Washington_County_TSP_Update_(Addendum_#3_Revision).pdf

PDF 247 KB Posted

Attached to
Washington County TSP Update
Solicitation number
2026.056-RFP
Issued by
Washington County, Oregon

About this file

This is a Request for Proposal (RFP) issued by Washington County, Oregon for a comprehensive Transportation System Plan (TSP) update. Washington County seeks a qualified consultant team to develop an updated TSP that complies with Oregon's Transportation Planning Rule, establishes a 2050 planning horizon, and responds to the 2022 Climate-Friendly and Equitable Communities rulemaking. The scope encompasses three distinct phases: Phase 1 addresses countywide policy and technical foundation including project management, community engagement, plans and policy review, system inventory analysis, future conditions assessment, and alternatives analysis; Phase 2 focuses on subregional engagement and solutions development including community engagement specific to subregions, evaluation of strategic capacity improvements under OAR 660-012-0830, and preliminary project prioritization; and Phase 3 integrates prior work into the adopted TSP including countywide project prioritization, development of a financially constrained project list, and Title VI and equitable outcomes reporting. The pre-proposal conference is scheduled for June 10, 2026 at 10:30 a.m. via Microsoft Teams. Questions must be submitted by June 26, 2026 at 5:00 p.m., with proposals due electronically by July 8, 2026 at 2:00 p.m. through the County's Procurement Portal. The contractor selection is anticipated for July 24, 2026. The initial contract term is two years with options to renew for up to five additional years, with a maximum contract term of five years.

Proposals must not exceed 15 pages and will be evaluated in two phases. Phase 1 evaluation criteria include page count compliance (10 points), qualifications and relevant experience with Oregon TSP updates and OAR 660-012-0830 strategic capacity reviews (30 points), community engagement approach with focus on underserved populations and OAR 660-012-0135 equity analyses (25 points), technical approach and understanding of project scope including multimodal system inventories and Metro coordination (25 points), project management and team structure (10 points), and budget management and cost control on comparable projects (10 points). Phase 2 may include interviews for top-ranked proposers, with interview scores weighted at 50 points. All proposals become property of the County, and the County reserves the right to reject any or all proposals, negotiate final terms, and cancel the award if deemed in the County's best interest. Proposers must comply with Oregon tax laws, register with the Oregon Secretary of State if selected, and submit certificates of insurance per Attachment C. The County encourages use of recycled and sustainable products and supports cooperative purchasing agreements with other public agencies.

View the file

Other files

File Type Posted
1.28.2026_PP_SERVICES_CONTRACT_MASTER.pdf PDF
2022-ATTACHMENT-C.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

WASHINGTON COUNTY TSP UPDATE

(NO. 2026.056-RFP)

FOR

Washington County, Oregon

RELEASE DATE: June 3, 2026 DEADLINE FOR QUESTIONS: June 26, 2026

RESPONSE DEADLINE: July 8, 2026, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/washington-county-or

Washington County TSP Update

1. Request for Proposal (RFP) w/Pre-Prop

2. Introduction

3. Overview and Purpose

4. Evaluation Phases

5. Evaluation and Award Process

6. Instructions to Proposers

7. Terms and Conditions

8. Vendor Submissions

Attachments:

A - 1.28.2026_PP_SERVICES_CONTRACT_MASTER

B - 2022-ATTACHMENT-C

Washington County TSP Update

1. 1. Request for Proposal (RFP) w/Pre-Prop

Washington County, Oregon is requesting proposals from qualified firms to provide Washington County TSP Update.

A pre-proposal conference will be held on Wednesday, June 10, 2026 at 10:30 am. Information distributed or responses to questions at the pre-bid meeting will not in any way alter or affect any of the provisions contained in the bidding documents and contract requirements.

Statements made by the agency’s representatives at this meeting do not change the provisions and requirements of the solicitation documents unless confirmed by written addendum issued by the Agency. More information can be found in the Introduction Section of the Procurement Portal posting under Timeline.

Proposals must be received by 2:00 pm Wednesday, July 8, 2026.

The County may reject any proposal not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all proposals upon a finding by the County it is in the public interest to do so.

A copy of the Request for Proposal document is posted on https://secure.procurenow.com/portal/washington-county-or. Proposal documents can be viewed and downloaded from the site. The County’s electronic solicitation portal can also be accessed at www.washcopurch.com/biz. Proposer is responsible for checking the site for any addendums before submitting their proposals.

The Washington County Board of Commissioners reserves the right to reject any and all proposals and to waive any and all informalities in the best interest of the County.

Kiersten Vanderhoof, Senior Procurement Analyst

Posted to: Wednesday, June 3, 2026 OregonBuys https://secure.procurenow.com/portal/washington-county-or

Washington County TSP Update

2. 2. Introduction

The following instructions, terms, and conditions apply to all solicitations to provide either goods or services to Washington County.

1. 2.1. Summary

Washington County is updating its Transportation System Plan (TSP) for regulatory compliance and to establish a planning horizon of 2050. The TSP serves as the transportation element of Washington County's Comprehensive Plan and guides the policies, projects, and programs that help manage, operate, and improve the transportation system.

This update is intended to respond to significant revisions to Oregon's Transportation Planning Rule adopted in 2022 under the Climate-Friendly and Equitable Communities (CFEC) rulemaking.

