Warrington_Building_Plans.pdf
PDF 483 KB Posted
- Solicitation number
- 2023-IFB-195
- Issued by
- Allegheny County, Philadelphia City, Pennsylvania
About this file
The document is a comprehensive set of architectural floor plans and site plans for the Warrington Recreation Center, located at 329 Warrington Avenue in Pittsburgh, Pennsylvania, prepared by Massaro Design Build, LLP. The plans include detailed drawings of the basement, first level, second level, and site layout, with precise measurements and room-by-room specifications. The building appears to be a multi-purpose recreational facility with extensive amenities, including a gymnasium, pool areas, dressing rooms, club rooms, offices, mechanical spaces, and auxiliary rooms.
The architectural drawings reveal a three-story building with complex mechanical and electrical infrastructure, including multiple electrical panels, water heaters, storage tanks, and exhaust systems. The plans indicate some aging infrastructure, such as old and unused heating units, and note that certain electrical panels should be replaced immediately. The site plan shows the building's location on Warrington Avenue, surrounded by residential structures, with clear indications of street layouts, property boundaries, and adjacent buildings. The detailed floor plans provide insights into the building's current condition and potential renovation needs, which could be relevant to the lead abatement contract opportunity referenced in the government file description.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lead_Abatement_for_Various_Public_Works_Facilites_(Addendum_#3_Revision).pdf | ||
| Moore_Building_Plans.pdf | ||
| Ormsby_Building_Plans.pdf | ||
| West_Penn_Building_Plans.pdf | ||
| Riverview_Building_Plans.pdf | ||
| Herschel_Building_Plans.pdf | ||
| Lead_Dust_Testing_Results.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING NO.
CHECKED BY:
DRAWN BY: DATE:
DATE:
PR
O
JE
C
T:
D el ta D r.
P itt sb ur gh
, P A
-2
P ho ne
(4
) 9
-2
Fa x:
2)
-2 w w w
.m as sa ro co rp or at io n.
co m
M A
SS
A
R O
D
ES
IG
N
B
UI
LD
, L
LP
C
O N
SU
LT
AN
T
DRAWING TITLE:
The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.
Please verify exact field conditions before using these for further construction and renovation work.
8/
/2
4:
:5
P
M
C1.01
SITE PLAN
MLK
NMH 08/10/16
08/10/16
W ar rin gt on R ec re at io n C en te r - B
W ar rin gt on A ve nu e P itt sb ur gh
, P A
1" = 60'-0"1 Site Plan
E WARRINGTON AVE
ESTELLA AVE
KINGSBORO ST
UP
UP
UP
Room
Stair Hall
Girls Dressing Room
Basket Room
Showers
Girls
Stair Hall
Corridor to Playground
Chlorinator Room
Apparatus Room
Boiler Room 011 Pantry
Kitchen
Boys Dressing Room
Basket Room
Boys Entrance
Club Room
Tickets Room
Men's
Women's
DRAWING NO.
CHECKED BY:
DRAWN BY: DATE:
DATE:
PR
O
JE
C
T:
D el ta D r.
P itt sb ur gh
, P A
-2
P ho ne
(4
) 9
-2
Fa x:
2)
-2 w w w
.m as sa ro co rp or at io n.
co m
M A
SS
A
R O
D
ES
IG
N
B
UI
LD
, L
LP
C
O N
SU
LT
AN
T
DRAWING TITLE:
The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.
Please verify exact field conditions before using these for further construction and renovation work.
8/
/2
4:
:3
P
M
A1.00
BASEMENT
FLOOR PLAN
MLK
NMH 08/10/16
08/10/16
W ar rin gt on R ec re at io n C en te r - B
W ar rin gt on A ve nu e P itt sb ur gh
, P A
3/32" = 1'-0"1 Basement Floor Plan
DN
DN
UP
UP
Lobby
Storage
Corridor
Club Room
Unknown
Unknown
Guard
Girls Pool Entrance
Room
Girls
Boys
Lobby
Auditorium and Gymnasium
Office
Boys Pool Entrance
102Janitor
DRAWING NO.
