Project Data Form - WASH_2026PLAN Rev 18AUG2025.docx

DOCX document 25 KB Posted

Attached to
AE IDIQ PLANNING SERVICES - NAVFAC WASH
Solicitation number
WASH_2026PLAN
Issued by

About this file

This document is a Sources Sought Project Data Form for an Indefinite Delivery Indefinite Quantity (IDIQ) Multidiscipline Planning Services contract for Naval Facilities Engineering Command (NAVFAC) Washington. The solicitation seeks architecture and engineering (AE) services for various locations within NAVFAC Washington's area of responsibility, and requires potential contractors to submit detailed project experience information using this standardized form.

The form is designed for contractors to document up to three relevant projects, with specific sections capturing contract details such as contract type (Design-Build or Design-Bid-Build), project completion percentage, self-performed work percentage, and comprehensive project descriptions. The Sources Sought notice is explicitly not a formal Request for Proposal, but rather a market research tool to assess potential contractor capabilities for the WASH_2026PLAN solicitation. The amendment dated 18 August 2025 updated the form to clarify that respondents should submit a maximum of three projects, with each project description limited to two pages.

View the file

Other files

File Type Posted
Sources Sought Notice WASH_2026PLAN 12AUG2025.pdf PDF
Contractor Information Form - WASH_2026PLAN.docx DOCX document
Project Data Form - WASH_2026PLAN.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT –PROJECT DATA FORM

WASH_2026PLAN

Architecture Engineering (AE), Indefinite Delivery Indefinite Quantity (IDIQ) Multidiscipline Planning Services Various Locations Within NAVFAC Washington’s Area of Responsibility

Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit a maximum of three (3) projects. Please limit response to two pages per project.

1.
Contractor Name:
2.
Project No. (check one):
|_| - 1|_| - 2|_| - 3
3.
Contract Number:
Delivery/Task Order No.:
Project Number:
Title:
Location:
4.
Award Date (mm/dd/yy):
5.
Final Contract Price:
$
Completion Date (mm/dd/yy):
(includes all options and mods)
Project is % complete (as of submission due date)
This is the |_| total project |_| subcontract price.
6.
Type of work:
|_| New Construction|_| Repair|_| Renovation
7.
Customer/Owner Name:
Point of Contact Name/Title: (person with project knowledge)
POC Phone Number:
POC Email Address:
8.
Were you the Prime contractor for this project?
|_| Yes|_| No
Were you a subcontractor for this project?
|_| Yes|_| No
If subcontractor, who was the Prime contractor?
9.
Type of Contract (check all that apply):

|_| Design-Build |_| Design-Bid-Build (fully designed project)

|_| Other (explain):
If Design-Build, provide the following information:
|_| Design accomplished in-house
Lead design firm name:
Years working together:
Address:

10. Provide a detailed description of the project:

11. Percentage of work you self-performed on this project: %.

Provide a detailed description of the work your firm self-performed on this project:

Form may be expanded. Please DO NOT change content of the form.

File details come from the government source that posted it. Updated .