The project will update goals and objectives, conduct a system inventory and needs assessment, evaluate strategic capacity improvements under OAR 660-012-0830, conduct a major equity analysis to determine benefits and burdens to underserved populations under OAR 660- 012-0135, and build a financially constrained project list aligned with regional climate and VMT reduction targets. The update builds on recent planning work, including the Transportation Safety Action Plan, Active Transportation Plan, Transit Study, and Complete Streets Design Update.

Community engagement is central to this project - not a supplementary task. The County is seeking a consultant team with demonstrated expertise in community-centered transportation planning, multimodal systems analysis, and meaningful engagement with underserved populations. This is a technically complex, multi-year effort with significant regulatory, community, and political dimensions.

2. 2.2. Contact Information

Project Contact:

CJ Doxsee Senior Planner 155 N First Ave Suite 350, MS14 Hillsboro, OR 97124 Email: cj_doxsee@washingtoncountyor.gov Phone: (503) 846-3403 Procurement Contact:

Kiersten Vanderhoof Senior Procurement Analyst 155 North First Ave, Ste 270, MS 28 Hillsboro, OR 97124 mailto:cj_doxsee@washingtoncountyor.gov tel:(503)846-3403

Washington County TSP Update

Email: kiersten_vanderhoof@washingtoncountyor.gov Phone: (503) 846-3585 Department:

LUT

3. 2.3. Timeline

The County reserves the right to modify this schedule at the County's discretion. Proper notification of changes to the due date will be made to all parties that have received the proposal from the County's Procurement Portal.

Date of Legal Advertisement June 3, 2026

Pre-Proposal Meeting (Non-Mandatory) June 10, 2026, 10:30am Microsoft Teams meeting Join:

https://teams.microsoft.com/meet/274915703 910030?p=vCzdZuXx7d0biiMlw7 Meeting ID: 274 915 703 910 030 Passcode: Yu3Ug9KJ

Question Submission Deadline June 26, 2026, 5:00pm

Submittals Due July 8, 2026, 2:00pm

Contractor Selection Date July 24, 2026 mailto:kiersten_vanderhoof@washingtoncountyor.gov tel:(503)846-3585 https://secure.procurenow.com/portal/washington-county-or https://teams.microsoft.com/meet/274915703910030?p=vCzdZuXx7d0biiMlw7 https://teams.microsoft.com/meet/274915703910030?p=vCzdZuXx7d0biiMlw7

Washington County TSP Update

3. 3. Overview and Purpose

1. 3.1. Overview and Purpose

The scope of work directs the consultant to support Washington County in completing a major update to its Transportation System Plan. The update must comply with Oregon's Transportation Planning Rule (TPR) and result in an adopted TSP.

The County will lead the project through a project management team (PMT) composed of key LUT planning, engineering, and public involvement staff. Consultant will manage day-to-day project coordination, lead technical analysis, and support community engagement. Specific responsibilities for each task will be detailed in the full scope of work.

The scope is organized into three phases. Summaries for each Phase is provided below. The full scope of work and budgets for all Phases will be negotiated with the selected consultant.

2. 3.2. Phase 1 - Countywide Policy and Technical Foundation

Task 1. Project Management.

Project management activities include a kickoff meeting, regular PMT meetings with agendas and summaries, monthly progress reports, and coordination with partner agencies and municipalities. A detailed schedule will be developed and approved at kickoff.

Task 2. Community Engagement

Community engagement activities run throughout Phase 1 and drive the overall project schedule. Key elements include:

• Community Engagement Plan. A Community Engagement Plan will be developed detailing goals, strategies, decision-making roles, and methods to involve the community with a specific emphasis on underserved populations consistent with OAR 660-012-0130.

• Community Profile. A Community Profile will identify geographic concentrations of underserved populations, key destinations, existing activity centers, and travel patterns consistent with OAR 660-012-0125.

• Community Engagement Activities. Engagement activities will include stakeholder interviews, public open houses, targeted focus groups, online engagement, interest group briefings, and Planning Commission and Board of Commissioners briefings.

• Community Impact Review. A technical memorandum will assess how current and past land use, transportation, and housing policies have harmed or are likely to harm underserved populations, consistent with OAR 660-120-0135.

• Advisory Committees. The Community Advisory Committee (CAC) and Interagency Coordination Committee (ICC) will be convened and managed at key project milestones.

Washington County TSP Update

CAC meetings facilitation, agenda, materials. and summary reports of committee recommendations are included in the scope.

Task 3. Plans, Policy, and Code Review

Plans, policies, and regulations adopted since the 2014 TSP update will be reviewed for consistency with current TPR requirements. Key elements include:

• Policy Framework Review. A technical memorandum will summarize relevant plans, policies, and regulations at the state, regional, and local levels, and identify areas where updates are needed.

• Goals, Objectives, and Performance Measures. Updated goals, objectives, strategies, and evaluation criteria will be developed. A performance and system prioritization framework, including minimum facility standards for pedestrian, bicycle, transit, and roadway modes, will be developed.

• Land Use and Code Review. The Community Development Code and Community Plans will be audited for alignment with CFEC requirements under OAR 660-012-0330.

• Development Review Procedures Update. Transportation Development Review procedures (R&O 86-95) will be updated to incorporate new system performance measures.

Task 4. System Inventory and Existing Conditions Analysis

Comprehensive system inventories will be developed consistent with OAR 660-012-0505, -0605, -0705, and -0805, building upon existing data. Inventories will cover land development and natural constraints, pedestrian, bicycle, public transportation, roadway, freight, transportation options, and air systems. Existing conditions will be analyzed to identify gaps and deficiencies across all modes, applying performance measures and standards established in Task 3. A countywide funding analysis will be conducted covering revenue history, expenditures, and forecasted funding availability.

