRUCTION:

Crush and shape HMA and gravel base at a depth of 6 inches. Use a water sprinkling system as approved by the Engineer. After crushing, 100 percent (100%) of the crushed material shall have a maximum particle size of 1-½ inches (1.5”). Particles exceeding 1- ½ inches shall be removed by the Contractor at the Contractors expense. The crushed material shall be initially shaped immediately after the crushing operation to established grade and cross section within a tolerance of ¾ inches and be opened to local traffic at end of same workday. Sufficient material shall be graded along edges (wind rowed) for final grading and blending shoulder after HMA placement. The crushed surface shall be left to cure in place for a period of time not exceeding three calendar days.

Rolling equipment shall be furnished in accordance with Section 501.03, except that combination of pneumatic tired (1 minimum) and steel vibratory (2 minimum) rollers will be used to properly compact the crushed material to achieve density requirements of Section 305.

MEASUREMENT AND PAYMENT:

The completed work as measured for the following Pay Items will be paid for at the Contract Unit Price for the following Contract Item (Pay Item):

Contract Item (Pay Item) Pay Unit

HMA Base Crushing and Shaping, Modified Square Yard

HMA Base Crushing and Shaping, Modified will be measured in area by square yard;

and will be paid for at the contract unit price per square yard, which price shall be payment in full for all labor, material, and equipment needed to accomplish this work.

Shaping includes initial, intermediate, and final shaping of the prepared crushed material.

The Department shall pay separately for additional aggregate as Aggregate Base, LM, Modified if additional aggregate is needed to construct the proposed cross section.

Part One - Washington Park

TRENCHING, MODIFIED

CITY OF OWOSSO/RC 1 OF 1 October, 2018

DESCRIPTION:

This work item shall consist of trenching either one or both sides of the existing pavement section so as to accommodate the widening for proposed pavement, to the depth as shown on the plans, or as directed by the Engineer. All work shall be done in accordance with Section 307 of the Michigan Department of Transportation (MDOT) 2020 Specifications for Construction and as modified herein.

METHOD OF CONSTRUCTION

The Contractor shall trench along the existing pavement edge at varying widths and varying depths as shown on the plans. The trench shall be excavated to the proposed width and depth. Any disturbed underlying soil shall be properly compacted, as directed by the Engineer. Some select excavated material may be leveled as embankment on-site, adjacent to the proposed pavement edge, as directed by the Engineer. Excess excavated material shall become responsibility of the Contractor for proper disposal.

METHOD OF MEASUREMENT AND PAYMENT

The completed work as measured for Trenching, Modified will be paid for at the Contract Unit Price for the following Contract Item (Pay Item).

CONTRACT ITEM (Pay Item) Pay Unit

Trenching, Modified Station

Trenching, Modified will be measured in length by stations; separately along each side of existing pavement; and will be paid for at the Contract unit price per station, which price shall be payment in full for all labor, material, and equipment needed to accomplish this work. Disposal of all excess material is included as part of the pay item Trenching, Modified.

Part One - Washington Park

City of Owosso/CW

SPECIAL

PROVISION FOR

SEWER SDR-26

1 of 1 March 2025

a. Description. The work of Sewer, SDR-26, _ inch, Tr Det _, Modified, shall consist of excavation, furnishing and placing plastic sewer pipe, and trench backfill, in accordance with section 402 of the Michigan Department of Transportation (MDOT) Standard Specifications for Construction, Michigan Department of Transportation Standard Plan R-83 series and the details within the construction plans, except as modified herein.

b. Materials. Materials for sewer pipe shall meet or exceed ASTM D-3034 SDR-26 or ASTM D-2241 SDR-26 specifications for PVC integral gasket sewer pipe, depending on pipe diameter.

Material for backfill shall be in accordance with the details within the standard plan R-83 series.

FERNCO couplers shall be Strong Back RC 6000 Series Couplings.

