Warrington_Building_Plans.pdf

PDF 483 KB Posted

Attached to
Lead Abatement for Various Public Works Facilites
Solicitation number
2023-IFB-195
Issued by
Allegheny County, Philadelphia City, Pennsylvania

About this file

The document is a comprehensive set of architectural floor plans and site plans for the Warrington Recreation Center, located at 329 Warrington Avenue in Pittsburgh, Pennsylvania, prepared by Massaro Design Build, LLP. The plans include detailed drawings of the basement, first level, second level, and site layout, with precise measurements and room-by-room specifications. The building appears to be a multi-purpose recreational facility with extensive amenities, including a gymnasium, pool areas, dressing rooms, club rooms, offices, mechanical spaces, and auxiliary rooms.

The architectural drawings reveal a three-story building with complex mechanical and electrical infrastructure, including multiple electrical panels, water heaters, storage tanks, and exhaust systems. The plans indicate some aging infrastructure, such as old and unused heating units, and note that certain electrical panels should be replaced immediately. The site plan shows the building's location on Warrington Avenue, surrounded by residential structures, with clear indications of street layouts, property boundaries, and adjacent buildings. The detailed floor plans provide insights into the building's current condition and potential renovation needs, which could be relevant to the lead abatement contract opportunity referenced in the government file description.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

PR

O

JE

C

T:

D el ta D r.

P itt sb ur gh

, P A

-2

P ho ne

(4

) 9

-2

Fa x:

2)

-2 w w w

.m as sa ro co rp or at io n.

co m

M A

SS

A

R O

D

ES

IG

N

B

UI

LD

, L

LP

C

O N

SU

LT

AN

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

8/

/2

4:

:5

P

M

C1.01

SITE PLAN

MLK

NMH 08/10/16

08/10/16

W ar rin gt on R ec re at io n C en te r - B

W ar rin gt on A ve nu e P itt sb ur gh

, P A

1" = 60'-0"1 Site Plan

E WARRINGTON AVE

ESTELLA AVE

KINGSBORO ST

UP

UP

UP

Room

Stair Hall

Girls Dressing Room

Basket Room

Showers

Girls

Stair Hall

Corridor to Playground

Chlorinator Room

Apparatus Room

Boiler Room 011 Pantry

Kitchen

Boys Dressing Room

Basket Room

Boys Entrance

Club Room

Tickets Room

Men's

Women's

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

PR

O

JE

C

T:

D el ta D r.

P itt sb ur gh

, P A

-2

P ho ne

(4

) 9

-2

Fa x:

2)

-2 w w w

.m as sa ro co rp or at io n.

co m

M A

SS

A

R O

D

ES

IG

N

B

UI

LD

, L

LP

C

O N

SU

LT

AN

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

8/

/2

4:

:3

P

M

A1.00

BASEMENT

FLOOR PLAN

MLK

NMH 08/10/16

08/10/16

W ar rin gt on R ec re at io n C en te r - B

W ar rin gt on A ve nu e P itt sb ur gh

, P A

3/32" = 1'-0"1 Basement Floor Plan

DN

DN

UP

UP

Lobby

Storage

Corridor

Club Room

Unknown

Unknown

Guard

Girls Pool Entrance

Room

Girls

Boys

Lobby

Auditorium and Gymnasium

Office

Boys Pool Entrance

102Janitor

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h P

A

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro c o rp o ra ti o n .c o m

M A

SS

A

R O

D E

SI

G

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/1

/2

:2

:3

A M

A1.10

LEVEL 1 FLOOR

PLAN

MLK

NMH 08/10/16

08/10/16

W a rr in g to n R e c re a ti o n C e n te r

B

W a rr in g to n A v e n u e

P it ts b u rg h P

A

3/32" = 1'-0"

Level 1 Floor Plan

Corridor

Club Room

Corridor

Club Room

Club Room

Above Stage

Boys Dressing Room

Toilet

Kitchen

Living

Toilet

Bed Room

Storage

Storage

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h P

A

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro c o rp o ra ti o n .c o m

M A

SS

A

R O

D E

SI

G

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/1

/2

:2

:3

A M

A1.20

LEVEL 2 FLOOR

PLAN

MLK

NMH 08/10/16

08/10/16

W a rr in g to n R e c re a ti o n C e n te r

B

W a rr in g to n A v e n u e

P it ts b u rg h P

A

3/32" = 1'-0"