Task 5. Future Conditions and Needs Assessment

Future transportation system conditions will be assessed based on population and employment forecasts and future travel demand modeling coordinated with Metro. The analysis will compare future and existing VMT per capita and identify projected deficiencies and needs across all modes, incorporating safety analysis from the Transportation Safety Action Plan. Performance measure options and alternatives will be developed for community and committee review before system performance measures are finalized.

Task 6. Alternatives Analysis

Transportation solutions will be identified and evaluated to address deficiencies and needs. The analysis will apply the evaluation framework developed in Task 3. The solutions analysis technical memorandum will include a description of needs to be addressed, proposed solutions, evaluations process, potential impacts, cost estimates, project location maps, and table comparing solutions against evaluation criteria.

Washington County TSP Update

3. 3.3. Phase 2 - Subregional Engagement and Solutions Development

Phase 2 applies the countywide foundation to subregional contexts through localized engagement, multimodal solution analysis, strategic capacity improvement evaluation, and preliminary project prioritization.

Task 7. Subregional Community Engagement

Subregion-specific engagement strategies will be implemented to address localized transportation needs and priorities, with emphasis on underserved communities. Engagement will include targeted surveys, workshops, focus groups, and online tools. Subregions group communities with shared transportation networks, land use patterns, and planning contexts.

This structure allows the project to address localized priorities while maintaining countywide consistency. Engagement findings will be documented and used to inform solutions development and preliminary project prioritization.

Task 8. Solutions Development

• Existing TSP motor vehicle capacity projects subject to re-examination under OAR 660- 012-0830 will be identified and a facility impact assessment will be prepared describing the purpose and need for each proposed facility, affected jurisdictions and populations, and relevant transportation system gaps and deficiencies. A community engagement strategy will be developed for each strategic capacity project consistent with OAR 660- 012-0830(4), including an engagement-focused equity analysis as provided in OAR 660- 012-0135(4). The Board of Commissioners will review and authorize which projects proceed to full strategic capacity evaluation.

• Strategic Capacity Improvement Evaluations. For each project authorized by the Board of Commissioners in Phase 1, a full strategic capacity evaluation will be conducted consistent with OAR 660-012-0830. A community engagement strategy will be developed for each project, including an engagement-focused equity analysis. Each engagement section will identify opportunities for public participation, a schedule of engagement activities, and reporting to affected jurisdictions.

• Subregional Project Prioritization. Preliminary subregional prioritized lists of multimodal projects will be established. Ranking will be informed by system inventories, public engagement, and regulatory criteria. These lists will serve as inputs to countywide project prioritization in Phase 3.

4. 3.4. Phase 3 - Countywide Synthesis and Adoption

Phase 3 integrates prior phase work into the adopted TSP, including countywide project prioritization, a financially constrained project list, a strategic capacity authorization report, a Title VI and equitable outcomes report, and the draft TSP document for Planning Commission and Board of Commissioners adoption.

Task 9. Project Prioritization

Washington County TSP Update

• Strategic Capacity Authorization Reports. The evaluation of each strategic capacity project will culminate in an authorization report recommending the alternative or alternatives selected to advance in the TSP, consistent with OAR 660-012-0830(8) and (9). Authorization reports will be presented to the Planning Commission and Board of Commissioners.

• Project Funding Tiers and Financially Constrained Project List. Projects will be categorized into funding tiers based on prioritization factors and evaluation results. The financially constrained project list will be developed from the top-scoring projects, with planning-level cost estimates not to exceed 125% of projected available funding. The list must demonstrate reductions in per capita VMT consistent with OAR 660-012-0160, show that burdens on underserved populations are no greater than and benefits are at least equal to those for the general county population, and demonstrate progress toward performance targets in the 2023 Regional Transportation Plan Appendix J. Projects not included in the financially constrained list will have identified pathways for future inclusion, including thresholds for amendments and substitution of similar projects.

Task 10. Draft TSP Adoption and Implementation

• Title VI and Equitable Outcomes Report. A Title VI report will be prepared documenting engagement processes and outcomes across all project phases for all income, race, gender, and age groups. The report will include summaries of all public engagement activities; analysis of qualitative and quantitative data, including lived experience, on how proposed changes affect underserved populations; a review of transportation performance measures for progress toward key community outcomes; a summary of how preferred solutions advance key community outcomes; and a summary of strategies implemented that provide benefit and/or reduce negative impacts to underserved communities. .

• Draft Transportation System Plan. The draft TSP will compile all technical memoranda, prioritized project lists, funding tiers, development code amendments, and engagement records into a single document for Planning Commission and Board of Commissioners adoption. Supporting materials not formally adopted will be included as appendices. The adoption process will include preparation of an adoption ordinance with staff report, findings, and presentation materials. Project submittals to Metro's 2028 Regional Transportation Plan update will be coordinated concurrent with the adoption process.

Washington County TSP Update

4. 4. Evaluation Phases

Proposal not to exceed fiftteen (15) pages.

1. Phase 1

No. Evaluation Criteria Scoring Method Weight (Points)

1. Page Count Proposal was within the page count and conformed to all instruction in regards to submittal.

Pass / Fail 10 (9.1% of Total)

2. Qualifications and Relevant Experience Demonstrated experience completing major transportation system plan updates for Oregon jurisdictions. Experience with OAR 660-012- 0830 strategic capacity reviews and multimodal system inventories under the updated TPR is highly relevant. Qualification of the project management and key technical staff will be evaluated.