When called for on the plans, Type IV Styrofoam Brand - "Square Edge" or "Score Edge" as manufactured by Dupont/Dow Chemical Company or approved equal shall be used for insulating sewer pipes. The total thickness and dimensions shall be specified on the plans or in the specifications. The minimum insulation thickness however shall not be less than 4 inches.

c. Construction. The extensions/connections to existing culverts/sewers on this project will require a FERNCO coupler to obtain a tight seal at the joint connecting new pipe to existing pipe. The joint between the existing and new pipes shall be constructed according to the MDOT Standard Specifications for Construction and as directed by the Engineer. Any extra work required to obtain tight joints will not be paid for separately but will be included in compensation for new pipe. Sewer trench shall meet requirements of Trench Detail B, Modified, as shown on the plans.

Sewer laterals shall be reconnected with a SDR-26 sewer wye, SDR-26 pipe, and FERNCO coupler meeting the size of the existing lateral.

d. Measurement and Payment. The completed work as measured for Sewer, SDR-26, _ inch, Tr Det _, Modified and Sewer, SDR-26, _ inch, Tr Det _, Insulated, Modified will be paid for at the contract unit price for the following contract item (pay item).

Contract Item (Pay Item) Pay Unit

Sewer, SDR-26, _ inch, Tr Det _, Modified .................................................................. Foot

Sewer, SDR-26, _ inch, Tr Det _, Modified will be measured in place by length in feet and will be paid for at the contract unit price per foot which price shall be payment in full for any Fernco fittings, wyes, bends, connecting to existing sewers and laterals, neoprene gaskets, couplers, sheeting or shoring trench walls, backfill as required.

Sewer, SDR-26, _ inch, Tr Det _, Insulated, Modified .................................................. Foot

Part One - Washington Park

DR STRUCTURE COVER, TYPE EJ ____

City of Owosso/CW 1 OF 1 May, 2022

a. Description. Dr Structure Cover, Type EJ ____, shall consist of materials and work meeting requirements of Section 403 of the MDOT 2020 Standard Specifications for Construction, and as modified herein.

b. Materials. All covers will be manufactured and supplied by East Jordan Iron Works. Cover types shall match with the pay item cover number.

d. Measurement and Payment. The completed work as measured for Dr Structure Cover, Type EJ ___ will be paid for at the Contract Unit Price for the following Pay Item:

Pay Item Pay Unit

Dr Structure Cover, Type EJ 1040 w/ Solid Gasket Sealed Cover….Each Dr Structure Cover, Type EJ 1040 w/ Vented Cover………………….Each Dr Structure Cover, Type EJ 1040 w/ Type N Oval Grate…………...Each Dr Structure Cover, Type EJ 1040 w/ Type O2 Beehive……………..Each Dr Structure Cover, Type EJ 7000……………………………………..Each Dr Structure Cover, Type EJ 6517 Ditch Grate……………………….Each

Dr Structure Cover, Type EJ ____will be measured in place by count of Each; and will be paid for at the contract unit price per Each.

DR STRUCTURE, MODIFIED

City of Owosso/CW 1 of 2 January, 2022

a. Description. The Contractor shall construct Dr Structure, inch dia, Modified of the size and at the locations as shown on the plans or as directed by the Engineer. Work shall be in accordance with Section 403 & 913 of the Michigan Department of Transportation (MDOT) Standard Specifications for Construction, or as modified herein.

b. Materials. Drainage Structures shall be precast reinforced concrete units manufactured to American Society for Testing Materials (ASTM) C-478 specifications and Section 913 of the Michigan Department of Transportation (MDOT) Standard Specifications for Construction, with either a cast in place bottom or precast concrete base as detailed on the plans.

The Contractor shall place the drainage structure cover as shown on the plans or as directed by the Engineer.

Provide 4"-12" adjustment area (chimney) above the structure's cone.

Masonry structures will not be allowed to be used on this project, unless approved by the Engineer for special circumstances, or where specifically called for on the Plans.

Thirty-six inch diameter drainage structures (catch basins or inlets) will be allowed to be used on this project, where called for on the plans or where directed by the Engineer.