CHECKED BY:
DRAWN BY: DATE:
DATE:
P R
O J E
C T
D e lt a D r.
P it ts b u rg h P
A
-2
P h o n e
-2
F a x
-2 w w w .m a s s a ro c o rp o ra ti o n .c o m
M A
SS
A
R O
D E
SI
G
N B
U
IL
D
L L
P
C O
N S
U L T
A N
T
DRAWING TITLE:
The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.
Please verify exact field conditions before using these for further construction and renovation work.
/1
/2
:2
:3
A M
A1.10
LEVEL 1 FLOOR
PLAN
MLK
NMH 08/10/16
08/10/16
W a rr in g to n R e c re a ti o n C e n te r
B
W a rr in g to n A v e n u e
P it ts b u rg h P
A
3/32" = 1'-0"
Level 1 Floor Plan
Corridor
Club Room
Corridor
Club Room
Club Room
Above Stage
Boys Dressing Room
Toilet
Kitchen
Living
Toilet
Bed Room
Storage
Storage
DRAWING NO.
CHECKED BY:
DRAWN BY: DATE:
DATE:
P R
O J E
C T
D e lt a D r.
P it ts b u rg h P
A
-2
P h o n e
-2
F a x
-2 w w w .m a s s a ro c o rp o ra ti o n .c o m
M A
SS
A
R O
D E
SI
G
N B
U
IL
D
L L
P
C O
N S
U L T
A N
T
DRAWING TITLE:
The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.
Please verify exact field conditions before using these for further construction and renovation work.
/1
/2
:2
:3
A M
A1.20
LEVEL 2 FLOOR
PLAN
MLK
NMH 08/10/16
08/10/16
W a rr in g to n R e c re a ti o n C e n te r
B
W a rr in g to n A v e n u e
P it ts b u rg h P
A
3/32" = 1'-0"
Level 2 Floor Plan
A B C D E F
CHLORINE ROOM
EXHAUST FAN
BOILER
HOT WATER CIRCULATION PUMP 1
HOT WATER CIRCULATION PUMP 2
PROPELLER EXHAUST FAN 1
PROPELLER EXHAUST FAN 2
DOMESTIC WATER
HEATER
DOMESTIC WATER
STORAGE TANK
PANEL - 225A M.L.O.,
120/208V, 3Ø, 4W, 42 POLE
PANEL - (SIEMENS) 400A M.C.B.,
120/208V, 3Ø, 4W, 30 POLE
PANEL - (SIEMENS) 100A, 120/208V,
3Ø, 3W, 30 POLE, MISSING COVER
Activity
Multi-purpose
Multi-purpose
Kitchen
Toilet
Toilet
Lobby
Stair
Toilet
Stair
Machine rm Machine rm
DRAWING NO.
CHECKED BY:
DRAWN BY: DATE:
DATE:
P R
O J E
C T
D e lt a D r.
P it ts b u rg h
P A
-2
P h o n e
-2
F a x
-2 w w w .m a s s a ro co rp o ra ti o n .c o m
M A
S S A
R O
D E
S
IG
N B
U
IL
D
L L
P
C O
N S
U L T
A N
T
DRAWING TITLE:
The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.
Please verify exact field conditions before using these for further construction and renovation work.
/2
/2
:5
:1
A
M
W a rr in g to n A v e P it ts b u rg h P
A
MEP1.00
BASEMENT
FLOOR PLAN
TB
CJL 01/20/17
01/20/17
W a rr in g to n R e c re a ti o n C e n te r B
1/16" = 1'-0"
Basement
A B C D E F
PANEL (SIEMENS) - 225A M.C.B.,
120/208V, 3Ø, 4W, 42 POLE
PENN ELECTRIC PANEL - 100A M.L.O.,
120/240V, 1Ø, 3W, REPLACE IMEDIATELY
PENN ELECTRIC PANEL - 100A M.L.O.,
120/240V, 1Ø, 3W, REPLACE IMEDIATELY
Gym
Girls Restroom
Boys Restroom
Vestibule Vestibule
Guard
Office
Activity
Lobby
Office
DRAWING NO.