Level 2 Floor Plan

A B C D E F

CHLORINE ROOM

EXHAUST FAN

BOILER

HOT WATER CIRCULATION PUMP 1

HOT WATER CIRCULATION PUMP 2

PROPELLER EXHAUST FAN 1

PROPELLER EXHAUST FAN 2

DOMESTIC WATER

HEATER

DOMESTIC WATER

STORAGE TANK

PANEL - 225A M.L.O.,

120/208V, 3Ø, 4W, 42 POLE

PANEL - (SIEMENS) 400A M.C.B.,

120/208V, 3Ø, 4W, 30 POLE

PANEL - (SIEMENS) 100A, 120/208V,

3Ø, 3W, 30 POLE, MISSING COVER

Activity

Multi-purpose

Multi-purpose

Kitchen

Toilet

Toilet

Lobby

Stair

Toilet

Stair

Machine rm Machine rm

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h

P A

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro co rp o ra ti o n .c o m

M A

S S A

R O

D E

S

IG

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/2

/2

:5

:1

A

M

W a rr in g to n A v e P it ts b u rg h P

A

MEP1.00

BASEMENT

FLOOR PLAN

TB

CJL 01/20/17

01/20/17

W a rr in g to n R e c re a ti o n C e n te r B

1/16" = 1'-0"

Basement

A B C D E F

PANEL (SIEMENS) - 225A M.C.B.,

120/208V, 3Ø, 4W, 42 POLE

PENN ELECTRIC PANEL - 100A M.L.O.,

120/240V, 1Ø, 3W, REPLACE IMEDIATELY

PENN ELECTRIC PANEL - 100A M.L.O.,

120/240V, 1Ø, 3W, REPLACE IMEDIATELY

Gym

Girls Restroom

Boys Restroom

Vestibule Vestibule

Guard

Office

Activity

Lobby

Office

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro co rp o ra ti o n .c o m

M A

S S A

R O

D E

S

IG

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/2

/2

:5

:1

A

M

W a rr in g to n A v e P it ts b u rg h P

A

MEP1.10

LEVEL 1 PLAN

TB

CJL 01/20/17

01/20/17

W a rr in g to n R e c re a ti o n C e n te r B

1/16" = 1'-0"

Level 1

A B C D E F

OLD AND UNUSED HEATING UNIT 1

OLD AND UNUSED HEATING UNIT 2

Office

OfficeMeeting

Activity

Living rm

Bed Kitchen

Toilet

DRAWING NO.

CHECKED BY:

DRAWN BY: DATE:

DATE:

P R

O J E

C T

D e lt a D r.

P it ts b u rg h

-2

P h o n e

-2

F a x

-2 w w w .m a s s a ro c o rp o ra ti o n .c o m

M A

S S A

R O

D E

S

IG

N B

U

IL

D

L L

P

C O

N S

U L T

A N

T

DRAWING TITLE:

The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.

Please verify exact field conditions before using these for further construction and renovation work.

/2

/2

:5

:1

A

M

W a rr in g to n A v e P it ts b u rg h P

A

MEP1.20

LEVEL 2 PLAN

TB

CJL 01/20/17

01/20/17

W a rr in g to n R e c re a ti o n C e n te r B

1/16" = 1'-0"

Level 2

B054 - Warringtion Recreation Center - C1-01 - SITE PLAN
Sheets
A1.00 - BASEMENT FLOOR PLAN
A1.10 - LEVEL 1 FLOOR PLAN
A1.20 - LEVEL 2 FLOOR PLAN
C1.01 - SITE PLAN
B054 - Warringtion Recreation Center - A1-00 - BASEMENT FLOOR PLAN
Sheets
A1.00 - BASEMENT FLOOR PLAN
A1.10 - LEVEL 1 FLOOR PLAN
A1.20 - LEVEL 2 FLOOR PLAN
C1.01 - SITE PLAN
B054 - Warringtion Recreation Center - A1-10 - LEVEL 1 FLOOR PLAN
Sheets
A1.10 - LEVEL 1 FLOOR PLAN
A1.20 - LEVEL 2 FLOOR PLAN
B054 - Warringtion Recreation Center - A1-20 - LEVEL 2 FLOOR PLAN
Sheets
A1.10 - LEVEL 1 FLOOR PLAN
A1.20 - LEVEL 2 FLOOR PLAN
B054 - Warrington Recreation Center MEP1-00 - BASEMENT FLOOR PLAN
Sheets
MEP1.00 - BASEMENT FLOOR PLAN
MEP1.10 - LEVEL 1 PLAN
MEP1.20 - LEVEL 2 PLAN
B054 - Warrington Recreation Center MEP1-10 - LEVEL 1 PLAN
Sheets
MEP1.00 - BASEMENT FLOOR PLAN
MEP1.10 - LEVEL 1 PLAN
MEP1.20 - LEVEL 2 PLAN
B054 - Warrington Recreation Center MEP1-20 - LEVEL 2 PLAN
Sheets
MEP1.00 - BASEMENT FLOOR PLAN
MEP1.10 - LEVEL 1 PLAN
MEP1.20 - LEVEL 2 PLAN

File details come from the government source that posted it. Updated .