The Contractor shall provide flexible connectors meeting ASTM C-923 requirements and ‘as manufactured’ by:

1. Trelleborg - Kor-N-Seal 106-406 and 206 series or approved equal.

2. Press-Seal Corporation’s – Direct Drive

3. A-Lok Products, INc. – A-LOK or Z-LOK Connector

c. Measurement and Payment. The completed work as measured for Dr Structure, __ inch dia, Modified will be paid for at the contract unit price for the following contract item (pay item).

Contract Item (Pay Item) Pay Unit

Dr Structure, inch dia, Modified .............................................................................. Each

The work of Dr Structure, inch dia, Modified includes the concrete footing, and up to 8' of drainage structure depth. The unit price for Dr Structure, inch dia, Modified incudes the cost of temporary or final grade adjustments of the structure. Dr Structure, inch dia, Modified will be measured by the unit each and will be paid for at the contract unit price per each.

Part One - Washington Park

City of Owosso/CW 2 of 2 January, 2022

If during construction, due to utility conflicts or plan revisions, modifications are required to the piping connection holes or additional taps are required to precast concrete sections, this work will be paid for separately, in the Pay Item for the Dr Structure, Tap, _ inch.

Part One - Washington Park

Dr Structure, __ inch dia, Sanitary, Modified

City of Owosso/CW 1 of 2 February, 2021

a. Description. The Contractor shall construct Dr Structure, inch dia, Sanitary, Modified of the size and at the locations as shown on the plans or as directed by the Engineer. Work shall be in accordance with Section 403 & 913 of the Michigan Department of Transportation (MDOT) Standard Specifications for Construction, or as modified herein.

b. Materials. Drainage Structures shall be precast reinforced concrete units manufactured to American Society for Testing Materials (ASTM) C-478 specifications and Section 913 of the Michigan Department of Transportation (MDOT) Standard Specifications for Construction, with either a cast in place bottom or precast concrete base as detailed on the plans.

The Contractor shall place the drainage structure cover as shown on the plans or as directed by the Engineer.

Provide 4"-12" adjustment area (chimney) above the structure's cone.

Masonry structures will not be allowed to be used on this project, unless approved by the Engineer for special circumstances, or where specifically called for on the Plans.

The minimum inside diameter of a sanitary sewer manhole for sewers up to 21 inches in diameter shall be 48 inches. For sanitary sewer 24 to 36 inches in diameter, the minimum inside diameter of the sanitary manholes shall be 60 inches. A larger diameter manhole may be required for right angle installation of sewers at the upper limit (i.e. 60 inch diameter manhole for 21 inch sewers at a right angle). Manholes shall be upsized to accommodate multiple pipes and maintain the structural integrity of the manhole between cored openings. Internal drops shall be provided on newly constructed manholes. The minimum inside diameter for manholes containing inside drop pipes shall be 60 inches.

Diameters for manholes containing multiple internal drops shall be approved by the Municipal Engineer and the City. In general, a four foot diameter clear opening should be provided in manholes containing internal drop structures. External drops may be required for connections to existing manholes and shall be approved by the Municipal Engineer and the City.

Flow channels shall be constructed in manhole bottoms with mechanically mixed concrete.

Precast flow channels shall not be used. Prior to placement of concrete, a bonding compound, Sealtight INTRALOK, Sika SIKABOND, ACRYL 60, or equal, herein shall be applied per manufacturers' recommendations to the manhole base. Flow channel depth shall not exceed 1/2 the pipe diameter and concrete thickness shall be a minimum of 4 inches measured from the top of the base to the bottom of the flow channel. Flow channels shall be a minimum ID same as the largest pipe on the downstream side of the manhole.

The Contractor shall provide flexible connectors meeting ASTM C-923 requirements and ‘as manufactured’ by:

1. Trelleborg - Kor-N-Seal 106-406 and 206 series or approved equal.

2. Press-Seal Corporation’s – Direct Drive

3. A-Lok Products, INc. – A-LOK or Z-LOK Connector

City of Owosso/CW 2 of 2 February, 2021

c. Measurement and Payment. The completed work as measured for Dr Structure, __ inch dia, Sanitary Modified will be paid for at the contract unit price for the following contract item (pay item).