CHECKED BY:
DRAWN BY: DATE:
DATE:
P R
O J E
C T
D e lt a D r.
P it ts b u rg h
-2
P h o n e
-2
F a x
-2 w w w .m a s s a ro co rp o ra ti o n .c o m
M A
S S A
R O
D E
S
IG
N B
U
IL
D
L L
P
C O
N S
U L T
A N
T
DRAWING TITLE:
The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.
Please verify exact field conditions before using these for further construction and renovation work.
/2
/2
:5
:1
A
M
W a rr in g to n A v e P it ts b u rg h P
A
MEP1.10
LEVEL 1 PLAN
TB
CJL 01/20/17
01/20/17
W a rr in g to n R e c re a ti o n C e n te r B
1/16" = 1'-0"
Level 1
A B C D E F
OLD AND UNUSED HEATING UNIT 1
OLD AND UNUSED HEATING UNIT 2
Office
OfficeMeeting
Activity
Living rm
Bed Kitchen
Toilet
DRAWING NO.
CHECKED BY:
DRAWN BY: DATE:
DATE:
P R
O J E
C T
D e lt a D r.
P it ts b u rg h
-2
P h o n e
-2
F a x
-2 w w w .m a s s a ro c o rp o ra ti o n .c o m
M A
S S A
R O
D E
S
IG
N B
U
IL
D
L L
P
C O
N S
U L T
A N
T
DRAWING TITLE:
The drawings and related digital files are a schematic rendition of the existing conditions of the facility only.
Please verify exact field conditions before using these for further construction and renovation work.
/2
/2
:5
:1
A
M
W a rr in g to n A v e P it ts b u rg h P
A
MEP1.20
LEVEL 2 PLAN
TB
CJL 01/20/17
01/20/17
W a rr in g to n R e c re a ti o n C e n te r B
1/16" = 1'-0"
Level 2
| B054 - Warringtion Recreation Center - C1-01 - SITE PLAN |
| Sheets |
| A1.00 - BASEMENT FLOOR PLAN |
| A1.10 - LEVEL 1 FLOOR PLAN |
| A1.20 - LEVEL 2 FLOOR PLAN |
| C1.01 - SITE PLAN |
| B054 - Warringtion Recreation Center - A1-00 - BASEMENT FLOOR PLAN |
| Sheets |
| A1.00 - BASEMENT FLOOR PLAN |
| A1.10 - LEVEL 1 FLOOR PLAN |
| A1.20 - LEVEL 2 FLOOR PLAN |
| C1.01 - SITE PLAN |
| B054 - Warringtion Recreation Center - A1-10 - LEVEL 1 FLOOR PLAN |
| Sheets |
| A1.10 - LEVEL 1 FLOOR PLAN |
| A1.20 - LEVEL 2 FLOOR PLAN |
| B054 - Warringtion Recreation Center - A1-20 - LEVEL 2 FLOOR PLAN |
| Sheets |
| A1.10 - LEVEL 1 FLOOR PLAN |
| A1.20 - LEVEL 2 FLOOR PLAN |
| B054 - Warrington Recreation Center MEP1-00 - BASEMENT FLOOR PLAN |
| Sheets |
| MEP1.00 - BASEMENT FLOOR PLAN |
| MEP1.10 - LEVEL 1 PLAN |
| MEP1.20 - LEVEL 2 PLAN |
| B054 - Warrington Recreation Center MEP1-10 - LEVEL 1 PLAN |
| Sheets |
| MEP1.00 - BASEMENT FLOOR PLAN |
| MEP1.10 - LEVEL 1 PLAN |
| MEP1.20 - LEVEL 2 PLAN |
| B054 - Warrington Recreation Center MEP1-20 - LEVEL 2 PLAN |
| Sheets |
| MEP1.00 - BASEMENT FLOOR PLAN |
| MEP1.10 - LEVEL 1 PLAN |
| MEP1.20 - LEVEL 2 PLAN |
File details come from the government source that posted it. Updated .