Points Based 30 (27.3% of Total)

3. Community Engagement Approach Demonstrated experience designing and leading community engagement processes that meaningful center underserved populations, including communities with limited English proficiency, low-income households, and communities of color. Experience completing major equity analyses under OAR 660-012-0135 or comparable equity planning work is highly relevant.

Points Based 25 (22.7% of Total)

4. Technical Approach and Understanding of Scope Demonstrated understanding of the project scope, key technical challenges, and regulatory requirements. The proposal should reflect a clear and feasible approach to tasks, including multimodal system inventories, travel demand coordination with Metro, and the strategic capacity review process.

Points Based 25 (22.7% of Total)

5. Project Management and Team Structure Clarity of the proposed team structure, staff roles and responsibilities, and approach to managing a multi-year, multi-stakeholder project. Demonstrated ability to coordinate effectively with public agency staff and manage complex project schedules.

Points Based 10 (9.1% of Total)

Washington County TSP Update

6. Budget Management and Cost Control Demonstrated ability to manage project budgets and control costs on comparable transportation planning projects. Relevant experience includes delivering work within negotiated budgets, minimizing the need for contract amendments, and applying effective cost control methods across multi-phase or multi-year projects.

Points Based 10 (9.1% of Total)

2. Phase 2

No. Evaluation Criteria Scoring Method Weight (Points)

1. Interviews (If Necessary) The County may invite top-ranked proposers to participate in an interview. If interviews are conducted, proposal scores from Phase 1 will determine which proposers are invited. A separate scoring rubric will be provided to proposers in advance of the interview.

Interview scores will be weighted 50 points of the total evaluation score.

0-5 Points 50 (100% of Total)

Washington County TSP Update

5. 5. Evaluation and Award Process

1. 5.1. Clarifications

The County reserves the right to obtain clarification at any point in regards to a proposal or to obtain additional information necessary to properly evaluate a proposal. Failure of a Proposer to respond to such a request for additional information or clarification could result in rejection of their proposal.

After evaluation, demonstrations, and or interviews have occurred, a single firm will be identified that is best able to provide the services to the County. The County reserves the sole right to determine the best Proposal. A notice of intent to award will be published and a recommendation will be presented to the County Administrator or Board of Commissioners for their consideration.

2. 5.2. Interviews

Top scoring proposers may be selected for interviews. If oral interviews are determined to be necessary, the scores from the written proposals will be considered preliminary. Final scores will be determined based on the points assigned to the interview process.

3. 5.3. References

The County reserves the right to check references only on the highest scoring proposers or depending on the scoring differential just the highest proposer.

Questionnaires may be sent to customer references by Washington County or contacted by telephone. Secondary references may also be contacted.

4. 5.4. Period Proposal Validity

All proposals shall remain firm for a period of 180 calendar-days after date specified for receipt of proposals.

5. 5.5. Acceptance, Rejection and Cancellation of Award

Washington County reserves the right to accept or reject any or all proposals received as a result of this RFP and to negotiate with any qualified proposer(s) for all or part of the requested goods and services. All proposals become the property of the County.

This RFP does not commit the County to award a contract or to pay any costs incurred by respondents. Washington County reserves the right to cancel award of this contract at any time before execution of the contract if cancellation is deemed to be in the County's best interests. In no event shall the County have any liability for the cancellation of the award. All costs of the

Washington County TSP Update proposal process, interviews, contract negotiations, and related expenses are the responsibility of the proposer.

Acceptance of a proposal is subject to budget approval, appropriation and budgetary constraints.

6. 5.6. Award Recommendation

The notice of intent to award will be posted on the County's Procurement Portal website at least seven (7) days before the award of the contract. See PROTESTS AND JUDICIAL REVIEW OF CONTRACT AWARD below for protest of award.

The decision by the Board or the County Administrator to award the contract shall constitute the final decision of the County to award the contract.

7. 5.7. Inspection of Proposals

Subject to the provisions of the Oregon Public Records Law, all proposals received will be available for public inspection after the notice of intent to award has been published. Proposals will be provided via an electronic link.

Copies of material from proposal files may be obtained from the Washington County Procurement Division upon payment of a charges based upon the current County Fee Schedule.

Prepayment is required for providing materials from the proposal files.

8. 5.8. Protests and Judicial Review of Contract Award

Purpose. The award by the Washington County Board of Commissioners of the contract shall constitute a final decision of the County to award the contract if no written protest of the award is filed. A proposer may protest the award of a contract, or the intent to award of a contract, whichever occurs first, if the conditions set forth in ORS 279B.410(1) are satisfied. A proposer must file a written protest with the County and exhaust all administrative remedies before seeking judicial review of the County's contract award decision.

Delivery. A proposer must deliver a written protest to the Washington County Procurement Manager within seven (7) days after issuance of the notice of intent to award the contract.

Content of Protest. A proposer’s written protest shall specify the grounds for the protest to be considered pursuant to ORS 279B.410(2). Proposer may not protest the content of specifications in an award protest. Proposers may protest only deviations from laws rules, regulations, or procedures including procedures set out in this RFP. Disagreement with the scoring by the Selection Committee is not a basis for protest. Protests must specify the grounds for the appeal including the specific citation of law, rule, regulation, or procedure upon which the protest is based.