Contract Item (Pay Item) Pay Unit

Dr Structure, inch dia, Sanitary, Modified ............................................................... Each

The work of Dr Structure, inch dia, Sanitary, Modified includes the concrete footing, and up to 8' of drainage structure depth. The unit price for Dr Structure, inch dia, Sanitary, Modified incudes the cost of temporary or final grade adjustments of the structure. Dr Structure, inch dia, Sanitary, Modified will be measured by the unit each and will be paid for at the contract unit price per each, which price shall be payment in full for all labor, material, and equipment necessary to accomplish this work.

If during construction, due to utility conflicts or plan revisions, modifications are required to the piping connection holes or additional taps are required to precast concrete sections, this work will be paid for separately, in the Pay Item for the Dr Structure, Tap, inch.

Part One - Washington Park

SPECIAL PROVISION FOR

SANITARY SEWER TESTING

City of Owosso/CW Page 1 of 3 April, 2021

In general, all sanitary sewers and all building connections shall be tested by applying an air pressure test described in the following paragraphs. The Contractor shall be responsible for furnishing all equipment and labor for the air testing. The Municipal Engineer may, as an alternative to or in addition to air testing, require an infiltration test of the sanitary sewers in certain instances.

1. Air Testing: The following described air test is required to be performed on all sanitary sewers.

A. General: The following described test procedure shall be used to determine the adequacy of the pipe joint to hold water and to check for structural defects (such as bell cracks, broken pipe) after completion of backfilling operations. Final air testing shall not be performed until all storm sewer and water main utilities are constructed.

B. Equipment Required: Portable air compressor, standard air hose and connections, minimum of 50 feet of single and triple air hose, 1 single and 1 triple connection pneumatic sewer plug, 1 hand air pump, stopwatch, and 1 air gauge, range 0-30 psi graduated in 1/10's from 0 to 10 psi. All test gages shall be mounted above ground in a suitable test stand.

C. Preliminary Requirements: After all sewer, lateral, and manhole construction and backfilling operations have been completed, the sewer shall be cleaned by the Contractor as follows:

(1) Cleaning: The new sewer shall be cleaned prior to air testing. The Contractor shall clean the sewer by jet rodding and vactoring the debris.

(2) Preliminary Test: Before actual line testing starts, the pneumatic plugs shall pass the following qualifying test in the presence of the engineer and Contractor. One (1) length of sewer pipe shall be laid on the ground and sealed at both ends with the pneumatic plugs to be checked;

air shall be introduced into the pipe until the pipe pressure reaches 15 psi. The pneumatic plugs being checked shall hold against this pressure without bracing being needed, and without movement of the plugs out of the pipe. All pneumatic plugs shall pass the aforementioned qualifications before being used to the actual installation.

(3) Sealing: All tees and lateral stubs shall be suitably capped, sealed and blocked to withstand the internal test pressures. The Municipal Engineer shall determine if additional test pressure is required over the standard 3 psi due to the presence of groundwater.

D. Test Procedures: Immediately following the pipe cleaning described, low pressure air shall be introduced into the sealed line until the internal air pressure reaches 4.0 psi greater than the average back pressure of any groundwater pressure that may be over the pipe. At least two (2) minutes shall be allowed for the air pressure to stabilize. Adequate prior notification shall be given the engineer before running the air test procedure.

(1) Acceptance: The portion of the line being tested shall be accepted if the portion under the test meets or exceeds the requirements of UNI-BELL Specifications. This requirement shall be accomplished by performing the test as follows: The time required in minutes for the pressure to decrease from 3.5 to 2.5 psi (greater than the average back pressure of any groundwater than may be over the pipe) shall not be less than the time shown for the given diameters in the table following this paragraph. If the system does not meet the foregoing requirements, the Contractor will be required to locate and repair the leaks and repeat the tests until the allowable leakage is obtained.

Part One - Washington Park

City of Owosso/CW Page 2 of 3 April, 2021

AIR TEST TABLE

NOTE: If the section of line to be tested includes more than 1 pipe size (i.e... lateral connections), calculate the test time for each size and add the test times to arrive at the total test time for the section.

UNI-BELL SPECIFICATIONS MINIMUM TEST TIME FOR VARIOUS PIPE SIZES

PIPE SIZE

TIME-PER 100' 200' 300' 400'

(INCHES) MIN:SEC. MIN:SEC. MIN:SEC. MIN:SEC.

4 3:46* 3:46 3:46 3:46 6 5:40* 5:40 5:40 5:00 8 7:34* 7:34 7:36 10:00 10 9:26* 9:26 11:52 15:00 12 11:20* 11:24 17:05 22:00 15 14: 10* 17:48 26:42 35:36 18 17: 00* 25:38 38:27 51:00

* denotes minimum test time for low air pressure requirements

E. Test Acceptance: The method of testing and measurement shall be approved by the Municipal Engineer.

2. Manhole Test: Vacuum manhole tests shall be used as the preferred test method as approved by the municipal engineer. This type test typically takes about an hour to perform by pulling a vacuum to 10-inches of mercury and holding to no less than 9-inches of mercury.

An exfiltration test may be performed as an alternate method, if conditions warrant such method.

All pipes for this method shall be plugged and the manhole filled with water to the bottom of the casting. After a stabilization period, the fall of water will be measured to determine the exfiltration rate. The maximum allowable exfiltration shall not exceed 0.5 gallons per foot of depth per foot of diameter per 24 hour day. All materials, labor, and water shall be furnished by the Contractor.

One or both test methods, as determined by the municipal engineer, shall be performed by the contractor at each manhole if conditions dictate.

3. PVC/GRP Deflection Tests: The completed installation of PVC or GRP sewers shall at no point have out-of-round pipe deflections greater than 5.0%. Deflectometer or go no-go gauging tests shall be performed prior to acceptance on all PVC and GRP sewers. The test shall be conducted after the final backfill has been in place at least 30 days.

4. Post Construction Infiltration: Following complete construction and prior to connection of services to the sewer, the engineer shall have the option of requiring retesting of any section of sewer where excessive infiltration is observed or suspected. Any of the above tests may be utilized per the engineer's requirements.

5. Cleaning Pipe and Fittings: All lumps, blisters, and excess coal tar, or other material shall be removed from the bell and spigot end of each pipe and fitting. The outside of the spigot and the inside of the bell shall be brushed and wiped clean, dry, and free from oil or grease prior to laying. The inside of the pipe shall be brushed in order to remove all dirt and debris. Any damage to exterior pipe coating shall be repaired with an approved coating before the pipe is laid.

Part One - Washington Park

City of Owosso/CW Page 3 of 3 April, 2021

6. TV Inspection: A Closed Circuit Television (CCTV) inspection of all newly constructed sanitary sewer shall be completed a minimum of 30 days after completion of all backfill. This will be used for signs of structural damage, joint leaks, lead verifications or infiltration before final acceptance. City shall be contacted for any additional specific requirements prior to televising. In general, televising shall be in accordance with National Association of Sewer Service Companies (NASSCO) requirements. All televising shall be completed in an upstream direction using the correct City manhole numbers for identification. All laterals shall be televised using a pan and tilt camera to verify any defects. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. All television inspection shall be recorded in digital format and provided on DVD or an alternate format accepted by the City. The recording must contain a continuous record of each sewer section, from manhole to manhole and include both video and audio inspection comments. All items noted in the inspections shall be documented utilizing the Pipeline Assessment and Certification Program (PACP) developed by NASSCO and based on the Water Research Center System (WRc) to standardize the coding of pipe defects in wastewater collections systems. The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to document any defects, service connections, or other points of interest noted during the inspection. In no case shall the television camera be moved at a speed greater than 30 feet per minute. If the camera encounters a dip in the sewer such that water is standing above the spring line of the sewer pipe, and if the camera lens becomes submerged because of this condition, the camera rig shall be withdrawn from the sewer and inserted from the other end as far as possible. The camera shall be adjusted to a height such that it is above the level of the flow. Two copies of a complete bound report of the television inspection shall be provided. The report shall include written logs of each section of sewer televised, giving specific details as to service connections and any defects, or other points of interest noted during the inspection. All media recordings shall be labeled to describe the reaches of sewer contained in the files, including street location and manhole numbers.