County Response.The County shall not consider a proposer’s contract award protest submitted after the timeline established for submitting such protest. The County shall issue a written disposition of the protest in a timely manner as set forth in ORS 279B.410(4). If the County upholds the protest, in whole or in part, the County may in its sole discretion either award the

Washington County TSP Update contract to the successful protestor or cancel the procurement or solicitation. The County shall not consider any protest against award based on the content of specifications.

Judicial Review. Judicial review of the Board’s or its designee’s decision relating to a contract award protest shall be in accordance with ORS 279B.415.

9. 5.9. Negotiation with Awarded Contractor(s)

The County reserves the right to negotiate final contract terms with the awarded contractor to the fullest extent allowed by law and as in the best interest of the County.

10. 5.10. Contract Term

The term of the contract will be Initial contract term will be two years, with the option to renew for up to five years. Changes in the term of the contract are allowed if agreed upon by both parties and not to exceed 5 years.

The maximum term of the contract will be five years.

11. 5.11. Contractor's Responsibility

It is understood that the specifications and other contract documents do not purport to control the method of performing the work, but only the requirements as to the nature of the completed work. The contractor assumes the entire responsibility for the method of performing the work. Suggestions as to the method included in the contract documents shall be deemed advisory only and the feasibility of such methods, or the lack thereof, shall not affect the contractor’s liability, or status as independent contractor, and contractor will remain responsible for the cost of all permits unless otherwise specified.

Washington County TSP Update

6. 6. Instructions to Proposers

1. 6.1. Deadline Disclaimer

It is the responsibility of the responder to upload and submit their electronic response before the deadline date and time approaches as posted on the County's Procurement Portal. Allow for a sufficient amount of time for the bid entry/document upload process in order to ensure timely submission.

Make sure that all documents are uploaded as soon as possible well in advance of the deadline.

The County's Procurement Portal will close promptly at the deadline date and time. All responses must be submitted, not in process, by that time…no exceptions are allowed.

Please note the system will accept Google Docs or Google Pages, but they are not readable by the County. DO NOT upload your response using a Google product.

2. 6.2. Precedence of Proposal Documents

The order of precedence of documents is as follows:

A. Instructions to Proposers

B. Contract Terms & Conditions (from attached sample contract)

C. Terms and Conditions

D. Project Details/Scope of Work

3. 6.3. Communication

Communication regarding this solicitation between a potential or actual Proposer and any Washington County staff, evaluation team member or any individual who has been in attendance during discussions regarding the scoring of proposals is strictly prohibited, all questions must be directed to the Procurement Division staff. These types of communication are prohibited from the time the Request for Proposals (RFP) is advertised until the award of a contract to the proposer selected. Failure to abide by this may be grounds for disqualification.

4. 6.4. Copies of Proposal Documents

Documents obtained from sources (such as directly from other contractors) other than the County's Procurement Portal are not valid proposal documents. It is the proposer's responsibility

Washington County TSP Update to ensure they are following a particular project on the County's Procurement Portal in order to receive notification of all addenda as well as additional relevant information.

5. 6.5. Pre-Proposal Conference

1. Statements made by County’s representative(s) at the pre-proposal conference are not binding upon the County unless confirmed by written addendum.

2. The purpose of the pre-proposal conference is to offer the prospective proposers an opportunity to ask questions and clarify RFP contract and instructions to ensure proposals submitted meet the criteria.

3. To guarantee the most appropriate use of time, proposers are expected to review the RFP before the pre-proposal conference. Questions regarding the project/proposal information will be discussed at the pre-proposal conference.

6. 6.6. Questions and Answers

Enter all questions regarding the meaning or intent of the solicitation into the questions area of the solicitation in the County's Procurement Portal.

7. 6.7. Specification Protest Process

Delivery:A proposer must deliver a protest of specifications to the County in writing no later than seven (7) calendar days prior to the proposal due date as follows:

Specification Protest Proposal#: 2026.056-RFP Washington County Procurement Division ATTN: Procurement Manager 155 North First Avenue, Suite 270 MS 28 Hillsboro, Oregon 97124-3072

Content:A proposer’s written protest must include:

A detailed statement of the legal and factual grounds for the protest; description of the resulting prejudice to the proposer; and a statement of the form of relief requested or any proposed changes to the specifications.

County Response: The County may reject without consideration a proposer’s protest received after the deadline established for submitting protest. The County shall provide notice to the applicable proposer if it entirely rejects a protest. If the County agrees with the proposer’s protest, in whole or in part, the County shall either issue an addendum reflecting its determination or cancel the solicitation.

Washington County TSP Update

Extension of Closing: If the County receives a written protest from a proposer in accordance with this rule, the County may extend closing if the County determines an extension is necessary to consider the protest and to issue addenda, if any, to the solicitation document.

Judicial review of the County’s decision relating to a specification protest shall be in accordance with ORS 279B.405.

8. 6.8. Phone Proposals, Late Proposals or Modifications

Late proposals or modifications of proposals will be handled in the following manner:

It is the sole responsibility of the Proposer to ensure the proposals are uploaded to the system by the specified time. The system will not allow Proposers to upload after this time and the proposal will not be considered.

Any modification of a proposal is subject to the same conditions set forth above.

Proposals will not be accepted via Phone, E-mail or FAX.

9. 6.9. Interpretations and Addenda

Enter all questions regarding the meaning or intent of the solicitation into the questions area of the solicitation

A. Interpretations or clarifications considered necessary in response to such questions will be posted as addenda or in Questions and Answers in the County's Procurement Portal.