7. Correction of Defective Work: In the event that any of the above tests or inspections indicates defective material or installation, the Contractor shall repair and retest the section to the satisfaction of the Municipal Engineer. The use of chemical grouts shall be limited to the repair of minor joint leaks and shall not be used without the specific written approval of the engineer. Any pipe or fitting having structural damage shall be removed and replaced. Any PVC sewer with deflection in excess of the 5.0% limitation shall be re-excavated, inspected for structural damage, and then re-bedded, backfilled, and retested. The corrective work shall be done immediately after the defective work is discovered.

Measurement and Payment. All equipment, material, and labor required to test sanitary sewer shall not be paid for separately, but will be included in the costs for sanitary sewer pay items.

CURB AND GUTTER, CONC, DET F4, MODIFIED

City of Owosso/RC/CW 1 OF 1 October 2024

a. Description. This work shall consist of constructing concrete curb and gutter. Complete this work according to the standard specifications, standard detail in the plans, and this special provision.

b. Materials. The materials shall meet the requirements of the Michigan Department of Transportation (MDOT) Standard Specifications for Construction, Section 802, for concrete curb and gutter.

c. Construction. Construct concrete curb and gutter according to Section 802 of the MDOT Standard Specifications for Construction and the standard detail in the plans.

d. Measurement and Payment. The completed work, as described, will be measured and paid for at the contract unit price using the following Pay Item:

Curb and Gutter, Conc, Det F4, Modified……………………………….Foot

Curb and Gutter, Conc, Det F4, Modified will be measured in place by length per foot and paid for per foot. Payment includes all labor, materials, and equipment to install concrete curb and gutter.

Part One - Washington Park

MAINTAINING TRAFFIC

City of Owosso/CW 1 of 5 October 2024

a. Description. The project will consist of 0.13 miles of road rehabilitation, including storm sewer, sanitary sewer, and water main on Washington Street and Wesley Drive in the City of Owosso, Shiawassee County.

b. General. Traffic shall be maintained in accordance with Sections 104.07C, 104.11. 812, and 922 of the Michigan Department of Transportation (MDOT) 2020 Standard Specifications for Construction, including any typicals or supplemental specifications and as specified herein.

The Contractor shall coordinate their operations with other Contractors, City of Owosso forces, and private utilities within the CIA to eliminate conflicts in traffic control. No additional payment will be made to the Contractor for the joint use of traffic control items.

The Contractor shall notify the Engineer, City of Owosso (989-725-0550), Shiawassee County Central Dispatch (989-743-9111), and Local Fire Department(s) (989-725-0580) that service the area a minimum of three full working days prior to the implementation of any detours or road closures.

c. Construction Influence Area (CIA). The Construction Influence Area shall include the Washington Street project and Wesley Drive project right-of-way and extend a distance of 1 mile north and south from the project limits and include the right-of-way of all intersecting streets within the project limits for a distance of 1,000 feet laterally from the Washington Street and Wesley Drive centerline.

The CIA shall also include the rights-of-way of any designed detour routes within the limits of the construction and detour signing.

d. Traffic Restrictions. Washington Street shall be closed to through traffic from North Street to Wesley Drive. Wesley Drive shall be closed to through traffic between Water Street and Washington St. Residents shall be allowed to access their homes on Washington Street and Wesley Drive at all times. When one lane in each direction cannot be maintained, at least one lane of traffic shall be maintained on Washington Street and Wesley Drive by using traffic regulators during day light hours and one lane of traffic in each direction shall be available at night.

The Contractor shall use the City of Owosso Truck Route System. The Contractor will be allowed to use North Street from M-52 to the work site. The Contractor shall not use Water Street from North Street to Wesley Drive.

The intersection at Washington St and Wesley Dr may be intermittently closed during the day, but shall be opened at night. Residents living on E Wesley Drive shall be allowed to access their homes at all times.

City of Owosso/CW 2 of 5 October 2024

Reasonable access to intersecting roads/streets and residential/commercial drives shall be maintained at all times. The Contractor may temporarily close alternate drives if a business or residence has multiple drives on the same roadway, except for drives that operate directionally (i.e. one way drives).