Bidders will be solely responsible to check for all addenda or questions and answers, if any, from the Procurement Portal prior to submitting their response.

B. Questions received after Friday, June 26, 2026 will not be answered unless the County determines, in its sole discretion, it is in the public’s best interest to do so.

C. Formal addenda and answers to questions posted in the Question and Answer section are made part of this solicitation and will be binding. Oral and other interpretations or clarifications will be without legal effect.

D. Written addenda may also be issued to modify the bid documents at the discretion of the County.

E. Receipt of addenda must be acknowledged on the County's Procurement Portal.

F. All questions pertaining to this bid shall be addressed only through the County's Procurement Portal. Do not contact any other Washington County staff, employee or official regarding this bid. Communication between bidder and any County staff is prohibited from the time the bid is advertised until the award of a contract to the bidder selected by the County.

G. After opening proposals, the County may issue or electronically post an addendum to the request for proposals that modifies the criteria, rating process and procedure for any tier of competition before the start of the tier to which the addendum applies.

Washington County TSP Update

H. The County shall send an addendum that is issued by a method other than electronic posting to all proposers who are eligible to compete under the addendum. The County shall issue or post the addendum at least five days before the start of the subject tier of competition or as the County otherwise determines is adequate to allow eligible proposers to prepare for the competition in accordance with County rules.

10. 6.10. Guidelines for Proposal Submittal and Receipt

To be considered for this contract, each proposer must enter its complete proposal per the Vendor Submission Section to the County's Procurement Portal.

Proposals must be uploaded by 2:00 pm Wednesday, July 8, 2026. The system will not allow late uploads. Allow plenty of time to ensure your upload is successful. Slow or malfunctioning internet shall not be an acceptable reason for late submissions. After uploading documents responders are encouraged to open and review uploaded documents to verify that they can be opened and are the correct documents before submitting. If the County cannot open any of the documents submitted the entire proposal will be disqualified.

Proposers are required to submit any proposal forms furnished in this RFP document. Please retain a copy for your records.

Each submittal shall contain the following:

• Any proposal response forms listed in the Attachment Section.

• Responses, Certifications, or Agreements required in this solicitation.

• Proposers shall provide a copy of any contracts, licensing agreements, or other documents that the County will be asked to sign if they are the chosen contractor. These do not count against the page limit.

• Failure to submit any of the required items may be grounds for rejection of the proposal.

https://secure.procurenow.com/portal/washington-county-or/projects/260395/document?section=2499608

Washington County TSP Update

7. 7. Terms and Conditions

1. 7.1. Laws and Regulations

A. The proposer is assumed to be familiar with all Federal, State, County or City laws or regulations, which in any manner affect those engaged or employed in the work or the materials or equipment used or which in any way affect the conduct of the work, and no pleas of misunderstanding will be considered on account of ignorance thereof. If the proposer shall discover any provision in these specifications or project information, plans or contract documents which is contrary to or inconsistent with any law or regulations, they shall report it to County in writing.

B. All work performed by the contractor shall be in compliance with all Federal, State, County and local laws, regulations and ordinances. Unless otherwise specified, the contractor shall be responsible for obtaining applicable permits and licenses.

2. 7.2. Recycled Materials and Sustainable Products and Processes

A. Contractor is encouraged to use recycled and recyclable products to the maximum extent economically feasible during the performance of the Contract.

B. Washington County prefers materials or supplies manufactured from recycled materials if the recycled product is available, and it meets the requirements set forth in the Specifications.

C. Washington County supports and encourages the use of sustainable products by the Contractor. To contribute to a clean environment for present and future generations, Contractor shall utilize sustainable products to the maximum extent feasible during the performance of this Contract.

3. 7.3. Proprietary Information, Ownership and Use of Documents

A. All documents submitted to the County shall become public records, subject to disclosure, unless otherwise protected pursuant to the Oregon Public Records Law.

B. The County is subject to the Oregon Public Records Law (ORS 192.410 to 192.505), which requires the County to disclose all records generated or received in the transaction of County business, except as expressly exempted in ORS 192.501, 192.502, or other applicable law. Examples of exemptions that could be relevant include trade secrets (ORS

192.501 (2)) and computer programs (ORS 192.501(15)). The County will not disclose records submitted by a Proposer that are exempt from disclosure under the Public Records Law, subject to the following procedures and limitations:

Washington County TSP Update

C. The entire RFP cannot be marked confidential, nor, shall any pricing be marked confidential.

D. All pages containing the records exempt from disclosure shall be marked “confidential” and segregated in the following manner:

1. It shall be clearly marked in bold and on each page of the confidential document.

2. It shall be kept separate from the other RFP documents in a separate file upload.

3. Where this specification conflicts with other formatting and response instruction specifications, this specification shall prevail.

E. Where such conflict occurs, the Proposer is instructed to respond with the following:

“Refer to confidential information enclosed.” This statement shall be inserted in the place where the requested information was to have been placed.

F. Proposers who desire that additional information be treated as confidential must mark those pages as “confidential”, cite a specific statutory basis for the exemption, and the reasons why the public interest would be served by the confidentiality. Should a proposal be submitted as described in this section no portion of it can be held as confidential unless that portion is segregated as described above.