The Contractor shall notify the Engineer a minimum of one week prior to changing traffic patterns on Washington Street and Wesley Drive.

All traffic regulators assigned to traffic control must receive all necessary instruction and training prior to starting operations.

The Contractor shall work between the hours of 7:00 a.m. and 7:00 p.m., Monday through Saturday. No work is allowed outside these time periods. The Contractor must provide 24-hour notice for Saturday work. The Contractor shall coordinate work so that any necessary preliminary or closing operations are also done within these time periods.

No work shall be allowed during the holiday periods as established by the Michigan Department of Transportation (MDOT).

The Contractor shall place maintenance gravel the same workday that the pavement is removed in all locations of the project to maintain access to adjacent properties. Any damage occurring to the subgrade from exposure to the elements will be undercut and replaced in accordance with Subgrade Undercutting, Type II, at the Contractor’s expense.

The Contractor shall place aggregate base the same workday that the earth is excavated in all locations of the project. Any damage occurring to the subgrade from exposure to the elements will be undercut and replaced in accordance with Subgrade Undercutting, Type II, at the Contractor’s expense.

Rubbish collection is done by private contractors between the hours of 7:00 a.m. and 7:00 p.m. according to the following schedule: All residential customers north of Main Street are serviced on Thursdays. All residential customers south of Main Street are serviced on Tuesdays. Rubbish collected at commercial properties is collected any time/date. The Contractor shall schedule work to allow and provide for rubbish collectors to provide their service to residential and commercial properties. If the rubbish collectors are unable to collect materials due to construction operations, then the Contractor shall coordinate with the rubbish collectors the moving of containers to the collection site and returning same containers to the property owners.

Current mail delivery is both via mailbox and doorstep. The Contractor shall conduct work so that the mail person may drive and walk unimpeded around construction work to make their delivery.

City of Owosso/CW 3 of 5 October 2024

e. Traffic Control Devices. All signs, barricades, warning lights, and other traffic control devices shall be in accordance with the 2011 Edition of the Michigan Manual on Uniform Traffic Control Devices (MMUTCD) and conform to MDOT Special Detail WZD-125-E.

All diamond shaped warning signs shall be 48” x 48”. All temporary signs shall be mounted at a minimum seven-foot bottom height. All temporary signs used for detour, except those at Type III Barricades, shall be installed on driven posts.

Temporary signs that are to remain in place for fourteen (14) days or more shall be installed on driven posts as directed by the Engineer. All other temporary signs (excluding detour signs) may be installed on portable supports.

Ground driven sign supports for temporary signs shall be installed in accordance with MDOT Special Detail WZD-100-A.

Advance work zone signing is revised to include R5-18c (Work Zone Begins) signs.

Install signs at locations shown in the plans or as directed by the Engineer.

For construction signing, layout as shown on MDOT typicals minimum Merging Taper Length “L”, distances between Traffic Control Devices “D”, and length of Longitudinal Buffer Length “B” shall be in accordance with Typical Sign Sequence M0020a.

If required, for a single daytime closure on Washington Street and Wesley Drive, local traffic shall be maintained utilizing traffic regulators (flaggers). Signing and traffic control devices shall be placed in accordance with the Typical Sign Sequence M0140a, or as directed by the Engineer.

During paving operations, traffic regulators (flaggers) shall be utilized, and intermediate traffic regulators (flaggers) shall be established at intersecting roads, streets, and at other traffic generators as directed by the Engineer.

W20-1 “Road Work Ahead” signs shall be placed on all intersecting roads at a minimum distance shown on the plans, or as directed by the Engineer.

Signs placed at Type III barricades shall be placed above and behind the barricade on their own supports.

A quantity of plastic drums with fluorescent sheeting has been established for lane closures and to be used adjacent to work areas.

g. Measurement and Payment. The Maintaining Traffic Pay Items will be paid for at the Contract Unit Price in accordance with MDOT 2012 Standard Specifications for Construction, with the exception by other Special Provisions, which shall be payment in full for all labor, material, and equipment needed to accomplish this work.