G. Notwithstanding the above procedures, the County reserves the right to disclose information that the County determines, in its sole discretion, is not exempt from disclosure or that the County is directed to disclose by the County’s Attorney, the District Attorney or a court of competent jurisdiction. Prior to disclosing such information, the County will notify the Proposer. If the Proposer disagrees with the County’s decision, the County may, but is not required to enter into an agreement not to disclose the information so long as the Proposer bears the entire cost, including reasonable attorney’s fees, of any legal action, including any appeals, necessary to defend or support a no-disclosure decision.

4. 7.4. Rights of the County

The County expressly reserves the following rights:

A. To waive irregularities in the proposals submitted.

B. To cancel the procurement or reject any proposals or portions thereof in accordance with ORS 279B.100.

C. To base awards with due regard to quality of services, experience, compliance with specifications, proposal response, and other such factors as necessary in the circumstances.

D. To make the award to any proposer whose proposal, in the opinion of management and the Board, is in the best interest of the County.

E. To negotiate contract terms and conditions.

Washington County TSP Update

5. 7.5. Subcontractor Payment Reporting

A. Contractor shall report payment information and utilization data for subcontractors that perform any services, using a County-designated online reporting system. As of the effective date of this contract, such system is accessible at:

https://washcopurch.mwdbe.com/?TN=washcopurch. Contractor must log in to an account in the system in order to submit reporting information. Reporting information must be submitted at least once monthly, concurrent with Contractor’s invoice submission, or on such other frequency as the Project Manager may require. Contractor must designate a representative to administer the reporting function and be a point of contact for the County.

B. Progress payment requests, except the first request, shall include the Contractor’s verification that Subcontractor payment data and workforce data (if applicable) for all tiers have been entered into the County’s online reporting systems

6. 7.6. Qualifications, References and Responsible Proposer

A. Qualifications of proposers will be evaluated when determining the award. Proposers may be required to produce acceptable personal, business, and credit references and completed examples of previous work of a similar nature.

B. The County reserves the right to investigate references and to consider the past performance of any proposer with respect to its performance of similar projects, compliance with specifications and contractual obligations, its completion or delivery of services on schedule, and its lawful payment of employees and workers whether or not specifically listed by the proposer.

C. Before awarding a contract, the County shall determine that the apparent successful proposer has met the requirements of responsibility outlined in ORS 279B.110.

7. 7.7. Social and Lawful Fairness in Access and Treatment

A. In order to promote economic growth, the County seeks to maximize the participation of consultants, partners, contractors, and suppliers with varied experience and backgrounds throughout the duration of the project.

B. Working in a way that promotes the empowerment of individuals, organizations, and communities most affected by unlawful fairness in access and treatment is a practical method of achieving County goals. The County wants to integrate empowering and lawfully fair strategies that allow for authentic voice to be heard and ultimately represented in decisions from this delivery of service.

C. The County values the community as a whole and calls out those providing and receiving services should have a positive economic impact from the delivery of services that is long term and positively changes our hierarchical systems to incorporate those who are most affected by inequities.

https://washcopurch.mwdbe.com/?TN=washcopurch

Washington County TSP Update

D. It is the County’s desire to create full and equal access to opportunities for all people that enable them to attain their full potential. We pay particular attention to the development of income and wealth for communities most affected by unlawful fairness in access and treatment.

8. 7.8. Cooperative Purchasing

A. Pursuant to the intent of Oregon Revised Statutes, Chapter 279A.200, any publicly funded city, county, district, agency or similar entity shall have the authority to purchase specified goods/services directly from contractor under the terms and conditions of this contract.

B. The proposer agrees to extend identical pricing and services to other public agencies for the same terms.

C. Each contracting agency will execute a separate contract with the successful proposer for its requirements. Any ordering and billing shall take place directly between the proposer and such entity.

D. Any proposer, by written notification at the time of the proposal due date and time, may decline to extend the prices, services and terms of this proposal to any, and/or all other public agencies. There is no penalty for declining cooperative procurements.

9. 7.9. Form of Contract

A. A copy of the County's contract that the County expects the successful firm or individual to execute is attached. The contract will incorporate the terms and conditions from this RFP document, attachments provided, and the successful proposer's response documents.

B. Firms taking exception to any of the contract terms should indicate the same by uploading in the Vendor Submission or their exceptions will be deemed waived.

10. 7.10. Insurance Requirements

The insurance requirements for this contract are outlined in the attached Attachment C.

11. 7.11. Oregon Corporate Activity Tax (“CAT”)

A. In 2019 Oregon adopted a Corporate Activity Tax (“CAT”) applicable to all types of business entities. The legislation accomplishes the following:

1. Establishes a "Fund for Student Success" that is separate and distinct from the state's general fund

2. Adopts a new Corporate Activity Tax (CAT) imposed on all types of business entities

B. The CAT is in addition to the state's current corporate income tax. The CAT is imposed on businesses for the privilege of doing business in this state. It is measured on a business's

Washington County TSP Update commercial activity, which is the total amount a business realizes from transactions and activity in Oregon. The CAT is applied to taxable Oregon commercial activity in excess of $1 million. Any costs relating to Oregon’s Corporate Activity Tax will not be reimbursable under Cost of the Work.

Washington County TSP Update

8. 8. Vendor Submissions

Please note the system will accept Google Docs or Google Pages, but they are not readable by the County. DO NOT upload your response using a Google product.

1. 1. Electronic Submittal* By electronically submitting this response the Supplier attests and certifies that:

1. Person completing this response represents that I am either authorized to bind the Supplier, or that I am submitting the Response on behalf of and at the direction of the Supplier's representative authorized to contractually bind the Supplier.