Payment for temporary signs will be made based on the maximum square feet of dissimilar sign legends in use at any one time during the project.

Payment for barricades, lighted arrows, and plastic drums will be made based on the maximum number in use at any one time during the project.

Part One - Washington Park

City of Owosso/CW 4 of 5 October 2024

Payment for barricades, lighted arrows, and plastic drums will be made based on the maximum number in use at any one time during the project.

City of Owosso/CW 5 of 5 October 2024

(ft )

SIGN AREA

9_<

9 _ 20<

N/A1 - 3 lb/ft

2 - 3 lb/ft 1 - 4" X 6"

2 - 4" X 6"

2 - 6" X 8"N/A

N/A

SIGNS 4 FEET AND GREATER IN WIDTH REQUIRE 2 POSTS.

36" X 36"

> X

X

X X

1 - 2" 12 or 14 GA

2 - 2" 12 or 14 GA

X

X> 144" WIDE

ROUNDING OF CORNERS IS NOT REQUIRED FOR TYPE I OR II SIGNS.

VERTICAL JOINTS ARE NOT PERMITTED.

HORIZONTIAL JOINTS THROUGH SIGN LEGEND OR SYMBOLS ARE NOT PERMITTED.

A MAXIMUM OF 2 POSTS WITHIN A 7' PATH IS PERMITTED.

<> N/A 3 - 6" X 8"

SIGNS GREATER THAN 8 FEET IN WIDTH REQUIRE 2 OR 3 WOOD

POSTS DEPENDING ON AREA OF SIGN.

36" X 36" _ 96" TO WIDE

POST TYPE

2 WOODSQUARE TUBULAR STEELU-CHANNEL STEEL

20 _ 30

N/A

N/A

POST SIZE REQUIREMENTS TABLE

SIGN MATERIAL SELECTION TABLE

SIGN SIZE TYPE I TYPE II TYPE III

SIGN MATERIAL TYPE

TYPE I ALUMINUM EXTRUSION

30 _ 60

60 _ 84 N/A

96" WIDE TO 144" WIDE

SUPPORTS FOR TEMP SIGNS

GROUND DRIVEN SIGN

WZD-100-AAUG

CON/ECH

1 11 7/20/2016

DEPARTMENT DIRECTOR MICHIGAN DEPARTMENT OF TRANSPORTATION

OF

SHEET

PLAN DATEF.H.W.A. APPROVALCHECKED BY:

DRAWN BY:

Michigan Department of Transportation

APPROVED BY:

APPROVED BY:

Kirk T. Steudle

BY

PREPARED

DIRECTOR, BUREAU OF FIELD SERVICES

DIRECTOR, BUREAU OF HIGHWAY DEVELOPMENT

FIELD SERVICES

OPERATIONS

BUREAU OF FIELD SERVICES SPECIAL DETAIL FOR

Part One - Washington Park

DISTANCE BETWEEN OUTSIDE POSTS.

SPREAD POSTS SO AS TO HAVE A 8' MIN. TO 9' MAX.

FOR ALL 11' AND 12' LONG SIGNS ON 3 WOOD SUPPORTS,

SIGN

L

2 POST SIGN SUPPORT SPACING

1/6L 1/6L2/3L

-1" 1" 1"

SIGN

L

1/6L 1/6L

-1" 1"

3 POST SIGN SUPPORT SPACING

1/3L 1/3L

1"+ -1"+

2 11

7/20/2016 WZD-100-A

NOT TO SCALE

MICHIGAN DEPARTMENT OF TRANSPORTATION

PLAN DATEF.H.W.A. APPROVAL

SHEET

OF

NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE MICHIGAN DEPARTMENT OF TRANSPORTATION.

BUREAU OF FIELD SERVICES SPECIAL DETAIL

Part One - Washington Park

AHEAD

CLOSED

ROAD

ROAD

WORK

AHEAD

DETOUR

AHEAD

AHEAD

CLOSED

RIGHT LANE

M.P.H.

BOTTOM HEIGHT AND OFFSET

6'-12' 6'-12'

6'

RURAL

URBAN

5' MIN.

2'

7…