2. I represent that the Supplier or its applicable representative(s) has reviewed the information contained in this Solicitation Package and that the information submitted is accurate.

3. Respondent agrees that the action of electronically submitting its response constitutes:

a. an electronic signature on the responses, generally,

b. an agreement to conduct business electronically,

c. an electronic signature on any form or section specifically calling for a signature, and

d. an affirmative agreement to any statement contained in the solicitation that requires a definite confirmation or acknowledgement.

☐ Yes

☐ No *Response required

2. 2. Solicitation Requirements* Proposer read through and confirm that you met all of the Solicitation requirements?

☐ Yes

☐ No *Response required

3. 3. Cooperative Purchasing* Will the proposer extend pricing and terms to other public agencies?(there is no penalty for not agreeing to extend pricing)

☐ Yes

☐ No *Response required

Washington County TSP Update

4. 4. Past Employment* Have you or a member of your staff been an employee of Washington County in the last six months?

☐ Yes

☐ No *Response required

5. 5. Oregon Secretary of State Business Registry* Enter your registry number without dashes or spaces. If you are not currently registered enter N/A. If you are the successful bidder you will be required to register with the Secretary of State in order to contract with the County, per OAR 125-246-0330.

*Response required

6. 6. Tax* The proposer hereby certifies that they have complied with the tax laws of Oregon and all political subdivision of the State of Oregon, including ORS 305.620 and ORS chapters 316, 317 and 318. Washington County may terminate the contract if contractor fails to comply with any tax laws during the term of the contract.

☐ Yes

☐ No *Response required

7. 7. Contact Name, Email, and Phone Number* Provide the name, email, and phone number for the contact in case of questions, or interview or demonstration arrangements.

*Response required

8. 8. Proposal Content The proposal shall be prepared succinctly, providing a straight forward, concise description of the proposer’s ability to meet the requirements of the RFP. There should be no unnecessary attachments or exhibits.

Proposal should contain no more than fiftteen (15) 8.5" x 11", pages of written material (excluding biographies and brochures which may be included in an appendix) describing the ability of the proposer to perform the work described. The minimum font shall be twelve (12) point single spaced and the minimum margins shall be one (1) inch on all sides.

1. 8.1. Proposal Content* Upload your proposal here. After uploading documents responders are encouraged to open and review uploaded documents to verify that they can be opened and are the correct documents before submitting. If the County cannot open any of the documents submitted the entire proposal will be disqualified.

Washington County TSP Update

*Response required

2. 8.2. Insurance Requirements County insurance requirement can be found under the section titled Attachments. The County may consider reducing insurance for these services. Please upload your Certificate of Insurance (Accord form) to indicate the level of insurance you currently possess.

3. 8.3. Confidential Information Upload all pages or documents containing information exempt from disclosure per the Proprietary Information, Ownership and Use of Documents article of the Terms and Conditions Section.

4. 8.4. Changes Requested to County Contract Standard Terms and Conditions Upload any alterations requested to Washington County's contract standard terms and conditions per the Form of Contract article of the Terms and Conditions Section.

5. 8.5. Solicitation Awareness* How did you hear about this opportunity?

Select all that apply

☐ Oregon Buys

☐ Link was emailed directly to me

☐ Washington County Website

☐ DJC Oregon, Portland Tribune or other printed media

☐ Twitter, Facebook or other social media

☐ Project Center, Plan room, etc?

*Response required

1. 1. Request for Proposal (RFP) w/Pre-Prop
2. 2. Introduction
1. 2.1. Summary
2. 2.2. Contact Information
3. 2.3. Timeline
3. 3. Overview and Purpose
1. 3.1. Overview and Purpose
2. 3.2. Phase 1 - Countywide Policy and Technical Foundation
3. 3.3. Phase 2 - Subregional Engagement and Solutions Development
4. 3.4. Phase 3 - Countywide Synthesis and Adoption
4. 4. Evaluation Phases
1. Phase 1
2. Phase 2
5. 5. Evaluation and Award Process
1. 5.1. Clarifications
2. 5.2. Interviews
3. 5.3. References
4. 5.4. Period Proposal Validity
5. 5.5. Acceptance, Rejection and Cancellation of Award
6. 5.6. Award Recommendation
7. 5.7. Inspection of Proposals
8. 5.8. Protests and Judicial Review of Contract Award
9. 5.9. Negotiation with Awarded Contractor(s)
10. 5.10. Contract Term
11. 5.11. Contractor's Responsibility
6. 6. Instructions to Proposers
1. 6.1. Deadline Disclaimer
2. 6.2. Precedence of Proposal Documents
3. 6.3. Communication
4. 6.4. Copies of Proposal Documents
5. 6.5. Pre-Proposal Conference
6. 6.6. Questions and Answers
7. 6.7. Specification Protest Process
8. 6.8. Phone Proposals, Late Proposals or Modifications
9. 6.9. Interpretations and Addenda
10. 6.10. Guidelines for Proposal Submittal and Receipt
7. 7. Terms and Conditions
1. 7.1. Laws and Regulations
2. 7.2. Recycled Materials and Sustainable Products and Processes
3. 7.3. Proprietary Information, Ownership and Use of Documents
4. 7.4. Rights of the County
5. 7.5. Subcontractor Payment Reporting
6. 7.6. Qualifications, References and Responsible Proposer
7. 7.7. Social and Lawful Fairness in Access and Treatment

This is the start of the file's text. The full file is on GovTribe.